HomeMy WebLinkAbout79043_Bysheim/ Whittaker Creek Yatch Harbor_20210211 0 ❑CAMA/ LI DREDGE & FILL =,p - u(rl 3a N° 79043 A -B C D
GENERAL PERMIT Previous permit#
�� ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued N't\
As authorized by the State of North Carolina,Department of Environmental Quality /� /70
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
/ 1-1/
// � g1Rules attached.
Applicant Name ` 4_ i ,) /`r/i,f '" /Gv' ��I'4 e-' ( Project Location: County -7ic j i /
Y � K
Address (// /t: A" ' f/ l'�v( Street Address/State Road/Lot#(s) L// [ti%/� ,-
City i ,�-•.'-tc,--(.. State ZIP f- -'-7) r.1
IT 7� 7 - Subdivision
Phone#( �, ) G-- E-Mail
Authorized Agent 4 1�•�-t -t'>-j _ City t "' ZIP 2 7(`
❑CW . EW JPTA Aft S ]PTS Phone# ( 7 51) 775 C &L River Basin /Li -5 2
Affected ❑OEA ❑HHF O IH ❑UBA ❑N/A !!//
AEC(s): Adj.Wtr. Body / .(i/v• 6 , i (hat /man /unkn)
ORW: yes / no PNA niT0/ no
Closest Maj.Wtr. Body 1�J ''` ��C—
Type of Project/Activity ' .-'c /
(Scale: I -- )
Pier(dock)length
Fixed Platform(s) ` ` i ` . i
;
Floating Platform(s) i
Finger pier(s) riII
Groin length '-_._........ ,,. -,,,,Ls _i___
1
Bulkhead/Riprap length )C --
avg distance offshore /v / j 1
max distance offshore /O ; 1
iL
IIi
( •
} ' � } tT_..._._._.Boathouse/Boatlift - ; � � � i __ _�,_... �/ �Il �- _......._i- i _IL .3 —I l a M[_:N1i. 4r i4, ..-■
_ _ II. a. a" . lid■II111 r��ru�►IE����II�
Beach Bulldozing — ,
Other I1 ... III
I
, ,
,,..„,, ) , ,
Shoreline Length ' -:----'?---_,L, '
u C II
'� ( IIi , , , ,
,,
SAV: not sure yes no i ___,_, , -, '
, , , , ,
Moratorium: n/a yesI ;
Photos: yes ,. i
Waiver Attached: yes �o. 1
A building permit may be required by: el._ /c e- 6' / , .c . See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction) / _
t Notes/Special Conditions ,�,,t) J�' V -'/' C-'y� �-c' c" A i ,'„- -
c
hst e 15Y 2,. nn ,r\I 11 CA_-
Agent or Applicant Printed Name Pe ' Office s Printed N�e"
,- ....)
Signature **Ple se r¢ad compliance statement on back of permit** Signatur
y
Ot lit Nc Ley (, re // , Zvzi l w /l ,ZC)z1
Application Fee(s Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret, Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
r
eCAMA/
GENERALDGE &PERILL
MIT 1O ��q 3a � � 1V�Pre79043vious it# A BCD
)C• ❑New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued '
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC •
p Rules attached.
Applicant Name Project Location: County ` ,
Address Street Address/State Road/Lot#(s)
City State ZIP
Phone# ( ) E-Mail Subdivision
Authorized Agent _ 44'2- t r City ZIP
Affected ❑Cw El EW WPTA 1S X PTS Phone# ( ) ' / (LI i River Basin
AEC(s): ❑OEA ElHHP ❑IH ❑UBA ❑N/A Adj.Wtr. Body / / // �' (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body ' <-
Type of Project/Activity
(Scale: / '1• )
Pier(dock)length ,
Fixed Platform(s) c N I it ` ' ,` '� '
I
Floating Platform(s) i I I
,
Finger pier(s) I
{ i
Groin length j 1 I f' 1 S' , F 1-
number ' , - - -_ - --1- -
Bulkhead/Riprap length r i ------- —
4
avg distance offshore + f ' I 1
max distance offshore t;.. i i 1
i 1 1 I 1 1 i
mchannel I
Bas
cubic yards j I i i F 3) r 1
i
Boat ramp j I "-1 ,:.. , , I
Boathouse/Boatlift — — r ! _4 �— - -___—
+� �II 1i
7 !
