Loading...
HomeMy WebLinkAboutKelly (7) r CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K 0I03or NCGS 113A-103(5)(b)(5) j Applicant 1) Kell 7Uj'`�'"\ N )phoneNumber 9,b — ?PP l Address Lit001 C., DA1 ;1c 0[L City a `� le � �j°`'"' State lam'LC- Zip ��y60 5 Project Location(C unt State Road,Wate Body etc.) -) c E � ` '- ( ru n C UB ►C.F- r e e�-- Project k- .=s(ou--.0,1 VA VT s GA-nil�}L l,)f� 14_ g_ Type and Dimensions of Project (2�J c., cl I 4 so F -. D A y, a SO s2' 0 (9 8�J) /Z_ep( atLt- 3 g 02- &o pl ll hg c ('' 'wcx. The proposed project to be located and constructed as This certification of exemption from requiring a CAMA permit described above is hereby certified as exempt from the is valid for 120 days from the date of issuance. Following CAMA permit requirements.This exemption to CAMA expiration,a re-examination of the project and project site may permit requirements does not alleviate the necessity of be necessary to continue this certification. your obtaining any other State, Federal, or Local authorization. A1,4....- S }>^r 1 /h R, Pat,,k-t k AEC(S).: t !r< / t�L ) SCALE: JUT-c I I I I I I I I I 1 I I I I I I I I 1 I 1 I 1 I 1 I I I 1 I I I I I I I I I I I I I I I I I I I 1 I 1 I 1 I I I I I I I I I 1 I 1 1 I I I I 1 1 I I I I 1 I 1 I I I I I I I I I I 1 1 I I I I I I I I I 1 I 1 h--r--r--r--t--r--r--r--}--t--r--t-----r--Y--r--t--r-----t--t--t- -I I I I I I I 1 I I 1 1 I I I I I 1 1 I -- --I I Ir iI 1if IrI - -- -- -- - 7-- -- --y-- --7- r- t--r-�--- -- --t--4_ I I I II I I I I 1 I 1 I 11 I 1 1 I 1 I I 1 I1 I I I 1 I I I I I 1 I 1 I --r--r--r--1 1 1 I I 1I I -r-- --r- -r--r--r--T--r--r-- 1--r--T1--r--r--r--Y --r--r--T--T- r-- - r--r--r--1 I r-- r- -11---T - -- -- -- -' "r-- --Z- r--T-- --T-'r-1--- - T--T--T- r- T- r- r' r-- I �I I I I I I I 1 1 1 1 I 1 I 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 I 1 1 I 1 1 1 I 1 I r--r--r--r--r--r--r--r--r--r--r--T--1--r--T--r--T--r--I---r--r--T--r--r--r--r--r--r--, L1 I L1 1I I I I I I 1 I I I I II 1 1 F2 I I 1 1 1 1 I 1 I I__1 1 I 1 I II IIr-- r--Ii...--r--r--r--r--r--T--r--T--I- r - I I rr-- --r- ---r--r--T- _Ls: T- r--r- r--i / `_� � I 1 1 1 1 I 1 1 1 1 1 1 1Ir -T r r I 1 IrT II II 1 T T T , ek, I I II 1 I I I I I 1 I 1 1 1 I 1 1 1 1 I 1 I I 1 1 1 I L__L__LL 1L L1L 1L 11L 1L 1 1111L 1LLLJ I I I I I I I I I I I I I 1 1 I II I I I 1 I I I I 11 I I I I I I I I I I I 1 I I I I I . I 11 1.- L__1_ L__L__1__L__1__L__1__1__L__1__L__1__L_J___L__1__1__1__L__1__L__L_-L--J I I I I I 1 I 1 I I I I I I I I I I I I I I I I I I I I 'Itn I 1 I I 1 I 1 I I I I I I I I I I I 1 I L_ / 1`\,. AI _ L__L__L__IL__1__L__1__1__IL__1__L__1__L_J___1__L__1I__1__L__1__L__I __L__J 1 I I I I I I I 1 I I I I I I I 1 1 I I I I I I I I I 1 I I 1 I I I I I I I I I 1 I I I I I 1 I I I I I I 1 I I I 1 1 I I 1 I I I I 1 1 1 I I I I I I I I I I I I I 1 I 1 I I I I I 1 I I I I I I 1 I I I I I I I I I I I I 1 I I I I 1 I I I I I I I I I I I I I I I 1 I I L_-4' 4--4--�--4--4--+'--4--1--4--�--�--I---'�--4--+--�--J---�_-}__;--;_-4_-�--L--�---4--J I I I I I I I I I 1 I 1 I 1 I I I I I I I I I I 1 I I I 1 I I I I 1 1 I I 1 I I I I I I I I I 1 I 1 1 I I I _ .,1, I I I I I 1 I I I I 1 1 I I I I I I I I I 1 I 1 I 1 �'1 1 I I I I I I I I I I I I I I I I I I I I 1 1 I yy_i__i__i_ :Y1: (/^ (--....F) Y-144 ' Any person who proceeds with a development without the con,. -7 sent of a CAMA official under mistaken assumption that the 'Applfc signatur /= • development is exempted, will be in violation of the CAMA if there _ is a subsequent determination that a permit was required for the , ,_or- development. CAMA Officia's s1 nature The applicant certifies by signing this exemption that the f ` - Z02.0 3/'a-/2o t applicant will abide by the conditions of this exemption. Issuing date Expiration Date CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K C)ti 3 r NCGS 113A-103(5)(b)(5),-__ _ D _jGk \I t(�ApplicantName vc DGm 1 ahu I/D / — L���� Phone Number L.