HomeMy WebLinkAbout30924D - Fox 0 CAMA / DREDGE & FILL 30924
GENERAL PERMIT Previous permit#
��
New Modification Complete Reissue Partial Reissue Date previous permit issued
As authorized,by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC 7//• y 7 0 C., .
C Rules attached.
Applicant Name (1 h at(.L 5 j"U-' Project Location: County f 1' t riS w/C kr.
•
Address I 00 (,t'5(LA...)a v1 Dry i VC Street Address/State Road/ Lot#(s) 3
City .✓1 Isle 1 CGcI1 State KiC ZIP Z Li (09 Lee .57�"e f"
Phone# (1 Ili) 171- O U Fax # ( ) Subdivision
Authorized Agent f,•- City - 4 f 6!C ec!c/. ZIP . 5z/C� (/
Affected CW EW - PTA ❑ES PTS Phone # ( )_ River Basin L.c(i�)b c r-
OEA HHF :_,IH ❑UBA N/A
AEC(s): Adj.Wtr. Body Cn r )6-7 (nat / an unkn)
PWS: FC: _!
ORW: yes / no PNA yes / no ) Crit. Hab. yes / no Closest Maj.Wtr. Body [(J/c.)
Type of Project/Activity (10-V) 1 ri tC' f /4?'e r . y Ge, iifr j 2)6 C/c.
(Scale: 4- ( "-- /0' )
Pier(dock)length /t x 6
Platform(s) _ n x 2 C)
Finger pier(s)
Groin length -
number — . ------ -.
l�j,;w/I�- _. .
Bulkhead/Riprap length
avg distance offshore i r---- ��
max distance offshore
/
Basin,channel p
cubic yards / T/,...<.;"i,.p
Boat ramp C) C., .
Boathouse/Boatlift --- -r — — -
Beach Bulldozing
Other /C,
j r i
Shoreline Length 0 i /(GnA/.7 .• _. _l - i 1
SAV not sure yes no ..___ e.
Sandbags: not sure yes
Moratorium: n/a yes
So �Lz- l
L/ (l /)C r f
Photos: yes lib, I
A L ,S�7G Ze,i C • L
Waiver Attached: yes no
A building permit may be required by: -t, ),I-10 f 0.(7F'G�, i 4-//C ecac-- E See note on back regarding River Basin rules.
Notes/Special Conditions / /( ' ici /, /7� 11 7/✓ /.2 CO 44--.. ,
64,
C u_-..t.'7i c.{ /}C 4/C C1r
Agent or Applicant Printed Name Permit Officer's Signature
Fi.t S j u3 40v, 5-,6 3
Signature **Please read compliance statement on back of permit Issuing Date Expiration Date
70 i ! U./%Crj /,.
Application Fee(s) Check# Local Planning Jurisdiction Rover File Name
I
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
1 Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office(252-946-648 I)or the Wilmington
Regional Office(910-395-3900)for more information on how to comply with thesebuffer rules.
Division of Coastal Management Offices
Central Office Elizabeth City District Washington District
Mailing Address: 1367 U.S. 17 South 943 Washington Square Mall
1638 Mail Service Center Elizabeth City, NC 27909 Washington, NC 27889
Raleigh, NC 27699-1638 252-264-3901 252-946-648 I
Location: Fax: 252-264-3723 Fax: 252-948-0478
(Serves:Camden,Chowan,Currituck, (Serves: Beaufort, Bertie, Hertford, Hyde,
Parker Lincoln Building
2728 Capital Blvd. Dare,Gates, Pasquotank and Perquimans Tyrrell and Washington Counties)
Counties)
Raleigh, NC 27604
9I 9 733 2293 / I-888-4RCOAST Morehead City District Wilmington District
Fax: 919 733 1495 15 I-B Hwy. 24 127 Cardinal Drive Ext.
