HomeMy WebLinkAboutLand Use Plan- 2020S u n s e t B e a c h
Unified Development Ordinance
Town of
Town of Kill Devil Hills
CAMA Land Use Plan Update
T ABLE OF C ONTENTS
CAMA Land Use Plan 9/14/2020 Page TC-1
SECTION 1. INTRODUCTION
Plan Purpose ............................................................................................................................................................... 1-1
Planning Process ........................................................................................................................................................ 1-1
Development of the CAMA Land Use Plan ......................................................................................................... 1-2
Regional Setting and Context ................................................................................................................................... 1-2
History ......................................................................................................................................................................... 1-4
Past Planning Efforts ................................................................................................................................................ 1-8
Plan Overview ............................................................................................................................................................ 1-8
Vision Statement ........................................................................................................................................................ 1-9
SECTION 2. COMMUNITY PROFILE
Introduction ................................................................................................................................................................ 2-1
Population ................................................................................................................................................................... 2-1
Regional Permanent Population ........................................................................................................................ 2-1
Seasonal Population ............................................................................................................................................. 2-2
Population by Age ................................................................................................................................................ 2-2
Educational Attainment ...................................................................................................................................... 2-3
Housing ....................................................................................................................................................................... 2-4
Housing Unit by Type ......................................................................................................................................... 2-4
Housing Unit by Age ........................................................................................................................................... 2-5
Housing Units by Tenure.................................................................................................................................... 2-6
Property Tax Rates ............................................................................................................................................... 2-6
Median Home Value ............................................................................................................................................ 2-7
Economic Data .......................................................................................................................................................... 2-7
Labor Force ........................................................................................................................................................... 2-7
Employment by Industry .................................................................................................................................... 2-8
Income ................................................................................................................................................................... 2-8
Local Economic Issues ....................................................................................................................................... 2-9
Summary ...................................................................................................................................................................... 2-10
Population ............................................................................................................................................................. 2-10
Housing .................................................................................................................................................................. 2-10
Economic Data ..................................................................................................................................................... 2-10
SECTION 3. EXISTING CONDITIONS
Introduction ................................................................................................................................................................ 3-1
Natural Systems .......................................................................................................................................................... 3-1
Climate ................................................................................................................................................................... 3-1
Geography and Topography .............................................................................................................................. 3-1
Flood Zones .......................................................................................................................................................... 3-2
Storm Surge Inundation ...................................................................................................................................... 3-4
Hazard Mitigation and Preparation ................................................................................................................... 3-4
Soils ........................................................................................................................................................................ 3-8
Surface Waters ...................................................................................................................................................... 3-10
Areas of Environmental Concern ..................................................................................................................... 3-12
Estuarine Waters and Estuarine Shoreline (AEC) .................................................................................... 3-12
T ABLE OF C ONTENTS
Page TC-2 9/14/2020 CAMA Land Use Plan
Coastal Shorelines ........................................................................................................................................... 3-14
Public Trust Waters – Waters and Beaches................................................................................................ 3-14
Coastal Wetlands ............................................................................................................................................ 3-15
Non-Coastal Wetlands ................................................................................................................................... 3-16
Inlet Hazard Areas ......................................................................................................................................... 3-16
Ocean Beaches/Shorelines and Areas of Excessive Erosion.................................................................. 3-18
Beach Nourishment ....................................................................................................................................... 3-19
Fragile Areas .................................................................................................................................................... 3-20
Slopes in Excess of 12% ............................................................................................................................... 3-20
Water Supply Watershed ............................................................................................................................... 3-22
Areas of Resource Potential ............................................................................................................................... 3-22
Regionally Significant Parks .......................................................................................................................... 3-22
Marinas and Mooring Fields ......................................................................................................................... 3-22
Floating Homes or Structures ...................................................................................................................... 3-22
Primary Nursery Areas, Anadromous Fish Spawning Areas, Submerged Aquatic Vegetation,
Shellfishing Waters ......................................................................................................................................... 3-22
Aquaculture ..................................................................................................................................................... 3-23
Water Quality ........................................................................................................................................................ 3-24
Subbasin 03-01-56 .......................................................................................................................................... 3-24
Community Facilities ................................................................................................................................................. 3-25
Health Care Resources ........................................................................................................................................ 3-25
Medical Facilities ............................................................................................................................................. 3-25
Dare County Health Department ................................................................................................................ 3-27
Police Department ............................................................................................................................................... 3-27
Patrol Division ................................................................................................................................................ 3-27
Criminal Investigations Division.................................................................................................................. 3-27
Animal Control ............................................................................................................................................... 3-27
Fire Protection and Emergency Medical Services........................................................................................... 3-28
Fire Protection ................................................................................................................................................ 3-28
Ocean Rescue Division ................................................................................................................................. 3-28
Emergency Medical Services ........................................................................................................................ 3-28
Dare MedFlight ............................................................................................................................................... 3-29
Emergency Management ..................................................................................................................................... 3-29
Parks, Recreation, and Open Space .................................................................................................................. 3-30
Public Access ................................................................................................................................................... 3-30
Parks ................................................................................................................................................................. 3-31
Afterschool Program ..................................................................................................................................... 3-32
Fresh Pond ...................................................................................................................................................... 3-32
Historic Properties ............................................................................................................................................... 3-32
Water System ........................................................................................................................................................ 3-34
Sewer System ........................................................................................................................................................ 3-34
Natural Gas ........................................................................................................................................................... 3-35
Solid Waste ............................................................................................................................................................ 3-35
Street Maintenance ............................................................................................................................................... 3-35
Administration ...................................................................................................................................................... 3-35
T ABLE OF C ONTENTS
CAMA Land Use Plan 9/14/2020 Page TC-3
Existing Land Use ...................................................................................................................................................... 3-36
Introduction .......................................................................................................................................................... 3-36
Methodology ......................................................................................................................................................... 3-36
Commercial ..................................................................................................................................................... 3-36
Industrial .......................................................................................................................................................... 3-36
Office & Institutional .................................................................................................................................... 3-37
Mixed Use ........................................................................................................................................................ 3-37
Multi-Family Residential ................................................................................................................................ 3-37
Single-Family Residential ............................................................................................................................... 3-38
Recreational ..................................................................................................................................................... 3-38
Vacant/Unimproved ...................................................................................................................................... 3-38
Existing Land Use Map ....................................................................................................................................... 3-39
Land Use and Transportation ............................................................................................................................ 3-39
Zoning and Vacant Parcels ................................................................................................................................. 3-41
Appraised Value Per Acre ................................................................................................................................... 3-44
Summary ...................................................................................................................................................................... 3-45
Natural Systems ..................................................................................................................................................... 3-45
Community Facilities ............................................................................................................................................ 3-46
Existing Land Use ................................................................................................................................................. 3-46
SECTION 4. PROJECTIONS/FUTURE DEMAND
Introduction ................................................................................................................................................................ 4-1
Population Projections .............................................................................................................................................. 4-1
Future Community Facilities and Services Needs ................................................................................................ 4-2
Public Safety (Police and Fire Departments) .................................................................................................... 4-2
Parks and Recreation ............................................................................................................................................ 4-3
Water System.......................................................................................................................................................... 4-5
Sewer System .......................................................................................................................................................... 4-5
Street Maintenance ................................................................................................................................................ 4-6
Town-Maintained Streets .............................................................................................................................. 4-6
State-Maintained Streets ................................................................................................................................ 4-6
Multi-Modal Transportation ......................................................................................................................... 4-7
Stormwater Management ..................................................................................................................................... 4-7
Beach Nourishment .............................................................................................................................................. 4-9
Summary ...................................................................................................................................................................... 4-10
SECTION 5. FUTURE LAND USE
Introduction ................................................................................................................................................................ 5-1
Future Land Use Map ............................................................................................................................................... 5-1
Methodology .......................................................................................................................................................... 5-1
Future Land Use Categories ................................................................................................................................ 5-2
Commercial ..................................................................................................................................................... 5-2
Residential ........................................................................................................................................................ 5-2
Conservation ................................................................................................................................................... 5-2
Industrial .......................................................................................................................................................... 5-3
T ABLE OF C ONTENTS
Page TC-4 9/14/2020 CAMA Land Use Plan
Government and Public Institutional ......................................................................................................... 5-3
Future Land Use Acreages ................................................................................................................................... 5-3
SECTION 6. GOALS AND STRATEGIES
Introduction ................................................................................................................................................................ 6-1
Public Input ................................................................................................................................................................ 6-2
Project Website ...................................................................................................................................................... 6-2
Public Meetings...................................................................................................................................................... 6-3
Goals ............................................................................................................................................................................ 6-3
Policies Regarding Land Use and Development in AECs .................................................................................. 6-4
Land Use Plan Management Topics ....................................................................................................................... 6-5
Public Access ......................................................................................................................................................... 6-6
Land Use Compatibility ........................................................................................................................................ 6-6
Infrastructure Carrying Capacity ......................................................................................................................... 6-8
Natural Hazard Areas ........................................................................................................................................... 6-11
Water Quality ......................................................................................................................................................... 6-13
Local Areas of Concern........................................................................................................................................ 6-14
SECTION 7. TOOLS FOR MANAGING DEVELOPMENT
Guide for Land Use Decision Making ................................................................................................................... 7-1
Existing Management Program ............................................................................................................................... 7-1
Continuing Planning Process ................................................................................................................................... 7-1
Land Use Plan Amendments ................................................................................................................................... 7-3
Citizen Participation .................................................................................................................................................. 7-4
MAPS
Map 1. Regional Location ......................................................................................................................................... 1-3
Map 2. Flood Hazard Areas ..................................................................................................................................... 3-3
Map 3. Fast Moving SLOSH ................................................................................................................................... 3-5
Map 4. Slow Moving SLOSH .................................................................................................................................. 3-6
Map 5. Soils ................................................................................................................................................................. 3-9
Map 6. Water Quality and Aquatic Life ................................................................................................................. 3-12
Map 7. Wetlands......................................................................................................................................................... 3-17
Map 8. NHP Natural Areas and NC Protected Lands ........................................................................................ 3-21
Map 9. Community Facilities ................................................................................................................................... 3-26
Map 10. Historic Properties ..................................................................................................................................... 3-33
Map 11. Existing Land Use ...................................................................................................................................... 3-40
Map 12. Zoning .......................................................................................................................................................... 3-43
Map 13. Future Land Use ......................................................................................................................................... 5-4
TABLES
Table 1. Regional Population Growth, 1980-2016 ............................................................................................... 2-1
Table 2. Kill Devil Hills Age Distribution, 2016 .................................................................................................. 2-3
Table 3. Educational Attainment, 2016 .................................................................................................................. 2-3
T ABLE OF C ONTENTS
CAMA Land Use Plan 9/14/2020 Page TC-5
Table 4. Housing Units by Type, 2016 ................................................................................................................... 2-4
Table 5. Year Structure Built, 2016 ......................................................................................................................... 2-5
Table 6. Median Home Value, 2016 ....................................................................................................................... 2-7
Table 7. Kill Devil Hills Employment by Industry, 2016 .................................................................................... 2-8
Table 8. Flood Hazard Areas ................................................................................................................................... 3-2
Table 9. Storm Surge Inundation ............................................................................................................................ 3-4
Table 10. NC Division of Water Resources Waterbody Classifications ........................................................... 3-10
Table 11. Waterbody Classifications ....................................................................................................................... 3-11
Table 12. Wetlands .................................................................................................................................................... 3-15
Table 13. Dare County EMS Stations .................................................................................................................... 3-29
Table 14. Existing Land Use .................................................................................................................................... 3-39
Table 15. Zoning ........................................................................................................................................................ 3-42
Table 16. Total Value Per Acre ............................................................................................................................... 3-44
Table 17. 2050 Population Projections ................................................................................................................... 4-1
Table 18. Future Land Use ....................................................................................................................................... 5-3
APPENDICES
Appendix A. Citizen Participation Plan
Appendix B. Albemarle Regional Hazard Mitigation Plan Mitigation Strategies
Appendix C. Endangered Species, Threatened Species, Federal Species of Concern, and Candidate Species
Appendix D. Shellfishing Closures
Appendix E. Recommended Street Improvements
Appendix F. NCDOT Level of Service
Appendix G. Land Use Plan Survey – 2007 and 2017 Comparison
Appendix H. Future Land Use Vacant Parcels
Appendix I. Soil Characteristics
T ABLE OF C ONTENTS
Page TC-6 9/14/2020 CAMA Land Use Plan
Matrix for Land Use Plan Elements – 15A NCAC 7B .0702
Page Reference(s)
Organization of the Plan
Matrix that shows the location of the required elements as set forth in this
Rule
TC-6 to TC-9
Community Concerns and Aspirations
Description of the dominant growth-related conditions that influence land use,
development, water quality and other environmental concerns in the planning
area
1-9
Description of the land use and development topics most important to the future of the
planning area, including:
Public Access 6-6
Land Use Compatibility 6-6
Infrastructure Carrying Capacity 6-8
Natural Hazard Areas 6-11
Water Quality 6-13
Community Vision
Description of the general physical appearance and form that represents the
local government’s plan for the future. It shall include objectives to be
achieved by the plan and identify changes that may be needed to achieve the
planning vision.
1-9
Existing and Emerging Conditions
Population, Housing and Economy
Discussion of the following data and trends:
Permanent population growth trends using data from the two most decennial
Censuses
2-1
Current permanent and seasonal population estimates 2-1 to 2-2
Key population characteristics including age and income 2-2 to 2-3, 2-8
Thirty-year projections of permanent and seasonal population in five-year
increments
4-1
Estimate of current housing stock, including permanent and seasonal units,
tenure, and types of units (single-family, multifamily, and manufactured)
2-4 to 2-7
Description of employment by major sectors and community economic activity 2-7 to 2-9
Natural Systems
Description of natural features in the planning jurisdiction to include:
Areas of Environmental Concern (AECs) as set forth in Subchapter 15A NCAC
07H
3-13 to 3-16, 3-18, 3-22, 3-32
Soil characteristics, including limitations for septic tanks, erodibility, and other
factors related to development
3-8, 3-9, Appendix I
Environmental Management Commission (EMC) water quality classifications
and related use support designations
3-10 to 3-12, 3-22
Division of Marine Fisheries (DMF) shellfish growing areas and water quality
conditions
3-11, 3-23, 3-24
Flood and other natural hazard areas 3-2 to 3-3
Storm surge areas 3-4
Non-coastal wetlands, including forested wetlands, shrub-scrub wetlands and
freshwater marshes
3-15 to 3-17
Water supply watersheds or wellhead protection areas 3-11, 3-22
Primary nursery areas 3-22 to 3-23
Environmentally fragile areas, such as wetlands, natural heritage areas, areas
containing endangered species, prime wildlife habitats, or maritime forests
3-15 to 3-22
T ABLE OF C ONTENTS
CAMA Land Use Plan 9/14/2020 Page TC-7
Natural Systems, contd. Page Reference(s)
Additional natural features or conditions identified by the local government 3-23
Environmental Conditions
Discussion of environmental conditions within the planning jurisdiction to include an
assessment of the following conditions and features:
Status and changes of surface water quality; including:
- Impaired streams from the most recent Division of Water Resources
(DWR) Basin Planning Branch Reports
3-11, 3-23, 3-24
- Clean Water Act 303 (d) List 3-11
- Other comparable data N/A
Current situation and trends on permanent and temporary closures of
shellfishing waters as determined by the Report of Sanitary Survey by the
Shellfish Sanitation and Recreational Water Quality Section of the DMF
3,20, 3-23, Appendix D
Areas experiencing chronic wastewater treatment malfunctions 3-34, 3-35
Areas with water quality or public health problems related to non-point source
pollution
4-9
Areas subject to recurrent flooding, storm surges and high winds 3-2 to 3-7
Areas experiencing significant shoreline erosion as evidenced by the presence
of threatened structures or public facilities
3-18
Environmentally fragile areas (as defined in Part (c)(2)(A)(ix) of this Rule) or
areas where resources functions are impacted as a result of development
3-20
Natural resource areas that are being impacted or lost as a result of
incompatible development. These may include, but are not limited to the
following: coastal wetlands, protected open space, and agricultural land.
3-20
Existing Land Use and Development
MAP of existing land use patterns 3-40
Description of the existing land use patterns 3-36 to 3-39
Estimates of the land area allocated to each land use category 3-39
Characteristics of each land use category 3-36 to 3-38
MAP of historic, cultural, and scenic areas designated by a state or federal agency or by
the local government
3-33
Descriptions of the historic, cultural and scenic areas 3-32
Community Facilities
Evaluation of existing and planned capacity, location and adequacy of community
facilities to include:
MAP of existing and planned public and private water supply service areas 3-26
Description of existing public and private water supply systems to include:
- Existing condition 3-34
- Existing capacity 3-34
- Documented overflows, bypasses or other problems that may degrade
water quality or constitute a threat to public health as documented by
the DWR
3-25, 3-34
- Future water supply needs based on population projections 4-5
MAP of existing and planned public and private wastewater service areas 3-26
Description of existing public and private wastewater systems to include:
- Existing condition 3-34
- Existing capacity 3-34, 4-5
- Documented overflows, bypasses or other problems that may degrade
water quality or constitute a threat to public health as documented by
the DWR
3-34
- Future wastewater system needs based on population projections 4-5
MAP of existing and planned multimodal transportation systems and port and airport
facilities
3-26
Description of any highway segments deemed by the NC Department of
Transportation (NCDOT) as having unacceptable service as documented in the
most recent NCDOT Transportation and/or Thoroughfare Plan
4-6
T ABLE OF C ONTENTS
Page TC-8 9/14/2020 CAMA Land Use Plan
Community Facilities, contd. Page Reference(s)
Description of highway facilities on the current thoroughfare plan or current
transportation improvement plan
3-35, 4-6, 4-7
Description of the impact of existing transportation facilities on land use
patterns
3-39, 4-7
Description of the existing public stormwater management system 4-7 to 4-9
Identification of existing drainage problems and water quality issues related to
point-source discharges of stormwater runoff
4-9
Policy
Citation(s)
Page
Reference(s)
Future Land Use
Policies
Policies that exceed the use standards and permitting requirements found in
Subchapter 7H, State Guidelines for Areas of Environmental Concern
N/A 6-4, 6-5
Policies that address the Coastal Resources Commission's (CRC's) management topics:
Public Access Management Goal:
Maximize public access to the beaches and the public trust waters of the coastal region.
The planning objectives for public access are local government plan policies that:
Address access needs and opportunities
P.1, P.2, I.1, I.2,
I.3
6-6
Identify strategies to develop public access P.1, P.2, I.2, I.3 6-6
Address provisions for all segments of the community, including persons with
disabilities
P.1, I.2 6-6
For oceanfront communities, establish access policies for beach areas targeted
for nourishment
P.2, I.3 6-6
Land Use Compatibility Management Goal:
Ensure that development and use of resources or preservation of land balance protection
of natural resources and fragile areas with economic development, and avoids risks to
public health, safety, and welfare.
The planning objectives for land use compatibility are local government plan policies
that:
Characterize future land use and development patterns
P.3-P.15, I.6-
I.17
6-7 to 6-8
Establish mitigation criteria and concepts to minimize conflicts
P.3-P.15, I.6-
I.17
6-7 to 6-8
Infrastructure Carrying Capacity Management Goal:
Ensure that public infrastructure systems are sized, located, and managed so the quality
and productivity of AECs and other fragile areas are protected or restored.
The planning objectives for infrastructure carrying capacity are local government plan
policies that:
Establish service criteria
P.16-P.25, I.18-
I.28
6-9 to 6-11
Ensure improvements minimize impacts to AECs and other fragile areas
P.16, P.18,
P.25, I.18, I.22
6-9 to 6-10
Natural Hazard Areas Management Goal:
Conserve and maintain barrier dunes, beaches, floodplains, and other coastal features for
their natural storm protection functions and their natural resources giving recognition to
public health, safety, and welfare issues.