�. Address ti ry 1 E, Onto 'C I it . City t) Q I(:- S1tef State � f Zip ���& r A _ !�C Pro.ect Location(C unt State Road,Wat Body etc. ru r�S w f �7tre — Type and Dimensions of Project p.t� 1lY 1 A 00 s - �C eel ALA S r� ern ' >•h� c ./ J The proposed protect to be located and constructed as This certification of exemption from requiring a CAMA permit descnbed above is hereby certified as exempt from the is valid for 120 days from the date of issuance Following CAMA permit requirements.This exemption to CAMA expiration,a re-examination of the project and project site may permit requirements does not alleviate the necessity of be necessary to continue this certification. your obtaining any other State,Federal,or Local Ale,t44---authonzation ; S_4-4 Ey ej e , ► h e_ri q , f3, Po,,k,,k J AEC(S) rm.., �W �SCALE. f�— s I1 1 1 +--r--+--r-_v--+--r'--.-- -- --^- ---,--T--+--t-- -..--r'- ,_-• 1 I I I I I I I 1 I 1 1 I I I I I I 1 1 I I I 1 I I I I I I I I I I t I I I I I I 1 1 I I I 1 1 1 I I I I I I I I t i I 1 r--r--r--r--t--r--r--r--r I I I I I I I I I I I I I - - --r--t---r--y 1 i 1 1 I I I SE 9th 1 1 1 I I I r -r i - -I i I I — -- --r- --r--i---ii---i --r--r--r-JT j' r r--r I 1 I I i 1 11 I I I .. --T--r- T--r--r--r--1 1 I 1 1 i I I 1 I I I 1 r- r-itt-r--+L-r--r r--r r I 1 1 1 1 I I I 1 1 1 1 1 T--r--T--r--r--r--� I III I I 1 1 I I I I 1 I I 1 r--r--r--r--r--r--r r--r y, I I I I i r I I I I I I I I I • --T`-r--T--r--r--r--j I I _I 1 I 1 - 1 I I I 1 I I 4IIIiii Ir -- ,I . 4- r �--I T 1 f T T i �� I t- II 1 1 1 1 1 1 1 L'1 1- I I. 1 i 1 1 i 1 I 1 I 1 1I I--1__L--1--L--L--t'--J 1- I t L--i--L__L _ (� ( 1 1 1 1 1 1 1 1 r�rl r J}(� 1 I 1 1 CO I 1--L--1--L--L--L--1 j--1 ��' �I--L--L--L - 1 1 i I I 1 t I I 1 --1--L--1--L--L--L--J 1 I 1 1 1 1 1 I I 1 1 I 1 1 1 _L L__L__L__L__L__L 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I__L__1__L_1__L__J 1 1 I 1 I I 1 I 1 1 1 1 1 1 1 I 1 1 1 1 I I 1 I 1 i I 1 1 1 1 i t 1 „ 1--1--1---1--1'--1---1---J I 1 I 1 I 1 1 1 I ::.r-.,y- .�+_.'.w ,�..:!�:' I 1 1 I 1 L--I'--I' +--+-- --I'--l'--+ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 III --I'--L r'--+-- -- --+--111111111 I I I III1 1 1 i 1 tI I --�'--+--�--i- 1 1 I 1 1 1 I I 1 1 1 1 i 1 1 1 1 i i 1 I i t 11141 1 -1'--`• �--a ... A. -- -_1Ua__1• I I I Any person who proceeds with a development without the con 1 - sent of a CAMA official under mistaken assumption that the development is exempted, will be in violation of the CAMA if there AppI1C Ignature is a subsequent determination That a narmit..,=t r.,q..,rod for Inc development CAMA(Mc' I's sl§'nature The applicant certifies by signing this exemption that the /2-/202o -3/z_,'2o 1 applicant will abide by the conditions of this exemption. Issuing date Expiration Date Brink, Benjamin From: eb@statureengineering.com Sent: Monday; November 2, 2020 7:14 AM To: MacPherson,Tara Cc: Brink, Benjamin Subject: RE: [External] Oak Island Canal Walkover- Emergency Repair CAMA Permit Application Attachments: doc03029520201019123020.pdf;20289 - Oak Island Canal Walkover Eval 10-6-20.pdf CAUTION: Tara, Please let me know if you need any additional information. SE 20th Canal Walkover - SF of walkway. 