Loading...
HomeMy WebLinkAbout77483_Terry & Linda Keech_20201207 0 ❑1 CAMA/ : DREDGE & FILL , j I No 77483 A, Ci•) C ID GENERAL PERMIT t..' `T Previous permit# ,;t// �� ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /•1 As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC <'////G7U /, ' [Rules attached. Applicant Name re.-r, + L. : e‘< /rse e L Project Location: County / - /2- 1 Address I/.? O/J ,/lr, /(/ L - ,.€ Street Address/State Road/Lot#(s) J. 5 / , ,e ,., G,,,, City .fe-/Z State ,/i/ ZIP .17✓6 Phone#(,7,5�,2) t/L,2 - /C /-7; E-Mail Subdivision !//-/ Authorized Agent icv'r•< 1- `�� 7, /O�✓���� City /;� � ��h _ ZIP �— � Affected ❑CW ❑EW ®'PTA [g€S l PTS Phone# ( -) — River Basin / :-,- `/ ❑OEA ❑HHF ❑IH ❑USA ❑WA AEC(s): Adj.Wtr. Body /o K-,' nat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / Closest Maj.Wtr. Body �' Type of Project/Activity ( it ,, rc/1«P,,,,,, i (._- /1 ( ,i `,. - / r/ /1/' X I.- /If Are (Scale: l Li :: ) Pier(dock)length /t; Fixed Platform(s) It 1 x I/ I I I i' Floating Platform(s) J�,,i.'yo , ce !c t ! Finger pier(s) �L,__ .._._. I • iy",2i hoc/ ..i Groin length j { j number _._...__. — ....._._. �_ . —_._._.. ...,I._._... �.___ I ! Bulkhead/Riprap length ; ' ' I ' �_.._._._._ -- �.: — I j avg distance offshore ,'C, x 4,'— max distance offshore I IU• • i Basin,channel f I l cubic yards I , 1fi� „ , , . 1 r i�4 / f Boat ramp 1 t oathous \Boatlift Pi YaZ✓I I — — ; — 4 rI Beach Bulldozing 1 rt,i, 4, /, � Other I ,a- , tr., /,.,,1 I ' _ �<•{e / ,•"..,+, Shoreline Length I 1 ' ! SAV: not sure yes no } —. L_._.. - ------._......._.---- ----.___.__,._ _.. t- , Moratorium: n/a yes no i ❑ '-_ _-.;_...... Photos: yes no ____ � ... r Waiver Attached: yes 1.3" �,/ ! 1 A building permit may be required by: o ,- .• / - . RI/See See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions `. , /. P--frel (_-,--- 1 r67.1 i J 4-J��f Agent or Applicant Prin Name Permit Officer's Printed Name , Signature Please read compliance statement on back of permit" Signature 1 0 .2 o 7 o•2 �,,. / / o?�o?/ 60 Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-6481 Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie,Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 0 CAMA / ❑DREDGE & FILL z, �141 N° 77483 A BCD GENERAL PERMIT -- Previous permit# •> 21New El Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC ❑Rules attached. Applicant Name 7. Project Location: County Address ✓7' L-/-1 Street Address/State Road/Lot#(s) City State ZIP Phone# ( ) , ,% E-Mail Subdivision Authorized Agent / r / /✓' - City ZIP /4- ❑CW ❑EW p PTA [TES ❑PTS Phone# ( 7 River Basin / /f/, Affected ❑OEA ❑HHF ❑IH ❑UBA ❑N/A AEC(s): Adj.Wtr. Body (nat /man /unkn) ❑ PWS: ORW: yes /;no PNA yes / no Closest Maj.Wtr. Body Type of Project/Activity -,. / t 1 (Scale: / ) Pier(dock)length _ , Fixed Platform(s) /( k ; ' ; 4 j-"�'" I Ih r l I i � ' r I ; Floating Platform(s) t { ' ; Finger pier(s) 4 -- : "-- i j I { _ Groin length , ' . --s i X f _.....__ number -. .______..._ _ _._.._...__.�_,— ...-.--.-- __ 1 ! .__......_-- -.._..__- I i Bulkhead/Riprap length - - ' ----! —--__._ _.__ ,—.______ _____._.......—__ �___._. ._..� I .. __.__._._.__.....__ 4 _ i avg distance offshore .,,!. i` /1:.1 1 T '*p max distance offshore ! Basin,channel /$- 1 - l /y , ^ �' cubic yards . _.__. ._ I i rf.> r ; t f l / f Boat ramp I ; _ I I i Boathouse/Boatlift /I/ " f . — --�.._.... . t it / r I Beach Bulldozing - 11 -_-- —_ i ; { f 17 / , ( r Other i. . 4,�[ ,i I ij 1 H Shoreline Length ' -.- , j • SAV: not sure yes t no — i ' + , 1 { —,_... Moratorium: n/a yes i Photos: yes no �_y Waiver Attached: yes no i t.f /„ A building permit may be required by: / . H See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions / i PI.' /, , r, / - Agent or Applicant Printed Name Permit Officer's Printed Name y' -.-sue. Signature Please read compliance statement on back of permit** Signature %/ / �./G,,10 i / ,,i / Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-6481) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 ROY COOPER Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar-Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 026.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open-slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre-project site conditions: e J�w� By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. Agent or Applicant Printed Name Permit Officer's Sig ure 7 Agent or Applicant Signature Issue Date CAMA GENERAL PERMIT#: 7 7 q'-1/7- State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington,NC 27889 1252-946-6481 Wilmington Office 1127 Cardinal Drive Ext.Wilmington,NC 28405-3845 1910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City,NC 28557 1252-808-2808 , ROY COOPER d,a Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B. 0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. L. