Loading...
HomeMy WebLinkAbout77652D - Gudelsky ❑CAMA/RREDGE & FILL u c N9 77652 A B C D AN ERAL PERMIT Previous permit# lew --Modification ❑Complete Reissue `Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality 07 t� 1 7 and the Coastal Resources Commission in an area of environmental concern pursuant to ISA NCAC (T / ❑Rules attached. Applicant Name le)rr ari)e e v. °, G u el er S lc Project Location: County rr t1 r C ' i C k_ Address I 1 71 re..c.1-1 /. ( 4C [3, / Street Address/State Road/Lot#(s) City 'A V e.,v Cps'i�J State MO ZIP vl o (J1 7? tAJ ' O c AC, P r. Phone#( ) E-Mail b LA g)f Sk ®r,p•iCa c/ Subdivision -"I' LA Authorized Agent — 4- City (Jr .-k'C T- Cl aA-‘0 ZIP -0 OS 0 CW ❑EW 0 PTA ❑ES ❑PTS Phone # ( '- ) River Basin L u v"-Le._.-- Affected AEC(s): EA HF ❑IH ❑UBA ❑WA Adj.Wtr. Body f f'l7 a�"+'C- OC ear '(Pat man /unkn) ❑PWS:` / ORW: yes / Io' PNA yes / no Closest Maj.Wtr. Body 2+ �i L Q✓ a 1^ Type of Project!Activity 7 GC GQ, , / r eat le.. S 77 ETZ,cre • (Scale: l\I I J ) Pier(dock)length Fixed Platform(s) ! f Floating Platform(s) !, I _ C/)d �,1 Finger piers) — . 4. Groin length L —W �t, 1 number 0 sr z Bulkhead/Riprap length avg distance offshore t 1 I. max distance offshot� �;Basin,channel / �� _._,� - cubic yards j i, I` 111 t Boat ramp i �. �-' - .`- � t Boathouse/ ift --�— -- f j ; ; i'I J 1.._ -jr Beach Bulldozing 4 *�117 la . • _ Other(���j�/\��,(�C �. _ I � l ' (_ ,r X ,,, Lo,it r Ni',K <777" ',___ : ', 'kj.-)4"." , ...)) i ___ ,, Shoreline Length r :(, SAV: not sure yes 0 I ..,- i �, Moratorium: n/a yes no ; Photos: yes no ' Waiver Attached: yes no L ------'—Wt..!_. ___. A building permit may be required by: 001 / - /Q✓1 See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) / L Notes/Special Conditions d/,ra l has 10 r,74/T/1OLi1 rff 11/r e(J lJ ti rr Gv e r// /``'e Pq/h LL._ --r-Aivia 1 i CsstQn(-) nt or Ap inted Perm[rOff�icer's,Printed Name (A - if : Si p re Please read compliance statement on back of permit�`""' Si 'at e ' a) ov 1A-O Sys s - 1 / iD I - c/ .-))41 Application Fee(s) m�O Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action;and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ 1-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden, Chowan, Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 er! tCAMA//REDGE&FILL N9 77652 A B C NERAL PERMIT Previous permit# )�=/" w DModification UComplete Reissue OPartia(Reissue Date previous permit issued As authorized by the State of North Carolina.Department of Environmental Quality t)7 f}-, I .70'0 and the Coastal Resources Commission in an area of environmental concern pursuant to ISA NCAC // / [)Rotes attached. Applicant Name3grr gm/fee/let f eey(a 6"de fk 7 Project Location: County. r►.Lt2 S w I.Lk---- Address_ Ii 2 0 7 1 C id, ct.ai 4c _ Street Address/State Road/Lot#(s) _ CitY_SA f("pi,;vs, State MO ZIP a 09Uv &71 3 (,J t 0c 1!/; Phone#( ) l E-Mail_�jo3-1Af elsk Cprie41jSubdivision __ tJ Authorized Agent P44— Ci 4L ^ /—. -�,4 29 i(OS i Ag tY_OCCt�—irSl�`�` ZIP rr,,,..,,,t 0 CW DEW 0 PTA ❑ES OPTS Phone# (�' River Basin__ - (t AEC(S): r iF i]IH 0 URA ON/A Adj,Wtr.Body 0.erl C-VL_ +', tnavrman/unkn C� p PWS: f QQ� ORW: yes o PNA yes Closest Maj.Wtr Body__AIM' L-- Type of Project/Activity Y{" q�cl� S 4-9-f 1 p D ! rea. 5 r ''Ure• J ( 7 (Scale: tATS ) Pier(dock)length --_- _ _l j _I _ Fixed Platform(s) — - 1 ! • j - - 1 r '_I j I - I ' 1- ~—.J- -i FloatingPlatform(s)_ 1 ! -_) •��_-. L I ry-�`f.-!v Finger pler(s) •—.' - -- — I - �,' - �` • I -- • - Groin length ( __ r I l l ! ' . number . - .-.__. I .. I •--j --- . • _ . - I......-t.- • Bulkhead/Rlprap gth -=-4- ._!_.--: --- ' - -I ,-_. :. _!_� ___. _-I --; l . • avgdisran offshore I - -- • -- ---- . -j- - -- -- - - max dis eoffshor I , I i i --- I &Lt_ Basin,channel I 1.1 : cubic y//7 -_ -• I ZI ! --- Boat ram "_--- -�- --i- PIr461 : - • Jam_ i 1 Beach Bundozinp f 1- 1 I ` I ' ! I _ ._ + _- t y- ` 1. 77 !L to I I Oth t I I i j_—.