The planning objectives for natural hazard areas are local government plan policies that:
Establish mitigation and adaptation concepts and criteria for development and
redevelopment, including public facilities
P.32, P.33,
I.33-I.36, I.38,
I.43, I.45
6-11 to 6-13
Minimize threats to life, property and natural resources resulting from erosion,
high winds, storm surge, flooding, or other natural hazards
P.26, P.28-
P.30, I.32-I.36,
I.45
6-11 to 6-13
T ABLE OF C ONTENTS
CAMA Land Use Plan 9/14/2020 Page TC-9
Water Quality Management Goal:
Maintain, protect and where possible enhance water quality in all coastal wetlands,
rivers, streams, and estuaries.
The planning objectives for water quality are local government plan policies that:
Establish strategies and practices to prevent or control nonpoint source
pollution
P.34, I.49-I.51 6-13 to 6-14
Establish strategies and practices to maintain or improve water quality
P.34-P.38, I.49-
I.54
6-13 to 6-14
Future Land Use Map
Page Reference(s)
MAP of future land uses that depicts the policies for growth and development and the
desired future patterns of land use and development with consideration given to natural
system constraints and infrastructure
5-4
Descriptions of land uses and development associated with the future land use
map designations
5-1 to 5-3
Tools for Managing Development
Description of the role of plan policies, including the future land use map, in
local decisions regarding land use and development
7-1 to 7-4
Description of the community's development management program, including
local ordinances, codes, and other plans and policies
1-8, 7-1 to 7-4
Action Plan and Implementation Schedule
Description of actions that will be taken by the local government to implement
policies that meet the CRC's management topic goals and objectives, specifying
fiscal year(s) in which each action is anticipated to start and finish
6-5, 6-6, 6-8 to 6-15
Identification of specific steps the local government plans to take to implement
the policies, including adoption and amendment of local ordinances, other
plans, and special projects
6-6, 6-8 to 6-15
S ECTION 1. I NTRODUCTION
CAMA Land Use Plan 9/14/2020 Page 1-1
What is CAMA?
CAMA is the North Carolina Coastal Area
Management Act (NCGS 113A-100, et seq.), which
establishes a cooperative program of coastal area
management between local and state governments.
The Act, originally passed in 1974 and since
amended, states that local governments shall have
the initiative for planning, while the state
government establishes areas of environmental
concern. With regard to planning, the state
government is directed to act primarily in a
supportive, standard-setting, and review capacity,
except in situations where local governments do
not elect to exercise their initiative.
In addition, CAMA establishes the Coastal
Resources Commission within the Department of
Environmental Quality, whose duties include
approval of Coastal Habitat Protection Plans and
designation of Areas of Environmental Concern
(AEC). After designation of these areas, the
Commission is responsible for issuing all permits.
Source: National Oceanic and Atmospheric
Administration, Coastal Services Center.
PLAN PURPOSE
The Land Use Plan is intended to provide a framework that will guide Kill Devil Hills government
officials, respective Town Boards, and private citizens as they make day-to-day and long-term decisions
affecting land use and development. The Land Use Plan contains information about the physical
appearance of the Town of Kill Devil Hills as it exists today, what directions the Town should take in the
future, and the steps that need to be taken to get there.
By serving as the overall “blueprint” for development of the Town of Kill Devil Hills, the implementation
of the Land Use Plan will result in the most suitable and appropriate use of land and provision of public
services. Use of the Plan will lead to the protection of natural resources, as well as public health, safety,
and welfare.
The Land Use Plan focuses on the physical development of the Town of Kill Devil Hills. It contains
policy statements established through the identification of community goals (broad statements describing
the value of the community) and implementing actions (i.e., actions to be taken to fulfill community goals
and to implement policies). The Plan is general, or “broad brush,” in that its recommendations are area-
wide, rather than site specific. The Land Use Plan is also comprehensive in that it includes all areas of the
Town, as well as all elements that affect its physical development (such as population trends,
environmental features, utilities, transportation, and housing).
PLANNING PROCESS
The land use planning process will result in the
adoption of an official CAMA Land Use Plan for
Kill Devil Hills. This planning process will be
considered an update to the Town’s existing
CAMA Land Use Plan, initially adopted in 1997.
A Land Use Plan is a long-range policy document
with a particular time horizon – fifteen years in the
case of Kill Devil Hills. The plan will include an
assessment of existing conditions, a summary of
public input, projection of future needs for topics
relating to land use and development, and a
comprehensive listing of goals, policies, and
strategies. Because the Town of Kill Devil Hills is
located in one of North Carolina’s twenty Coastal
Area Management Act (CAMA) counties, the plan
will also address issues relating specifically to
coastal growth and development.
S ECTION 1. I NTRODUCTION
Page 1-2 9/14/2020 CAMA Land Use Plan
In North Carolina, a Land Use, or Comprehensive, Plan is the legal foundation for development
regulations. This land use plan is intended to establish policy regarding land use and development. This
document is non-regulatory, except for development proposals situated within Areas of Environmental
Concern (AECs). Regulatory permits must be issued by the NC Department of Environmental Quality
(NCDEQ) regarding all development within AECs, which should comply with the standards outlined
within this plan. These permits are issued by NCDEQ and CAMA local permit officers.
The following is included as part of the CAMA land use planning process:
Community and Demographic Profile
Assessment of Existing Conditions
Projection of Future Population and Supporting Infrastructure Needs
Future Land Use and Transportation Needs
Goals and Implementing Strategies
DEVELOPMENT OF THE CAMA LAND USE PLAN
The Kill Devil Hills Board of Commissioners adopted a citizen participation plan (CPP) at the outset of
the project (see Appendix A). The Town’s Planning Board was tasked with providing oversight during
the development of the CAMA Land Use Plan. The Planning Board members are listed below.
Howard Buchanan, Chair
James C. “Chip” Almoney, Vice Chair
Nelson “Skip” Jones, Jr.
Michael Lowack
Ron Seidman
Mary Simpson
Eddie Valdivieso
REGIONAL SETTING AND CONTEXT
The Town of Kill Devil Hills is located along a stretch of barrier islands known as the Outer Banks. The
Outer Banks is a 200-mile-long (320 km) string of barrier islands and splits off the coast of North Carolina
and southeastern Virginia, on the east coast of the United States. It covers most of the North Carolina
coastline, separating the Currituck Sound, Albemarle Sound, and Pamlico Sound from the Atlantic
Ocean.
Kill Devil Hills is located along the stretch between the Town of Nags Head and the Town of Kitty Hawk.
The Town can be accessed from both the north and south via US 158 and NC Highway 12, which travels
the full extent of the Outer Banks. The Town’s corporate limits include approximately 4.7 miles of
oceanfront shoreline. Aside from US 158 and NC Highway 12, the majority of the Town is served by
town-owned public rights-of-way. Map 1 provides the regional location for Kill Devil Hills.
I 0 10 20 30 405Miles
Map 1. Regional Location
Brunswick
Craven
Onslow
Pender
New Hanover
Hyde
Chowan
Pamlico
Carteret
Bertie
Tyrrell Dare
Gates
Hertford Pasquotank
Camden
Currituck
Beaufort
Perquimans
Washington
Ki
l
l
Devi
l
Hi
l
l
sAlbemarle Sound
Atlantic Ocean
Kitty Hawk Bay
Kitty Hawk
Nags Head
Colliington
Island
1-3
S ECTION 1. I NTRODUCTION
Page 1-4 9/14/2020 CAMA Land Use Plan
HISTORY
1700s and 1800s
The area known as Kill Devil Hills was
originally inhabited by Native Americans and
later by a small group of local farmers and
fishermen.
Image Source: Town of Kill Devil Hills.
1808 - 1814
The town’s name first appeared on an 1808 map, where it was shown as "Killdevil Hills." A map
printed in 1814 displayed the name as "Kill Devil Hills" for the first time. The name originates from
a series of sand dunes in the area, the largest of which was referred to as Kill Devil Hill.
1878
The US Life Saving Station, one of 11
lifesaving stations along the Outer Banks
coastline, is established in Kill Devil Hills
across from the present day site of the
Wright Brothers National Memorial.
Image Source: NPS Historical Handbook.
S ECTION 1. I NTRODUCTION
CAMA Land Use Plan 9/14/2020 Page 1-5
1900
The Ohio-based Wright brothers, Orville and
Wilbur, choose the area as the location to
test their new flying machines. First
attempts at flying their manned glider from
the tall soundside dunes proved
unsuccessful.
Image Source: www.amazingtoptens.com
1901 - 1902
The Wright brothers returned in the summer of 1901 with a second glider making several dozen test
flights, with mixed results. By September of 1902, they were back at Kill Devil Hills with a new
glider, not much larger than the last one, but redesigned based on their growing knowledge of
aerodynamics.
December 17, 1903
Wilbur and Orville Wright make four brief
flights at Kill Devil Hills with their first
powered aircraft. The final flight traveled
852 feet in 59 seconds.
1911
Orville Wright returns to Kill Devil Hills and sets a new world glider record, with a total airtime of 9
minutes and 45 seconds.
Image Source:
http://www.learnnc.org/lp/multimedia/11331.
S ECTION 1. I NTRODUCTION
Page 1-6 9/14/2020 CAMA Land Use Plan
1927
Calvin Coolidge signs a bill which grants
$50,000 for the construction of the Wright
Brothers Memorial. Construction starts on the
memorial in 1928.
1932
The Wright Brothers Memorial opens to the public and is dedicated with Orville Wright in
attendance.
1933
The Kill Devil Hills Life Saving Station is closed. It is later purchased in 1986 and moved to Corolla to
serve as an office.
1953
The Town of Kill Devil Hills is officially
incorporated.
Image Source: https://www.nationalparks.org/explore-
parks/wright-brothers-national-memorial.
Image Source: https://www.twiddy.com/outer-
banks/kill-devil-hills/#/WXWkk2_fT+iHf9XiUPIVcgL/.
S ECTION 1. I NTRODUCTION
CAMA Land Use Plan 9/14/2020 Page 1-7
1953
The Wright Brothers Memorial is transitioned
into a National Park. Two replica gliders are
constructed at a new Visitors’ Center to
commemorate the 50th anniversary of the
Wright Brothers’ flight.
1958
The Avalon Fishing Pier is constructed,
becoming one of the first piers along the
Outer Banks.
1960s
Numerous motels and restaurants are built to accommodate the new “beach traffic” of fishermen
and families.
2003
Kill Devil Hills celebrates the Centennial of
Flight – a week-long celebration with many
noted visitors in attendance including Neil
Armstrong, Buzz Aldrin, Chuck Yeager, John
Glenn, and President George W. Bush.
Image Source: Town of Kill Devil Hills.
Image Source: https://www.outerbanks.com/kill-devil-
hills.html.
Image Source: https://www.gettyimages.com/event/kill-devil-hills-
continues-celebrating-first-flight-centennial-2815961.
S ECTION 1. I NTRODUCTION
Page 1-8 9/14/2020 CAMA Land Use Plan
PAST PLANNING EFFORTS
As part of the planning process, past policy documents, capital improvements plans, and CAMA Land
Use Plans were analyzed for significant findings related to Kill Devil Hills’ future. These past planning
efforts help to provide a broader sense of understanding for the issues facing Kill Devil Hills today. The
following planning projects were utilized to gather information, research past public input priorities, and
understand growth and development that has occurred over the past two decades.
2015 Albemarle Regional Hazard Mitigation Plan
Kill Devil Hills Zoning Ordinance (Chapter 153)
Kill Devil Hills Subdivision Ordinance (Chapter 152)
2010 Kill Devil Hills Stormwater Management Ordinance
Kill Devil Hills Flood Damage Prevention Ordinance (Chapter 151)
1998 Kill Devil Hills Shoreline Access Plan
2004 Kill Devil Hills Recreational Facilities Plan
2012 Kill Devil Hills Pedestrian Plan
2003 Kill Devil Hills Street Improvement Master Plan
1997 Kill Devil Hills CAMA Land Use Plan
2017 CAMA Land Use Plan Survey
PLAN OVERVIEW
The Kill Devil Hills CAMA Land Use Plan Update is divided into six independent components that focus
on various aspects of the community. The following provides a brief synopsis of what will be addressed
within each plan element:
Section 1. Introduction
This plan element provides a general overview of the plan, planning process, and enabling legislation
regarding the establishment and use of comprehensive/land use plans in local government decision-
making.
Section 2. Community Profile
This section provides a general overview of existing conditions in the Town of Kill Devil Hills with
regard to population, housing age and condition, and economic indicators. This section serves as a
basic overview of the Town’s current state of affairs and as a baseline for discussion regarding
growth, development, and public policy.
Section 3. Existing Conditions
This plan element focuses on existing environmental and land use conditions throughout Kill Devil
Hills’ planning jurisdiction, including environmental factors, facilities and services, transportation,
land use/suitability, and neighborhoods. This information provides the data and analysis necessary
to make sound decisions regarding development of the Town’s Future Land Use Map.
Section 4. Projections/Future Demand
This section of the plan focuses on future growth and demand which may have an impact on land
use and transportation.
S ECTION 1. I NTRODUCTION
CAMA Land Use Plan 9/14/2020 Page 1-9
Section 5. Future Land Use
The Future Land Use section defines the framework for future growth and development throughout
the Town of Kill Devil Hills.
Section 6. Goals and Strategies
The discussion of goals, policies, and strategies will serve as a guide for the integration of the CAMA
Land Use Plan into the Town’s day-to-day decision-making process. The goals and policies defined
within this plan element will establish an organized and thorough listing of implementation
strategies intended to provide for sound principles relating to future growth, economic development,
environmental factors, modifications of service delivery, and infrastructure expansion. Citizen input
garnered as a result of the plan is also summarized in this section.
Section 7. Tools for Managing Development
This section of the plan provides narrative and tools for implementing the strategies outlined in
Section 6 of the plan. It is intended that this document be an integral part of the Kill Devil Hills
decision-making process concerning future land use.
Land use development, water quality, and other environmental conditions in the planning area are
influenced by the substantial seasonal population influx, protection of vital natural resources,
establishment of sustainable municipal services, improvement of traffic flow/congestion, lack of available
land for development, and consistent/compatible land uses and zoning considerations. Additionally, the
following CAMA issues must be considered: public access, land use compatibility, infrastructure carrying
capacity, natural hazard areas, and water quality.
VISION STATEMENT
Kill Devil Hills is, and will continue to be, a community:
rich in history and tradition;
environmentally conscious;
mixing attributes of a vacation beach destination while maintaining attributes of a year-round
community;
characterized by a variety of residential development types (including vacation homes,
traditional homes, and multi-family) and a variety of commercial establishments to serve year-
round residents and seasonal visitors;
possessing undisturbed natural areas such as Fresh Pond and the Maritime Forest, as well as
the nationally significant Wright Brothers National Memorial; and,
with major tourist attractions including the Wright Brothers National Memorial, the Atlantic
Ocean, and the waters of Kitty Hawk Bay, Albemarle Sound, and Roanoke Sound.
S ECTION 2. C OMMUNITY P ROFILE
CAMA Land Use Plan 9/14/2020 Page 2-1
INTRODUCTION
The Community Profile section outlines various demographic information, including population,
housing, and economic indicators. Throughout this section, data for the North Carolina beach towns of
Nags Head and Emerald Isle are utilized for comparison purposes. The Town of Nags Head was chosen
because of the community’s close proximity to Kill Devil Hills. Growth trends within surrounding
communities often have an impact on municipal service delivery in Kill Devil Hills due to the close
proximity of the towns along the Outer Banks and the frequency of seasonal and transient visitors. The
Town of Emerald Isle was selected due to the community’s comparable location along a stretch of barrier
islands in southeastern North Carolina with similar demographic characteristics to Kill Devil Hills. In
spite of the fact that these two communities are significantly separated geographically, the towns face
many of the same challenges with regard to a range of issues, including economic development, shoreline
protection, and Areas of Environmental Concern (AECs) protection.
For the purposes of this plan and for the sake of consistency, demographic data are sourced primarily
from the US Census Bureau. Census data may also be supplemented with figures from the NC Office of
State Budget and Management (NCOSBM). It should be noted that unless otherwise expressly
mentioned, all data and figures reference permanent residents. Detailed demographic information is not
available for seasonal residents through the US Census Bureau or the NCOSBM.
POPULATION
Regional Permanent Population
Population growth throughout the central Outer Banks has been substantial since the early 1980s;
however, a majority of this population influx occurred between 1980 and 2000. Kill Devil Hills’
permanent population in 2016 is significantly higher than other Outer Banks communities, and it should
be noted that Kill Devil Hills experienced the second highest rate of growth in relation to other Outer
Banks communities since 1980 (315.8%). Between the years 1980 and 2000, the Town’s permanent
population increased significantly at a rate of 252.9%, and by another 17.8% between the years of 2000
and 2016.
Table 1 provides the population of several Outer Banks communities, as well as other regional
municipalities that provide services and workforce housing for the thriving commercial economy present
during summer months.
Table 1. Regional Population Growth, 1980-2016
Municipality
1980
Population
1990
Population
2000
Population
2010
Population
2016
Estimate
% Growth/Decline
1980-2016
Atlantic Beach 941 1,938 1,781 1,495 1,671 77.6%
Elizabeth City 14,007 14,292 17,188 18,683 18,025 28.7%
Emerald Isle 865 2,434 3,488 3,655 3,709 328.8%
Kill Devil Hills 1,671 4,238 5,897 6,683 6,948 315.8%
Kitty Hawk 849 1,937 2,991 3,272 3,403 300.8%
Manteo 902 991 1,052 1,434 1,638 81.6%
Nags Head 1,020 1,838 2,700 2,757 2,858 180.2%
Southern Shores 520 1,447 2,201 2,714 2,827 443.7%
Source: US Census Bureau.
S ECTION 2. C OMMUNITY P ROFILE
Page 2-2 9/14/2020 CAMA Land Use Plan
As noted in Table 1, the permanent population in Kill Devil Hills rapidly increased beginning in the mid-
to late 1970s into the 1980s and early 1990s. This growth can be mainly attributed to the proliferation of
municipal infrastructure that was constructed over this same period of time. Prior to 1980, transportation
to many portions of Kill Devil Hills, as well as the Outer Banks at large, was limited. Development of this
key infrastructure provided the opportunity for expanded housing stock and commercial growth focused
on serving the transient tourist population.
Seasonal Population
Because demographic data is collected only for permanent residents, it can be difficult to determine the
precise number of seasonal residents that are located in a given jurisdiction at any given time. Peak day
population was calculated by adding the Town’s total 2016 permanent population to the total seasonal
rental housing population plus day visitors and hotel occupancy figures.
Sources:
Permanent Population: Total 2016 population as reported by the US Census Bureau = 6,948.
Seasonal Rental Housing Population: Estimated number of seasonal rental units 3,474 (91.2% of total
2016 vacant housing units [3,809] as reported by the US Census Bureau) X 6 persons per unit = 20,844.
Hotel Occupancy: Total number of available rooms in Kill Devil Hills (1,027) X an average of 4 persons
per room = 4,108.
Day Visitors: Total number of public access parking spaces (494) X an average of 4 persons per car X a
daily usage of 2 cars per space per day = 3,952.
Population by Age
Typically, beach communities have a higher median age than mainland communities. This occurrence is
due to the large retirement age population that typically resides in coastal municipalities. However, in
Kill Devil Hills, this is not the case. The Town’s median age of 38.7 is directly in line with the state’s
overall median age (37.0). The Town’s lower median age can be attributed to several factors, including its
longstanding history as a regional commercial center along the Outer Banks and the various types of
housing stock which provide more economically priced housing options for many portions of the Outer
Banks. Kill Devil Hills compares favorably with other beach communities mentioned in the plan with
regard to median age, including Nags Head (43), Atlantic Beach (50.7), and Emerald Isle (52.5).