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either normal water line(NWL) or normal high water line(NHWL) and extends 30 feet landward) shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the buffer is a violation of the riparian buffer rules. 2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized) flow of storm water runoff through the buffer. 3. Construction Corridors:Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten (10)feet landward(unless specifically authorized otherwise by DCM) from the structure may be maintained as a stable lawn in order to provide for structural stability. s. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum, pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through March 30) after completion of the bulkhead. ® Pre-project site conditions: j+-It;., i<;,,e I /4-1.�H 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing, grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all inforr ation is complete and accurate. Agent or Applicant Printed Name Permit Officer's Signatur �— A., 7 &_ ' Agent pp icant Signature Issue Date CAMA GENERAL PERMIT#: 77 yI?.,27 State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington.NC 278891 252-946-6481 Wilmington Office 1177 Carrfinal nrivn FYI'wilmingtcn.NC 28405-3845; gl0-796-7215 Morehead City Office;400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 B. F. Warren & Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax(252)964-6861 Forrest cell(252)945-2492 Freddy cell (252)945-4240 NC General Contractor License#72600 www.ncpiers.com Authorized Agent Consent Agreement To:State of North Carolina Department or Local Government Department from whom this permit is being applied for. I,the undersigned property owner,do hereby authorize B.F.Warren&Sons INC.to act on my behalf in obtaining the necessary permits for the below listed projects.I have contracted there services to perform the work permitted.This agreement is limited only to the specific activity of obtaining permits for the below specified projects. Projects: Bulkhead and eP pier replacement Project location/address: 535 Foreman Lane Belhaven NC,27810 Body of Water: Pungo Creek Property Owner Mailing Address: Terry&Linda Keech 112 Old Mill Ln Bath,NC 27808 (252)402-1973 Property Owner's Signature: / Date: 6 "2` - 20 a c� Authorized Agent Signature: y— Date: Adjacent Riparian Property Owner Statement Pr epaned by B. F. Wan-en &Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office (252)964-4628 Fax (252)964-6861 Freddy Mobile (252)945-4240 Forrest Mobile(252)945-2492 NC General Contractor License# 72600 www.ncpiers.com December 4, 2020 I,the undersigned property owner, do hereby certify that I own property adjacent to Terry Keech's property located at 535 Foreman Lane,Belhaven NC on Pungo Creek(body of water), in Beaufort County NC. The applicant has described to me, as shown below,the development proposed at the above location. I understand that any construction,excluding bulkheads,must be set back a minimum distance of fifteen feet(15')from my area of riparian access unless waived by me. Please initial the appropriate blank, sign and date below. I have no objection to the project as proposed but do not wish to waive the fifteen foot (15')set back. I have no objection to the project as proposed but do wish to waive the fifteen foot(15') setback. I object to the project proposed. Property owner signature M2J'1/1/K511 GA( Printed name ' `,\ tèrt4i3t ] l Address " C r-er ti,n '--r 1 sd h Ai , ► 1 C i to Telephone number( ZC L ) oi k J - Liq--y3 Date / 4 / qw5 Description and/or Drawing of Proposed Development Bulkhead replacement, concrete dock 5x70 w/ 16x17 L platform and boathouse 14x28 Adjacent Riparian Pi►vperty Owner Statement Ptepared by B. F. Warren &Sons, Inc. 180 Taylor Farm Road, Belhaven NC 27810 Office(252)964-4628 Fax(252)964-6861 Freddy Mobile(252)945-4240 Forrest Mobile(252)945-2492 NC General Contractor License#72600 www.ncpiers.com December 4, 2020 I,the undersigned property owner,do hereby certify that I own property adjacent to Terry Keech's property located at 535 Foreman Lane,Belhaven NC on Pungo Creek(body of water),in Beaufort County NC. The applicant has described to me,as shown below,the development proposed at the above location.I understand that any construction,excluding bulkheads,must be set back a minimum distance of fifteen feet (15')from my area of riparian access unless waived by me. Please initial the appropriate blank,sign and date below. have no objection to the project as proposed but do not wish to waive the fifteen foot (15')set back. I have no objection to the project as proposed but do wish to waive the fifteen foot(15') setback. I object to the project proposed. Property owner signature ��d;Zeee.:.04, ,I /���-iie,Yl Printed named/; apt p cic,/ c� r Address $ /Cib5 /0/`1hGd 1d✓/ la,gezrz,4 a. 093/6y Telephone number( 257 ) C:`v - 4,23a V Date /a / 2 / v?D,9_� Description and/or Drawing of Proposed Development Bulkhead replacement,concrete dock 5x70 w/ 16x17 L platform and boathouse 14x28