Hestron Plaza II Wilmington, NC 28405-3845
Morehead City, NC 28557 910-395-3900
202-808-2808 Fax: 910-350-2004
Fax: 252-247-3330 (Serves: Brunswick, New Hanover,
(Serves: Carteret,Craven,Onslow-above Onslow-below New River Inlet-and
New River Inlet-and Pamlico Counties) Pender Counties)
Revised 10/C
•
GENERAL PERMIT COMPUTER FORM
APPLICANT NAME: Cd' .t-Ge..d j-z
ADDITIONAL NAMES:
AEC DESIG: -c) P DEVELOP AREA: .�' / PROJ DESC: P - t2-
(Wtill only take 6) ———— (Will only take 1)
WORK: /6, 6
(Will only take 4)
7 - 5-, 2-o
MAINT:
(Will only take 4)
IMP:
(will only take 6)
ACTION EXPIRATION
DREDGE&FILL REQUIRED: • S c 3 // • S- 6 3
CAMA MAJOR DEVEL REQUIRED: •5-. o //, S• 0 3
+ENDER: COMPLETE THIS VECTION COMPLETE THIS SECTION ON DE (VERY
■ Comi,lete items,1,2,and 3.Also complete A. Sigrtu.e/
item 4 if Restricted Delivery is desired. [[// '/ 0 Agent
II Print your name and address on the reverse X ` ( (/ 0 Addresse
so that we can return the card to you. B. Received by(Pr ted ame) C. Dat of Del' r
• Attach this card to the back of the mailpiece, ^� I (
or on the front if space permits. ✓'�CJ[,.L� l� 1 C. • (tn
D. Is delivery sss-1 -v-y rom item 1? Yes
1. Article Addressed to: If YES ter deli .•.res •-low: 0 No
ISO y d farce r-il10S EGO?
r. I: .
/L42 FIuN,i..$ Rd
T3. Sere Type,,,�LI1e S G 2ets 0 Certified Msu7` 0 EKpresS Mail
❑ Registereek ' Return Receipt for Merchandis
❑ Insured Mail 0C.O.D.
C461,q H 044g/ ocli 4. Restricted Delivery?(Extra Fee) 0 Yes
2. Article Number f'K.1�+7001 2510 0005 3572 6967
(Transfer from service label)
PS Form 3811,August 2001 Domestic Return Receipt 102595-01-M-2t
UNITED STATES POSTAL SERVIe f First-Class Mail.
q1(.' ' Postage& Fees Paid
C) . M usPs
_J Permit No. G-10
u.
• Sender: Please print your name, address, and ZIP+4 in this box •
a4,/„ / --
/ CQ"se'...�.Y 1�,.
(Qc ev4 /sir ec‘. NC
Y6
2 J
IIII!II11I!!I!!IlIIHIlIIIIIIIIlI ,It1 IIri,!!11 II!lllilll
-ENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY
• CoTnplete items 1,2,and 3.Also complete A. Signature -
item 4 if Restricted Delivery is desired. X n D ' / ❑ Agent
• Print your name and address on the reverse �+�-C . 0 AddressE
so that we can return the card to you. B. Received by(Printed Naive) C. Date of Delivei
• Attach this card to the back of the mailpiece,
or on the front if space permits. .61-N/ iC /er/T 2J
D. Is delivery address different from item 1? 0 Yes
1. Article Addressed to: If YE er d ive dress below: 0 No
R 1 � eJ dad
``'14:e i Pe5yy �e;T-z / e(0
� \�
73 4) Ald6 , it E ` l �'
, 8
a IC
ic Or
3. Service Type
yi I Wpr.Certified Mail Express Mail
Z8 6 D/ ❑ Registered pi Return Receipt for Merchandis
0 Insured Mail 0 C.O.D.
4. Restricted Delivery?(Extra Fee) 0 Yes
2. Article Number 7002 3150 0003 2210 2248
(Transfer from service label)
S Form 3811,August 2001 Domestic Return Receipt 102595-01-M-2t
UNITED STATES POSTAL SERVICE • First-Class Mail
11 • Postage& Fees Raid
USPS
Permit No. G-10
• Sender: Please print your name, address, and ZIP+4 in this box •C.l
cn r(e5 you (4-.171.44_
Ile C aw5ecaw../ Or .