Permanent
Population
Seasonal
Rental
Housing
Population
Hotel
Occupancy Day Visitors Peak Day
Population
6,948 20,844 4,108 3,952 35,852
S ECTION 2. C OMMUNITY P ROFILE
CAMA Land Use Plan 9/14/2020 Page 2-3
According to the US Census Bureau, the “Baby Boomer” age cohort accounts for the largest percentage of
Kill Devil Hills’ population (26.8%); however, roughly 65% of the Town’s population is currently 49 years
old or younger. This factor differs slightly from North Carolina’s age distribution as a whole, whose
“Baby Boomer” age cohort accounts for only 20% of the population. Again, this demographic reiterates
the fact that Kill Devil Hills serves as a “bedroom community” serving the economy of the Outer Banks.
Table 2. Kill Devil Hills Age Distribution, 2016
Defined Generation 2016 % of Population
Silent Generation (Older than 70) 522 7.5%
Baby Boomers (50-69) 1,864 26.8%
Generation X (35-49) 1,493 21.5%
Millennial (20-34) 1,404 20.2%
Generation Z (Younger than 20) 1,665 24.0%
Source: US Census Bureau.
Educational Attainment
The overall educational attainment of a given community can be a significant indicator in economic
mobility and socioeconomic status. Most coastal barrier island communities are comprised of a
population base with higher educational attainment. This factor can be attributed to the significant
number of residents moving into town with varied professional backgrounds. As of 2016, approximately
27.1% of Kill Devil Hills residents had either an Associate’s or Bachelor’s Degree, which compares
similarly to North Carolina overall (27.9%). As with several other demographic categories, Kill Devil
Hills educational attainment indicates a population base focused on supporting the local economy. The
percentage of high school graduates in Kill Devil Hills is slightly higher than the comparison
communities, while it is slightly lower in higher education (Associate’s and Bachelor’s degrees).
Table 3. Educational Attainment, 2016
Kill Devil Hills Nags Head Emerald Isle
Number % of Total Number % of Total Number % of Total
Population 25 years and over 4,871 100.0% 2,248 100% 3,019 100%
Less than 9th grade 177 3.6% 32 1.4% 16 0.5%
9th to 12th grade, no diploma 158 3.2% 46 2.1% 97 3.2%
High school graduate (includes
equivalency)
1,274 26.2% 412 18.3% 642 21.3%
Some college, no degree 1,601 32.9% 601 26.7% 488 16.2%
Associate’s degree 446 9.2% 326 14.5% 385 12.8%
Bachelor’s degree 874 17.9% 580 25.8% 723 23.9%
Graduate or professional
degree
341 7.0% 251 11.2% 667 22.1%
Source: US Census Bureau.
S ECTION 2. C OMMUNITY P ROFILE
Page 2-4 9/14/2020 CAMA Land Use Plan
HOUSING
The discussion of housing includes a description of units by type, occupancy status, and year structure
built. In Kill Devil Hills, as in other coastal municipalities, it is important to include discussion of vacant
housing units that may be seasonally occupied, giving a greater understanding of the conditions facing
the community during the peak summer months.
Housing Unit by Type
A majority of the Town’s housing stock is comprised of single-family residential (SFR) housing. As of
2016, approximately 85.1% of all units throughout the Town were classified as single-family. The number
of single-family homes in Kill Devil Hills has increased at a rate of 24.7%, resulting in 1,135 new units
since the 2000 Census.
The percentage of single-family homes in the Town compares similarly to the other jurisdictions being
utilized for comparison purposes. Kill Devil Hills, as well as Nags Head, maintains a healthy percentage
of single-family housing units, while also supporting multi-family complexes which provide temporary
housing for the area’s transient population base. It should also be noted that Kill Devil Hills maintains a
small percentage of its housing stock in manufactured housing. Manufactured housing can be beneficial
in coastal beach communities by providing an additional affordable housing choice. However, it should
be noted that the proliferation of manufactured housing in such a dynamic weather environment such as
the Outer Banks can prove problematic in the event of hurricanes/tropical storms.
Table 4. Housing Units by Type, 2016
Units Kill Devil Hills Nags Head Emerald Isle
Total Units 6,743 4,833 6,721
Single-Family Residential
Units (includes duplexes)
5,735 4,144 4,718
% of Single-Family
Residential
85.1% 85.8% 70.2%
Multi-Family Residential
Units
839 640 982
% of Multi-Family
Residential
12.4% 13.2% 14.6%
Manufactured Home Units* 169 49 1,021
% of Manufactured Homes 2.5% 1.0% 15.2%
*Manufactured home means a preassembled dwelling unit built on a chassis designed to be
used as a dwelling, with or without a permanent foundation, when connected to the
required utilities which meets HUD model standards for manufactured homes. Previously
referred to as “mobile home.”
Source: US Census Bureau.
S ECTION 2. C OMMUNITY P ROFILE
CAMA Land Use Plan 9/14/2020 Page 2-5
Housing Unit by Age
The housing stock situated throughout Kill Devil Hills’ jurisdiction is fairly new. Approximately 68.2%
of homes located in Town have been built since 1980, while nearly 86% have been developed since 1970.
This housing growth is comparable to other growth indicators showing that rapid development
expansion followed the Town’s expansion of infrastructure and other central municipal services. The
growth since 1980 is also in line with the other towns being utilized for comparison. Since 1980, 73.5% of
homes have been built in Nags Head and 74.7% in Emerald Isle.
Table 5. Year Structure Built, 2016
Kill Devil Hills Nags Head Emerald Isle
Number % of Total Number % of Total Number % of Total
2014 or later 52 0.8% 0 0.0% 15 0.2%
2010 to 2013 11 0.1% 10 0.2% 40 0.6%
2000 to 2009 900 13.3% 771 16.0% 1,081 16.1%
1990 to 1999 1,058 15.7% 1,175 24.3% 1,819 27.1%
1980 to 1989 2,576 38.2% 1,597 33.0% 2,061 30.7%
1970 to 1979 1,166 17.3% 874 18.1% 1,334 19.8%
1960 to 1969 489 7.3% 128 2.6% 226 3.4%
1950 to 1959 264 3.9% 124 2.6% 131 1.9%
1940 to 1949 93 1.4% 108 2.2% 9 0.1%
1939 or earlier 134 2.0% 46 1.0% 5 0.1%
Total 6,743 100.1% 4,833 100.0% 6,721 100.0%
Source: US Census Bureau.
85.1%
12.4%
2.5%
Kill Devil Hills % of Total Housing Units
Single-Family Residential
Multi-Family Residential
Manufactured Homes
S ECTION 2. C OMMUNITY P ROFILE
Page 2-6 9/14/2020 CAMA Land Use Plan
Housing Unit by Tenure
Of the approximately 6,743 housing units in Kill Devil Hills’ corporate limits, nearly 56.5% (3,809) are
considered vacant by the US Census Bureau. This percentage is much lower than most coastal beach
towns in eastern North Carolina. This circumstance reiterates the fact that Kill Devil Hills serves as a hub
for services and housing geared towards serving the Outer Banks tourist economy.
Property Tax Rates
For second homeowners, property tax rates can be a deterrent to investment, purchase, or construction of
vacation units. Property tax rates are based on the total appraised value of land and buildings per $100 of
value. The property tax rate in Kill Devil Hills is currently $0.381 per $100 valuation. The Town’s
property tax rate is slightly higher than the majority of coastal beach towns in eastern North Carolina,
including the municipalities located along the Outer Banks. It should be noted that Kill Devil Hills’
property owners must also pay a Dare County tax rate of $0.43 per $100 of property valuation.
43.5%
25.2%27.5%
56.5%
74.8%72.5%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Kill Devil Hills Nags Head Emerald Isle
Occupancy Status, 2016
Occupied Units
Vacant Units
$0.000 $0.100 $0.200 $0.300 $0.400 $0.500 $0.600 $0.700
Southern Shores
Nags Head
Manteo
Kitty Hawk
Kill Devil Hills
Emerald Isle
Elizabeth City
Duck
Atlantic Beach
Property Tax Rates per $100 Valuation
FY2016-2017
S ECTION 2. C OMMUNITY P ROFILE
CAMA Land Use Plan 9/14/2020 Page 2-7
Median Home Value
In 2016, the median home value in Kill Devil Hills was $234,900. This median home value is
approximately 65% higher than that of the state overall. Both Nags Head and Emerald Isle have a higher
median home value to that of Kill Devil Hills. Home values are typically higher in coastal communities
than in mainland communities due to the presence of large vacation homes in close proximity to the
water.
Table 6. Median Home Value, 2016
Municipality Amount
Kill Devil Hills $234,900
Nags Head $341,800
Emerald Isle $363,700
North Carolina $157,100
Source: US Census Bureau.
ECONOMIC DATA
Data related to Kill Devil Hills’ local economy is included on the following pages. Information detailing
the labor force, employment by industry, and household income is provided.
Labor Force
According to US Census data, approximately 75% of Kill Devil Hills’ population aged 16 years and older
are considered part of the labor force. This category consists mainly of workers involved in service
delivery and public administration, establishing a workforce and infrastructure necessary to support the
area’s rapidly fluctuating seasonal population base.
75.0%
67.2%
52.8%
62.6%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
Kill Devil Hills Nags Head Emerald Isle North Carolina
% of Population 16 Years & Over in the
Labor Force, 2016
S ECTION 2. C OMMUNITY P ROFILE
Page 2-8 9/14/2020 CAMA Land Use Plan
Employment by Industry
In Kill Devil Hills, the arts, entertainment, and recreation/accommodation and food services industry
provides the greatest percentage of employment to residents. Nearly 27% of the Town’s employed
population 16 years and over work in this industry, compared to 9.6% for the State. Other industries
employing most of the Town’s workers include construction, retail trade, and professional, scientific, and
management/administrative and waste management services.
Table 7. Kill Devil Hills Employment by Industry, 2016
Industry % of Employed Population Over 16 Years
Agriculture, Forestry, Fishing, Hunting, & Mining 0.3%
Construction 11.0%
Manufacturing 5.0%
Wholesale Trade 3.1%
Retail Trade 10.7%
Transportation, Warehousing, & Utilities 2.2%
Information 2.8%
Finance, Insurance, and Real Estate 9.5%
Professional, Scientific, Management, Administrative, and Waste
Management Services
10.7%
Educational Services, Health Care, and Social Assistance 8.9%
Arts, Entertainment, Recreation, Accommodation, & Food Service 26.9%
Other Services, Except Public Administration 2.6%
Public Administration 6.3%
Source: US Census Bureau.
Income
For demographic purposes, income figures are calculated per household by the US Census Bureau. This
figure includes the combined incomes of all people sharing a particular household or place of residence.
Median household income in Kill Devil Hills ($48,517) is roughly nineteen percent less than the
comparison communities of Nags Head and Emerald Isle.
$48,517
$56,707
$61,106
$48,256
$0
$10,000
$20,000
$30,000
$40,000
$50,000
$60,000
$70,000
Kill Devil Hills Nags Head Emerald Isle North Carolina
Median Household Income, 2016
S ECTION 2. C OMMUNITY P ROFILE
CAMA Land Use Plan 9/14/2020 Page 2-9
Local Economic Issues
In 2007, the Town of Kill Devil Hills commissioned a survey and related report from the East Carolina
University Center for Survey Research. This survey yielded the following issues/concerns regarding the
economic climate of the Town.
Employment Issues
o Need more employment opportunities.
o Need higher paying jobs.
o Need more recruitment for service jobs, i.e., teachers, police, etc.
o Maintain good working conditions.
Industry/Business
o Sustain Kill Devil Hills’ opportunity to become the center showplace of the island. It
could be the cultural, commercial, and overall economic hub of the Outer Banks.
o Increase small manufacturing.
o Keep year-round residents thriving by providing more industry.
o Invite good high tech industry/business to settle in Kill Devil Hills.
Economy (General)
o Attract more tourists – for revenue to support the Town.
o Enhance economic development/growth.
o Support for the local economy.
o Support the services and economy needed to maintain the Town.
S ECTION 2. C OMMUNITY P ROFILE
Page 2-10 9/14/2020 CAMA Land Use Plan
SUMMARY
Population
Kill Devil Hills’ permanent population has increased by 315.8% since 1980.
Kill Devil Hills’ estimated peak seasonal population is 35,852 persons.
Approximately 26.2% of Kill Devil Hills’ residents have a high school diploma or equivalency,
while roughly 27% have either an Associate’s or Bachelor’s degree.
Housing
Over 85% of the housing stock in Kill Devil Hills is comprised of single-family dwellings.
Approximately 68% of the homes located within Kill Devil Hills’ corporate limits have been built
since 1980.
Within Kill Devil Hills, roughly 43.5% of total housing units are occupied units, while the
remaining 56.5% are vacant, most of which are available for rental use.
Economic Data
Within Kill Devil Hills, 75% of the resident population 16 years and over is engaged in the labor
force.
The largest employer industry for residents of Kill Devil Hills is arts, entertainment, and
recreation, and accommodation & food service.
The median household income for residents of Kill Devil Hills was reported as $48,517 in 2016.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-1
INTRODUCTION
Sound land development policies require a thorough understanding of the existing natural systems, land
use patterns, transportation networks, and supporting community facilities and services. The following
existing conditions section provides information and details pertaining to each of these topics for the
Town of Kill Devil Hills.
NATURAL SYSTEMS
Climate
The climate in Kill Devil Hills is dynamic and can present fairly harsh conditions, especially during
winter months. The Town’s unique location along the North Carolina coastline makes the Town
vulnerable to heavy winds associated with hurricanes/tropical storms and nor’easters. Overall, the
Town has a temperate coastal environment with a year-round temperature average of 70 degrees
Fahrenheit (F). Over the course of a typical year, the temperature ranges from 37 degrees F to 87 degrees
F. Other climate statistics include the following:
Spring temperature averages 68 degrees F.
Summer temperature averages 80 degrees F.
Fall temperature averages 62 degrees F.
Winter temperature averages 49 degrees F.
Record low temperature -6 degrees F (December 1989).
Record high temperature 103 degrees (June 1952).
A wet day is one with at least 0.04 inches of liquid or liquid-equivalent precipitation. The chance of wet
days in Kill Devil Hills varies throughout the year. The wetter season lasts three months, from June 13 to
September 12, with a greater than 36% chance of a given day being a wet day. The chance of a wet day
peaks at 49% on August 5. The drier season lasts nine months, from September 12 to June 13. The
smallest chance of a wet day is 23% on October 31.
According to the National Weather Service, the water temperatures for Kill Devil Hills range from an
average of 56 degrees F in January to 73 degrees F in August.
Geography and Topography
The topography within two (2) miles of Kill Devil Hills is essentially flat, with a maximum elevation
change of 90 feet and an average elevation above sea level of 7 feet. Approximately 3 to 20 feet is
generally the characteristic of the entire Outer Banks, with the exception of Jockey’s Ridge (66 feet) in
Nags Head and the Wright Brothers Memorial (90 feet) in Kill Devil Hills. It should be noted, however,
that the Wright Brothers Memorial is a man-made structure and not natural topography.
The Town of Kill Devil Hills is located on the Outer Banks of North Carolina. As noted in Section 1, the
Outer Banks is a 200-mile-long string of barrier islands along the coast of North Carolina and
southeastern Virginia. The Outer Banks extends along most of the North Carolina coastline, separating
the Currituck Sound, Albemarle Sound, and Pamlico Sound from the Atlantic Ocean. Due to this unique
landscape, Kill Devil Hills is nearly surrounded by water with the exception of the northern and southern
S ECTION 3. E XISTING C ONDITIONS
Page 3-2 9/14/2020 CAMA Land Use Plan
extents of Town. There are also several creeks and bays bordering the Town’s estuarine shoreline
including: Blount Bay, Buzzard Bay, Colington Creek, and Kitty Hawk Bay.
Flood Zones
According to the 2006 flood maps, approximately 67% of the Town of Kill Devil Hills is inundated by a
Special Flood Hazard Area (SFHA). This percentage does not include areas impacted by the X flood zone
as described in Table 8. A SFHA is defined as a land area with a greater than 1% chance per year of
flooding and is also known as a “floodplain.” Special Flood Hazard Areas are indicated on Flood
Insurance Rate Maps (FIRMs), which are considered the most reliable and consistent source for
delineating SFHAs and are the source used to determine whether or not the purchase of flood insurance
is mandatory for developed properties with a mortgage.
SFHAs are broken into “AE” zones and “VE” zones. “AE” zones, formerly known as the 100-year
floodplain, are areas subject to risk of flooding by standing or relatively static flood waters, while “VE”
zones are areas subject to wave action. “Shaded X” is a supplemental flood hazard area in which there is
a 0.2% annual chance of flooding, also known as the “500-year floodplain.” Land bordering the Atlantic
Ocean is most susceptible to wave inundation, whereas land bordering estuarine areas are most
susceptible to flooding/rising waters.
Approximately 60% of the Town’s planning jurisdiction is impacted by the AE zone, while only 7.2% is
impacted by the VE zone. These percentages are based on flood maps prepared by the National Flood
Insurance Program in 2006. These maps are currently being updated and could affect the acreages
outlined in Table 8. The geographic location of each flood hazard area is displayed on Map 2. Digital
FEMA Flood Insurance Rate Maps are available for review at www.ncfloodmaps.com.
Table 8. Flood Hazard Areas
Flood Zones Acres % of Town Acreage
X (0.2% Annual Chance) 1,254.46 32.46%
A 13.68 0.35%
AE 2,318.08 59.99%
VE 278.05 7.20%
Total 3,864.27 100.00%
Source: Federal Emergency Management Agency.
Kitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
N
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailCol
i
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrMap 2. Flood Hazard Areas
I 0 0.25 0.5 0.75 10.125 Miles
Atlantic Ocean
Albemarle Sound
Legend
Dare County
Kill Devil Hills Town Limits
Fresh Pond
Roads
Flood Zones
A
AE
VE
X
Source: FEMA Flood Maps (09/20/06)3-3
S ECTION 3. E XISTING C ONDITIONS
Page 3-4 9/14/2020 CAMA Land Use Plan
Storm Surge Inundation
Maps 3 and 4 display areas of Kill Devil Hills that may be
impacted by a hurricane-generated storm surge based on
the SLOSH (Sea, Land, and Overland Surges from
Hurricanes) model developed by the National Oceanic and
Atmospheric Administration (NOAA), which computes
storm surge heights from tropical cyclones, such as
hurricanes. The SLOSH model estimates the extent of storm
surge inundation for “fast-moving” storms (forward
velocity greater than 15 miles per hour) and for “slow-
moving” storms (forward velocity less than 15 miles per
hour). Storm surge inundation from a slow-moving storm
would result in the greatest potential damage to property in
Kill Devil Hills. Approximately 86% of the Town would be
potentially impacted by a slow-moving Category 5
hurricane. The following table provides a summary of
surge inundation for both fast- and slow-moving hurricanes.
Table 9. Storm Surge Inundation
Fast Moving Storm Acres % of Town Acres
Category 1 & 2 600.24 15.53%
Category 3 2,562.15 66.30%
Category 4 & 5 3,151.62 81.56%
Slow Moving Storm Acres % of Town Acres
Category 1 & 2 1,702.78 44.06%
Category 3 2,402.25 62.16%
Category 4 & 5 3,328.69 86.14%
Source: National Oceanic and Atmospheric Administration.
Hazard Mitigation and Preparation
The Town of Kill Devil Hills falls under the jurisdiction of the Albemarle Regional Hazard Mitigation
Plan. This plan involves the participation of Camden County, Chowan County, Currituck County, Dare
County, Gates County, Hertford County, Pasquotank County, and Perquimans County. The plan
identifies existing land use patterns in relation to the existing built environment, including what
measures should be taken to reduce the risk of life and property throughout the Region as a result of
natural hazard activity. Development and update of this plan is a requirement imposed by both the
Federal (Disaster Mitigation Act of 2000) and State (NC Senate Bill 300) governments. The Albemarle
Regional Hazard Mitigation Plan was certified by FEMA on May 12, 2015.