Beach Bulldozing —
— I i I ..--- I
Other , �1! ,)� i 1 j , _
Shoreline Length _ - 3
) `
SAV: not sure yes no j
I I
Moratorium: n/a yes no ' . ' i , I
Photos: yes no i — —
Waiver Attached: yes no I i
A building permit may be required by: . See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions
/1StC /\ /2..t .• i l c' _-
Agent or Applicant Printed Name Perm' Office s Printed N e /
i 1...� 11
Signature **Please read compliance statement on back of permit** Signatur ` </ `
• 1� 1�
1/
— J c // 2 1
Application Fee(s) -" Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may thepermittee to a fine or criminal or civil action; andmay
subject cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT l
I hereby certify that I own property adjacent to 't�.,' fl( ct�C'f +(�C �Cit�f tYr��°Lit's
(Name of Property Owner)
property located at 1-A 1,2 �� h� c, �� 1 . h� C)(t-rotc,l tip. ZLi 7 j
(Address, Lot, Block, Road, etc.)
on in r)11e,ltCt , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
location.
xI have no objection to this proposal.
have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF ROPOSED DEVELOPMENT
(individual proposing development must fill in de ription below or attach a site drawing)
cAlc1; tvIct et-1r to E �;5t �cCZ
(c�►lc.� 12� (`��c� p ,1 :No c5�►' ..ct �
yc,i . Ar1C i:c C T + 3
St- '5 %ckc
Vc,tn •
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
k__ I do wish to waive the 15' setback requirement.
k/t I do not wish to waive the 15' setback requirement.
(Property Owner Information) (ldjacent Property Owner Information)
Signattdir Sir ature* /
�tl�t F t� 51 t 1 tiY1 (
Print er Types Name Punt or Type Name
r L 1 I '-{ t,T)Z t,.. 11. Ct c~k:f + t LA. i (c`_
Mailing A ,ss Meiling Address _
c 'i t>` 1,11c, 1 �: L ;AL'�r! ,( i ,�,,,t- c.1 1�. �- ;� 71
City/State/Zip 1 City/State/Zip
L "1C 3?S<< q/R . 2to , ? a 2.-1
Telephone Number/email address T, :phone Number/email address
Date .to•
(Revised Aug. 2074)
*Valid for one calendar year after signature'
ADJACENT RIPARIAN PRQPgRTY OWNER STATEMENTy L
I hereby certify that I own property adjacent to J hl t1 c k-e V� -r-e / c f 116 wars
(Name of Property Owner)
L'
property located at 'I I?J
1 (Address, Lggtt,, Block, Rod, etc.)
on VJ VI l t�� /Ir Cat' , in CJ rl e v k c•. , N.C.
(Waterbody) (City/Town and/or County)
The applicant has described to me, as shown below, the development proposed at the above
local n
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must till in description below or attach a site drawing)
f ,
. (- oS 1C7vl t+19cA10v) ct nA RT. c.kor
1-c) b o c.c -e w- r 6 vi c e- , Rep\oc�
4001-- l ` l`n S an / cDv15�t-,)t--
\r'0.1fl‘P Icy � Rap &„1 VA-ea
11�p1GCC'
Sae
1-Of t,f-� v o �� tuess S
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15'from my area of riparian access unless waived by
me. (If you wish to waive the setback,you must initial the appropriate blank below.)
I do wish to waive the 15'setback requirement.
I do not wish to waive the 15'setback requirement. i
(Property Owner Information) (AdjaceZ ner Information)
°Y
Si 9ture * � ) k
nV Lp O / Sid I Sign ture wa i+-e r �+ l/1 G
P ' t or T Name Print or Type Name
o o�c 3�7 �I13 1n1111 t-EGk-ev ft
MMat ng ds Adss
IrAd I�e 41 N M S`1l n lgl 0 drerG Svc. ` S I
City/State/ZipAs-a 67 o 3 7,e City/State/Zip
Telephone Number/email address Telephone Number/email address
D a . o ' D.0at o Ro3I
Date Date*
(Revised Aug. 2014)
*Valid for one calendar year after signature*
I
I
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: t,.,I,I4-.rr - Cie,I( V�,c,i-1).'ier c.,a,,,,- „
Mailing Address: 7/`I r,-A„Acke i!„ ,o,,/
Phone Number: pi(! ?-7c Ud3 2
Email Address: L'.,,,, .1 f pc,/;e/0�r)46:a,.
I �'fI
certifythat I have authorized Jut,Tri /iLr: Jill W 1"1v. C s7Liv i^
� e
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: So „r y,u,,fe r„&k d.1 e,.,74,
at my property located at y/ `i w/;(11,i�, /o, i- ,c� ,
in P,,,li" County.
I furthermore certify that I am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
.___A C----9.— _______
\ 'IC) CI i / Ce( k f Li
Signature
Print or Type Name
Title
o2- I 11 I00011
Date
This certification is valid through / I
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
•
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below.Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either
normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
• filling in the buffer is a violation of the riparian buffer rules.
2. Clearing&Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zane 1 is not compromised,which includes
maintaining diffused (non-channelized)flow of storm water runoff through the suffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below,
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. •
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation ata stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead. i
• Pre-project site conditions: •o aS4J. 1711✓Y5 fir,/ a-' /L12- 1 `'"re L‘Pre,Jk
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts. �r t
By your signature below you agree to be held responsible for meeting all of the above listed condition"; d verify that all
information is complete and accurate.
Agen or Applicant Printed Name Permit Officer's Si ature
A t or Applicant Signature Issue Date
CAMA GENERAL PERMIT#:
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 278891252-946-6481
Wilmington Office 1127 cardinal Drive E tt.WiImingtor.NC 28405_3845; 9l0-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808