` 11 Shorelina Length_f'$1�—.t i_ -__i- _i -( ( i I I_ i_1__-,- - I --- Spy: not SUM yes �-i- � Moratorium: n/a yes no I • i ttI Photos: yes no V (Jj 1 l i - _ ?/) . . . 1 , , 1 _ Waiver Attached: yes no /���L� 1�� �+lf�t ✓✓t ll(1�� A building permit may be required by: (70 f>1 adi r/r (J See note on back regarding River Basin rules. (Note Local Planning Jurisdiction r Notes/Special Conditions Ir j f 17 U G'/re D 7 rci l ye r-G / Ae,947 , Se c0 tLrr — — / /. uS era or Applicant Printed arne Permit OfG�cer s Printed Name , e read compliance statemen onbacko7permtt" Signatu e 1 a D. _/.!?_i AppllcationFee(s) 0 Check Issuin Date Expiration ate • S ►.i CAMA// REDGE & FILL 1V 9 77652 ABCD I�IERAL PERMIT Previous permit# > % ew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality 07H-, 17` and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC • ❑Rules attached. Applicant Name Garr Jaen ct 6ude-1 g'k Project Location: County R.r't,t.h, c L 1 CI.. _ Address l 2071 -re.c.k Pot c'4i 4C- g Street Address/State Road/Lot#(s) City St lve Or CPv -�q State MO ZIP as"D'U� col) 3 L i P 6 c.G, Pr, Phone#( ) / E-Mail 19 d. j SI���:14asi,Subdivision 1 �/ -D Authorized Agent 14-4— 'City notk—�rLe-AG+, ZIP Z- C/65 ❑CW ❑EW ❑PTA ❑ES ❑PTS Phone# ( r,l/----- River Basin Lu l er, Affected nFA F ❑IH El UBA ❑N/A AEC(s): Adj.Wtr. Body a`}`.C-A k man /unkn) ❑PWS: _� -'ORW: yes o PNA yes Closest Maj.Wtr. BodyMkLi4" �L 0 L`-�Q� Type of Project/Activity ,71-6-1- cad 64g1 1D pr 'l c/1.11 re Scale: LiS ) Pier(dock)length Fixed Platform(s) ; 1r ,I Floating Platform(s) ®■■■— IO. I I ; I j �.J_ L� 1Ov Finger pier(s) MEE 1 Groin length I i ,^!, ' �� ME I �� � l number — Bulkhead/Riprap ngth avg distan offshore 1 HI max dis nce offshorII t---1 1 Basin,channel I I 1 <mukt . I ' c Ai cubic yards ■■ I j 1 j Boat ram `� I age ` ' I I P �1. i 1 Ij'4tiBoathouse/Bo ift 11 - 1 ttI _L _ iii 4 , -_ Beach Bulldozin ® _i 1 I Ui 1 I .! I I `l Oth - t,111. li i I j I I I i \ " ffil ' "WI 74IMMr. I I , =Num Shoreline Length 4150 1 [ I I II I SAV: not sure yes no I — I ( I 1 Moratorium: n/a yes no —.�_I _ _ — --.— ' I Photos: yes no I I—._.. / ( — — - 1 Waiver Attached: yes no PAL ( i 1 A building permit may be required by: OM t�fI ?a . U See note on back regarding River Basin rules. (Note Local Planning Jurisdiction ,�1 �afh / / Notes/Special Conditions �GL t LG 9'l��GL�UI/1 rPCyGyreLv ,� fie i i /�G- ,J eace- C-0 rr r I'M -503 -8 70 ' 1 ,....„ --ribilk II/. 1' .. Agent or Ap A-inted Narn PermitOfficer s Printed Name•,y 70 rti-Pt'L' '0/Lez_ Signature **Please read compliance statement on back of permit'* Signatu e 1/630'moo 1°1-0s N1-351— lop a! / -! Application Fee(s) r Check# Issuin Date Ex Expiration ate PP P • Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action;and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the.Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: n Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(9 I 0-796-7215)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves:Beaufort,Bertie,Hertford,Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-390 I Fax: 910-395-3964 Fax: 252-264-3723 (Serves:Brunswick,New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates,Pasquotank and Perquimans and Pender Counties) s, Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 SECTION.1700-GENERAL PERMIT FOR EMERGENCY WORK REQUIRING A CAMA AND/OR A DREDGE AND FILL PERMIT 15A NCAC 07H.1701 PURPOSE This permit allows work necessary to protect property and/or prevent further damage to property caused by a sudden or unexpected natural event or structural failure which inuninently endangers life or structure. For the purposes of this general permit, major storms such as hurricanes, northeasters or southwesters may be considered a sudden unexpected natural event although such storms may be predicted and publicized in advance. History Note: Authority G.S. 113-229(c1); 113A-107(a),(b);113A-113(b); 113A-118.1; Eff.November 1, 1985. 