Storm surge damage resulting from Hurricane
Matthew in 2016 washed out the Beach Road just
south of the Black Pelican in Kitty Hawk. Image
Source: Matt Lusk Photography.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
t
a
n
H
w
y
N
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailBickett StOcean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
I 0 0.25 0.5 0.75 10.125 Miles
Map 3. Fast Moving SLOSH
Atlantic Ocean
Albemarle Sound
Legend
Dare County
Kill Devil Hills Town Limits
Fresh Pond
Roads
Category 1/2
Category 3
Category 4/5
Source: National Oceanic & Atmospheric Association 3-5
Kitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
N
C
r
o
at
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailCol
i
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrMap 4. Slow Moving SLOSH
I 0 0.25 0.5 0.75 10.125 Miles
Atlantic Ocean
Albemarle Sound
Legend
Dare County
Kill Devil Hills Town Limits
Fresh Pond
Roads
Category 1/2
Category 3
Category 4/5
Source: National Oceanic & Atmospheric Administration
3-6
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-7
The following provides a listing of all hurricane events that have impacted the Town since 1996. The full
Regional Hazard Mitigation Plan is available for review at the Kill Devil Hills Administration Building,
or on the Town’s website. Additionally, the mitigation strategies developed by Dare County and the
Town of Kill Devil Hills through this process have been provided in Appendix B.
1996 – Fran
August 23 – September 10
Max wind Speed: 121 mph
Landfall: Cape Fear
Category 3 at landfall with 115 mph winds and an 8-12 foot storm surge
No evacuations in Dare County
1998 – Bonnie
August 19 – August 31
Max Wind Speed: 115 mph
Landfall: Cape Fear
Category 3 at landfall 6-8 foot storm surge
Evacuation – all of Dare County
1999 – Dennis
August 24 – September 8
Max Wind Speed: 104 mph
Landfall: Dare County 9/14/99
Tropical Storm at landfall 69 mph winds
Evacuation – all of Dare County
Estimated $10 million in damages
1999 – Floyd
September 7 – September 19
Max Wind Speed: 155 mph
Landfall: Topsail Island 9/16/99
Category 2 at landfall with 109 mph winds
Evacuation – all of Dare County
2003 – Isabel
September 7 – September 29
Max Wind Speed: 160 mph
Landfall: Drum Inlet 9/18/03
Category 2 at landfall with 104 mph winds and 6-10 foot storm surge
Created breech in island between Frisco and Hatteras Village
Evacuation – all of Dare County
Estimated $400 million in damages
2010 – Earl
August 25- September 5
Max Wind Speed: 145 mph
Passed 100 miles off of the NC Coast
Evacuation - all of Hatteras Island and oceanfront of all Towns
Estimated $500,000 in damages
2011 – Irene
August 20 – August 28
Max Wind Speed: 120 mph
Landfall just south of the Outer Banks
Evacuation all of Dare County
Significant flooding
Estimated Damages: $54 million
2012 – Sandy
October 25 – October 31
Max Wind Speed: 70 mph
Significant road damage to NC 12 in Kitty Hawk and Rodanthe
7-8 inches of rainfall
Emergency ferry activation due to NC 12 road damage
Estimated Damages: $13+ million
2014 – Arthur
July 3 – July 4
Max Wind Speed: 101 mph
Category 2 at landfall
Earliest hurricane on record
Landfall between Cape Lookout and Beaufort
Mandatory evacuation issued for Hatteras Island
2016 - Matthew
October 8 – October 9
Max Wind Speed: 94 mph
Category 1 at landfall in South Carolina
NWS reported rainfall 9.53 inches
Estimated damaged: $52.2 million
S ECTION 3. E XISTING C ONDITIONS
Page 3-8 9/14/2020 CAMA Land Use Plan
Soils
According to the Dare County Soil Survey, there are 16 different soil types within Kill Devil Hills’
corporate limits (see Map 5). The most prominent soil types are various fine sands, which account for a
majority of the soil in Kill Devil Hills. Most of the soils in Kill Devil Hills are considered very poorly
drained or “hydric” soils. These soil types are often found in flood hazard and wetland areas. It should
be noted; however, that the predominant method for wastewater treatment in a majority of homes and
businesses is through some form of on-site system. Septic tank failures within Town are not common.
Septic permits are issued by the Dare County Health Department on a site-by-site basis.
BnD – Beaches-Newhan complex, 0 to 25 percent slopes
CnA – Conaby muck, 0 to 2 percent slopes, rarely flooded
CoB – Corolla fine sand, 0 to 6 percent slopes, rarely flooded
CrB – Corolla-Duckston complex, 0 to 6 percent slopes, rarely flooded
CuA – Currituck mucky peat, 0 to 1 percent slopes, frequently flooded
DtA – Duckston fine sand, 0 to 2 percent slopes, occasionally flooded
DuE – Dune land, 2 to 40 percent slopes
DwE – Dune land-Newhan complex, 2 to 40 percent slopes
FrD – Fripp fine sand, 2 to 30 percent slopes
HoA – Hobonny muck, 0 to 1 percent slopes, frequently flooded
NeC – Newhan fine sand, 0 to 10 percent slopes
NhC – Newhan-Corolla complex, 0 to 10 percent slopes
NuC – Newhan-Urban land complex, 0 to 10 percent slopes
OsA – Osler fine sand, 0 to 2 percent slopes, rarely flooded
OuB – Ousley fine sand, 0 to 5 percent slopes, rarely flooded
PsB – Psamments, 0 to 6 percent slopes
Refer to Appendix I for a summary of soil types throughout Kill Devil Hills and their respective
limitations relating to suitability for development.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
N
C
r
o
at
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailCol
i
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
Map 5 Soils
I 0 0.25 0.5 0.75 10.125 Miles
Albemarle Sound
Atlantic Ocean
Legend
Dare County
fresh pond
Kill Devil Hills Town Limits
Roads
Soil Type
BnD
CnA
CoB
CrB
CuA
DtA
DuE
DwE
FrD
HoA
NeC
NhC
NuC
OsA
OuB
PsB
W
Source: USDA Natural Resource Conservation Service 3-9
S ECTION 3. E XISTING C ONDITIONS
Page 3-10 9/14/2020 CAMA Land Use Plan
Surface Waters
Each stream mile of water in North Carolina is evaluated
and rated by the NC Division of Water Resources
(formerly the Division of Water Quality). The
classifications are based upon the existing or
contemplated best usage of the various streams and
segments of streams within a basin, as determined
through studies, evaluations, and comments received at
public hearings. The state water classification system is
summarized in Table 10.
Table 10. NC Division of Water Resources Water Body
Classifications
PRIMARY FRESHWATER AND SALTWATER CLASSIFICATIONS*
Class Best Uses
C and SC Aquatic life propagation/protection and secondary
recreation
B and SB Primary recreation and Class C uses
SA Waters classified for commercial shellfish harvesting
WS Water Supply Watershed. There are five WS classes
ranging from WS-I through WS-V. WS classifications are
assigned to watersheds based on land use characteristics
of the area. Each water supply classification has a set of
management strategies to protect the surface water
supply. WS-I provides the highest level of protection and
WS-V provides the least protection. A Critical Area (CA)
designation is also listed for watershed areas within a half-
mile and draining to the water supply intake or reservoir
where an intake is located.
SUPPLEMENTAL CLASSIFICATIONS
Sw Swamp Waters: Recognizes waters that will naturally be
more acidic (have lower pH values) and have lower levels
of dissolved oxygen.
Tr Trout Waters: Provides protection to freshwaters for
natural trout propagation and survival of stocked trout.
HQW High Quality Waters: Waters possessing special qualities
including excellent water quality, Native or Special Native
Trout Waters, Critical habitat areas, or WS-I and WS-II
water supplies
ORW Outstanding Resource Waters: Unique and special surface
waters that are unimpacted by pollution and have some
outstanding resource values.
NSW Nutrient Sensitive Waters: Areas with water quality
problems associated with excessive plant growth resulting
from nutrient enrichment.
*Primary classifications beginning with an “S” are assigned to salt
waters. Source: NC Department of Environmental Quality.
North Carolina Water Quality Basics
What Are Surface Water Classifications?
Surface Water Classifications are designations
applied to surface water bodies, such as water
streams, rivers and lakes, which define the best uses
to be protected within these waters (for example
swimming, fishing, drinking water supply) and carry
with them an associated set of water quality
standards to protect those uses. Surface water
classifications are one tool that state and federal
agencies use to manage and protect all streams,
rivers, lakes, and other surface waters in North
Carolina. Classifications and their associated
protection rules may be designed to protect water
quality, fish and wildlife, the free flowing nature of a
stream or river, or other special characteristics.
How Do They Affect Me?
Before you buy property, plan a new development
project, construct a new road or undertake other
land use activities, you should check with local,
state, and federal agencies about the assigned
surface water classification for the waterbody on
your property. Many of the newer classifications,
especially those designed to protect drinking water
supplies and certain high quality waters, have
protection rules which regulate some land or
disturbance and other human activities.
Why Do They Sometimes Overlay?
Many streams, rivers, and lakes may have several
classifications applied to the same area. This is
because surface waters are classified to protect
different uses or special characteristics of the
waterbody. For example, a stream or specific stream
segment may be classified as Class WS-III Tr HWQ by
the NC Division of Water Resources (DWR). This
protects it as a drinking water supply (WS-III), as
Trout Waters (Tr), and as High Quality Waters
(HQW). The stream segments upstream or
downstream may have different classifications
based on other water uses or stream characteristics.
Stream’s Classification?
DWR classifies all surface waters. A waterbody’s
classification may change at the request of a local
government or citizen. DWR reviews each request
for a reclassification and conducts an assessment of
the waterbody to determine the appropriateness of
the reclassification. DWR also conducts periodic
waterbody assessments which may result in a
recommendation to reclassify the waterbody. In
order for a waterbody to be reclassified it must
proceed through the rule-making process.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-11
The water classifications relevant to Kill Devil
Hills are provided in Table 11 (see Map 6).
Fresh Pond is currently a designated water
supply watershed. There are also three (3)
wellhead protection areas associated with the
water system (see image to right). The Safe
Drinking Water Act Amendments of 1986
established requirements for states to develop
Wellhead Protection Programs (WHPPs). A
WHPP is a pollution prevention and
management program used to protect
underground sources of drinking water. These
programs were intended by Congress to be a
key part of a national groundwater protection
strategy to prevent contamination of
groundwaters that are used as public drinking
water supplies. In North Carolina,
development of a local Wellhead Protection
Plan is not mandatory; however, it is viewed
as a valuable supplement to existing state
groundwater protection programs. North Carolina’s WWHP is intended for city and county
governments and water supply operators who which to provide added protection to their local
groundwater supplies. The Wellhead Protection Plan, once implemented, reduces (but does to eliminate)
the susceptibility of wells to contaminants. The wells located in the Town of Kill Devil Hills fall under
the jurisdiction of the Dare County Wellhead Protection Plan adopted by the County Board of
Commissioners on March 24, 2014. A full copy of the Dare County Wellhead Protection Plan is available
at https://www.darenc.com/home/showdocument?id=4354.
Table 11. Waterbody Classifications
Waterbody Description Classification
Atlantic Ocean The waters of the Atlantic Ocean contiguous to that portion of
Pasquotank River Basin that extends from the North Carolina-
Virginia state line to the northeast tip of Ocracoke Island
SB
Colington Creek From Kill Devil Hills Bridge north to Kitty Hawk Bay SC
Colington Creek Wildlife ramp on Bay Drive SC
Freshwater Lake at Kill Devil Hills Entire lake WS-III; CA
Roanoke Sound Northeast of a line from Rhodams Point to Mann Point SA; HQW
Buzzard Bay Entire bay SC
Source: NC Department of Environmental Quality.
Under section 303(d) of the Clean Water Act, states, territories, and authorized tribes (included in the
term State here) are required to submit lists of impaired waters. These are waters that are too polluted or
otherwise degraded to meet water quality standards. According to the 2018 Final 303(d) list, the
following waterbodies in Kill Devil Hills are identified as 303(d) impaired waters: Roanoke Sound as
listed in Table 11 above. It should be noted that Colington Creek (wildlife ramp on Bay Drive) is no
longer listed on the 303(d) list.
Wellhead Protection Areas. Image Source: NCDEQ.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
at
a
n
H
w
y
N
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailColington RdBickett StOcean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
Map 6. Water Quality & Aquatic Life
I 0 0.25 0.5 0.75 10.125 Miles
Atlantic Ocean
Legend
Dare County
Kill Devil Hills Town Limits
Fresh Pond
Submerged Aquatic Vegetation
Roads
Water Quality
SA;HQW
SB
SC
WS-III;CA
Source: NC Department of Environmental Quality
Roanoke Sound
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-13
Areas of Environmental Concern
The shorelines within the Town of Kill Devil Hills fall under the jurisdiction of the North Carolina
Coastal Area Management Act (CAMA). CAMA establishes “Areas of Environmental Concern” (AECs)
as the foundation of the Coastal Resources Commission's permitting program for coastal development.
An AEC is an area of natural importance; it may be easily destroyed by erosion or flooding, or it may
have environmental, social, economic, or aesthetic values that make it valuable.
The Coastal Resources Commission designates areas as AECs to protect them from uncontrolled
development that may cause irreversible damage to property, public health or the environment, thereby
diminishing their value to the entire state. Statewide, AECs cover almost all coastal waters and less than
3% of the land in the 20 coastal counties.
Fragile areas are those areas that are not explicitly defined as AECs but that could cause significant
environmental damage or other diminution of quality of life if not managed. These include wetlands,
natural heritage areas, areas containing endangered species, prime wildlife habitats, or maritime forests.
The Town works diligently to manage development in a manner that will minimize adverse impacts on
the Town’s natural resources. The Town has no violations of Areas of Environmental Concern and has
not adversely impacted any areas governed by the Environmental Protection Agency, the NC
Department of Environmental Quality, the Coastal Area Management Act, or the US Army Corps of
Engineers. Additionally, the Town’s land use plan and zoning regulations define development patterns
and land use types that limit development within environmentally sensitive areas, thus limiting
incompatible development.
Estuarine Waters and Estuarine Shorelines (AEC)
An “estuary” can be defined as "a semi-enclosed coastal body of water which has a free connection to the
open sea and within which sea water is measurably diluted with fresh water derived from land
drainage." Estuaries basically serve as transition zones between fresh and salt water and are protected
from the full force of ocean wind and waves by barrier islands, mudflats, and/or sand.
For regulatory purposes, the inland, or upstream, boundary of estuarine waters is the same line used to
separate the jurisdictions of the Division of Marine Fisheries and the Wildlife Resources Commission.
However, many of the fish and shellfish that spend parts of their lives in estuaries move between the
"official" estuarine and inland waters.
Estuarine shorelines are land areas leeward of mean high tide that are immediately adjacent to or
bordering estuarine waters. These areas support the ecological function of estuaries and are highly
vulnerable to erosion caused by wind or water and to damage caused by development.
Under CAMA rules, all lands leeward from the mean high water mark are classified as estuarine
shorelines and are subject to CAMA development regulations. No domestic discharges are permitted in
these waters. Additionally, CAMA AEC setback factors for estuarine shorelines are enforced for all new
development. The minimum setback for new construction is 30 feet from the mean high water mark.
Estuarine waters are situated along the Town’s western shoreline adjacent to the Albemarle Sound,
including a number of bays and creeks such as Colington Creek, Kitty Hawk Bay, and Buzzard Bay.
S ECTION 3. E XISTING C ONDITIONS
Page 3-14 9/14/2020 CAMA Land Use Plan
Coastal Shorelines
The Coastal Shorelines category includes estuarine shorelines and public trust shorelines. Estuarine
shorelines AEC are those non-ocean shorelines extending from the normal high water level or normal
water level along the estuarine waters, estuaries, sounds, bays, fresh and brackish waters, and public
trust areas as set forth in an agreement adopted by the Wildlife Resources Commission and the
Department of Environmental Quality for a distance of 75 feet landward. For those estuarine shorelines
immediately contiguous to waters classified as Outstanding Resource Waters (ORW) by the
Environmental Management Commission (EMC), the estuarine shoreline AEC shall extend to 575 feet
landward from the normal high water level or normal water level, unless the Coastal Resources
Commission establishes the boundary at a greater or lesser extent following required public hearing(s)
within the affected county or counties. Public trust shorelines AEC are those non-ocean shorelines
immediately contiguous to public trust areas, as defined in 15A NCAC 07H.0207(a), located inland of the
dividing line between coastal fishing waters and inland fishing waters as set forth in that agreement and
extending 30 feet landward of the normal high water level or normal water level. Coastal shorelines
within Kill Devil Hills are located adjacent to estuarine waters as defined above.
Public Trust Areas – Waters and Beaches
The North Carolina Division of Coastal Management (DCM) defines “Public Trust Areas” as the coastal
waters and submerged lands that every North Carolinian has the right to use for activities such as
boating, swimming, or fishing. These areas often overlap with estuarine waters, but they also include
many inland fishing waters. The following lands and waters are considered public trust areas:
All waters of the Atlantic Ocean and the lands underneath, from the normal high water mark on
shore to the state's official boundary three miles offshore; all navigable natural water bodies and
the lands underneath, to the normal high watermark on shore (a body of water is considered
navigable if you can float a canoe in it). This definition does not include privately owned lakes
where the public does not have access rights; all waters in artificially created water bodies that
have significant public fishing resources and are accessible to the public from other waters; and
all waters in artificially created water bodies where the public has acquired rights by
prescription, custom, usage, dedication or any other means. Although public trust areas must be
delineated by on-site analysis, all submerged lands adjacent to Kill Devil Hills along the
Albemarle Sound shoreline and the Atlantic Ocean should be considered public trust areas.
Under CAMA regulations, all lands 30 feet leeward of public trust areas are subject to the
restrictions for estuarine shoreline areas.
Additionally, NCGS 77-20 clarifies the public’s right to use the full width of the State’s ocean beaches,
from the base of the dunes to the water, as outlined below:
(d) The public having made frequent, uninterrupted, and unobstructed use of the full width and
breadth of the ocean beaches of this State from time immemorial, this section shall not be
construed to impair the right of the people to the customary free use and enjoyment of the ocean
beaches, which rights remain reserved to the people of this State under the common law and are
a part of the common heritage of the State recognized by Article XIV, Section 5 of the
Constitution of North Carolina. These public trust rights in the ocean beaches are established in
the common law as interpreted and applied by the courts of this State.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-15
(e) As used in this section, "ocean beaches" means the area adjacent to the ocean and ocean inlets
that is subject to public trust rights. This area is in constant flux due to the action of wind, waves,
tides, and storms and includes the wet sand area of the beach that is subject to regular flooding
by tides and the dry sand area of the beach that is subject to occasional flooding by tides,
including wind tides other than those resulting from a hurricane or tropical storm. The landward
extent of the ocean beaches is established by the common law as interpreted and applied by the
courts of this State. Natural indicators of the landward extent of the ocean beaches include, but
are not limited to, the first line of stable, natural vegetation; the toe of the frontal dune; and the
storm trash line.
This public right was affirmed by the NC Court of Appeals in a unanimous 2015 ruling in the case of Nies
v. Emerald Isle. The case was appealed to the US Supreme Court, but the request to review the case was
denied. The November 2015 ruling of the NC Court of Appeals remains the definitive case law regarding
the public’s right to use the ocean beaches of North Carolina.