1,544 sf to be redecked. 3,088 sf total. 49% replacement. - Pile replacement 74 piles to be replaced our of 185 total piles. 40% replacement. - Gazebo pile replacement—replace 4 piles of 8 total. SE 9th Canal Walkover - SF of walkway. 1,950 sf to be redecked. 4,080 sf total. 48% replacement. - Pile replacement 38 piles to be replaced our of 86 total piles. 44% replacement. Thank you, EB Stature Engineering, P.C. 910-622-5261 From: MacPherson,Tara<tara.macpherson@ncdenr.gov> Sent:Thursday, October 22, 2020 8:22 AM To: eb@statureengineering.com Cc: Brink, Benjamin <Benjamin.Brink2@ncdenr.gov> Subject: RE: [External] Oak Island Canal Walkover- Emergency Repair CAMA Permit Application Hi EB, DO you mean the SE 9th and SE 10th walkovers?? We need to know the linear distance of walkover that needs to be replaced on the SE 9th walkover. How many pilings are there and how many need to be modified? SE 20th walkover—How many pilings are there and how many will be replaced? If you remove ALL cross bracing and want to replace the gazebo we may need to count all of the structural members to make sure we are under 50%. What is linear ft. area of damaged walkway to be replaced? I am not sure we can replace the floating dock since that would trigger a permit. The gazebo is currently over Coastal Wetlands, we will need to see if there are currently coastal wetlands beneath it... if do we can only do 50%... Once you have these details we can review. 1 . . AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Narne of Property Owner Fielpeating Permit .P -.4, Kelly, r:roltin,_ melia:gor Mailing Address: 4.6_01 E. Oak la-land ;privo, Oak Island, NC 28465 Phorteifiumber: 910-294-6188 _ .... _._ . . .. Email Address:; _,d1ce1lysaoi..oeit-it.,1 aiid...no_us 1 certify that have authorized E:.- , -arlTikuki: fikqept t-Contractpr to act]on;my behalf, for the purpose of applying for and obtaining all:CA.MA portriitS necessary for the following proposed-development SE 9th and 20th Street_ Canal Walkover -at my property located at a ..9th and 20th. Street's, Oak rotAtict in $xurksiA-ric-1 County. • I farthermore certify that I ant authOrizod to grant, .and do in foot 'opt-perhiloion tc. Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this pOrrnitapplication, Property Owner Information; Signature kaL...,:-.:::.-.01 Print OrTyp6 Nan* .. tOVe.. Title i i ej: i 1-HT - , Date:7 -- - This certification is valid through 12__ 1 1: I Stature Engineering, P.C. Structural,Marine,Historical Engineering and Construction Management Town of Oak Island October 6, 2020 Public Works Department 4601 E. Oak Island Drive Oak Island, NC 28465 RE: Limited Structural Evaluation Elevated Timber Canal Walkover Observation NE 9th and NE 20th Streets, Oak Island, NC Stature Project No. 20289 Dear Scott: The purpose of this letter is to provide our observations of the elevated timber canal walkovers at the subject locations. We performed a visual observation on September 25, 2020. During our observation, we did not remove finishes, perform material testing or perform calculations. NE 9th Street Walkover 1) Observations: a. Existing construction. This walkover is a 660' long elevated timber walkway—see photo A. It is supported by 6"diameter timber piles at 8' on center with an 18'span • at the canal. See attached drawing. i.. The