15A NCAC 07H.1702 APPROVAL PROCEDURES (a) Any person wishing to undertake development in an area of environmental concern necessary to protect life or endangered structures will notify the Division of Coastal Management or Local Permit Office (LPO) when a possible emergency situation exists. (b) The applicant may qualify for approval of work described in this permit after an onsite inspection by the LPO or Division of Coastal Management Field Consultant and upon his findings that the proposed emergency work requires a CAMA and/or Dredge and Fill`.permit. The LPO shall issue the permit if the required emergency measures constitute minor development. (c) Once the LPO or Consultant determines that the applicant's proposed project may qualify for an emergency permit, he shall consult with the applicant and assist him in preparing an application. The applicant shall include a sketch showing existing conditions and the proposed work. (d) The applicant for an emergency permit must take all reasonable steps to notify adjacent riparian landowners of the application,and prior to receiving a permit will certify by signing the permit the following: (1) that a copy of the application and sketch has been served on all adjacent riparian landowners, or if service of a copy was not feasible, that the applicant has explained the project to all adjacent riparian landowners; (2) that the applicant has explained to all adjacent riparian landowners that they have a right to oppose the issuance of a permit by filing objections with the local CAMA permit officer or with the Secretary of the Department of Environment,Health, and Natural Resources; (3) that, as to adjacent riparian landowners not contacted, the applicant has made a reasonable attempt to contact them and furnish them with the required information. (e) All work authorized by this general permit will cease after thirty days from the date of issuance. History Note: Authority G.S. 113-229(cl); 113A-107(a),(b); 113A-113(b); 113A-118.1; Eff November 1, 1985; Amended Eff May 1, 1990. 15A NCAC 07H.1703 PERMIT FEE The agency shall not charge a fee for permitting work necessary to respond to emergency situations except in the case when a temporary erosion control structure is used. In those cases, the applicant shall pay a permit fee of four hundred dollars($400.00)by check or money order made payable to the Department. History Note: Authority G.S. 113-229(c1); 113A-107(a),(b); 113A-113(b); 113A-118.1; 113A-119; Eff.November 1, 1985; Amended Eff. September 1, 2006;August 1, 2002;March 1, 1991; October 1, 199. 15A NCAC 07H.1704 GENERAL CONDITIONS (a) Work permitted by means of an emergency general permit shall be subject to the following limitations: (1) No work shall begin until an onsite meeting is held with the applicant and a Division of Coastal Management representative so that the scope of the proposed emergency work can.be delineated. (2) No work shall be permitted other than that which is necessary to protect against or reduce the imminent danger caused by the emergency, to restore the damaged property to its condition - immediately before the emergency,or to re-establish public facilities or transportation corridors. (3) Any permitted temporary erosion control projects shall be located no more than 20 feet waterward of the imminently threatened structure or the right-of way in the case of roads, except as provided under 15A NCAC 07H .0308.If a building or road is found to be imminently threatened and at increased risk of imminent damage due to site conditions, such as a flat beach profile or accelerated erosion, 61 temporary erosion control structures may be located more than 20 feet waterward of the structure•being ' protected. In cases of increased risk of imminent damage, the location of the temporary erosion control structures shall be determined by the Director of the Division of Coastal Management or the Director's designee. (4) Fill materials used in conjunction with emergency work for storm or erosion control shall be obtained from an