Coastal Wetlands
The Coastal Resources Commission rules define “Coastal Wetlands” as any marsh in the 20 coastal
counties (including Dare County and therefore, Kill Devil Hills) that regularly or occasionally floods by
lunar or wind tides, and that includes one or more of the following ten (10) plant species:
Spartina alterniflora: Salt Marsh (Smooth) Cordgrass
Juncus roemerianus: Black Needlerush
Salicornia spp.: Glasswort
Distichlis spicata: Salt (or Spike) Grass
Limonium spp.: Sea Lavender
Scirpus spp.: Bulrush
Cladium jamaicense: Sawgrass
Typha spp: Cattail
Spartina patens: Salt Meadow Grass
Spartina cynosuroides: Salt Reed or Giant Cordgrass
Coastal wetlands provide significant environmental and economic benefits to the residents of Kill Devil
Hills, as well as the Outer Banks overall. They protect against flooding, help maintain water quality,
provide habitat to wildlife, and serve as part of the estuarine system. In 2003, the Division of Coastal
Management classified and mapped coastal wetlands based on an analysis of several existing data sets,
including aerial photographs and satellite images of all coastal areas in North Carolina. Even though the
presence of wetlands must be established by an on-site delineation and investigation of plants, DCM
produced an excellent representation of wetlands in the Town, and throughout coastal North Carolina.
According to the Coastal Wetlands Inventory, approximately 14% of the Town’s planning jurisdiction, or
556 acres, are coastal/non-coastal wetlands (see Table 12 and Map 7).
Table 12. Wetlands
Wetland Type Acres % of Town Acreage
Cleared Estuarine Shrub/Scrub 2.11 0.05%
Cleared Maritime Forest 24.75 0.64%
Cutover Estuarine Shrub/Scrub 0.99 0.03%
S ECTION 3. E XISTING C ONDITIONS
Page 3-16 9/14/2020 CAMA Land Use Plan
Wetland Type Acres % of Town Acreage
Cutover Maritime Forest 4.15 0.11%
Depressional Swamp Forest 0.05 0.001%
Estuarine Shrub/Scrub 18.16 0.47%
Freshwater Marsh 4.93 0.13%
Managed Pineland 142.02 3.68%
Maritime Forest 55.22 1.43%
Pine Flat 13.24 0.34%
Salt/Brackish Marsh 290.47 7.52%
Total 556.09 14.39%
Source: Federal Emergency Management Agency.
Non-Coastal Wetlands
The US Army Corps of Engineers defines wetlands as those areas that are inundated or saturated by
surface or ground water at a frequency and duration to support, and that under normal circumstances do
support, a prevalence of vegetation typically adapted for life in saturated soil conditions. It is generally
agreed that wetlands have significant values that support the unique lifestyle enjoyed by residents of the
coastal area. These values include the following:
Water Storage. Wetlands are able to temporarily store heavy rain, surface runoff, and floodwaters,
and thereby, reduce downstream flooding.
Shoreline Stabilization. Ground cover and roots of wetlands plants help hold soils in place and
prevent sedimentation and nutrient transport.
Water Quality. Wetlands plants can enhance water quality by removing pollutants from surface
runoff.
Wildlife and Aquatic Life Habitat. The variety of plants, hydrologic and soil conditions associated
with wetlands provide abundant food and cover for animal populations and support a number of
rare and endangered plants. Wet pine savannas with the wet pine flat designation have special
importance because they are known to provide favorable habitat for rare species and are
themselves rare.
Recreation and Education. The rich array of plants and animals supported by wetlands provide
significant consumptive and non-consumptive use values - hunting and fishing, bird watching,
canoeing, etc.
The presence of non-coastal wetlands must be determined in the field on a case-by-case basis.
Inlet Hazard Areas
The Inlet Hazard AEC extends inland from an existing inlet a sufficient distance to encompass the area
where the State reasonably expects the inlet to migrate over time. Development within inlet hazard AECs
must comply with three key use standards: (1) the setbacks for the ocean hazard area; (2) density for
commercial and residential structures limited to no more than 3 units per acre; and (3) only residential
structures of 4 units or less or commercial structures of 5,000 square feet or less are allowed. There are no
inlet hazard areas within the Kill Devil Hills planning jurisdiction.
Kitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
N
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailCol
i
ngt
on RdBickett StO cean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrMap 7. Wetlands
I 0 0.25 0.5 0.75 10.125 Miles
Atlantic Ocean
Albemarle Sound
Legend
Dare County
Kill Devil Hills Corporate Limit
Fresh Pond
Roads
Wetlands
Cleared Estuarine Shrub/Scrub
Cleared Maritime Forest
Cutover Estuarine Shrub/Scrub
Cutover Maritime Forest
Depressional Swamp Forest
Estuarine Shrub/Scrub
Freshwater Marsh
Managed Pineland
Maritime Forest
Pine Flat
Salt/Brackish Marsh
Source: US Fish & Wildlife Service, National Wetlands Inventory 3-17
S ECTION 3. E XISTING C ONDITIONS
Page 3-18 9/14/2020 CAMA Land Use Plan
Ocean Beaches/Shorelines and Areas of Excessive Erosion
Ocean beaches and shorelines are lands consisting of unconsolidated soil materials (i.e., sand) that extend
from the mean low water line landward to a point where either: (a) the growth of vegetation occurs; or (b)
a distinct change in slope or elevation alters the configuration of the land form, whichever is farther
landward. The entire eastern boundary of the Town of Kill Devil Hills – nearly five miles of shoreline - is
an ocean beach. This entire area constitutes an Ocean Hazard AEC as defined by CAMA. The current
Ocean Erodible Area (one of three AECs within the Ocean Hazard Area) is the area where there exists a
substantial possibility of excessive erosion and significant shoreline fluctuation. The oceanward
boundary of this AEC is the mean low water line. The landward extent of this area is the distance
landward from the first line of stable and natural vegetation as defined in 15A NCAC 07H.0305(a)(5) to
the recession line established by multiplying the long-term annual erosion rate times 90; provided that,
where there has been no long-term erosion or the rate is less than two feet per year, this distance shall be
set at 120 feet landward from the first line of stable natural vegetation. For the purposes of this Rule, the
erosion rates are the long-term average based on available historical data. The current long-term average
erosion rate data for each segment of the North Carolina coast is depicted on maps entitled “2011 Long-
Term Average Annual Shoreline Rate Update” and approved by the Coastal Resources Commission on
May 5, 2011 (except as such rates may be varied in individual contested cases or in declaratory or
interpretive rulings).
The CRC updates long-term erosion rates every five to ten years, using aerial photographs to examine
shoreline changes. General maps of erosion rates are available free from the Division of Coastal
Management; detailed erosion rate maps are available for inspection at all Coastal Management field and
local permitting offices. There are two erosion rate factors affecting development setbacks and design
along oceanfront portions of Kill Devil Hills. A majority of the Town’s shoreline is subject to an erosion
rate setback factor of 2.0; however, there are two stretches of beach along the northern and southern
portions of town where a 4.5 to 6.0 setback factor is applied. Further information can be found at
https://deq.nc.gov/about/divisions/coastal-management/coastal-management-oceanfront-
shorelines/oceanfront-construction-setback-erosion-rate.
The oceanside shoreline adjacent to the Town of Kill Devil
Hills is extremely dynamic and highly susceptible to the
effects of coastal erosion. This erosion has begun to
encroach on development along some stretches of Virginia
Dare Trail (NC Highway 12). The ongoing impacts of
tropical storm events and nor’easters have prompted action
by the Town, as well as individual homeowners. These
efforts have included completion of the Town’s initial beach
nourishment project completed in September 2017,
(discussed further below) and the retrofitting of existing
single-family homes. It should be noted that currently
there are no threatened structures or public facilities at risk
due to significant shoreline erosion.
Retrofitting of an existing oceanfront home
through elevation. Image Source: HCP.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-19
Beach Nourishment
Oceanfront beach erosion compromises the overall structural integrity of the dune and beach system;
therefore, impairing environmental resources, the Town’s property values, recreational opportunities for
all, and the Town and County’s tourism economy. Accordingly, the Town adopted a Shore Protection
Plan in August of 2017, aimed at mitigating the erosive effects impacting the Town’s oceanfront. This
plan detailed the proposed activities to be carried out in conjunction with the Town’s 2017 Beach
Nourishment Project. Dare County (the contracting entity for the beach nourishment project which
includes the Towns of Duck, Southern Shores, Kitty Hawk, and Kill Devil Hills) awarded the contract to
Great Lakes Dredge and Dock Company for $38,596,850. For the Town of Kill Devil Hills, this effort
resulted in the construction of 2.6 miles of widened beach shoreline, from the Kitty Hawk/Kill Devil Hills
town line south to Prospect Avenue. Kill Devil Hills’ portion of this project cost was $8,861,529.
A portion of the 6% Occupancy Tax collected by
Dare County is set aside for the Beach
Nourishment Fund. The occupancy tax is
applied to gross receipts derived from rental of
room, lodging, campsite, or similar
accommodation furnished by any hotel, motel,
inn, tourist camp including private residence
and cottages rented to visitors. The Beach
Nourishment Fund must be used for the
placement of sand from other sand sources, the
planting of vegetation, and the building of
structures that are in conformity with NC
CAMA, such as sand fences and dunes, on
beaches of the Atlantic Ocean of North Carolina
for the purpose of widening the beach to benefit
public recreational use and mitigating damage
and erosion from storms to inland property. In
addition, funds for beach nourishment are also
provided by property and municipal service
district taxes.
Occupancy Tax Distribution Rate:
3% Room Occupancy Tax (68% of net
proceeds to Duck, Kill Devil Hills,
Kitty Hawk, Manteo, Nags Head, and
Southern Shores in proportion to the
amount of ad valorem taxes levied by
each town for the preceding fiscal
year and 32% to Dare County).
1% Room Occupancy and Tourism
Development Tax (net proceeds to the
Dare County Tourism Board).
2% Room Occupancy and Tourism Development Tax for Beach Nourishment.
2017 Beach Nourishment Project. Image Source: Town of Kill Devil Hills.
Why Should We Protect Ocean Beaches and Shorelines?
At the edge of the ocean, ocean hazard AECs get the full
force of any storm. Waves, wind, and water can quickly
change the shape of a shoreline, creating or filling inlets,
flattening nearby dunes, eroding beaches and battering
nearby structures. No oceanfront development can be
absolutely safe from destructive natural forces, but
development in ocean hazard areas can be carefully
designed and located to minimize the risk to life and
property, as well as to reduce the cost of relief aid.
Oceanfront beaches and dunes help protect buildings
and environments behind them by absorbing the force
of wind and waves, while the dense root networks of
dune plants trap and anchor sand. Left uncontrolled,
development can destroy these dunes and their
vegetation, increasing the risk of damage to structures
from erosion, flooding, and waves.
The Town is actively committed to preserving and
protecting the dunes.
S ECTION 3. E XISTING C ONDITIONS
Page 3-20 9/14/2020 CAMA Land Use Plan
Fragile Areas
Fragile areas are not AECs but are sensitive areas that could be damaged or destroyed easily by
inappropriate or poorly planned development. The inventory of fragile areas in Kill Devil Hills includes
three types: (1) Protected Lands that are controlled by the State or subject to easements or covenants that
limit development; (2) Natural Heritage Areas as identified by the NC Department of Natural and
Cultural Resources; and (3) Maritime Forests which are intact.
Protected Lands are areas dedicated to conservation and open space uses that are protected from
development by regulation or by ownership by governments or non-profit organizations. The North
Carolina Division of Coastal Management has identified these areas through the assistance of the NC
Center for Geographic Information and Analysis (NCGIA). There are several sites designated as
Protected Lands in Kill Devil Hills (see Map 8). These include the Wright Brothers National Memorial,
Nags Head Woods/Run Hill, and a small portion of the Kitty Hawk Woods Coastal Reserve. The sites
are comprised of state and Town-owned open space areas. Additionally, other facilities, such as CAMA
Public Access locations and town parks may be considered protected lands. These areas will be
discussed further in the Community Facilities section of the plan.
Natural Heritage Program Natural Areas (NHNA) are areas containing ecologically significant natural
communities or rare species. The North Carolina Natural Heritage Program of the NC Department of
Natural and Cultural Resources identifies and helps facilitate the protection of these areas. There are two
Natural Heritage Areas located within the Kill Devil Hills planning jurisdiction: the Wright Brothers
Dune Barrens and Nags Head Woods/Run Hill (see Map 8).
Kill Devil Hills’ maritime forests are an important natural resource that offers both opportunities and
limitations for development. The definitions applied to maritime forests are rather broad: “Forests (that)
have been developed under the influence of salt spray and (that) are found on barrier islands or
immediately adjacent to estuarine waters; dominated by oak, red cedar, holly, and pine trees and
evergreen shrubs.” These forested areas are often the most stable locations on barrier islands and they
offer safe and reasonable areas for development. There are several stands of maritime forests situated
throughout the Town’s planning jurisdiction.
As required by 15A NCAC 7B CAMA Land Use Planning Guidelines, Appendix C provides a US Fish &
Wildlife Services list of endangered/threatened species in Dare County.
It should be noted that through the planning process, it was determined that a majority of the Town’s
fragile and natural resource areas are not impacted by incompatible development. Nearly all of the
Town’s defined fragile areas have been designated as conservation space on the Future Land Use Map.
However, it has been determined that development within Kill Devil Hills, as well as adjacent
municipalities, has been detrimental to the water quality within shellfishing waters along the Town’s
estuarine shoreline. The Town intends to carry out all strategies defined in this plan relating to water
quality improvement in an effort to reduce the impacts of development in these areas.
Slopes in Excess of 12%
There are limited areas of slope in excess of 12% within Kill Devil Hills’ corporate limits. These areas are
mainly located in the dunes areas, erosion escarpment, and the south side of the Wright Brothers
Memorial.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
at
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ail
N
C
r
o
at
a
n
H
w
y
Coli
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
Map 8. Protected Lands/NHP Natural Areas
I 0 0.25 0.5 0.75 10.125 Miles
Legend
Dare County
Kill Devil Hills Town Limits
NC Protected Lands
Fresh Pond
Roads
NHP Protection Rating
R1 (Exceptional)
R2 (Very High)
R3 (High)
Atlantic Ocean
Source: North Carolina Natural Heritage Program 3-21
Roanoke Sound
S ECTION 3. E XISTING C ONDITIONS
Page 3-22 9/14/2020 CAMA Land Use Plan
Water Supply Watershed
As previously noted, all surface waters in North Carolina are assigned a primary classification by the NC
Division of Water Resources (DWR). The waters of Fresh Pond (refer to Map 6, page 3-12) are designated
by DWR as a water supply watershed (WS). Fresh Pond is designated a WS-III; a WS-II waterbody is
used as sources of water supply for drinking, culinary, or food processing purposes where a more
protective WS-I or II classification is not feasible. These water are also protected for Class C uses. Class C
uses are waters protected for uses such as secondary recreation, fishing, wildlife, fish consumption, and
aquatic life, including propagation.
Areas of Resource Potential
Regionally Significant Parks
The discussion of parks and open space will be addressed in the Community Facilities section of the plan.
Marinas and Mooring Fields
“Marinas” are defined by the NC Division of Coastal Management as any publicly or privately owned
dock, basin, or wet boat storage facility constructed to accommodate more than ten boats and providing
any of the following services: permanent or transient docking spaces, dry storage, fueling facilities,
haulout facilities, and repair service. The Town does not currently have a full service or public/private
marina. There are dockage facilities associated with residential developments adjacent to Colington
Creek, as well as docks attached to single-family homes. Some of these docks are separated by the road
from the principal use of the property. Kill Devil Hills is also served by a public boating access facility
(with no overnight docking facilities) which is located at the end of Dock Street.
A “freestanding mooring” is any means to attach a ship, boat, or other watercraft to a stationary
underwater device, mooring buoy, buoyed anchor, or piling not associated with an existing or proposed
pier, dock, or boathouse. When more than one freestanding mooring is used in the same general vicinity,
it is known as a “mooring field.” CAMA has regulations for the safe siting and operation of moorings
and mooring fields. There are currently no mooring fields in Kill Devil Hills.
Floating Homes or Structures
A floating home or structure is any structure, not a boat, supported by means of flotation and designed to
be used without a permanent foundation which is used for human habitation or commerce. A structure
is considered a floating home or structure if it is inhabited or used for commercial purposes for more than
30 days in any one location. A boat may be deemed a floating structure if its means of propulsion have
been removed or rendered inoperative and it contains at least 200 square feet of living area. There are
currently no floating homes within Kill Devil Hills’ corporate limits.
Primary Nursery Areas, Anadromous Fish Spawning Areas, Submerged Aquatic Vegetation, Shellfishing Waters
Primary Nursery Areas
Primary Nursery Areas, as defined by the Marine Fisheries Commission, are those areas in the estuarine
system where initial post larval development takes place. These areas are usually located in the
uppermost sections of a system where populations are uniformly very early juveniles. The Division of
Marine Fisheries is responsible for preserving, protecting and developing Primary Nursery Areas for
commercially important finfish and shellfish. High productive values in the estuarine waters are the
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-23
result of three essential processes: (1) circulation patterns caused by tidal energy, freshwater flow, and
shallow depth; (2) nutrient trapping mechanisms; and (3) protection offered to many species. Important
features of the estuary system are mud and sand flats, eel grass beds, salt marshes, submerged vegetation
flats, clam and oyster beds, and important nursery areas. There are no defined primary nursery areas
adjacent to Kill Devil Hills; however, Buzzard Bay and Kitty Hawk Bay are designated as special
secondary nursey areas.
Anadromous Fish Spawning Areas
“Anadromous” fish are those that migrate up rivers (or into estuaries) from the sea to breed in
freshwater. The NC Marine Fisheries Commission (MFC) defines anadromous fish spawning areas as
those where evidence of spawning of anadromous fish has been documented by direct observation of
spawning, capture of running trip females, or capture of eggs or early larvae. It should be noted that
there are no anadromous fishing spawning areas located within Kill Devil Hills’ corporate limits.
Submerged Aquatic Vegetation
Grasses that grow to the surface of, but do not emerge from shallow water are called submerged aquatic
vegetation (SAV). One of the most important ecosystem services of the shallow waters adjacent to the
northern shoreline of Kill Devil Hills is to provide refuge in which small fish and shellfish can hide from
larger finfish predators. The habitat value of shallow water is greatly enhanced when it has structure that
provides additional cover, and the structure provided by SAV provides some of the greatest habitat value
for many species. Significant portions of Kitty Hawk Bay, Blount’s Bay and Buzzard Bay support the
growth of SAV and are shown on Map 6.
Shellfishing Waters
The Shellfish Sanitation Section is responsible for monitoring and classifying coastal waters as to their
suitability for shellfish harvesting for human consumption. Recommendations are made to the Division
of Marine Fisheries to close those waters that have the potential for causing illness and opening those that
are assured of having clean, healthy shellfish. Up-to-date information about open and closed shellfishing
areas is posted daily on the NC Division of Marine Fisheries website. As this information is always
evolving, current closure locations have not been included in the plan. The Pasquotank River Basinwide
Water Quality Plan, prepared by NC Division of Water Quality, shows the waters adjacent to Kill Devil
Hills as fully supporting for aquatic life and primary and secondary recreation; partially supporting for
fish consumption; and partially or non-supporting for shellfish harvesting.
All estuarine waters adjacent to Kill Devil Hills are currently considered impaired with respect to
shellfishing with the exception of a small portion of Buzzard Bay (see Appendix D for information
concerning shellfish growing area I-2 in Kill Devil Hills).
Aquaculture
As defined under N.C. General Statute 106-758, aquaculture is the propagation and rearing of aquatic
species in controlled or selected environments. There is no significant aquaculture in Kill Devil Hills.
S ECTION 3. E XISTING C ONDITIONS
Page 3-24 9/14/2020 CAMA Land Use Plan
Water Quality
Basinwide water quality plans are prepared by the NC
Division of Water Resources (DWR) for each of the
seventeen major river basins in the state. Each basinwide
plan is revised at five-year intervals. While these plans are
prepared by DWR, their implementation and the protection
of water quality entails the coordinated efforts of many
agencies, local governments, and stakeholders in the State.