timber girders and cross bracing are attached with a mixture of nails and /or lag bolts—see photo B. ii. The piles are extended by setting the piles on top of each other — see photos C and D. They are not spliced. We assume that they are attached with a spike. iii. We found locations of railing damage that requires repair—see photo E. b. Storm damage—see drawing for damage location: i. We observed pile scour at approximately 30 piles — 15 pile bents. These piles are along the south end of the walkway—see photos F thru H. ii. The damaged pile bents have primarily lateral movement along the west side of the walkway and settlement along the east side of the walkway. We observed a maximum out of plumb measurement of 6-1/2" over a 67" long pile. The walkway is not structurally sound along this section of walkway and does not meet required ADA tolerances. iii. The south floating dock walkway, gangway, and walkway also been damaged and require replacement—see photo I. 2) Recommendations: a. Existing condition repairs. We recommend the following repairs to the existing conditions: i. The existing timber girders and cross bracing should be attached to the piles with thru bolts. ii. Pile extensions should be spliced together. The existing pile extensions should be removed and replaced with a pile that has a structural splice to the lower pile. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEngineerinq.com 1 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 iii. Replacing select guardrail members. These members should be attached with properly sized stainless-steel screws. b. Hurricane Isaias repair recommendations: i. We recommend replacing the damaged section of walkover. In order to gain access to the damaged area for construction equipment, the southern end of the walkover will need to replaced to the damaged section. This will require a little less than 50% of the walkway be replaced. ii. We also recommend replacing the southern floating dock, floating dock walkway, and gangway. NE 20th Street Walkover Observations: 1) Observations: a. Existing construction. This walkover is a 450' long elevated timber walkway—see photo J. It is supported by 6" x 6" timber piles at 12' on center with a 16' span at the canal. See attached drawing. iii. The deck boards are not properly secured to the stringers. iv. The handrails are attached to separate posts. The posts are not extensions of the timber piles. These posts are attached to the walkway with offset . steel brackets—see photo K. v. The guardrails have intermediate supports between posts. These intermediate posts are attached to the walkway with toe nails—see photo L. vi. There are numerous decayed timber piles at the gazebo and sitting area— see photo M. vii. Cross bracing is damaged, mis-sized, and missing. c. Storm damage—see drawing for damage location. i. We observed scour at approximately 25 piles — at 7 damaged pile bents along the southern end of the walkover and additional piles at the southern end of the walkway. The walkway is not structurally sound along this section of.walkway and does not meet required ADA tolerances — see photo N. ii. There is framing damage to the sitting area—see photo O. iii. The canal side floating dock is missing—see photo P. 2) Recommendations: a. Existing condition repairs. We recommend the following, repairs to the existing conditions: i. Replace decayed timber piles. ii. Replace offset brackets at guardrail posts. iii. Secure,intermediate guardrail posts with steel brackets. iv. Secure deck boards. v. Remove all cross bracing and replace with standard size cross bracing. b. Hurricane Isaias repairs. We recommend replacing the damaged sections of walkover. Walkway replacement is limited to 45% of the walkway. i. The southern end of the walkover is damaged to the seating area and requires replacement. ii. The walkway is also damaged near the gazebo. We believe the gazebo area can be replaced by accessing it from the canal. