HomeMy WebLinkAbout77483_Terry & Linda Keech_20201207 0 ❑1 CAMA/ : DREDGE & FILL , j I No 77483 A, Ci•) C ID
GENERAL PERMIT t..' `T Previous permit# ,;t//
�� ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /•1
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC <'////G7U /, '
[Rules attached.
Applicant Name re.-r, + L. : e‘< /rse e L Project Location: County / - /2- 1
Address I/.? O/J ,/lr, /(/ L - ,.€ Street Address/State Road/Lot#(s) J. 5 / , ,e ,., G,,,,
City .fe-/Z State ,/i/ ZIP .17✓6
Phone#(,7,5�,2) t/L,2 - /C /-7; E-Mail Subdivision !//-/
Authorized Agent icv'r•< 1- `�� 7, /O�✓���� City /;� � ��h _ ZIP �— �
Affected ❑CW ❑EW ®'PTA [g€S l PTS Phone# ( -) — River Basin / :-,- `/
❑OEA ❑HHF ❑IH ❑USA ❑WA
AEC(s): Adj.Wtr. Body /o K-,' nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / Closest Maj.Wtr. Body �'
Type of Project/Activity ( it ,, rc/1«P,,,,,, i (._- /1 ( ,i `,.
- / r/ /1/' X I.- /If Are (Scale: l Li :: )
Pier(dock)length /t;
Fixed Platform(s) It 1 x I/ I I I i'
Floating Platform(s) J�,,i.'yo , ce !c t !
Finger pier(s) �L,__ .._._. I • iy",2i hoc/ ..i
Groin length j { j
number _._...__. — ....._._. �_ . —_._._.. ...,I._._... �.___
I !
Bulkhead/Riprap length ; ' ' I ' �_.._._._._ -- �.: — I j
avg distance offshore ,'C, x 4,'—
max distance offshore I IU• • i
Basin,channel f I l
cubic yards I , 1fi� „ , , . 1 r i�4 / f
Boat ramp 1 t
oathous \Boatlift Pi YaZ✓I I — — ; —
4
rI
Beach Bulldozing
1 rt,i, 4, /, �
Other I ,a- , tr., /,.,,1
I ' _ �<•{e / ,•"..,+,
Shoreline Length I 1 '
!
SAV: not sure yes no } —. L_._.. - ------._......._.---- ----.___.__,._ _.. t- ,
Moratorium: n/a yes no i ❑ '-_ _-.;_......
Photos: yes no ____ � ... r
Waiver Attached: yes 1.3" �,/ ! 1
A building permit may be required by: o ,- .• / - . RI/See See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions `. , /.
P--frel (_-,--- 1 r67.1 i J 4-J��f
Agent or Applicant Prin Name Permit Officer's Printed Name
,
Signature Please read compliance statement on back of permit" Signature
1 0 .2 o
7 o•2 �,,. / / o?�o?/
60
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie,Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
0
CAMA / ❑DREDGE & FILL z, �141 N° 77483 A BCD
GENERAL PERMIT -- Previous permit#
•> 21New El Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC
❑Rules attached.
Applicant Name 7. Project Location: County
Address ✓7' L-/-1 Street Address/State Road/Lot#(s)
City State ZIP
Phone# ( ) , ,% E-Mail Subdivision
Authorized Agent / r / /✓' - City ZIP /4-
❑CW ❑EW p PTA [TES ❑PTS Phone# ( 7 River Basin / /f/,
Affected ❑OEA ❑HHF ❑IH ❑UBA ❑N/A
AEC(s): Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes /;no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity -,.
/ t 1 (Scale: / )
Pier(dock)length _ ,
Fixed Platform(s) /( k ; ' ; 4 j-"�'" I Ih r l I
i � ' r I ;
Floating Platform(s) t { ' ;
Finger pier(s) 4 -- : "-- i j I { _
Groin length , ' . --s
i X
f
_.....__
number -. .______..._ _ _._.._...__.�_,— ...-.--.-- __ 1 ! .__......_-- -.._..__-
I i
Bulkhead/Riprap length - - ' ----! —--__._ _.__ ,—.______ _____._.......—__ �___._. ._..� I .. __.__._._.__.....__
4 _
i
avg distance offshore .,,!. i` /1:.1 1 T '*p
max distance offshore !
Basin,channel /$- 1
- l /y
, ^ �'
cubic yards . _.__. ._ I i rf.> r ; t f l /
f
Boat ramp I ;
_
I I i
Boathouse/Boatlift /I/ " f . — --�.._.... . t
it / r
I Beach Bulldozing - 11 -_-- —_
i ; { f 17 / , ( r
Other i. . 4,�[ ,i
I ij 1 H
Shoreline Length ' -.- ,
j
•
SAV: not sure yes t no — i ' + , 1 { —,_...
Moratorium: n/a yes
i
Photos: yes no �_y
Waiver Attached: yes no i
t.f /„
A building permit may be required by: / . H See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions / i PI.' /, , r,
/ -
Agent or Applicant Printed Name Permit Officer's Printed Name
y' -.-sue.
Signature Please read compliance statement on back of permit** Signature
%/ / �./G,,10 i / ,,i /
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the
Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE
FOR PIER AND DOCKING FACILITIES ACCESS WAY
A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico &
Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The
Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water
Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies
with the aforementioned regulations.
Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation.
i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer
perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The
alignment shall minimize the removal of woody vegetation to the greatest extent practicable.
2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious
materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the
maximum extent practicable.
3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet.