upland source. Excavation below MHW in the Ocean Hazard AEC may be allowed to obtain material to fill sandbags used for emergency protection. (5) This emergency general permit allows the use of oceanfront erosion control measures for all oceanfront properties without regard to the size of the existing structure on the property or the date of construction. (b) Individuals shall allow authorized representatives of the Department of Environmental Quality to make inspections to ensure that the activity being performed under authority of this emergency general permit is in accordance with these Rules. (c) Development shall not jeopardize the use of the waters for navigation or for other public trust rights in public trust areas including estuarine waters. (d) This permit shall not be applicable to proposed construction where the Department has determined, based on an initial review of the application, that notice and review pursuant to G.S. 113A-119 is necessary because there are unresolved questions concerning the proposed activity's impact on adjoining properties or on water quality, air quality, coastal wetlands, cultural or historic sites,wildlife,fisheries resources,or public trust rights. (e) This permit does not eliminate the need to obtain any other state,local,or federal authorization. (f) Development carried out under this permit must be consistent with all local requirements, CAMA rules, and local land use plans,storm hazard mitigation,and post-disaster recovery plans current at the time of authorization. History Note: Authority G.S. 113-229(c1); 113A-107(a),(b); 113A-113(b); 113A-118; 113A-118.1; Eff.November 1, 1985; Amended Eff.December 1, 1991;May 1, 1990; RRC Objection due to ambiguity Eff. May 19, 1994; Amended Eff.April 1, 2019;May 1, 2010;August 1, 1998;July 1, 1994. 15A NCAC 07H.1705 SPECIFIC CONDITIONS (a) Temporary Erosion Control Structures in the Ocean Hazard AEC. (1) Permittable temporary erosion control structures shall be limited to sandbags placed landward of mean high water and parallel to the shore. (2) Temporary erosion control structures as defined in Subparagraph(1) of this Paragraph may be used to protect only imminently threatened roads and associated right of ways, and buildings and their associated septic systems. A structure is considered imminently threatened if its foundation, septic system, or right-of-way in the case of roads is less than 20 feet away from the erosion scarp.Buildings and roads located:more than 20 feet from the erosion scarp or in areas where there is no obvious erosion scarp may also be found to be imminently threatened when the Division determines that site conditions, such as a flat beach profile or accelerated erosion, increase the risk of imminent damage to the structure. (3) Temporary erosion control structures shall be used to protect only the principal structure and its associated septic system, but not appurtenances such as pools, gazebos, decks or any amenity that is allowed under 15A NCAC 07H.0309 as an exception to the erosion setback requirement. (4) Temporary erosion control structures may be placed waterward of a septic system when there is no alternative to relocate it on the same or adjoining lot so that it is landward of or in line with the. structure being protected. (5) Temporary erosion control structures shall not extend more than 20 feet past the sides of the structure to be protected except to align with temporary erosion control structures on adjacent properties, where the Division has determined that gaps between adjacent erosion control structures may result in an increased risk of damage to the structure being protected.The landward side of such temporary erosion control structures shall not be located more than 20 feet waterward of the structure to be protected or the right-of-way in the case of roads. If a building or road is found to be imminently threatened and at increased risk of imminent damage due to site conditions such as a flat