The Town of Kill Devil Hills is located in the Pasquotank
River Basin. The Pasquotank River basin lies entirely within
the outer coastal plain of North Carolina. The overall river
basin includes portions of the Albemarle, Currituck,
Croatan, Roanoke and Pamlico Sounds. The Pasquotank
River Basin is part of the Albemarle-Pamlico Estuarine
System, the second largest estuarine system in the United
States.
Subbasin 03-01-56
Kill Devil Hills is located in subbasin 03-01-56 of the
Pasquotank River Basin. This subbasin includes the Outer
Banks from the northern portion of Dare County south to
Oregon Inlet. It also includes portions of Currituck Sound,
Albemarle Sound, and Roanoke Sound. Ecologically, it is
within the Carolinian Barrier Islands and Coastal Marshes
ecoregions. Land cover generally consists of beaches, marshes,
forested wetlands and evergreen forests with scattered
urbanized areas, wildlife habitat and recreational areas. Several
public lands and significant natural heritage areas can be found
in this subbasin, including Jockey’s Ridge State Park, Nags
Head Woods Preserve, Run Hill State Natural Area, Wright
Brothers National Memorial, and Kitty Hawk Woods Coastal
Reserve. Portions of Currituck and Dare counties are in this
subbasin.
The Outer Banks have experienced rapid population growth
and development with the Towns of Kill Devil Hills and Nags
Head experiencing growth estimated at an increase of 39% and
47% by 2020, respectively. Water quality in areas with growing
populations would benefit from individual or community
implementation of backyard wetlands, rain gardens,
bioretention areas, conversion of impervious surfaces, use of
cisterns, streambank protection and restoration.
Subbasin 03-01-56 at a Glance
Land and Water Area
Total Area: 109 mi2
Land Area: 37 mi2
Water Area: 72 mi2
Land Cover (%)
Surface Water: 70%
Forest/Wetland: 22%
Urban: 7%
Cultivated Crop: <1%
Pasture/Managed Herbaceous: 2%
County
Dare
Municipalities
Kill Devil Hills, Nags Head, Kitty Hawk,
Southern Shores
Monitored Waterbody Statistics:
Recreation
Total: 134.9 mi/22,216.2 ac
Supporting: 134.5 mi/22,211.5 ac
Impaired: 0.5 mi/4.7 ac
Shellfish Harvesting
Total: 21,045.2 ac
Supporting: 19,258.3 ac
Impaired: 1,786.9 ac
Source: 2007 Pasquotank River Basinwide
Water Quality Plan.
Pasquotank River Basin. Image
Source: 2007 Pasquotank River
Basin Water Quality Plan.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-25
The Kill Devil Hills Reverse Osmosis (RO) Water Treatment Plant holds the only National Pollutant
Discharge Elimination System (NPDES) minor permit in the subbasin with a permitted discharge of 0.03
MGD. The water treatment plant discharges into the Atlantic Ocean via ocean outfall. The permit
specifies that the facility monitor whole effluent toxicity (WET). During the last two years of the
assessment period, WET tests show that the facility has failed to meet its 90% acute toxicity target effluent
concentration on three occasions for both outfalls (outfall 001 and outfall 002). DWQ regional office staff
report that outfall 001 is currently in compliance per the permit; however, outfall 002 is showing high
levels of chlorine. DWQ staff is working with the facility to ensure that both outfalls are in compliance
per permit limits. Additionally, there are six non-discharge permits and two stormwater discharge
permits in this subbasin.
COMMUNITY FACILITIES
The following provides an overview of all Town-maintained facilities and services. These day-to-day
operations are critical to sustaining the quality of life that both residents and visitors of Kill Devil Hills
have come to appreciate. This summary relates to existing public facilities and Town services that are
currently being provided. Future services and facilities based on anticipated need/demand will be
addressed in Section 4, Future Demand/Projections. See Map 9 for location of community facilities.
Health Care Resources
Medical Facilities
The largest hospital serving the region, Outer Banks Hospital, is located just south of Kill Devil Hills at
4800 South Croatan Highway in Nags Head. The Outer Banks Hospital is a full-service community
hospital offering a wide range of inpatient and outpatient services. A joint venture between Vidant
Health and Chesapeake Regional Healthcare, the 83,796 square foot facility includes eighteen (18) acute
care medical-surgical beds, two (2) labor and delivery/recovery/post-partum beds, one (1) Level II
nursery bed and three (3) operating rooms, a designated Caesarean section room, outpatient and
diagnostic services, and a 24-hour emergency department.
Designed especially to meet the health needs of
a coastal community, whose summer
population increases significantly from its year-
round population, the Outer Banks Hospital
has approval as a provider of Medicare and
Medicaid programs, licensure by the Division
of Facility Services, and accreditation by the
Joint Commission on the Accreditation of
Healthcare Organizations, College of American
Pathologists, and the American College of
Radiology.
In addition to Outer Banks Hospital, there are a number of physicians’ offices, as well as other healthcare
providers, located throughout Kill Devil Hills, and in Southern Shores, Kitty Hawk, and Nags Head.
Outer Banks Hospital also operates urgent care centers in Southern Shores and Nags Head.
Outer Banks Hospital Image Source: Vidant Health
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!!!
!!!!
!
!!
!
!
!
!
!
!
N
V
ir
ginia
D
a
re Tr
ail
N
V
ir
ginia
D
a
re Tr
ail
S C
r
o
a
t
a
n
H
w
y
S C
r
o
a
t
a
n
H
w
y
S V
ir
ginia
D
a
r
e T
r
ail
S V
ir
ginia
D
a
r
e T
r
ail
N
C
r
o
a
t
a
n
H
w
y
N
C
r
o
a
t
a
n
H
w
y
Col
i
ngt
on RdCol
i
ngt
on RdBickett StBickett StOcean Bay BlvdOcean Bay BlvdOcean Acres DrOcean Acres DrMartin StMartin StHayman BlvdHaym an BlvdBaum Bay DrBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
Map 9. Community Facilities
I 0 0.25 0.5 0.75 10.125 Miles
Albemarle Sound
Atlantic Ocean
Legend
!Public Access
!Community Facilities
Multi-Modal Transportation Facilities*
Water/Sewer Service Area**
Fresh Pond
Dare County
3 - Storage Sheds
5 - Water Tower
2 - Pollution Abatement & Recycling
4 - Fire Department
1 - Park Area
*Future Multi-Modal Transportation Facilitieswill be developed in conjunction with futuredevelopment and redevelopment as infill toexisting infrastructure.
**As noted in the narrative, the Kill Devil Hills sewer service area incorporates the Town's entire corporate limits. Although all properties do not currently have immediate access to an existing sewer line or force main, central sewer/capacity is available. However, line extensions may be required. The specific location of all lines have not been mapped due to Homeland Security concerns.
***School fields are available for usethrough joint use agreement
Source: Town of Kill Devil Hills, Dare County
6 - Police Department
1
4
1
5
6
31
2
3
5
7
7
7
7 - Schools***8 - First Flight Airport
8
3-26
- Sewer Service area for the 152-Acre Oyster Pointe Condo Complex
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-27
Dare County Health Department
The Dare County Department of Health & Human Services is the primary department responsible for
protecting the health of all Dare County residents and protecting, strengthening and helping families and
individuals achieve self-sufficiency. The Department of Health & Human Services partners with
individuals, families, and the community to strengthen their efforts towards healthy living,
independence, permanence and safety. It is comprised of a public health division, social services
division, and administrative division. The Dare County Health Department provides a range of services
including: Veterans Services, Public Health Division, Social Services, Community and Clinical Services,
Adult Services, Environmental Health Services, Children’s Services, Health Education and Outreach,
Economic Services, Home Health and Hospice Services, and Family Services.
Police Department
The Kill Devil Hills Police Department is responsible for protecting the lives and property of its citizens
and visitors. Their work is carried out through a varied program of law enforcement, detection and
prevention of crime and accidents, and planning and directing emergency response activities.
The department currently has 31 employees who provide police and support services to Kill Devil Hills’
citizens and visitors. Kill Devil Hills has a year-round population of approximately 7,000 residents. The
population grows to almost 36,000 during the summer months. The Department is divided into four
divisions: Administration and Recordkeeping, Patrol, Criminal Investigations, and Animal Control.
Patrol Division
Uniformed officers assigned to the Patrol Operations Division have the primary purposes of responding
to calls for service and conducting preventive patrols in the Town. After citizens telephone Dare Central
Communications, calls for service are forwarded to officers through the dispatch office. Often, officers
witness conditions that require self-initiated response. The first responding officer to a 911 call is usually
dispatched from the Patrol Operations Division.
Criminal Investigations Division
The Criminal Investigations Division is staffed by sworn police officers tasked with
investigating felony crimes that occur in the Town. Personnel assigned to the
Criminal Investigations Division are educated and trained in various fields of law
enforcement and the investigations of crimes. Such crimes include violent assaults,
narcotic related offenses, financial fraud, substantial larcenies, residential and
commercial burglaries, and other felonious activity.
Animal Control
The Animal Control Division is responsible for enforcing the Town’s ordinances
regarding animals, along with operating and maintaining the Kill Devil Hills
Animal Shelter.
Police Department
Detective Badge.
Image Source: Town
of Kill Devil Hills.
S ECTION 3. E XISTING C ONDITIONS
Page 3-28 9/14/2020 CAMA Land Use Plan
Fire Protection and Emergency Medical Services
Fire Protection
The Kill Devil Hills Fire Department is a combination fire department (staffed with both career and
volunteer firefighters) serving the Kill Devil Hills community. The department maintains an Insurance
Service Office (ISO) rating of 3. This outstanding rating not only indicates the effectiveness of the
department but also provides insurance benefits to property owners.
The Kill Devil Hills staffing model consists of well-trained, dedicated career and volunteer professionals.
The duty crews, or career team members, are tasked with emergency response duties 24 hours a day, 365
days of the year. They handle daily workload operations and maintenance tasks to ensure the
department is in a constant state of readiness. Maintaining training requirements is also an important
part of ensuring readiness, and ensuring that safety requirements are met. Reserve firefighters/
volunteers provide the necessary additional staffing and are a vital part of the department’s emergency
response model. This model is a balanced approach to meet the ever-changing conditions associated with
a coastal barrier island community.
Ocean Rescue Division
The Ocean Rescue Division became an integral part of the Kill Devil Hills Fire Department in August
1998. The first full season of the division was 1999 at which time it was equipped with 14 fixed guard
stands, four roving lifeguards on all-terrain four-wheelers, two pick-up trucks, and one jet-ski. Prior to
1998, lifeguards were a contracted service. The division now operates with 21 fixed guard stands, with
guards in four separate zones, and one roving lifeguard group leader in each zone. This level of staffing
gives the division nearly complete stand-to-stand sight lines and continuous visibility of the high water
line.
Equipment for the division includes two similarly outfitted
pick-up trucks, each with a jet-ski and other rescue and
communications equipment. The division also has one
three-seat personal water craft and two rigid inflatable
boats (12 feet and 19 feet in length, respectively).
The Ocean Rescue Division is located at the Ocean Bay
Boulevard Regional Access building. The building is located
at 103 S. Virginia Dare Trail at approximately the 8.5
milepost (at the end of Ocean Bay Boulevard on the
oceanfront).
Emergency Medical Services
Emergency medical services in Kill Devil Hills are provided by Dare County Emergency Medical Services
(EMS). Dare County EMS Station One, including all administrative offices, is located in Kill Devil Hills.
Dare County EMS operates eight EMS stations throughout the County (see Table 13).
Kill Devil Hills Ocean Rescue Division. Image
Source: HCP.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-29
Table 13. Dare County EMS Stations
Station Location Address
1 and EMS
Admin. Offices
Kill Devil Hills 1632 N Croatan Highway, Kill Devil Hills
2 Manteo 515 Bowsertown Road, Manteo
3 Frisco 50346 Highway 12, Frisco
4 Southern Shores 28 E. Dogwood Trail, Southern Shores (located in
the Southern Shores Volunteer Fire Department)
5 Nags Head 5314 S. Croatan Highway, Nags Head (located in
the Nags Head Fire Rescue Station)
6 Rodanthe 24297 Atlantic Drive, Rodanthe (located in the
Chicamacomico Banks Volunteer Fire Department)
7 Dare MedFlight
Crews Quarters
1078 Driftwood Drive, Manteo
1025 Driftwood Drive, Manteo
8 Manns Harbor 6677 Highway 64/264, Manns Harbor
Source: Dare County Emergency Medical Services.
Dare MedFlight
Dare County is recognized as an innovative pioneer in providing aeromedical transport services. Dare
MedFlight provides rapid medical transportation for its residents and visitors. For over 25 years, Dare
County has furnished one of the few county-owned aeromedical operations in the entire nation. Based at
the Dare County Regional Airport, Dare MedFlight serves all of Dare County.
Dare MedFlight has a dedicated staff of 5 pilots, 2 full-time
mechanics, and 11 flight paramedics. Together as a team,
they operate a MedFlight Airbus H-145 helicopter, capable
of carrying two patients and air crew members. The aircraft
has advanced safety features including enclosed tail rotors
and a four-axis pilot system.
Dare MedFlight began operating in 1975 to ensure that all
levels of medical care are accessible for residents and
visitors. A helicopter drastically reduces transport times
for patients needing rapid transfer to hospitals outside of
Dare County for provision of trauma and other critical care
services.
Emergency Management
The Town of Kill Devil Hills Fire, EMS, and Police Departments, in concert with Town Administration,
work closely with the Dare County Emergency Management Department to address threats from both
natural and man-made hazards. Dare County Emergency Management is charged with maintaining a
high level of preparedness, identifying vulnerabilities, effectively mitigating disasters, providing public
education, responding to all hazard emergency situations, and facilitating effective recovery efforts
following any all-hazard incident.
Dare MedFlight Landing Pad and Helicopter. Image
Source: Outer Banks Chamber of Commerce.
S ECTION 3. E XISTING C ONDITIONS
Page 3-30 9/14/2020 CAMA Land Use Plan
Parks, Recreation, and Open Space
Public Access
The North Carolina Division of Coastal Management defines two types of public access points:
Local accesses that primarily provide access for pedestrians and bicyclists from the immediate
neighborhood.
Regional accesses that include a large number of parking spaces, bike racks, restrooms and
bathhouse, and picnic area.
Kill Devil Hills maintains twenty-nine (29) beach access sites with varying amenities and parking
availability. The following provides a summary of these facilities running from north to south:
Arch Street – Access Only
Helga Street – Lifeguard
Chowan Street – Access Only
Hayman Boulevard - Parking, Lifeguard, Handicap Access, Shower, Bathroom
Walker Street – Access Only
Avalon Drive – Parking, Lifeguard, Dune Walkover
5th Street – Parking, Lifeguard
4th Street – Dune Walkover
3rd Street – Lifeguard, Dune Walkover, Shower, Pet Waste Bags
2nd Street – Parking, Lifeguard, Shower, Pet Waste Bags
1st Street – Parking, Lifeguard, Dune Walkover, Shower, Pet Waste Bags
Asheville Drive – Parking, Lifeguard, Handicap Access, Dune Walkover, Restrooms, Shower, Pet
Waste Bags
Prospect Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Glenmore Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Woodmere Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Ferris Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Raleigh Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Carlow Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Sutton Avenue – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Pinehurst Avenue – Access Only
Ocean Bay Boulevard – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags,
Bath House
Carlton Avenue – Access Only
Oregon Avenue – Lifeguard, Handicap Access, Shower
Clark Street – Parking, Dune Walkover, Shower, Pet Waste Bags
Calvin Street – Access Only
Martin Street – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
Atlantic Street – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags, Bathrooms
Lake Drive – Access Only
8th Street – Parking, Handicap Access, Dune Walkover, Shower, Pet Waste Bags
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-31
Parks
The Dare County Parks & Recreation Northern Beach Division office is located at the Dare County Youth
Center at Family Recreation Park in Kill Devil Hills. The Youth Center and Family Recreation Park serves
as the focal point for most of the division's activities and programs and provides programming for youth
and adults. Below are listed amenities at Dare County Family Recreation Park:
Family Recreation Park
o Multipurpose field
o Baseball field with lights
o Softball field with lights
o Two batting cages
o Four tennis courts with lights
o Outdoor volleyball court
o Tennis hitting wall
o Playground with climbing wall
o Covered picnic pavilion (with 4 grills, 15 picnic tables, lights, and electrical outlets)
o Concession stand (with heat and air conditioning)
o Three Press boxes (1 large with heat and air conditioning)
o Restrooms
Meekins Field is located behind the Fire Department in Kill Devil Hills. It is owned by the Town and
maintained by the Town with support from Dare County Parks & Recreation. Additionally, the Town’s
Building and Ground Division operates and maintains the following municipal open space/park
facilities: Aviation Park, Copley Park, and Hayman Park. Below are amenities at each of these facilities:
Aviation Park
o Roller hockey rink
o Skatepark
o Restrooms
o Children’s play area
o Fitness trail
Copley Park
o Playground equipment
Hayman Park
o Large open area
o Benches
o Picnic tables
o Grill
o Playground equipment
Meekins Field
o Softball field with lights
o Tennis courts with lights (2)
o Soccer field (210’ x 140’)
o Playground
o Restrooms
S ECTION 3. E XISTING C ONDITIONS
Page 3-32 9/14/2020 CAMA Land Use Plan
Afterschool Program
The Youth Center located at Family Recreation Park serves as a safe afterschool place for middle and high
school students. Conveniently located within walking distance from both First Flight Middle and High
Schools, youth can partake in open-play basketball, volleyball, soccer, Frisbee, and/or tennis, or
participate in one of the many other organized programs offered.
Fresh Pond
Fresh Pond is a 27-acre body of water that straddles Nags Head and Kill Devil Hills and is difficult to
access. Before 1980, it was one of the primary sources of drinking water for Kill Devil Hills and Nags
Head. As Dare County and the Towns moved to reverse osmosis plants that desalt groundwater 300 to
400 feet below the surface, the use of Fresh Pond as a drinking water resource was suspended.
Additionally, Fresh Pond is designated as a Small Surface Water Supply Watersheds Area of
Environmental Concern (AEC) by the NC Division of Coastal Management. In recent years, there has
been discussion about establishing access to the site which Kill Devil Hills has begun with hope of
providing a range of outdoor passive recreational activities for residents and visitors. This effort will be
discussed further in the Future Demands Section of the plan.
Historic Properties
There are currently three (3) properties in Kill Devil Hills listed on the National Register of Historic
Places. These properties include the Wright Brothers National Memorial Visitors Center, the Wright
Brothers Memorial, and Sam’s Diner (Kill Devil Grill). Refer to Map 10. In addition to those properties
listed on the National Register, the Town has designated a number of locally significant historic
structures, as listed below:
Birdsong/Phelan Cottage – 1825 North Virginia Dare Trail
Boyette Cottage – 1303 South Virginia Dare Trail
Brothers Cottage – 1211 B South Virginia Dare Trail
Brown Cottage – 1235 South Virginia Dare Trail
Christensen-Small Cottage – 2021 South Virginia Dare Trail
Coggins/Lassiter Cottages – 501 South Virginia Dare Trail
Green Cottage – 1233 South Virginia Dare Trail
Hall House – 2401 North Virginia Dare Trail
Hayman House – 418 West Hayman Boulevard
Johnston-Witt Cottage – 2041 South Virginia Dare Trail
Mardre-Woolard Cottage – 1229 South Virginia Dare Trail
McCandless Cottage – 2007 Newbern Street
Owens House – 1407 South Virginia Dare Trail
Pappendick-Heath Houses – 302 North Virginia Dare Trail
Perry-Owens Cottage – 2019 South Virginia Dare Trail
Poulas-Kiger House – 2309 North Virginia Dare Trail
Powell-Stokes Cottage – 1207 South Virginia Dare Trail
Reisse Cottage – 2807 North Virginia Dare Trail
Sawyer-Turk-Cheshire House – 2015 North Virginia Dare Trail
Smith Cottage – 2306 North Virginia Dare Trail
Spitzer-Weinburg House – 2701 North Virginia Dare Trail
Stick-Roebuck House – 1521/1523 North Virginia Dare Trail
White Cottage – 2400 North Virginia Dare Trail
Young/Croarkin Cottage – 201 Random Street
Z.A. Harris Cottage – 1413B North Virginia Dare Trail
!