&C24n (b(e Rc..l, I\lL
2 3L(6f
•
c Locality : " • Permit Number
•
n GENERAL INFORMATION
i.i
LAND OWNER. •
Name l 'eid iOcf(f . .
Address ZS02 Setddle- Clvb IOrw.,c.
City eurlin5 f-on( State N O- Zip Z7ZI c Phone 334 7J ®®73
I AUTHORIZED AGENT
Name 64 c./(es Fax (foww_a_
L ,ddress . 16- CavSewa7' Pr• .
City O(e4ct ts(e Refit �State Al C . .zip ."767 Phone r/o 5790for--
LOCATION OF PROJECT 23 Lee 5- c-/y g /1 0 cw+wra- / f-g ova Pub#/may .
Ii (If not oceanfront,is waterbody natural or manmade?) Manrrma,
DESCRIPTION OF PROJECT SZO erivey+-t Peck-
,
AREAS OF ENVIRONMENTAL CONCERN (AEC) CLASSIFICATION .
o be filled in by the Local Permit Officer prior to completing application.)
Ocean Hazard Estuarine Shoreline ORW Shoreline Public Trust Shoreline Other
PROPOSED USE
n VResidential Commerical/Industrial Other
SQUARE FOOTAGE OF BUILDING FOOTPRINT AND OTHER IMPERVIOUS OR
;UIL'I-UPON SURFACES (such as driveways, etc.) within 75 feet of the estuarine shoreline, or 575 feet of an
• RW shoreline, or 30 feet of the public trust shoreline. I2So
SQUARE FOOTAGE OF TOTAL FLOOR AREA OF BUILDING /6o sr Docg ; 25To $ 11/1j
SQTTAE-FOOTAGE OF SITE 5 'ISo --
OTHER PERMITS MAY BE REQUIRED: Zoning,Drinking Water Well, Septic Tank
(or other sanitary waste treatment system),
The activity you are planning may require Burning,Electrical, Plumbing, Heating and
- permits other than the CAMA minor Air Conditioning, Insulation and Energy
development permit. As a service we have Conservation, FIA Certification, Sand Dune,
compiled a listing of the kinds of permits that Sediment Control, Subdivision Approval,
might be required. We suggest you check Mobile Home Park Approval, Highway
1 over the list with your LPO to determine if Connection, and others.
any of these apply to your project.
•
•
Z1VIENT OF OWNERS U P
n
,undersigned, an applicant for a CAMA minor development permit,being either the owner of property in
AEC or a person authorized to act as an agent for purposes of applying for a CAMA minor development
srmit, certify that the person listed as landowner on this application has a significant interest in the real
aroperty described therein. This interest can be described as: (check one) •
an owner or record title,Title is vested in aru ns w:c 1c_ , see Deed Book /5 7/
page 12/1 in the gru nsw i a is County Registry of Deeds.
an owner by virtue of inheritance. Applicant is an heir to the estate of
probate was in County.
if other interest, such as written contact or lease, explain below or use a separate sheet and attach to this
—application.
•
O
n
OTIFICATION OF ADJACENT PROPERTY OWNERS
•
Furthermore certify that the following persons are owners of properties adjoining this property. I affirm that I
ave given ACTUAL NOTICE to each of them concerning my intent to develop this property and to apply for
CAMA permit.
(Name) (Address)
/}?oyd Proper4-;es 1L-12o FI;NNs 11-4,1s,,;1/1 S_c. 24'sS'o
!.) B1tkc 4 PC3,9y Res -2cJ 73s- S 7%. M(1 , /4.c Ico r./ N G Z8(D0/
:)
OR DEVELOPERS IN OCEAN HAZARD AND ESTUARINE HAZARD AREAS:
acknowledge that the land owner is aware that the proposed development is planned for an area which may
susceptible to erosion and/or flooding. I acknowledge that the local permit officer has explained to me the
irticular hazard problems associated with this lot. This explanation was accompanied by recommendations
incerning stabilization and floodproofing techniques.
