HomeMy WebLinkAbout30458D - Naylor 0 CAMA / DREDGE & FILL N? 30458-\-
GENERAL PERMIT Previous permit# ?� 7' ) Cri—J
>G New Modification Complete Reissue Partial Reissue Date previous permit issued i t ,)?.. .,
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC 7 N,/.)U(--)
iles attached.
Applicant Name 1 dic, j J 1/&. - Project Location: County ,•:)A,C l c. L.
Address .L L,q 47-21 'i-A C 'w'IL 7 f I" ' Street Address/State Road/Lot#(s) '- /--/
City (V JK i 1 )P<A , State�J�' ZIP y� L /
Phone# ( ) (-t/- �� e Fax# ( ) - Subdivisiion(,4'+1 if Pe ` 244`( /JO g7)^
Authorized Agent CO LA I%`f V ANA k N, _.. City !1/✓l'1)' 7M7 / ZIP JCythl
Affected cw ❑.EW A ❑ES LIFTS Phone # ( ) River Basin (.,A6.. , `.-A. c f' I
OEA L HF 'IH ❑UBA ❑N/A
AEC(s): Adj.Wtr. Body rp.1,4 t/ _(nay/man Iunkn)
PWS: ❑FC: �__.--
ORW: yes / no PNA yes / no.) Crit. Hab. yes r no Closest Maj. Wtr. Body '' ZL'
Type of Project/Activity ?fi t VA -?', e Q
I (Scale: )
Pier(dock)length T. X il el .-.
Platform(s) — • 1 1
Finger pier(s) _ _: I j
Groin length --1--- '
number f I
i 1
Bulkhead/Riprap length I _j I i_--
avg distance offshore _
max distance offshore 0 /
Basin,channel -- --- ------._.
cubic yards - • _-d kWA
Boat ramp
Boathouse/Boatlik _--_.._.�- -- - ----�------ -
Beach Bulldozing �_
•
--
Other F o I 1'P5 YO c
7 " . 1.- ..."
vt(K
_ .
Shoreline Length 1 I
SAV: not sure yes no _— —
Sandbags: not sure yes no T
Moratorium: n/a yes no
Photos: - , yes no
Waiver Attached: yes no
I
A building permit may be required by: i&O A--1 I 1 -1>1- 7 See note on back regarding River Basin rules.
Notes/Special Conditions
•
Agent or Applicant Printed Name' ) )`1' /`�Signature re V
��� Permit Officer's
`k/i�/ Ce ' �_ U6' - -off ) , �,,)
Signature **Please read compliance statement on back o permit** Issuing Date Expiration Date
''A C/47
Application Fee(s) //d0. Check# .5-09` Local PlanningJurisdiction Rover File Name
a
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
I Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office(252-946-648 I)or the Wilmington
Regional Office(9 I 0-395-3900)for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District Washington District
Mailing Address: 1367 U.S. 17 South 943 Washington Square Mall
1638 Mail Service Center Elizabeth City, NC 27909 Washington, NC 27889
Raleigh, NC 27699-1638 252-264-390 I 252-946-648 I
Location: Fax: 252-264-3723 Fax: 252-948-0478
(Serves:Camden,Chowan,Currituck, (Serves: Beaufort, Bertie, Hertford, Hyde,
Parker Lincoln Building
2728 Capital Blvd. Dare, Gates, Pasquotank and Perquimans Tyrrell and Washington Counties)
Counties)
Raleigh, NC 27604
733 2293 / 1 888 4RCOAST Morehead City District Wilmington District
Fax: 9 19 733 1495 15 I-B Hwy. 24 127 Cardinal Drive Ext.
Hestron Plaza II Wilmington, NC 28405-3845
Morehead City, NC 28557 910-395-3900
202-808-2808 Fax: 910-350-2004
Fax: 252-247-3330 (Serves: Brunswick, New Hanover,
(Serves:Carteret, Craven, Onslow-above Onslow-below New River Inlet-and
New River Inlet-and Pamlico Counties) Pender Counties)
Revised I0/05/01
CODES FOR AEC DESIGNATIONS
"OH" - Ocean Hazard "PT' - Public Trust
"EW" - Estuarine Waters "CW"- Coastal Wetlands
"ES" - Estuarine Shoreline "FC" - Fragile Coastal Natural/Cultural
"PW" - Public Water Supply "OR" - Outstanding Resource Water
CODES FOR PROJECT
"P"- Private-usually an individual "F" - Federal
"C" - Commercial "L" - Local Government
"U" - • Utility "H"- Housing Development •
"S" - State "0" - Other
•
# CODES FOR PROJ DESCRIPTION
"11" - Bulkheads,Riprap "16" - Utility Lines •
"12" - Piers,Docks Boathouses "17" - Emergency Repairs
"13" - Boat Ramps "18" - Beach Bulldozing
"14" - Wooden Groins "19" - Temporary Structures
"15" - Maintenance of Basins, Channels,Ditches. _ -- --.- --•--- - --._•
_.