!!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
^
^
^
Sam's Diner
Wright Brothers National Memorial
Wright Brothers National Memorial Visitors Center
Kitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
t
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ail
N
C
r
o
a
t
a
n
H
w
y
Coli
ngt
on RdBickett StO cean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrMap 10. Historic Properties
I 0 0.25 0.5 0.75 10.125 Miles
Albemarle Sound
Atlantic Ocean
Legend
Dare County
Kill Devil Hills Town Limits
Fresh Pond
Roads
^National Register Historic Properties
!Town Designated Historic Properties
(Kill Devil Grill)
Source: National Register Historic Places, Town of Kill Devil Hill's Guide to Local Historic Landmarks 3-33
S ECTION 3. E XISTING C ONDITIONS
Page 3-34 9/14/2020 CAMA Land Use Plan
Water System
The Town of Kill Devil Hills operates a town-wide water distribution system serving all single-family
residences and businesses. The Town’s water system contains 1.65 million gallons of storage – both
ground storage and elevated. Recently performed on-site visual and non-intrusive inspections of the
above-ground facilities at the 8th Street pump station facility and the Old Town Hall pump station facility
show that structures and equipment are generally in good condition. The 8th Street elevated tank was
repaired and repainted in 2018 and it is anticipated that the Old Town Hall elevated storage tank will be
replaced in 2019.
The Dare County Water Department is the wholesale supplier of potable water to many communities in
the County, including the Town of Kill Devil Hills. The County can currently produce up to 10 million
gallons per day (mgd) in potable water and deliver a maximum of 14 mgd.
To meet the growing demand of its customer base, Dare County is considering expanding one of its two
plants by 2-mgd, resulting in a 12-mgd capacity for its system. This expansion will enhance the ability of
the County to meet the Town’s long-term water supply needs (see page 4-5 for more information).
As the Town is responsible for the drinking water quality of its customers, it has to be prepared to meet
existing and future regulatory requirements. A comparison of the finished water quality to USEPA
drinking water quality standards shows that the Dare County water treatment plants are producing high
quality water that meets, and in most cases, exceeds today’s regulatory standards. This standard is
critical to the Town’s ability to meet requirements throughout its distribution system.
It should be noted that the Kill Devil Hills Reverse Osmosis WTP discharges into an unnamed tributary
that reaches the Atlantic Ocean which impacts water quality as discussed on page 3-25.
Sewer System
Kill Devil Hills Wastewater Treatment Plant, LLC, (KDH WWTP) provides central sewer service to some
properties located in Kill Devil Hills; however, this service is not operated by the Town and is only
available if service lines are installed or are already available. Information on the current condition of the
plant is not available. A summary of the system’s current capacity in relation to Kill Devil Hills is
provided on page 4-5. It should be noted that there are no areas experiencing chronic wastewater
treatment malfunctions specific to the KDH WWTP.
The Ocean Acres Wastewater System operates a collection only system for wastewater within the
Southern Sanitary District. Disposal is through a purchased capacity from the KDH WWTP. It is
considered a private wastewater utility regulated by the NC Utilities Commission. There are currently no
plans to expand the system beyond its current capacity. As demand increases, the collection system can
be expanded but will require plant expansion and land acquisition. It should be noted that the operator
of the Ocean Acres system has been subject to NCDEQ enforcement action in 2019 due to impacts
associated with plant discharge. This enforcement action relates to the KDH WWTP and is not associated
with the force mains or gravity sewer serving the Ocean Acres development. These issues are being
addressed and do not pose a threat to water quality or constitute a threat to public health.
Additionally, there is private package wastewater treatment plant for the 152-unit Oyster Point
condominium complex. Additional information for this system is unavailable.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-35
There are no current plans to develop a large-scale, public, central sewer system in Kill Devil Hills. In
lieu of a central wastewater treatment system controlled by the Town, Kill Devil Hills will continue to
rely on state and county permitting for on-site wastewater systems. A wastewater permit issued by the
Dare County Health Department is required prior to commencing any development project throughout
town when on-site septic is utilized. Permit staff at Dare County Health Department indicates that
generally permits for septic tanks are not a problem in Kill Devil Hills and that once installed, the systems
function as intended. The Dare County Health Department oversees the overall wastewater system
functions.
Natural Gas
Kill Devil Hills does have access to central natural gas service along NC 12 and US 158 through Piedmont
Natural Gas. Additionally, there are several private companies that provide LP gas service for
commercial and private residential use.
Solid Waste
The Town of Kill Devil Hills provides curb-side solid waste management services. During winter/off-
season months, the Town provides services once per week. The east side of Highway 158 is collected on
Mondays and the west side of Highway 158 is collected on Tuesdays. Once-per-week collections run
from November through March of each year. Throughout the remainder of the calendar year, curb-side
collection is provided twice per week as follows: the east side of Highway 158 is collected on Mondays
and Thursdays and the west side of Highway 158 is collected on Tuesdays and Fridays. The Town does
provide curb-side recycling collection as a subscription service through a franchise agreement with Outer
Banks Hauling. The Town also has a centralized Recycling Center for use by all residents located at 701
Bermuda Bay Boulevard. Pickup of bulk items is provided two times per year.
Street Maintenance
The Town of Kill Devil Hills is responsible for street maintenance on all right-of-ways (approximately 60
miles) throughout the Town’s corporate limits, with the exception of NCDOT right-of-ways which
include Colington Road, US 158, and NC 12. The Town’s Public Services Department maintains a
schedule of improvements that is updated annually, which outlines the greatest needs/deficiencies
relating to right-of-way maintenance.
Administration
The Town of Kill Devil Hills Administration Department serves the following purposes:
To promote the Town of Kill Devil Hills in a positive manner to its citizens and visitors through
programs and events.
To continue to search for ways to further involve its citizens in Town activities.
To welcome inquiries and requests for assistance and provide friendly, pleasant, and efficient
service.
To ensure that the services provided by the Town to its citizens and visitors are cost-efficient and
responsive, meet the needs of our citizens, and are compliant with the provisions of local
ordinances and state and federal law.
The Administration Department includes the Town Manager, Assistant Town Manager, Town Clerk,
Administrative Specialist, Office Assistant, and Administrative Assistant.
S ECTION 3. E XISTING C ONDITIONS
Page 3-36 9/14/2020 CAMA Land Use Plan
EXISTING LAND USE
Introduction
The following provides a summary of Kill Devil Hills’ existing land use. Land use patterns with maps
and associated data enable policy makers to make more informed decisions about future service needs
and future land use demands. This effort, in turn, assists elected officials, planning board members and
citizens at-large in making educated decisions about rezoning cases (map amendments), quasi-judicial
hearings and zoning ordinance text amendments.
The following existing land use map and associated data provide a comprehensive update from the
information presented in the 1997 Kill Devil Hills CAMA Land Use Plan. Three factors are reflected: an
improvement in the data available, a shift in the existing land use designations utilized in the plan, and
actual changes in land use. The existing land use designations have been modified slightly to better
reflect the current built environment throughout Kill Devil Hills.
Methodology
Existing land use should not be confused with zoning. Existing land use classifies the current land use,
which may differ from current zoning. The Dare County tax parcel file, in coordination with aerial
photos, was used to determine the existing land use classification for properties in Kill Devil Hills. Field
surveys and Google’s street view were used to confirm the accuracy of the aerial photos and tax data.
Further, property value was used to ensure whether parcels were unimproved. The following provides a
summary of the existing land use categories utilized:
Commercial
Retail, service, and shopping establishments.
Industrial
Light manufacturing and fabrication.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-37
Office and Institutional
Government offices, medical facilities, airport,
churches, and offices.
Mixed Use
Retail and residential uses occupying the same
structure.
Multi-Family Residential
Four or more units within the same structure.
S ECTION 3. E XISTING C ONDITIONS
Page 3-38 9/14/2020 CAMA Land Use Plan
Single-Family Residential
All residential properties with three or fewer units on
a single lot.
Recreational
Public parks/open spaces and public beach access
sites currently operated and maintained by the Town
of Kill Devil Hills.
Vacant/Unimproved
Parcels that are either undeveloped or are unimproved.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-39
Existing Land Use Map
Like many barrier island beach communities, Kill Devil Hills’ existing land use pattern is characterized
predominantly by single-family residential development. Non-residential development in the form of
commercial or office and institutional land uses are situated along the Town’s main transportation
thoroughfares including Croatan Highway (US 158) and certain portions of Virginia Dare Trail (NC 12).
There are a number of multi-family residential developments throughout Town, and mixed use
development is fairly limited.
The following table and associated map provide an overview of existing land use throughout the Town of
Kill Devil Hills.
Table 14. Existing Land Use
Land Use Acres % of Total
Commercial 199.0 6.4%
Industrial 32.7 1.0%
Office and Institutional 596.2 19.2%
Mixed Use 5.8 0.2%
Multi-Family Residential 97.2 3.1%
Single-Family Residential 1,153.8 37.1%
Recreational 86.9 2.8%
Vacant/Unimproved 941.3 30.2%
Total 3,112.9 100.0%
Source: Dare County Tax Office, HCP, Inc., Town of Kill Devil Hills.
Land Use and Transportation
The Town’s existing transportation network provides access to all portions of the Town. As discussed,
this network is comprised of the NC Highway 58 corridor, the NC 12 Corridor, and networks of local
access streets. Traffic buildup is clearly a concern during peak summer months; however, the existing
transportation network is not a limiting factor regarding land use and development. Due to the limited
availability of land, land use, and in turn, zoning patterns have been developed to respond to the current
transportation demands at peak summer levels. As discussed on page 4-6, improvements and/or
expansion of existing transportation systems will be addressed as capacity needs evolve through the
planning period. As defined under the Plan’s strategy discussion, the Town will work closely with
NCDOT to address these needs.
Land uses along key transportation corridors generally takes two forms. Development along NC
Highway 12 (Beach Road) is characterized by varying land use types with direct access onto the roadway.
This portion of town has both residential and non-residential uses with each independent structure
maintaining its own curb cut intended for highway access. Crosswalks at intersections are generally not
available. Land uses along Highway 158 take the form of larger lot commercial structures with large
parking lots. The wider four land highway supports a much higher level of service than Highway 12.
Uses, in many cases, share highway access. This development pattern is also characterized by wide
expansive parking areas. Crosswalks are provided at several signalized intersections.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ail
N
C
r
o
at
a
n
H
w
y
Coli
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrKitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
I 0 0.25 0.5 0.75 10.125 Miles
Map 11. Existing Land Use
Atlantic Ocean
Albemarle Sound
Legend
Roads
Kill Devil Hills Town Limits
Fresh Pond
Commercial
Industrial
Office/Institutional
Mixed Use
Multi-Family Residential
Single-Family Residential
Recreational
Vacant/Unimproved
Dare County
Source: Town of Kill Devil Hills, Dare County
3-40
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-41
Zoning and Vacant Parcels
Throughout the corporate limits of Kill Devil Hills, there is approximately 946 acres of vacant land, as
identified through the existing land use survey process. A substantial percentage of this acreage (59.1%
or 559 acres) is comprised of land that is in large part protected and/or considered fragile areas (see
discussion of Fragile Areas on page 3-20). This area is located in the southwestern corner of the Town’s
corporate limits and contains the Run Hill State Natural Area land that is deed restricted by The Nature
Conservancy and Fresh Pond, as discussed in the Parks and Recreation section of the plan. This portion
of Town is zoned Maritime Forest Environmental District for the purposes of environmental protection.
Also included in this area (south of Run Hill State Natural Area) is The Natural Conservancy Land which
is zoned MFED and Government/Institutional – Public. The remaining 387 acres of vacant land are, for
the most part, zoned for either residential or commercial use. Development of these vacant parcels is
governed by a number of local ordinances and State and Federal regulations. The use of vacant land, and
redevelopment of existing development to new uses, must comply with standards defined in the Town of
Kill Devil Hills Zoning Ordinance.
The Kill Devil Hills zoning ordinance is considered a
pyramidal or cumulative zoning code. This variation of
Euclidian zoning is less commonly used today. It does still
afford a great level of protection for single-family residential
uses when located in a single-family residential district
because that is the exclusive use allowable in that zone.
However, in this scheme, each successively more intense
zoning category (multi-family, commercial, and industrial)
allow most of the uses from the previous zones.
The uses at the top of the pyramid can slide down to the zones below, but not back up. For example, in
this scheme, multi-family and single-family would be allowed in a commercial zone. The reverse is not
true, so a commercial use would not be allowed in a multi-family or single-family residential zone. The
fact that this type of zoning would allow a single-family use to be built in an industrial zone gives the
property owner more discretion, but dilutes the power of protection intended in zoning.
There are nine Zoning Districts included in the Town of Kill Devil Hills Zoning Ordinance (see Map 12).
The following provides a summary of these districts:
Ocean Impact Residential (OIR) Zone: The OIR zone is established in an effort to promote
health, safety and welfare and to limit the level of peril to the public welfare associated with
dwellings and other structures located in that part of the town that borders on the Atlantic Ocean
and which is subject to tropical storms, storm surges, hurricanes and shoreline migration.
Low Density Residential (RL) Zone: The RL zone is established as an area in which the principle
use of the land is for single-family residences and is intended to preserve and enhance low-to-
medium density neighborhoods.
High Density Residential (RH) Zone: The RH zone is established as an area to preserve, enhance
and encourage high density neighborhoods.
Commercial (C) Zone: The C zone is established primarily to encourage convenient and
accessible sales, service, entertainment, and professional and business facilities to the general
Euclidean zoning is a convenient
nickname for traditional as-of-right or
self-executing zoning in which: district
regulations are explicit; residential,
commercial, and industrial uses are
segregated; districts are cumulative; and
bulk and height controls are imposed.
Source: American Planning Association.
S ECTION 3. E XISTING C ONDITIONS
Page 3-42 9/14/2020 CAMA Land Use Plan
populace of the town in such a manner that will not infringe upon nor degrade the natural
qualities of residential neighborhoods.
Light Industrial Two (LI-2) Zone: The LI-2 zone is established to provide standards for the
location of commercial services which are required for the development of the town. It is the
intent of this section to regulate and buffer such uses so that their location will not be detrimental
to adjacent uses.
Light Industrial One (LI-1) Zone: The LI-1 zone is established to provide standards for the
location of commercial services which are required for the development of Kill Devil Hills; such
facilities as wholesale food and beverage warehousing, building supply facilities and other
similar uses which are required elements of a self-sufficient community. It is the intent of this
section to regulate and buffer such uses so that their location will not be detrimental to adjacent
uses, the environment and sources of potable water, such as the Fresh Pond and groundwater.
Government and Institutional – Public (G/I-Public) Zone: The G/I-Public zone is established to
provide the proper location and setting for governmental use and institutional operation,
structures, and equipment necessary for providing public services and the maintenance of public
health and well-being.
Government and Institutional – Private (G/I-Private) Zone: The G/I-Private zone is established
to provide proper location for privately-owned wastewater treatment facilities and multi-family
planned unit developments.
Maritime Forest Environmental District (MFED): The MFED zone is established to conserve the
natural resources and environment located within the Town collectively known as the Maritime
Forest. The MFED is created to require that any development be compatible with the
environmentally-sensitive setting of Nags Head Woods Maritime Forest.
Table 15. Zoning
Zoning District Acres % of Total
OIR 208.3 6.7%
RL 899.2 28.9%
RH 20.7 0.7%
C 568.4 18.3%
LI-1 41.2 1.3%
LI-2 41.6 1.3%
G&I-Public 750.2 24.1%
G&I-Private 56.1 1.8%
MFED 507.2 16.3%
Not Zoned* 19.9 0.6%
Total 3,112.8 100.0%
*There are three small islands adjacent to Colington Island
that fall within the Town’s corporate limits. The Town has not
zoned this upland area.
Source: Town of Kill Devil Hills, HCP, Inc.
Kitty Hawk Bay
Blount Bay
Buzzard Bay
Oyster Point
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
a
ta
n
H
w
y
N
C
r
o
a
ta
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailCol
i
ngt
on RdBickett StOcean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrMap 12. Zoning
I 0 0.25 0.5 0.75 10.125 Miles
Albemarle Sound
Atlantic Ocean
Source: Town of Kill Devil Hills, Dare County
Legend
Dare County
Roads
C
Government/Public Institutional
Government/Private Institutional
LI-1
LI-2
MFED
OIR
RH
RL
3-43
S ECTION 3. E XISTING C ONDITIONS
Page 3-44 9/14/2020 CAMA Land Use Plan
Appraised Value Per Acre
Understanding the financial impacts of particular types of development can help a community become
more fiscally sound. Specifically, it is important to understand the value of all land use classes from a
proportional standpoint. Calculating the per acre appraised value of each different land use reveals
development types that may be most beneficial to the Town from a revenue perspective. Of the existing
developed land use categories, the mixed use category yields the greatest average appraised value per
acre; however, single-family residential is extremely close in comparison. These development types yield
higher tax revenues per acre primarily due to their increased density (number of units per acre).
The following provides a summary of value per acre of developed land based on the existing land use
map (see Map 11).
Table 16. Total Value Per Acre
Land Use
% of Total Land
Use Acreage $ per Acre Value
Commercial 6.4% $494,470
Industrial 1.0% $234,890
Office and Institutional 19.2% $135,162
Mixed Use 0.2% $379,943
Multi-Family Residential 3.1% $28,677
Single-Family Residential 37.1% $552,283
Recreational 2.8% $125,303
Vacant/Unimproved 30.2% $134,204
Source: Dare County Tax Office, HCP, Inc., Town of Kill Devil Hills.
S ECTION 3. E XISTING C ONDITIONS
CAMA Land Use Plan 9/14/2020 Page 3-45
SUMMARY
Natural Systems
The year-round temperature average in Kill Devil Hills is 70 degrees F. The summer temperature
average is 80 degrees F, while the winter temperature average is 49 degrees F.
The topography within Kill Devil Hills is generally flat; however, the Wright Brothers Memorial
has a vertical elevation of 90 feet above sea level.
Approximately 68% of the Kill Devil Hills corporate limits is located within a designated
floodplain (A, AE or VE).
During a slow moving hurricane, as defined by the Sea, Land, and Overland Surges from
Hurricanes (SLOSH) model, approximately 44% of the Town will be inundated by a Category 1 &
2 storm, while roughly 62% will be inundated by a Category 3 storm.
Since 1996, the Town of Kill Devil Hills has been impacted by ten landfalling hurricanes.
There are sixteen different soil types located within Kill Devil Hills, which are primarily
comprised of fine sands.
Fresh Pond is a currently designated water supply watershed located within Kill Devil Hills.
There are also three wellhead protection areas within the Town’s corporate limits.
Estuarine waters are located along the Town’s western shoreline adjacent to the Albermarle
Sound.
Approximately 14% of the Town’s corporate limits are comprised of Coastal Wetlands.
The oceanfront portions of Kill Devil Hills are subject to excessive erosion and the effects of
erosion stemming from surge associated with hurricane/tropical storm events.
The Town of Kill Devil Hills undertook its first beach nourishment project in 2017, resulting in a
storm protection project which widened 2.6 miles of shoreline.
Kill Devil Hills has three areas within the Town’s corporate limits designated as NC State Natural
Heritage Areas including: Kitty Hawk Bay Islands, Wright Brothers Dune Barrens, and Nags
Head Woods/Run Hill.
There are no marinas or mooring fields located within the Town of Kill Devil Hills.
Significant portions of Kitty Hawk Bay, Blount’s Bay, and Buzzard Bay support the growth of
subaquatic vegetation.
Kill Devil Hills is located within the Pasquotank River Basin, part of the Albermarle-Pamlico
Estuarine system, considered the second largest estuarine system in the United States.
