HomeMy WebLinkAbout79098_John Gardner_20210330 Rgy
____, i
-44
0GENERAL_ DREDGE
PER FILL
MIT �D ��193 1v Previous / c D
'-
)C ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /(4
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC !' '/L� . -
)0/)
LL Rules attached.
Applicant Name (:)74 - ehe1 Project Location: County 2 '\ /' (-..
Address f q0 (!mil//',t '" - ( Street Address/State Road/Lot#(s) /w (.t i'
City ill""1��.(11•�-c- State /ZIP 2 / '-7 Fl,
Phone#lu) 522- l•'9/ - E-Mail `"" ------- Subdivision �2, Y 'c ("3`e' ''
Authorized Agent 6( f tt;e 5 City i1 J Ay)." -1. ZIP
LI CW 'EW O.PTA ❑ES ❑PTS Phone# '9 )J 27 6)34' River Basin ��4-C
Affected ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Q
AEC(s): Adj.Wtr. Body 11,s,7,.. 9-,1/4/(--1 (nat /man /unkn)
❑ PWS: ■f
ORW: yes / no PNA yes /� Closest Maj.Wtr. Body '`l e"` Sr- 6
�.2 ' ' I /-< o6eD�'- 5 g Li/ 9x207 -,
Type of Project/Activity �l'�r� f �' Yi c i
.. 'L > C`l /1 (Scale: )
Pier(dock)length ./f
/o ° i i
Fixed Platform �s) '" WO
j ,
due , i , oT
Floating Platform(s) . (
Finger pier(s) �
. —. — —....
1
. r
Groin length i ( I t
number r---
Bulkhead/Riprap length ^"
avg distance offshore p i
max distance offshore • o ( X I
Basin,channel I f
: 1 r...a. I A(.4 /PI tvi--4,0- 5 1
cubic yards ; { 1 -
j
t �
Boat ramp I 7airi
Boathouse/Boatlift — ._..._._.._... .�_...... _...._...
;spa , i
a �.
Beach Bulldozing I ,(J, } i
Other �-" L"U Jr, ' �:
if ,�`� &� I i
tin f -•� 1� '
Shoreline Length ADO ' I 416. y- t-)(12,1
i I 1 46't VI
SAV: not sure yes no (J 1 l—+......_--._.-- I -i
Moratorium: n/a yes j �� _ L
Photos: yesFO'Q a _
• rt
Waiver Attached: ,- s cf
A building permit may be required by:F' \.I , (..fl `t, ' . See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) /
�T; „-/ ' ra j' -02- ^ � � ' �,
6'
Notes/Special Conditions �t
..---;":1-11 i /,,,,...__
-onAppIicant Printed a Pe ' icer's Pri N
q )
Signature Please read compliance statement on back of permit** r
0
"\ L (.. 1L' 56 i a •"2/1)" t 3D 7-6L/ - / 3V)) 2 d z_f
Application Fee(s) Check# Issuing Date / J Expifation Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s)
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves: Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0 CAMA/ - DREDGE & FILL . I c �'as N . 79098 A BCD
GENERAL PERMIT o Previous permit#
>'% ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
❑Rules attached.
Applicant Name Project Location: County
Address / /C. , j , :'./ - - < / Street Address/State Road/Lot#(s) /`/L.` i
City State ` ZIP ' / -- .-
Phone# ( ) E-Mail _ Subdivision , .
Authorized Agent City ZIP
❑CW E EW ❑PTA ❑ES ❑PTS Phone# ('• ) ^-'1 `--� River Basin '
Affected
AEC(s): ❑oEA ❑HHF IH ❑UBA El Adj.Wtr. Body /. ,, `yc e.ti,` (nat /man /unkn)
❑ PWS: .!\ ' 'c �,'—
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
' (Scale: )
Pier(dock)length '5,'.