GENERAL PER ET COMPUTER FORM
•
APPLICANT NAME: 'go h NA"(8 Joe •
ADDITIONAL NAMES: QUA-I,J ' .NA)Z/&t I UA% F A-)
' �'�® = OD/
AEC DESIG: � (,d �� Of
�},P DEVELOP AREA: C e O/ PROJ DESC: P -
(Will only take 6) (Will only take 1)
WORK: PJZ 3 x 19
': (Will only take 4)
n
•
MAINT: -
(will only take 4)
•
IMP: DC<J
(will only take 6)
ACTION EXPIRATION
DREDGE&FILL REQUIRED:
CAMA MAJOR DEVEL REQUIRED: g-9 - O Z //—
�.
•
SECTION.1200-GENERAL PERMIT FOR CONSTRUCTION OF PIERS:DOCKS:AND BOAT HOUSES IN
ESTUARINE AND PUBLIC TRUST WATERS
15A NCAC 07H.1201 PURPOSE.
This permit will allow the construction of new piers,docks,and boat houses in the estuarine and public trust waters AECs and
construction of new piers and docks within coastal wetlands AECs according to the authority provided in Subchapter 7J.1100
and according to the following guidelines. This permit wilt not apply to the Ocean Hazard AEC.
History Note: Authority G.S;113A-107(a);113A-107(b);113A-113(b);113A-118.1;113A-124;
.Eff March I, 1984.
15A NCAC 07H.1202 APPROVAL PROCEDURES
(a) The applicant must contact the Division of Coastal Management and complete an application form requesting approval for
development. The applicant shall provide information on site location,dimensions of the project area, and his name and
address.
(b) The applicant must provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property owners
indicating that they have no objections to the proposed work;or
(2) confirmation that the adjacent riparian property owners have-been notified by certified mail of the proposed
work. Such notice shall instruct adjacent property owners to provide any comments on the proposed
development in writing for consideration by permitting officials to the Division of Coastal Management
within 10 days of receipt of the notice,and,indicate that no response will be interpreted as no objection.
DCM staff shall review all comments and determine,based on their relevance to the potential impacts of the
proposed project,if the proposed project can be approved•by General Permit. If DCM staff finds that the
comments are worthy of more in-depth review,the applicant shall be notified that he must submit an
application fora major development permit.
• (c) Approval of individual projects shall be acknowledged in writing,by the Divisionof Coastal Management and the
applicant shall be provided a copy of this Section.
(d) Construction must be completed within 90 days of the approval of the permit or the permit expires.
(e) Any modification or addition to the approved project shall require prior approval from the Division of Coastal
Management.
History Note: Authority G.S.113A-107(a);113A-107(b);113A-113(b);113A-118.1;113A-124;
Eff.March 1,1984;
Amended Eff.August 1, 1998;January 1, 1990.
15A NCAC 07H..1203 PERMITkr:P,
The applicant must pay a permit fee of one hundred dollars(S 100.00)by check or money order payable to the Department.
History Note: Authority G.S. 113A-107;113A-113(b);113A-118.1;113A-119; 113-119.1; 113A-124;
Eff March.],1984;
•
Amended Eff.August 1,2000;March 1, 1991.
•
15A NCAC 07H.1204 GENERAL CONDITIONS
(a) Piers authorized by this general permit shall be for the exclusive use of the land owner,or occupant and shall not provide
either leased or rented docking space or any other commercial services. Piers designed to provide docking space for more
than two boats shall,because of their greater potential for adverse impacts,be reviewed through the major permitting process
and,therefore,are not authorized by this general permit. •
•
(b) Individuals shall allow authorized representatives of the Department of Environment and Natural Resources to make
periodic inspections at any time deemed necessary in order to be sure that the activity being performed under the authority of
this general permit is in accordance with the terms and conditions prescribed herein.
(c) There shall be no unreasonable interference with navigation or use of the waters by the public by the existence of piers,
docks and boat houses.
(d) This permit will not be applicable to proposed construction where the Department believes that the proposed activity
might unnecessarily endanger adjoining properties;significantly affect historic,cultural,scenic,conservation or recreation
• values, identified in G.S. 113A-102 and G.S. 113A-113(b)(4),nor that might significantly affect the quality of the human
environment.
(e) This permit does not eliminate the need to obtain any other required state,local,or federal authorization.
(f) Development carried out under this permit must be consistent with all local requirements,AEC Guidelines,and local land
use plans current at the time of authorization.
History Note: Authority G.S. 113A-107(a);113A-107(b);113A-113(b);113A-118.1; 113A-124;
Eff March 1, 1984;
•
Amended Eff.May 1,1990;
RRC Objection due to ambiguity Eff.May 19, 1994;
Amended Eff.August 1,1998;July 1, 1994.
15A NCAC 07H.1205 SPECIFIC CONDITIONS
(a) Piers,docks,and boat houses may extend or be located up to a maximum of 400 feet from the normal high water line,or the
normal water level,whichever is applicable.
(b) Piers,docks,and boat houses shall not extend beyond the established pier length along the same shoreline for similar use.
