Loading...
HomeMy WebLinkAbout79126_Berry Bo Little_20210406 12 5 OFCAMA / ❑DREDGE & FILL -D l b I t 5 No 79126 A ' C D GENERAL PERMIT v Previous permit# >( New ❑Modification El Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ' �' . / / Rules attached. Applicant Name /---'-''''•,> L . ///e Project Location: County - /, Address / -if L , (,-6 /?d: /,,-1 Street Address/State Road/Lot#(s) /1/ ( , re City 4 t fi• ,, State c/L ZIP 2;_, /> / /, /K, /' ( 41 Phone# ( ) ----'! 4. E-Mail ._ Subdivision 4/1-- Authorized Agent ,Ii .-, /' City /,'e• /!' t,e',- ZIP f ("'iv/0 Affected ❑CW EfEW [ PTA ❑ES ❑PTS Phone# ( ) River Basin T=,- // , ❑OEA ❑HHF ❑IH ❑UBA ❑N/A // AEC(s): Adj.Wtr. Body .-/ , /j c;: A-L.-r alPman /unkn) ❑ PWS: ORW: yes L no PNA yes / no Closest Maj.Wtr. Body /' /„-„, ''I- Type of Project/Activity / 7 , . `i.// (Scale: l ` G' ) Pier(dock)length I Y Fixed Platform(s) Floating Platform(s) I Finger pier(s) Groin length I 1 number _ I_........._— ---.._._ _ 4.._. Bulkhead/f&prap length �U —_ ! L.I._ ,` et f avg distance offshore /- ' 1 at' max distance offshore /(,, I Basin,channel ; T , 1 i i cubic yards • I 1 Boat ramp ( j i Boathouse/Boatlift 1L........... ........... _.._ .... _.1.I ._. ........ I — :..7 --4- ._................_ _—�-._ — _ • v r — Beach Bulldozing -. ,I t ���� ! Other -_ - i I , l '` Shoreline Length i ` CC c�'* SAV: not sure yes no 1 \ 41 1 f (.—C),. / 4 4, /zf,t/ Moratorium: n/a yes O jU f / 04 y/.f Photos: yes I� t di ti 1 r ; _ _.._ Waiver Attached: yesII ill A building permit may be required by: ��I 4'-, 7,- / . I"I See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions - e (),///. / 00 / / ,i - . /- , ,/-,.. , Agent plicant Pri Name PermitOfficer's Printed Name z tie ignature ** elance st as ead comp laat�fnen on back of permit** Signature se //(-e ///e, /,2/ 1/4/2/ Application Fee(s) Check# Issuing Date 'Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford,Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) ht-tp://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 t 'CAMA / ❑DREDGE & FILL -- .� �.oi I S No 79126 A B C D o GENERAL PERMIT Previous permit# > Z ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC ❑Rules attached. Applicant Name Project Location: County Address Street Address/State Road/Lot#(s) / City State ZIP Phone# ( ) - : E-Mail .__ Subdivision Authorized Agent City ZIP Affected ElCW ❑EW El PTA ❑ES ❑PTS Phone# ( ) River Basin AEC(s): ❑OEA ❑HHF ❑IH ❑UBA El N/A Adj.Wtr. Body •(nat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / no Closest Maj.Wtr. Body Type of Project/Activity (Scale: / L ) Pier(dock)length - I 1 I i. I I Fixed Platform(s) I j Floating Platform(s) j ! I Finger pier(s) I 1 i Groin length F i number --- -- ---I — --�-- - �___.._.. i .---- —jj-----� Bulkhead/Riprap length .'c: --- I I I - �r t I -__..._ avg distance offshore I / ! i max distance offshore I , „..-r-''� I i Basin,channel �..---� I14- I 11 , I , cubic yards I Boat ramp I I I 1 Boathouse/Boatlift ___.._......._.._.,..__... —_--_...._.._..._... — }--. ;._......._.......j........-_ ___.__.._._..._._... _- _ .—..... _.............1._......._.. — — Y T i Beach Bulldozing I _..r,_.__i I- Other / . t I I ----: Shoreline Length �' y .w`..5.t .> , . I el 4. . ,,, ; f , ty,, <` t a.,.., " y ` . i SAV: not sure yes (no, i I _- t i I 1 > -I Moratorium: n/a yes no 1i4,i i I 1 1 ' r • ' �' Photos: yes no I I l /le —— Waiver Attached: yes no I I I A building permit may be required by: . n See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions ,•./ , . / I ti Agent o{Applicant Printed Name Permit Officer's Printed Name zio iS nature *"`Please lead com fiance statotnen on back of permit** Signature g P P g / / Application Fee(s) Check# Issuing Date 'Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Head Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare, and Pender Counties) e,Gates, Pasquotank and Perquimans Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 ROY COOPER Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered byyour Coastal Area Management Act (CAMA) received S permit have Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer,Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. >. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line(NWL) or normal high water line (NHWL) and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. z. Clearing& Grading: Clearing and grading of Zone 2(begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects (bulkheads)only;sites where wave overwash is expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise by DCM)from the • structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. 3 Pre-project site conditions: "i9G,.1e:me /&,.... 7 Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. •r -r.1 A:, ;,t or Applicant Prin-eci Nate Permit Officer's Signature .ice .r s///-Z/ Agent or p, scant Sign r r: issue Date CAMA GENERAL PERMIT#: 7f n/2 /J State of North Carolina I Environmental Qualtty I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 2?889 i 252-946-6481 Wilmington Office 1177 Cardinal()rye Pvt Wiimiegrnn.NC 23405-3845 1 ?10-79—7215 Morehead City Office 400 Commerce Avenue Morehead City.NC 28557 : 252-808-2308 Permission Document 1/6/2021 To whom it may concern, I give permission to Jerol Selby jr. to get permit for placing rock at our bulkhead at our property at 131 Carolina Road, Belhaven, NC 27810 Thank you, Barry Bo Little Bo Little From: Linda Thompson <Ilthompson4@gmail.com> Sent: Wednesday,January 6, 2021 8:29 AM To: Bo Little Subject: Neighbor bulkhead permit I agree to allow my neighbor Bo Little and Patricia Daughtridge to put rock in front of their bulkhead. Linda Thompson 1/6/2021 1 Bo Little From: dcviverette <dcviverette@gotricounty.com> Sent: Wednesday,January 6, 2021 8:28 AM To: Bo Little Subject: rocks I aggree that Bo Little and Pat Daughtridge have permission to put rocks on the bulkhead next to my property at 129 Carolina Rd. Belhaven. Dianne Viverette 1/6/2021 Sent from my U.S.Cellular©Smartphone 1