I
Fixed Platform(s) //L' ''Y s ? F - i
Floating Platform(s) !! , _ l
Finger pier(s) a_._t j
Groin length i t / { I
i
number —
Bulkhead/Riprap length
avg distance offshore I1 I 1i t' / --
max distance offshore i I '��
:.Basin,channel I I / ���;, 1-_I�
I
4 cubic yards , /,y/
f t , I —
i
Boat ramp ; �/i>A�'o j t
Boathouse/Boatlift ._ , �..- f i — —.... .... )1 i ...... — ..__
f t
I �
Beach Bulldozing — — rLt
1
Other / i J I
I ( I I i -hi '
Shoreline Length
y, r
j ,, { III
SAV: not sure yes no __:_ _--- _—• ') i �.__-- J-- -
-- — — / J __
Moratorium: n/a yes no 7� -� ) � i �- - E
Photos: yes no l—i._. r#� . _L... .....__ -_ .. _`�__ .. ....1-
Waiver Attached: yes no ,
A building permit may be required by: } ' . ?I!I See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) /
Notes/Special Conditions . '/, " / l f_'�'�- C C' •
_. { -i
pri 0 1 , ? . opecticyi
....)k. y i
. , ,e-e / r-?
Agent or Applicant Printed Name Permit ices Pn Name'
Signature **Please read compliance statement on back of permit** Signatur i / I
-? r=-� ;ti . 7 b —21 ),,t rI'1-- L 7,52. l 1 , i t .3,,, -/ L, Z l
Application Fee(s) Check# Issuing Date / Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
From: John Gardner gardner227@gmail.com
Subject: Re:China Grove Project
Date: March 29,2021 at 10:09 AM
To: Brandi Robertson brandiprobertson@gmail.com
You have my consent
Sent from my iPhone
On Mar 29,2021, at 9:49 AM. Brandi Robertson<brandiprobertson@gmail.com>wrote:
Dear Mr.Gardner,
I have been in contact with Mr. Flowe about his missing Notification Letter and we should have the issue resolved momentarily. I
am hoping to get an appointment with the CAMA Field Rep,Mr.Vaughan this week.
Please respond to this email confirming that I have permission to act as your authorized agent. This designation will allow me to
obtain the permit on your behalf. This will alleviate the need for you to be present at the site visit,although you are more than
welcome to join us.
Please feel free to contact me if you have any questions.
Sincerely.
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
brandiprobertson@ gmail.com
From: John Flowe jflowel@hotmail.com c'P
Subject: RE:China Grove Rd. Project
Date: March 29,2021 at 9:58 AM
To: Brandi Robertson brandiprobertson@gmail.corn
Brandi
I acknowledge I have been informed of the Gardner dock project.
I have no objections to this project.
Thanks
John Flowe
From: Brandi Robertson <brandiprobertson@gmail.com>
Sent: Monday, March 29, 2021 9:39 AM
To: jflowe1@hotmail.com
Subject: China Grove Rd. Project
Dear Mr. Rowe,
Thank you so much for your call on Saturday! I have been expecting your
signed letter back, but I did in fact send it to the Harding address. We can
however complete the notification process via email.
Please respond to this email confirming that you have in fact been Notified
about the proposed project at 190 China Grove Rd. I have attached a
drawing of the project as well.
Please do not hesitate to contact me if you have any questions.
r sA1mwr ..ram ' Pi rYJw,'..o.. vt.
10110111111.
1 flwr M otw�b EVE mmnad
'Rom a01 so!et arx.rc
3eacteem010 AMOK DRAwlno or PROPOSE
•"rr'r pgswie tame a o essrmlipecor•
F l
glekrrlrctr
Pirpc�
Sxic,
5x ID
iit-
9x-=
P0.•4.