ERMISSION TO ENTER ON LAND
urthermore certify that I am authorized to grant and do in fact grant permission to the local permit officer
id his agents to enter on the afoxementionedlands_inconnection-with-evaluating-information-related to-this-
trmi t application.
us application includes: general information(this form),a site drawing as described on the back of this application,
ownership statement,the AEC hazard notice where necessary,a check for$100.00 made payable to the locality,
d any information as may be provided orally by the applicant. The details of the application as described by these
arces are incorporated without reference in any permit which may be issued. Deviation from these details will
nstitute a violation of any permit. Any person developing in an AEC without permit is subject to civil, criminal
d administrative action.
ds the lo(44 day of 7vaE ,20 3
Land owner or-person au d to act a ass
p his agent
for purposes of filing a CAMA permit application.
•
•
AEC HAZARD NOTICE •
Project Is In An: Ocean Erodible Area High Hazard Flood Area Inlet Hazard Area
Date Lot Was Platted: SPECIAL NOTE: This hazard notice is required for
This notice is intended to make you,the applicant,aware development in areas subject to sudden and massive
storms and erosion.Permits issued for development in this
of the special risks and conditions associated with
development in this area, which is subject to natural area expire on December 31 of the third year following the
hazards such as storms,erosion and currents.The rules of begins on the year in which the permit was issued.Shortly before work
the Coastal Resources Commission require that you determine the vegetationroject e Officer, the Local Permit line and setback distance at your
receive an AEC Hazard Notice and acknowledge that site.If the property has seen little change and the proposed
notice in writing before a permit for development can be development can still meet the setback requirement,the
issued. LPO will inform you that you may begin work.It is impor-
The Commission's rules on building standards,oceanfront tant that you check with the LPO before the permit expires
setbacks and dune alteration are designed to minimize,but for official approval to continue the work after the permit
not eliminate, property loss from hazards. By granting has expired. Generally, if foundation pilings have been
permits, the Coastal Resources Commission does not placed and substantial progress is continuing, permit
guarantee the safety of the development and assumes no renewal mairot be necessary.If substantial progress has
liability for future damage to the development. not been m . ., the permit must be renewed and a new
setback line established. It is unlawful to continue work
The best available information,as accepted by the Coastal after permit expiration without this approval.
Resources Commission, indicates that the annual ocean
erosion rate for the area where your property is located is
feet per year. For more information,contact:
The rate was established by careful analysis of aerial
photographs of the coastline taken over the past 50 years.
Studies also indicate that the shoreline could move as '��`'�, f1 a1
much as feet landward in a major storm. Local Permit Officer
The flood waters in a major storm are predicted to be about / ,"f/ J .-
feet deep in this area. t/ 5 C '/� NL'
Preferred oceanfront protection measures are beach Address
nourishment and relocation of threatened structures.
Hard erosion control structures such as bulkheads, �CP � 5
seawalls, revetments, groins,jetties and breakwaters are Locality
prohibited.Temporary devices,including sand bags,may
be allowed under certain conditions. S 7f 3a,
This structure shall be relocated or dismantled within two Phone
years of becoming imminently threatened.
The applicant must acknowledge this information and
requirements by signing this notice in the below space.
Without the proper signature, the application will not be
complete.
Applicant's Signature
1/2ilei
Date
Revised 11/93
• BEFORE YOU BUILD
•Setting Back for Safety: A Guide to Wise Development Along the Oceanfront
When you build along the oceanfront you take a calculated whichever is greater.If the erosion rate is greater than 3.5
risk.Natural forces of water and wind collide with tons of feet/year,the setback is 30 times the erosion rate plus 105
force,even on calm days. feet.