beach profile or accelerated erosion, temporary erosion control structures may be located more than 20 feet waterward of the structure being protected. In cases of increased risk of imminent damage,the location of the temporary erosion control structures shall be determined by the Director of the Division of Coastal Management or the Director's designee. (6) Temporary erosion control structures may remain in place for up to eight years for a building and its associated septic system, or a bridge or a road. The property owner shall be responsible for removal of any portion of the temporary erosion control structure exposed above grade within 30 days of the end of the allowable time period. 62 . (7) For purposes of this Rule, a community is considered to be actively pursuing a beach nourishment or • an inlet relocation or stabilization project if it: (A) has an active CAMA permit,where necessary, approving such project;or (B) has been identified by a U.S. Army Corps of Engineers'Beach Nourishment Reconnaissance Study, General Reevaluation Report, Coastal Storm Damage Reduction Study, or an ongoing feasibility study by the U.S. Army Corps of Engineers and a commitment of local or federal money,when necessary;or (C) has received a favorable economic evaluation report on a federal project;or (D) is in the planning stages of a project designed by the U.S. Army Corps of Engineers or persons meeting applicable State occupational licensing requirements and initiated by a local government or community with a commitment of local or state funds to construct the project or the identification of the financial resources or funding bases necessary to fund the beach nourishment or inlet relocation or stabilization project. If beach nourishment, inlet relocation or stabilization is rejected by the sponsoring agency or community, or ceases to be actively planned for a section of shoreline, the time extension is void for that section of beach or community and existing sandbags shall be subject to all applicable time limits set forth in Subparagraph(6)of this Paragraph. (8) Once a temporary erosion control structure is determined by.the Division of Coastal Management to be unnecessary due to relocation or removal of the threatened structure, it shall be removed by the property.owner to the maximum extent practicable within 30 days of official notification from the Division of Coastal Management,regardless of the time limit placed on the temporary erosion control structure. If the temporary erosion control structure is determined by the Division of Coastal Management to be unnecessary due to the completion of a storm protection project constructed by the U.S. Army Corps of Engineers, a large scale beach nourishment project, or an inlet relocation or stabilization project, any portion of the temporary erosion control structure exposed above grade shall be removed by the permittee within 30 days of official notification by the Division of Coastal Management regardless of the time limit placed on the temporary erosion control structure. (9) Removal of temporary erosion control structures is not required if they are covered by sand. Any portion of a temporary erosion control structure that becomes exposed above grade after the expiration of the permitted time period'shall be removed by the property owner within 30 days of official notification from the Division of Coastal Management. (10) The property owner shall be responsible for the removal of remnants of all portions of any damaged temporary erosion control structure. (11) Sandbags used to construct temporary erosion control structures shall be tan in color and 3 to 5 feet wide and 7 to 15 feet long when measured flat. Base width of the structure shall not exceed 20 feet, and the total height shall not exceed'6 feet,as measured from the bottom of the lowest bag. (12) Soldier pilings and other types of devices to anchor sandbags shall not be allowed. (13) Excavation below mean high.water in the