�'d►7d14-+ 0 yC. Don RCA.r�tMNos MrIE"al
matt Se Cot Jett ...ovum&Amu,o'1'"Srr!eV i.or R'
Y.n rY To,aft b.mm Ow+wewct ytx nwM ratiel b so a
do wr t) t`:1t IS'YQsU s¢Qw.,F.
i 40 not whet R.wYw Its 1S ...Pact rt owaer'en:
(P•00rr Ow a Wiwrd4 WAIRoonl Pt,
Unto"waft
Thank you,
Brandi Prescott Robertson
B Prescott Marine Construction, LLC
252.249.0149
Orandiprobertson@gmail.com
.4s7r;asEcs..-_,. ..avAircr. etsc.:4 r, .,-,_
'1,--fit--L"t'egAk41
/ -I: C"C /4 1/CO .,•77_ z.,-c-is,-
sweappejr7 1 jaaz kiroi elm4A 6L 5 v i t 0 p p e.„spricii,-f-iewurw w.x It~2
P.Wite+-07-8.44_,!„"^ , , - 0 L,--) --c—s--r-
azjte
(2 L....s / ---*7-4, 1. 7tteinov
-ssair-Pyr--tt=dov
ty ---z.,2o-t9 -w!.--0 irr;
aosefogaz 0 Misi .4.4eSt W•....T Jafid--.... -------..-„_„..............m.
. - . sArlawris -agmtia-g:
172 'llt
_ agontl r a u 0 AuterioldwaNafiav) (tic u A g two Pii-Immo Atitidesd)
-1M-Min=43eCOSS_SL MU aigteA CC 141;ralail*p I -
1-Lgr- ---in-ba:IPREitas at,aql i‘pee.ci tIsVA op
c,„_,, .wer 31_±-,trir;r•ali.p.fiz!zy44satu no4 vitqw_2:.---1---44adWAE t!!!•fts zicA il -z-itt
41-.3aN.Citt mulls" ''' Lvat=p.Xi VaX&II.i.' /-:za;Et szepts am-13Pa Et Nom at tt,tt.0
111:115-k:'.m',ancrazezq ' '...eproC twat riaLm -thud a,niews-1:)...w-1Z Z t':'.P11 ..-itiPtall 1
NOLL-13S-1E1A- WM v-vm A---
.
- ,aav,,,,,q .)
--<1/5-PacioAd
onR,V
40 (A
,CMAS
, -
}---orn 1•j) .a-Cfrie\-\
,
POPPlup,_ , aieFelFinitavoi3dAs3saps4i1g1sfitu!ptudaramfiligisodpsdlergpowswe
IMMO-RA.3a a38030e153 30 entiNAKI Meta'reouistiosaa
1-=-xicue s[3:4 c,SUM413 ateti 1
izsurin;*1 Mg*I 60-1X4cie°Lt 'ial 1 -72 /-171201
a'''Q'Re r-(41E. tc:iaid 4L1,,Attletz_4.w za.'ll 41%1:1QC Ve3t.is Sc' .sJ oacilr3s6P sell vaexicIlie out -
— - (Kmbr'0 loifxre war _ r (420414P-M1
U u.= f
U (-- a t.1208'Vote :ITT'Ssavopy)' /mini 04 --014-n ) 0 b 1 ;'-'PaPEnai AvatioxI
(243*10 Azxklici jo s. i
-,I
jaMacer .q-----i-T—r .1.4.,„e_.414..mciaut WOO 1 Ma km;gzi fIcs1911 1
!ILISIS IMMO A31171(30ktd teiRitrOti IPI
- a . ROY COOPER
A Gowtror
MICHAEL S. REGAN
Secretaty
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL.QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities accessways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259.The
Division of Coastal Management(DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
>. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly(which is defined as between 75 and 105 degrees)unless otherwise approved by DCM.The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials:All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width:The width of the pier or docking facility access way shal I be limited to six(6) feet.
4. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facilityand any requested access way.This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: L'(- 19
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
fatetv"\
or Appli t in d Name Permit Officer's Signat
r, 'et r'cj4. -32„
gent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#:
State of North Carolina l Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 278891252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1 252-808-2808