4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your
property indicating the relative location of the pier or docking facility and any requested access way. This
drawing will be used to aid in compliance and monitoring efforts.
• Pre-project site conditions: e J�w�
By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify
that all information provided is complete and accurate.
Agent or Applicant Printed Name Permit Officer's Sig ure
7
Agent or Applicant Signature Issue Date
CAMA GENERAL PERMIT#: 7 7 q'-1/7-
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481
Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215
Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808
,
ROY COOPER
d,a Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON DAVIS
ENVIRONMENTAL QUALITY Director
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River
basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal
Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has
reviewed your project proposal and has determined that the project as proposed complies with the aforementioned
regulations.
Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization
provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to
comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the
construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation.
L. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
normal water line(NWL) or normal high water line(NHWL) and extends 30 feet landward) shall be minimized to
what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and
filling in the buffer is a violation of the riparian buffer rules.
2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes
maintaining diffused (non-channelized) flow of storm water runoff through the buffer.
3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is
expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre.
Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30) after completion of the bulkhead.
® Pre-project site conditions: j+-It;., i<;,,e I /4-1.�H
7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction
corridors.This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
inforr ation is complete and accurate.
Agent or Applicant Printed Name Permit Officer's Signatur
�— A., 7 &_ '
Agent pp icant Signature Issue Date
CAMA GENERAL PERMIT#: 77 yI?.,27
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1943 Washington Square Mall Washington.NC 278891 252-946-6481
Wilmington Office 1177 Carrfinal nrivn FYI'wilmingtcn.NC 28405-3845; gl0-796-7215
Morehead City Office;400 Commerce Avenue Morehead City.NC 28557 1252-808-2808
B. F. Warren & Sons, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax(252)964-6861
Forrest cell(252)945-2492 Freddy cell (252)945-4240
NC General Contractor License#72600
www.ncpiers.com
Authorized Agent Consent Agreement
To:State of North Carolina Department or Local Government Department
from whom this permit is being applied for.
I,the undersigned property owner,do hereby authorize B.F.Warren&Sons INC.to act on my behalf in
obtaining the necessary permits for the below listed projects.I have contracted there services to perform
the work permitted.This agreement is limited only to the specific activity of obtaining permits for the
below specified projects.
Projects:
Bulkhead and eP
pier replacement
Project location/address:
535 Foreman Lane
Belhaven NC,27810
Body of Water:
Pungo Creek
Property Owner Mailing Address:
Terry&Linda Keech
112 Old Mill Ln
Bath,NC 27808
(252)402-1973
Property Owner's Signature: / Date: 6 "2` - 20 a c�
Authorized Agent Signature: y— Date:
Adjacent Riparian Property Owner Statement
Pr epaned by
B. F. Wan-en &Sons, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office (252)964-4628 Fax (252)964-6861
Freddy Mobile (252)945-4240 Forrest Mobile(252)945-2492
NC General Contractor License# 72600
www.ncpiers.com
December 4, 2020
I,the undersigned property owner, do hereby certify that I own property adjacent to Terry
Keech's property located at 535 Foreman Lane,Belhaven NC on Pungo Creek(body of water), in
Beaufort County NC.
The applicant has described to me, as shown below,the development proposed at the above
location. I understand that any construction,excluding bulkheads,must be set back a minimum
distance of fifteen feet(15')from my area of riparian access unless waived by me.
Please initial the appropriate blank, sign and date below.
I have no objection to the project as proposed but do not wish to waive the fifteen foot
(15')set back.
I have no objection to the project as proposed but do wish to waive the fifteen foot(15')
setback.
I object to the project proposed.
Property owner signature M2J'1/1/K511 GA(
Printed name '
`,\ tèrt4i3t ] l
Address " C r-er ti,n '--r 1 sd h Ai , ► 1 C i to
Telephone number( ZC L ) oi k J - Liq--y3
Date / 4 / qw5
Description and/or Drawing of Proposed Development
Bulkhead replacement, concrete dock 5x70 w/ 16x17 L platform and boathouse 14x28
Adjacent Riparian Pi►vperty Owner Statement
Ptepared by
B. F. Warren &Sons, Inc.
180 Taylor Farm Road, Belhaven NC 27810
Office(252)964-4628 Fax(252)964-6861
Freddy Mobile(252)945-4240 Forrest Mobile(252)945-2492
NC General Contractor License#72600
www.ncpiers.com
December 4, 2020
I,the undersigned property owner,do hereby certify that I own property adjacent to Terry
Keech's property located at 535 Foreman Lane,Belhaven NC on Pungo Creek(body of water),in
Beaufort County NC.
The applicant has described to me,as shown below,the development proposed at the above
location.I understand that any construction,excluding bulkheads,must be set back a minimum
distance of fifteen feet
(15')from my area of riparian access unless waived by me.
Please initial the appropriate blank,sign and date below.
have no objection to the project as proposed but do not wish to waive the fifteen foot
(15')set back.
I have no objection to the project as proposed but do wish to waive the fifteen foot(15')
setback.
I object to the project proposed.
Property owner signature ��d;Zeee.:.04, ,I /���-iie,Yl
Printed named/; apt p cic,/ c� r
Address $ /Cib5 /0/`1hGd 1d✓/ la,gezrz,4 a. 093/6y
Telephone number( 257 ) C:`v - 4,23a V
Date /a / 2 / v?D,9_�
Description and/or Drawing of Proposed Development
Bulkhead replacement,concrete dock 5x70 w/ 16x17 L platform and boathouse 14x28