This restriction shall.not apply to piers 100 feet or less in length unless necessary to avoid unreasonable interference with
.navigation or other uses of the waters by the public. The length of piers shall be measured from the waterward edge of any
wetlands that border the water body. •
• (c) Piers longer than200 feet shall be permitted only if the proposed length gives access to deeper water at a rate of at least
one foot:at.each 100 foot increment of pier length longer than 200 feet,or if the additional length is necessary to span some
obstruction to navigation. Measurements to determine pier lengths shall be made from the waterward edge of any coastal
wetland vegetation which borders the water body.
(d) Piers and docks shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate
as measured from the bottom of the decking.
(e) Any.portion of a pier(either fixed or floating)extending from the main structure and six-feet or less in width shall be
considered either a"T"or a forger pier.
(f) Any portion of a pier(either fixed or floating)greater than six feet wide shall be considered a platform or deck.
(g) "T"s,fmger piers,platforms,and decks ofpiers on lots with shorelines 100 feet or greater in length shall not exceed a
•
.combined total area of 400 square feet. The combined total area for lots less than 100 feet shall not exceed four square feet per
linear foot of shoreline.
-_ (h) Platforms and decks shall have no more than six feet of any dimension extending over coastal wetlands.
(i) Boathouses shall not exceed 400 square feet and shall have sides extending no further than one-halfthe height ofthewalls
and only covering the top half of the walls. Measurements of square footage shall be taken of the greatest exterior
dimensions. Boathouses shall not be allowed on lots with less than 75 linear feet of shoreline.
(j) Areas enclosed by boat lifts shall not exceed 400 square feet.
(k) Piers,docks,decks,platforms and boat houses shall be single story. They may be roofed but shall-not be designed to
allow second story use.
(1) Pier alignments along federally maintained channels must also meet Corps of Engineers regulations for pier construction
pursuant to Section 10 of the Rivers and Harbors Act.
(m) Piers,docks,and boat houses shall in no case extend more than 1/4 the width of a natural water body,human-made canal
or basin. Measurements to determine widths of the water body, human-made canals or basins shall be made from the
waterward edge of any coastal wetland vegetation which borders the water body.The 1/4 length limitation shall not apply
•
when the proposed pier is located between longer piers within 200 feet of the applicant's property. However,the proposed
pier shall not be longer than the pier head line established by the adjacent piers,nor,longer than 1/3 the width of the water
body.
(n) Piers,docks and boat houses shall not interfere with the access to any riparian property,and shall have a minimum setback
of 15 feet between any part of the pier and the adjacent property lines extended into the water at the points that they intersect
the shoreline. The minimum setbacks provided in the rule may be waived by the written agreement of the adjacent riparian
owner(s),or when two adjoining riparian owners are co-applicants.Should the adjacent property be sold before construction
of the pier commences,the applicant shall obtain a written agreement with the new owner waiving the minimum setback and
submit it to the Division of Coastal Management prior to initiating any development of the pier,dock,or boat house. The line
of division of areas of riparian access shall be established by drawing a line along the channel or deep water in front of the
• property,then drawing a line perpendicular to the line of the channel so that it intersects with the shore at the point the upland
property line meets the water's edge. Application of this Rule may be aided by reference to the approveddiagram in Paragraph _
(q)of this Rule illustrating the rule as applied to-various shoreline configurations. Copies of the diagram may obtained from
• the Division of Coastal Management. When shoreline configuration is such that a perpendicular alignment cannot be
achieved,the pier shall be aligned to meet the intent of this Rule to the maximum extent practicable.
(o) Piers,and mooring facilities shall be designed to provide docking space for no more than two boats.
• (p) Applicants for authorization to construct a dock or pier shall provide notice of the permit application to the owner of any
part of a shellfish franchise or lease over which the proposed dock or pier would extend. The applicant shall allow the lease
holder the opportunity to mark a navigation route from the pier to the edge of the lease.
(q) The diagram shown below illustrates the various shoreline configurations.
History Note: Authority G.S.113A-107(a);113A-107(b);;113A-113(b); 113A-118.1;113A-124;
Eff.March 1, 1984;
Amended Eff December 1,1991;May 1, 1990;March 1, 1990;
RRC Objection due to ambiguity Eff.March 18,1993;
Amended Eff.August 1,.1998;April23,1993.
sorew—
QUALITY MARINE 507
PHONE 910-327-1720 rJQ7
SNSAND DOLLAR COVE t / ``('���//�V� 451
203 FERRY, NC 28460
Date 66-30/53I
I;
I,I% Pay to the 1 n ,)
Order of •FJ C C. I✓ . �V . 0c„ a
ii
0Ae. A u4d1ei Dd (1i
— Dollars n =" ""
FIRST CITIZENS 457
R,L��{( FineCillz�rn B�rW 6 Tn.t Company
L' J��z SMa t:V:4.N.0 28460
www.tirstoitizens.eom
Ca /774::t7sgIF--j-- Ylete57# 1:
u For VCk r rti i q Ctit .i.l'IS�
i
1:0 5 3 100 3001:004 5 7 1 3 2 7064116 00 50 7
- ram:-s-..a.1,71;;ai®r:ifitearners
OUARU1AN01 SAFETY BLUE WBr
•