Ocean Hazard AEC may be allowed to obtain material to fill sandbags used for emergency protection. (14) An imminently threatened structure may be protected by a temporary erosion control structure only once regardless of ownership, unless the threatened structure is located in a community that is actively pursuing a beach nourishment project, an inlet relocation or stabilization project in accordance with Subparagraph (7) of this Paragraph. Existing temporary erosion control structures may be permitted for additional eight-year periods provided that the structure being protected is still imminently threatened, the temporary erosion control structure is in compliance with requirements of this Subparagraph, and the community in which it is located is actively pursuing a beach nourishment or an inlet relocation or stabilization project in accordance with Subparagraph (7) of this Paragraph. In the case of a building, a temporary erosion control structure may be extended, or new segments constructed, if additional areas of the building become imminently threatened. Where temporary structures are installed or extended incrementally, the time period for removal under Subparagraph(6) or(7) of this Paragraph shall begin at the time the initial erosion control structure is installed. For the purpose of this Rule: (A) a building and its associated septic system shall be considered as separate structures;and (B) a road or highway shall be allowed to be incrementally protected as sections become imminently threatened. The time period for removal of each contiguous section of sandbags shall begin at the time that section is installed in accordance with Subparagraph (6) or (7) of this Paragraph. (15) Existing temporary erosion control structures may be repaired or replaced within their originally permitted dimensions during the time period allowed under Subparagraph(6)or(7)of this Paragraph. (b) Erosion Control Structures in the Estuarine Shoreline,Estuarine Waters,and Public Trust AECs. Work permitted by this Rule shall be subject to the following limitations: (1) The erosion control structure shall be located no more than 20 feet waterward of the imminently threatened structure. If a building or road is found to be imminently threatened and at increased risk of 63 imminent damage due to site conditions such as a flat shore profile or accelerated erosion, temporary • erosion control structures may be located more than 20 feet waterward of the structure being protected. In cases of increased risk of imminent damage,the location of the temporary erosion control structures shall be determined by the Director of the Division of Coastal Management or the Director's designee. (2) Fill material used in conjunction with emergency work for storm or erosion control in the Estuarine Shoreline,Estuarine Waters and Public Trust AECs shall be obtained from an upland source. •(c) Protection, Rehabilitation, or Temporary Relocation of Public Facilities or Transportation Corridors. This permit authorizes only the immediate protection or temporary rehabilitation or relocation of existing public facilities.Long-term stabilization or relocation of public facilities shall be consistent with local governments' post-disaster recovery plans and policies which are part of their Land Use Plans. (1,) Work permitted by this general permit shall be subject to the following limitations: (A) no work shall be permitted other than that which is necessary to protect against or reduce the imminent danger caused by the emergency or to restore the damaged property to its condition immediately before the emergency; (B) the erosion control structure shall be located no more than 20 feet waterward of the imminently threatened structure or the right-of-way in the case of roads. If a public facility or transportation corridor is found to be imminently threatened and at increased risk of imminent damage due to site conditions such as a flat shore profile or accelerated erosion, temporary