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: htti://StatureEnoineerinq.com 2 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 iii. Replace the floating dock at the canal. We reserve the right to modify our conclusions and recommendations if new information becomes available. If you have any concerns, please feel free to contact us. 4Sincerely, ��, v s �kWkit � ax . " d'1 =_ Y eT" Ifs ^b 4_.,.,13;s a. _.e.,;.. _" , , \", 1r STATURE ENGINEERING, P.C. NC PE Firm License C-4719 , Q,, �� ig, � Everett B. Pannkuk, P.E., SECB kurt�� Attachments: Photos A thru P. -°S �. v7" 'bs ems , " 'a ,.,:° . — r �° f ..�—r--'—°' P . ���y„, e,y,,s i1 ,. ...yam -^^9 ° l` t- - I i fit a ",..A /,a' y ., '&, Photo A. Timber walkover at SE 9th Street canal. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEngineerinq.com 3 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 .A 'fit,, .' ro 2'1 a 4 " t . y ram" . ° � . . i iy�� IT it f`�;E as m ' + . k. a- d ttf.: i. fiat; 1 17 i 1. 4°! I • 1. Photo B. Typical girder and cross bracing connection Photo C. Pile extension with no splice connection. with either nails or lag bolts. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEngineerinq.com 4 • • NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 �� _ , ads ` Y •` - ". °'° 4. 4 + V.I. # , E Photo D. Pile extension at handrail. Y-41- Y. • ,- w0 ---:. :.-. —. _ ors- `; • +-K«.:.�..,,,,., _,,.....a sir. _rrsres+ � .. __ ° Photo E. Failed guardrail member. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: htto://StatureEngineerinq.com 5 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 £ �r .. ice,. -k ::, .! , _ .tea,.... ,1,- a " A o-� 4., z • A ' + t-, ( kadd,, I,i (4.1...... ......-.-t4-...—.........4 :::/,!,.r.,,, ,., ?. .,,,..:\c:.,:.,,.:,: j€ ��ya 5 P. a •'sly. t ' t , xk dad 3 c eta^,,, Y3 k w 4,'' .� '„`& t, * t f £ Au ! ! rv. A, Photo F. Damaged walkway at southern end of Photo G. Piles at seating area are out of plumb. walkover. Piles are deflected and walkway is out of level. Structurally unsound. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEnoineerinq.com 6 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 .. ,,,,, . -- ' ',,,.,. , - '-t..• •, —-• *•.-' • "f41 • ., 11 1, '...... -:%.7 ,i,lti,4, i -' : .4\ iti - - -; ; - - .t 'ill( -' : '-•-•,,,Z,_ - ' .. -_'..• . . . , V-- ...-... 1 , ' f ..r. .% ,. ' -rt. ---- -440.41.• '• 6-0 r_ -':,,,:t,. --: .: '4,,,,,,,,. 1 1- --..-----,-. .1 '-'''..-• . ° "*.a...... l' t-• ' -.--;,. 4,..t1^. ,` ,. 1 : : , ,,- 0,,• 11 '7"5*--,t,---L--,---___:.": - '*-7-•';'" _ -,, t,t., , ' r .._,....,.,..---oi-,...._,--- ,.. r.r•-•- --,,-.: 4,....,...—... .. -,?!.,,..),- . -7.--...4,4;:,..,• Ism., '.,-• z''''=•—_-_-..,,- _ , ,!‘- ...f. -,, • i,, F.,.ti ., 7,-'—•_--'- 'Nifi:, -I., h„,.., - , 1 , .. .::-.A..\‘'Sq.:7; - '47 4:-.\,-. • PO ' - . •N:\, •i'''' '', "7 --.---.-• , ,...,,„ \ _... , • ,4 .:6- A t .11,‘.- ir ) •i.. fc I \ r ...".......,Ki t. ' r . . \i ,$„ v,,,,,,i„..