Man-made structures cannot be guaranteed to survive the The Reasons
force of a hurricane. Long-term erosion (or barrier island The beachfront is an ever-changing landform. The beach
migration)may take from two to ten feet of the beach each and the dunes are natural "shock absorbers", taking the
year and, sooner or later, will threaten oceanfront struc- beatings of the winds and waves and protecting theinland
tures. These are the facts of life for oceanfront property areas.By setting back 30 or 60 times the annual long-term
owners. erosion rate,you have a good chance of enjoying the full
The Coastal Resources Commission (CRC) has adopted life of the structure.At first,it seems very inviting to build
rules for building along the oceanfront. The rules are in- your dream house as close to the beach as possible,but in
tended to avoid an unreasonable risk to life and property five years you could find the dream has become a
and to limit public and private losses from storms and nightmare as high tides and storm tides threaten your
long-term erosion.These rules lessen but do not eliminate investment.
the element of risk in oceanfront development. The Exception
As you consider building along the oceanfront, the CRC The Coastal Resources Commission recognized that these
wants you to understand the rules and the risks.With this rules, initially passed in June of 1979, might prove a
knowledge you can make a more informed decision about hardship for some property owners.Therefore,they estab-
where and how to build in the coastal area. lished an exception for lots which cannot meet the setback
requirement.The exception allows buildings in front of the
The Rules setback line if the following conditions apply:
When you build along the oceanfront, coastal manage (1) the lot must have been platted as of June 1,1979,and
ment rules require that the structure be sited to fit safely not capable of being enlarged by combining with adjoining
into the beach environment. land under the same ownership,(2)development must be
Structures along the oceanfront must be behind the frontal as far back on the property as possible and in no case less
dune,landward of the crest of the primary dune and set than 60 feet landward of the vegetation line, (3) no
back from the first line of natural stable vegetation a dis- development can take place on the frontal dune(4)special
tance equal to 30 times the annual erosion rate(a minimum construction standards on piling depth and square footage
of 60 feet).Large structures(multi-family residential struc- must be met and (5) all other CAMA, state and local
tures greater than 5,000 square feet and non-residential regulations must be met.
structures greater than 5,000 square feet)must be set back
from the first line of natural stable vegetation a distance The exception is not available in the Inlet Hazard Area.
equal to 60 times the annual erosion rate or 120 feet, To determine eligibility for the exception,the Local Permit
Officer will make these measurements and observations:
I required setback from vegetation line
I
L SETBACK SETBACK I,� FIRST LINE OF
It K STABLE exception setback(maximum feasible)
160 x ANNUAL 30 x ANNUAL I NATURAL
Do n AVERAGE AVERAGE VEGETATION rear property line setback
1j IEROSION I EROSION
I RATE 1 RATE max.allowable square footage on lowest floor
BOO I I I lot area as calculated from vegetation Iine
1 piling length needed to extend 4 feet below MSL
(LARGE (SMALL
STRUCTURES) 1 STRUCTURES) 1
PRE-PERMIT STRUCTURE;INADEQUATE SETBACK
ris„....--
PERMITTED
STRUCTURE; I PRE-STORM BEACH PROFILE
ADEQUATE POST-STORM BEACH PROFILE
SETBACK
�� ONE YEAR AFTER STORM/BEACH REBUILDING
After the storm,the house on the dune will be gone. The other house has a much better chance of survival.
CHARLES FOX HOMES, LTD COASTAL FEDERAL BANK 7017
16 CAUSEWAY DRIVE SUNSET BEACH,NC 28468
OCEAN ISLE BEACH, NC 28469 67-7235/2532
910-579-0908
PAY TO THE Delq
�.ORDER OF 7')i)Q
DOLLARS
P) 3 o 9 a t-f G-? 309 g 3 n �u
o betl
(re 30 6L P 3L1-7,/0
Cr yog ; G
aF3Q la5—
y MEMO vo 9f �__
r
AUTHORI SIG TURE
11'0070 L711° 1: 253 27 23551: L 25700 L 29711'
•