erosion control structures may be located more than 20 feet waterward of the facility or corridor being protected. In cases of increased risk of imminent damage, the location of the temporary erosion control structures shall be determined by the Director of the Division of Coastal Management or the Director's designee in accordance with Subparagraph (a)(1) of this Rule. (C) any fill materials used in conjunction with emergency work for storm or erosion control shall be obtained from an upland source except that dredging for fill material to protect public facilities or transportation corridors shall be considered in accordance with standards in 15A NCAC 07H.0208;and (D) all fill materials or structures associated with temporary relocations which are located within Coastal Wetlands, Estuarine Water, or Public Trust AECs shall- be removed after the emergency event has ended and the area restored to pre-disturbed conditions. History Note: Authority G.S. 113-229(cl); 113A-107(a),(b); 113A-113(b); 113A-115.1; 113A-118.1; Eff.November 1, 1985; Amended Eff.April 1, 1999;February 1, 1996;June 1, 1995; Temporary Amendment Eff. July 3, 2000;May 22, 2000; Amended Eff.April 1, 2019;May 1, 2013;May 1, 2010;August 1,2002. • 64 I _ ... . ' , '1 ," IIIiiIII1I1IIIIIIIIIIi ■1■■■■ ■■■ " 'a --- 1111111111111RVIIIIMIMI i■■ ■■■S■■■■■ ■■■ ■■ ■ 1111 1111111111R11111111111 -- ■■■■■iviii • 1■■■■■■ m i■■■■■■■■ - - ----- - • l i L •■■■■■■■ii■■■■■■■■ -7.• 1- ral ICI ! i••••••••••••••••• ___ ___ - . ti\■�■■■■otme ■i■■T__l _mr.•■ .___ ■■■■■ . __ _ .. . _■■■ ■■0,„..,■ .� 1 . , _______, --.-- - - ----- - . - - ----- --., , NI- --- 4.111- -- -L' pil ' '- --. ' , •-- : • so , ,___, _,__ -- - - - -- -. - _____ri_i__ ___ ___ . e,,.... 1, . _ _____ _ . . _ . ,,,„_7____,.4_._ __ _____.. . _ ..,. . , _ . .., . " • ....... ___________:__ ___„_,:.„ 4.,.., ,__,,,,„ ! . ___ _ _ __ __ .... . , , , .... } mmig.. . + 1 _ . L ; ; Iidi NIL, _ _■■ ■■■■■■■■■ - - • - -, , , . . „ ' h - EMI -- -- --- _ 111111111111111111111111X M11111111111111111111111111111. r r - . _ ■■■■■■ i _ is 1 1 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Barry Gude!sky 's (Name of Property Owner) property located at 6713 West Beach Dr Oak Island.NC (Address,Lot, Block,Road,etc.) on Atlantic Ocean in Brunswick N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. x I have no objection to this proposal. • I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) Sand'Bag placement to prevent erosion WAIVER SECTION I understand that a pier,.dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me.(If you wish to waive the setback,you must initial the appropriate blank below.) I do wish to waive the 15'setback requirement. x I do not wish to waive the 15'setback requirement. Owner Information) (Adjacent Property Owner Information) n ure Signature* Bar Gudels Lpy_Ya:u‘ Print or Type Name Print or Type Name 12071 Tech Rd 9SM_Stsc,Y,S--� Mailing Address Mailing Address Silver Spring,MD 20904 NAWM.r SV it Va_ 2.flQ7 a City/State/Zip City/State/Zip 301-452-1234 'O44_ _ Telephone Number/email address Telephone Number/email address 01/11/2021 Qt_1� 7nZt Date Date* (Revised Aug.2014) 'Valid for one calendar year after signature' AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit: Barry Gudelsky Mailing Address: 12071 Tech Rd Silver Spring, MD 20904 Phone Number: 301.-452-1234 Email Address: bgudelsky@comcast.net I certify that I have authorized B&B Marine Construction Agent/Contractor To act on my behalf, for the purpose of applying for and obtaining all CAMA permits Necessary for the following proposed development: Sand Bag placement to prevent erosion at my property located at 6713 West Beach Dr Oak Island, NC in Brunswick County. I furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Pro ner Information: �.