„?,,,,,,,...,,, . , . - i•-• . , .., ..,,,-4.,..,t. 4 ,,- \'', ;',,.'i.4-4',•=i,, . . f N • ', \ (..: 7-'....`'t ,, •' ., , , ''' •I'll'-'41,-, Photo H. Scour at timber pile. There is a void at the Photo I. Southern failed floating dock walkway. pile indicating pile movement. P.O. Box 1429: Carolina Beacti, NC 28428: Phone 910.622.5261 :web: http://StatureEnqineerinq.com 7 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 , 33x,,.T 1TT • p,f,„ i ,J . P ----- V 1 cA-x+ir i•• -,,...,. k '--;- -‘ A ti' r a — ^ f ii,',., ; .\-..„ \\. , ^, Photo J.Timber walkway at NE 20th Street at canal. Photo K. Steel bracket at offset guardrail posts. P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEngineerinq.com 8 • NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 . ; ,a q • ', • •'o`&F.V i P t' 1 s 1 if) tit Photo L. Timber guardrail posts at the south end of the walkover are toe nailed to the girder. • P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: htto://StatureEngineerinq.com 9 NE 9th Street and NE 20th Street Walkover Observation October 6, 2020 r 5 .t ;.' . �--- ;,L ! w 1 t; c•1"�y. '---. \.... 5 {1 a " 1 fi .a\ 1 1• 4*�:1 yr " .� jst1y ' w f F r t /-171' ri:til.1: , - •'' t atx i• ; . Photo M. Decayed existing piles. Photo N. Scour at timber piles. Shows pile movement during Hurricane Isaias. • P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: htto://StatureEngineerino.com 10 NE 9th Street and NE 20th Street Walkover Observation October 6, 2.020, tg .40".. :14.--: 4 If `"- 41; _ ` t IA �; I\:14 4-:;: . s a f _‘.., .,,-'''-'4'' i ; i'''''''''a ' 14 10:04-14,„ . k.444%.- V., Itiel m+ • a t J• c , a f. • . irk. E .1!, � i#; . 3 tk I� r a r , it, E� . ;. -_.. . Photo O. Timber seating area toward south end of Photo P. Floating dock at north end canal is timber walkover has damaged framing. missing. 1 P.O. Box 1429: Carolina Beach, NC 28428: Phone 910.622.5261 :web: http://StatureEngineering.com 11 i STATURE 1 al: `ENGINEERING J PO BOX. .. 14=. , iltr 6' -.41. "•'', 1%010,... .ij A CAS El O SITE PLAN w.a O SECTION ,ap,�„ OAK ISLAND CANAL WALKOVER SE 9TH ST- SITE PLAN& CROSS SECTION SiAnolDLTDO mum DATE ism.. SCALE. ASBOTITO r STATURE SS ENGINEERING, w s PROJECT 1416ACIBEENT PO BOX 14P3 CAP01211BE.,NC 26661261 T, Jr - t w . Q6¢GS . .s 1 O SITE PLAN O SECTION .�..a OAK ISLAND CANAL WALKOVER SE 20TH ST- SITE PLAN& CROSS SECTION S2 Oak Island SE 9th and SE 20th Canal Walkover Hurricane Isaias Damage Preliminary Engineer's Probable Cost of Construction SE 9th Street Walkover Description Quantity Units Unit Price Total Comments Mobilization 1 LS $ 5,000.00 $ 5,000.00 Replace Elevated Timber Walkway 1950 SF $ 25.00 $ 48,750.00 Replace Timber Guardrail 650 LF $ 50.00 $ 32,500.00 Replace Elevated Timber Floating Dock Ramp 300 SF $ 25.00 $ 7,500.00 Replace Timber Guardrail 50 LF $ 50.00 $ 2,500.00 Replace Timber Floating Dock 160 Sf $ 30.00 $ 4,800.00 Engineering Budget $ 25,000.00 Engineering and Material Testing Total $ 121,050.00 SE 20th Street Walkover Description Quantity Units Unit Price Total Comments Mobilization 1 LS $ 15,000.00 $ 15,000.00 Replace Elevated Timber Walkway 1630 SF $ 25.00 $ 40,750.00 Replace Timber Guardrail 410 LF $ 50.00 $ 20,500.00 Replace Gazebo Roof 352 SF $ 50.00 $ 17,600.00 Replace Timber Floating Dock 160 Sf $ 30.00 $ 4,800.00 Install Timber Floating Dock Piles 2 EA $ 1,250.00 $ 2,500.00 Engineering Budget $ 25,000.00 Engineering and Material Testing Total $ 111,150.00 Stature Engineering,P.C. 10/6/2020