�igna ure Barry Gudelsky Print or Type Name Owner Title 01 /11 /2021 Date This certification is valid through I I • • ADJACENT RIPARIAN PROPERTY OWNER STATEMENT I hereby certify that I own property adjacent to Barry Gudeisky (Name of Property Owner) property located at 6713 West Beach Dr Oak Island NC (Address, Lot, Block, Road,etc.) on Atlantic Ocean , in Brunswick . N.C. (Waterbody) (City/Town and/or County) The applicant has described to me, as shown below, the development proposed at the above location. x I have no objection to this proposal. I have objections to this proposal. DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT (Individual proposing development must fill in description below or attach a site drawing) Sand Bag placement to prevent erosion WAIVER SECTION I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15'setback requirement. I do not wish to waive the 15' setback requirement. (Pr pe wner Information) (Adjacent Property Owner Information) Si Signal urr*' Barry Gudelsky :70\r\h lCH‘cje Print or Type Name -- Print or Tie Name 12071 Tech Rd G( t 1 , -' \\s Mailing Address arling Addres Salver Spnmq.MD 20904 CX(f Sc City/State/Zip Cr y/Stafe/Ztip -. 301-452-1234 4 (25 Telephone Number/email address Telephone ItumberIemail address 01/11/2021 Date Date' (Revised Aug. 2014) 'Valid for one calendar year after signature' SANDBAG REMOVAL NOTICE TO WHOM IT MAY CONCERN: I, Barry Gudelsky , give permission to B&B Marine Construction to act as my agent in my behalf in obtaining a CAMA General Permit to place sandbags as a temporary erosion control structure in front of my property at 6713 West Beach Dr Oak Island, NC I Barry Gudelsky have read the specifications in 15A NCAC 7H-0308(a)(2) and understand that the sand bags may remain in place for up to 8 years after the date of permit approval. I understand that I will be responsible for removing the sandbags within 30 days after that date or at any time that they are determined by DCM staff or its agent to be unnecessary due to relocation or removal of the structure. I will also be responsible for removing any damaged sandbags during the period they are authorized to be in place. I also understand that the removal of the sandbags shall not be required if at the specified date for removal they are determined by DCM staff to be covered by dunes with vegetation sufficient to be considered stable and natural. AUTHORIZED SIGNATU : DATE: / �� � Check Oat.Received Dab Deposited Check From Name Name of Permit Holder Vendor 11/ amount Permit Number/Comments R•oe/pr or RWund/R.eilocated Column/ Coktmn2 Column3 Column4 Column6 Columns Coarnm7 _ Columns Column9 1/25/2021 1/2612021 Elizabeth Edmunson Robbie Edmunson State Employees CU 5021 S 400.00 GP#777360 JD rot.13605 1125/2021 1/262021.Haden Docks and Bulkheads Cathy Louden CreaCom Bank ___, 3650 S 400.00 GP 677726D BB rct.13505 1/25/2021 1262021 Allied Manne Contractors LLC Janet Friday FCB 1_ 9757 $ 200.00 GP 9777370 JD rct.13606 _1/25/2021 1/26/2021 Brandon Grimes Money Order Barry and Sawa Gudelsky Welts Fargo Bank 19-088347337 $ 400.00 GP 0776520 BB rct 13581 1252021 1/262021 Brandon Grimes Money Order Kelly Coy Wells Fargo Bank 19-088347328 $ 400.00 GP/71860D BB rct.13579 _1/25/2021 1/262021 CLTMC.Inc. Paul Watson .FCB 1156 $ 800.00 GP977539D Ben rot.12456 _ 1/252021 1/26/2021 Allied Marine Contractors LLC _ Barry Sheppard FCB _ 9737 $ 200 00 GP#742820 Tmac rct 13582 _ 1/25/2021 126/2021 Allied Marine Contractors LLC _ Paul Dobranski FCB 9738 $ 600.00 GP 0777040 Tmac rct.13583 1252021 126/2021 Jerry Erman David Moore Coastal Bank and Trust 3580 $ 200.00 GP9775270 JD rct.13608 1/25/2021 1/26/2021 Rainwater Coastal Construdlon Herbert and Michelle Siner First Bank 358 5 200.00 GP#71664D Tmac rot.13585 1/25/2021. 1/26/2021 Kevin Morse same _ BB&T 2696 $ 200.00 GP#77841D PA rct 11579 1/25/2021 126/2021 Over-beck Marine Const/Daniel Shirley Carrie Fales Suntnul 5388 $ 400.00 GP#761720 PA rct.11580 1/25/2021 1/26/2021 Phyllis Smith money order same BOKF.NA __..20944262475 $ 200.00 GP#77590D KE rct.13665 1/252021 1/262021 Roger Davis Roger and Perry Davis BBBT 5446 $ 400 D0 GP#764930 PA rct.11581