S ECTION 3. E XISTING C ONDITIONS
Page 3-46 9/14/2020 CAMA Land Use Plan
Community Facilities
Kill Devil Hills is served by the Outer Banks Hospital located in neighboring Nags Head.
The Dare County Health Department provides a variety of health and human services aimed at
improving the overall health of County residents.
The Kill Devil Hills Police Department maintains four divisions and provides protection for
roughly 7,000 residents during off peak months and 36,000 during summer months.
The Kill Devil Hills Ocean Rescue Division operates under the Town’s Fire Department and was
initiated in 1998 (prior to that it was a contracted service).
Dare County operates eight EMS Stations. The Kill Devil Hills station is located at 1632 North
Croatan Highway and serves as the County’s EMS administrative headquarters.
Emergency Management for the Town of Kill Devil Hills is overseen by Dare County; however,
the Town administration and first responders are also directly involved in his process.
Kill Devil Hills maintains twenty-nine beach access points, which have varying access facilities.
There are several public recreation facilities located within the Town of Kill Devil Hills including
Family Recreation Park, Meekins Field, Aviation Park, Copley Park, and Hayman Park.
The water system within Kill Devil Hills is owned and operated by the Town and peak demand
clearly comes during summer months. The water is purchased from Dare County.
The Kill Devil Hills Wastewater Treatment Plant, LLC, provides central sewer service to certain
portions of Town.
The Town of Kill Devil Hills provides curb side waste collection services; however, curb side
recycling service is available through a franchise agreement with Outer Banks Hauling on a
subscription basis. The Town maintains a Recycling Center and bulk trash drop off for all
residents.
Existing Land Use
There are eight existing land use categories designated within Kill Devil Hills including:
Commercial, Industrial, Office and Institutional, Mixed Use, Multi-Family Residential, Single-
Family Residential, Recreational, and Vacant/Unimproved.
Approximately 59% of the Town’s vacant acreage, as indicated by the existing land use map, is
comprised of land that is protected and/or considered fragile area.
The Town of Kill Devil Hills maintains nine zoning districts ranging from Industrial
development to the Maritime Forest Environmental District.
The highest value existing land use within Kill Devil Hills is the Single-Family Residential
category with a developed value of $552,283 per acre, while Commercial properties are a close
second at $494,470 per acre.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
CAMA Land Use Plan 9/14/2020 Page 4-1
INTRODUCTION
This section of the Comprehensive Plan focuses on the future demand for Kill Devil Hills. This
discussion addresses a range of issues including the following:
Population Projections
Future Community Facilities and Services Needs
This discussion of community facilities and services needs combined with a discussion of future land use
in Section 5 is intended to provide a foundation for the development of the implementing actions
component of this plan. These sections provide a summary of need with regard to community services
and facilities while also defining future growth and land use patterns. Permanent and seasonal
population projections are provided as a baseline for determining the increased need for Town-sponsored
programs, services, and community facilities.
POPULATION PROJECTIONS
Establishing future population forecasts for the Town of Kill Devil Hills is essential to determining
impacts to infrastructure and community services/needs. However, calculating population projections is
a difficult task and all forecasts are subject to a variety of unforeseen factors. Population forecasting is as
much an art as it is a science.
“Straight-line” population growth trends over time are typically used to calculate population projections.
Because most of Kill Devil Hills allows for residential development in every zone (with the exception of
Government and Institutional – Public [G/I-Public] zoning district), straight-line projections are not
considered appropriate. As discussed in Section 3 of the plan, development throughout Kill Devil Hills is
subject to standards outlined in the Town’s pyramidal or cumulative zoning code. Table 17 provides a
summary of population projections for the Town of Kill Devil Hills.
Table 17. 2050 Population Projections
2016 Total
Number of
Housing Units
2016 Total
Housing
Occupancy
2035 Estimated
Total Number of
Housing Units1
2035 Total
Housing
Occupancy2
2035 Total
Peak Seasonal
Daily Visitors3
2035 Total Daily
Peak Population
Estimate
6,743 27,792 8,263 36,425 8,060 44,485
2016
Permanent
Population
Estimate
2020
Permanent
Population
Estimate
2025 Permanent
Population
Estimate
2030
Permanent
Population
Estimate
2035
Permanent
Population
Estimate
2040 Permanent
Population
Estimate
2045 Permanent
Population
Estimate
2050 Permanent
Population
Estimate
6,948 7,012 7,092 7,172 7,265 9,536 11,807 14,078
2016 Peak
Seasonal
Population
Estimate
2020 Peak
Seasonal
Population
Estimate
2025 Peak
Seasonal
Population
Estimate
2030 Peak
Seasonal
Population
Estimate
2035 Peak
Seasonal
Population
Estimate
2040 Peak
Seasonal
Population
Estimate
2045 Peak
Seasonal
Population
Estimate
2050 Peak
Seasonal
Population
Estimate
35,852 37,668 39,938 42,208 44,485 46,757 49,028 51,299
12035 number of housing units is based upon an average increase of 80 housing units per year during the planning period (19 years x 80 housing units
per year = 1,520 additional housing units). This figure was determined by assessing building permit activity dating back to 2008.
22035 total housing occupancy is based upon the number of increased housing units (1,520) times the persons per household as reported in the US
Census. Persons per household assumes that approximately 91.2% of the new units will be rental occupied as reported in the 2016 American
Community Survey. The remaining units assume an average household size of 2.37 as reported by the US Census. 1,520 X 91.2% = 1,386 rental-
occupied units X 6 persons per household = 8,316 persons; 134 owner-occupied housing units X 2.37 persons per household = 317 persons; 8,316 +
317 = 8,633 persons.
32035 total peak seasonal daily visitors is based on 2016 estimates (see page 2-2).
Source: US Census Bureau and HCP, Inc.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
Page 4-2 9/14/2020 CAMA Land Use Plan
FUTURE COMMUNITY FACILITIES AND SERVICES NEEDS
Many factors have an impact on the land use, infrastructure, and transportation systems within a given
jurisdiction. For Kill Devil Hills, the primary impacts are related to a growing permanent population,
increasing use of second homes (throughout the entire year – not just during typical vacation season),
increasing visitation in the pleasant spring and fall seasons, the desire for additional amenities, and
sustained economic growth for local businesses.
While managing these impacts, the Town must stay true to its core identity, and recognize that Kill Devil
Hills succeeds in its desirability as a beach destination that embraces its traditional family beach image
and small-town atmosphere. Community infrastructure and services such as utilities, beach
nourishment, police, fire, emergency medical services, public services, and recreation will all be affected
by these factors, as well as projected growth and development. Projected needs that will result from
future development and changes to the land use pattern are discussed in this section, in addition to
impacts on infrastructure and services.
Public Safety (Police and Fire Departments)
Based on the mutual needs of these departments, the discussion of future demand has been coordinated
between the two departments. Discussions with staff personnel of both the police and fire departments
has provided a consensus that there is a substantial need for a Town Public Safety Facility. Currently, the
departments are housed independently within facilities that are, at times, inadequate for the needs and
demands of supporting the Town’s growing population. This situation becomes especially problematic
during peak summer months, as well as during hurricane/tropical storm events.
A Town public safety facility would serve a variety of needs as well as address deficiencies regarding
each department’s current facility arrangements. One of the principal benefits of establishing this facility
would be the ability of emergency service and police personnel to remain on the island in the event of a
Category 4, and possibly Category 5, hurricane event.
The proposed facility would not only assist in protecting personnel, but will ensure protection of
evidence and records associated with Police Department investigations, as well as Fire Department
inspection records and equipment. The Public Safety Building would serve as an on-site Emergency
Operations Command Center when needed and should have the capacity to house and feed, at a
minimum, thirty Town personnel.
The following provides additional needs identified specifically by department. There is no current plan
to address these needs; however, the Town will continue to seek grant funding to assist in the acquisition
and/or construction of these facilities throughout implementation of this plan. It should be noted that
both the Police and Fire Departments are on a regular rotation for both equipment and vehicle
replacement as a component of the Town’s capital budgeting program.
Police Department:
o Construct a Town-sponsored firing range for officer training and development. This
effort may be accomplished in concert with the Town of Nags Head.
o Acquire a modern computer-based fingerprinting machine.
Fire Department:
o Increase resources for Ocean Rescue as need is determined.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
CAMA Land Use Plan 9/14/2020 Page 4-3
o Establish a Quick Response Unit comprised of volunteers and former staff personnel to
supplement existing response companies. It is anticipated that the scope of these Quick
Response Units will increase as the Town’s population increases.
Parks and Recreation
The Town of Kill Devil Hills completed an update of its parks and recreation plan in 2004. The plan
provided the following recommendations to improve the provision of parks and recreation facilities and
services to the citizens of Kill Devil Hills. It should be noted that these recommendations reflect general
policies and projects not completed to date.
Develop cooperative agreements with other area recreational providers including the YMCA,
Dare County Senior Services, and the Dare County Parks and Recreation Department for
programming and staffing of activities and events utilizing Town-owned sites and facilities.
Review (every five years or when circumstances dictate) and revise as necessary the
memorandum of understanding between Kill Devil Hills and Dare County concerning the
operation and maintenance plan for Meekins (Commissioners’) Field at 1634 North Croatan
Highway.
Solicit and use assistance from youth groups such as the Boy Scouts of America, Girl Scouts of
America, Grounded Adventure Club, and civic groups such as the Rotary Club for site
maintenance and event staffing.
Charge the Building and Grounds Division with recording (photographs and written
documentation) improvements to facilities and at sites as they are completed, and marking
improvements such as utility line locations on exhibits and maps.
Charge the Building and Grounds Division with developing and maintaining a maintenance
routine schedule in spreadsheet form to chart activities, expenditures, recommendations for
improvements and activities at sites, and general observations of site and facility conditions.
Consider and incorporate parks and recreation related activities and facilities into planning for
the potential conversion of the Fresh Pond Park and surrounding property from a primary water
source/water protection areas to other uses.
Consider revisions to the 1998 Town of Kill Devil Hills Shoreline Access Plan Update.
Evaluate the appropriateness of including recreational uses and facilities when Town-owned
land is considered for sale for development or improvement.
Evaluate the potential for and appropriateness of developing recreational uses and facilities on
land(s) that may be considered for acquisition by the Town or offered/donated to the Town.
Consider revisions to the Kill Devil Hills 2004 Recreational Facilities Plan Update as
improvements are made and projects are completed.
Seek grant money and/or consider additional Town funding for new recreational facilities and
improvements to existing facilities.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
Page 4-4 9/14/2020 CAMA Land Use Plan
Seek grant money and/or consider additional Town funding for conceptual planning and design
of improvements at Fresh Pond Park and Hayman Park.
Support efforts to acquire land in central Kill Devil Hills for use as a park site and to provide
additional connection to existing oceanfront facilities or to those that may be acquired or
developed.
Support efforts to increase and improve the Town’s bike and pedestrian facilities and seek grant
money and/or consider additional Town funding for new bike and pedestrian facilities and
improvements to and/or extensions of existing facilities.
The following addresses specific recommendations regarding existing and proposed park facilities:
Projects at Aviation Park:
o Construct penalty boxes.
o Install electric score/bulletin board.
o Construct special events pavilion.
o Complete as-built survey of site utilities.
Projects at Fresh Pond Park:
o Install Town identification sign.
o Install 400 linear feet of split-rail wooden fence.
o Develop nature walking trail and designated natural areas.
o Develop interconnection with and parking at adjacent Town-owned (water plant
building) property.
o Provide landscaping.
Projects at Hayman Park:
o Replace swing set.
o Install three (3) picnic tables and construct concrete pads/in-ground mounts for picnic
tables.
o Construct 40’ x 20’ open air pavilion with restrooms, water fountains, and septic tank
drainfield system.
o Install bike rack.
o Relocate perimeter fencing to increase usable park/field area.
o Replace sign.
o Modify/relocate irrigation system to meet area needs after fence relocation.
o Replace children’s picnic table.
o Complete as-built survey of site irrigation system.
o Install two (2) portable soccer goals.
Projects at Meekins Field:
o Pave parking area (to the south) adjacent to existing lot; plant trees to screen parking area
and the (fenced) area under the water tower; install signage, striping, and movement
controls in parking area; and repair existing parking lot.
o Install perimeter landscaping.
o Install bike rack.
o Install concrete pad (if necessary) for bike rack.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
CAMA Land Use Plan 9/14/2020 Page 4-5
o Replace tennis nets.
o Replace restroom building and fencing.
o Relocate portion of sidewalk along first base line to accommodate bleachers.
o Install concrete pad behind home plate backstop for bleacher and picnic table placement.
o Install two (2) picnic tables.
o Install concrete pads for two picnic tables.
o Install fence around entire perimeter.
o Replace tennis court screen.
o Complete as-built survey of site utilities.
Water System
As outlined in Section 3 of the plan, the Town of Kill Devil Hills owns and maintains water distribution
lines that serve the entire planning jurisdiction. The Town does not treat the water; it is purchased from
Dare County at a negotiated rate and capacity. Based on population projections provided on page 4-1,
maximum daily demands for Kill Devil Hills will occur during the summer months, and are projected to
reach 2.61 mgd by 2020, 2.80 mgd by 2030, 2.99 mgd by 2040, and 3.18 mgd by 2050. Therefore, the 3.0
mgd contractual water supply should be adequate to serve the Town through 2040.
The Town will continue to follow and implement the water system improvement recommendations as
outlined in the Town of Kill Devil Hills Water Master Plan.
Sewer System
As discussed in Section 3 of the plan, the Town of Kill Devil Hills does not operate or provide wastewater
treatment services to any property owners within its corporate limits. For the purposes of this plan, the
private/public wastewater service area is considered to be all land located within the corporate limits of
Kill Devil Hills (refer to Map 9, page 3-26). A majority of this land is served by privately-owned
individual septic tank systems; however, approximately 250 properties are served by the Ocean Acres
Wastewater System operated by the Kill Devil Hills Wastewater Treatment Plant (KDH WWTP).
The Ocean Acres system is privately-owned and access to the system’s capacity is driven by request for
services from individual property owners. The Town of Kill Devil Hills has acquired enough of the
allocated capacity to account for all existing and future development within Ocean Acres. This accounts
for 69,490 gallons per day (GPD) of KDH WWTP’s 660,000 GPD capacity (10.5%). Overall, approximately
570,999 GPD (86.5%) of the plant’s capacity is currently either in use or reserved for future development.
The remaining 89,001 GPD is available for allocation.
There are currently no plans for expansion of the system, but as additional capacity is requested KDH
WWTP will expand plant operations as needed. In order to expand, land acquisition and expansion of
the plant will need to occur. All properties within Kill Devil Hills have access to the KDH WWTP;
however, the cost of system expansion will be the responsibility of the developer.
Planning guidance requires that a community provide projections of capacity to address growth and
population expansion over the next thirty years. Due to the fact that a majority of the Town is served by
private septic systems, there is no reasonable way to forecast current or projected demand. The Town has
no plans to establish a Town-wide system, and will continue to rely on private on-site systems
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
Page 4-6 9/14/2020 CAMA Land Use Plan
throughout the planning period. As noted, expansion of the privately-owned/operated systems will only
be carried out as requests for increased capacity occur.
Street Maintenance
Town-Maintained Streets
As noted in Section 3, Kill Devil Hills’ road network is comprised of private roads, Town-maintained
streets, and state-maintained Colington Road, US Highway 158, and NC Highway 12. In total, the Town
is responsible for maintaining 62.99 linear miles of public right-of-way. The Town of Kill Devil Hills
utilizes funding provided, in part, through the Powell Bill program for maintenance and improvement of
all town-maintained streets as well as the Town’s Capital Reserve fund. The Town maintains a prioritized
maintenance schedule that is revisited on an annual basis in accordance with the availability of Powell
Bill funding in a given fiscal year.
A detailed breakdown of proposed street improvements is provided in Appendix E of the plan. This
summary provides all proposed improvements recommended by the Town’s Street Improvement Special
Project Subcommittee through fiscal year 2021, as of the drafting of this plan.
State-Maintained Streets
The two main thoroughfares providing access to Kill Devil Hills, as well as a majority of the Outer Banks,
are NC Highway 12 and US Highway 158. These roads are owned and maintained by NCDOT. The
following provides a summary of proposed improvements regarding US 158 as outlined in the Dare
County Comprehensive Transportation Plan, which was adopted in July 2015.
Identified Problem: Existing US 158 is projected to be over capacity by 2040 from the Currituck County
line to 8th Street, and near capacity from 8th Street to US 64. There is significant congestion on this
facility during the summer tourist season. The primary purpose of improving US 158 is to relieve
congestion on the existing facility such that a minimum Level of Service (LOS) D can be achieved,
and to improve mobility of the facility through Dare County, consistent with the North Carolina
Strategic Highway Corridor (SHC) Vision Plan. Another desired outcome of this improvement is
safety. An explanation of DOT level of service is provided in Appendix F.
Justification of Need: US 158 is a major corridor in Dare County that connects Currituck County in the
north to US 64 on the southern end, which leads westward to Roanoke Island and the mainland. This
facility is the primary north-south connector through the towns of Kitty Hawk, Kill Devil Hills, and
Nags Head, which comprise the more densely populated portion of the Outer Banks in Dare County.
It also serves as a parallel alternative to a portion of NC 12, which is a 2-lane facility that runs along
the coastline through the entire length of the Outer Banks. By 2040, the facility is projected to be over
capacity from the Currituck County line to 8th Street and near capacity from 8th Street to US 64,
based on providing a LOS D. Summer weekday traffic counts are projected to increase in range from
20,800 to 34,500 vehicles per day (vpd) in 2012 to 27,500 to 45,500 vpd in 2040, compared to a LOS D
capacity of 32,650 vpd for most of the facility.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
CAMA Land Use Plan 9/14/2020 Page 4-7
Multi-Modal Transportation
Apart from the recommendations on the two major corridors through Kill Devil Hills, several sidepaths,
sharrows, and signed routes are recommended to improve connectivity for cyclists and build on existing
bike infrastructure. All existing multi-modal transportation facilities are delineated on Map 9.
Additional multi-modal trails will supplement the 3.6 mile multi-use trail along Bay and Canal Drives on
the west side of the island. Bicycle boulevards are recommended where roadways are connected for
several blocks in a row between US 158 and NC 12. These boulevards will provide an alternative option
for cyclists that prefer low-traffic roadways and can be implemented affordably within existing right-of-
way. The locations of future multi-modal facilities have not been identified.
Multi-modal transportation is critical to a barrier island coastal community such as Kill Devil Hills. Not
only does this transportation provide an alternative source of travel for pedestrians and cyclist(s), but
these facilities also serve as economic development opportunities, demonstrating improvements in
quality of life for both citizens and visitors. Providing a robust multi-modal system assists in reducing
overall trip counts, especially during peak summer months.
The following outlines needs and proposed improvements regarding multi-modal transportation in Kill
Devil Hills as outlined in the Albemarle Regional Bicycle Plan completed in 2013:
US 158 bears the weight of local access and regional mobility. Locally, the corridor serves as the
commercial and residential lifeline for Kitty Hawk, Kill Devil Hills, and Nags Head. It also
provides critical mobility for regional trips and during evacuations. US 158 is designated as a
boulevard in need of upgrade as part of the state’s Strategic Highway Network. Several issues
make the corridor dangerous for bicycle travel: high traffic volumes, unpredictable automobile
movements, an inconsistent bicycle network, limited safe crossing opportunities, and multiple
accesses cut from side streets and businesses.
US 158 provides access to numerous activity centers (e.g., the Wright Brothers National
Memorial) as well as the majority of the beach’s commercial properties and residences. Many
cyclist crashes have occurred along the corridor, indicating a need to address bicycle safety.
In addition to the improvements outlined above, the Town of Kill Devil Hills currently budgets $100,000
for expansion the Town’s existing multi-use path and sidewalk network through the Town’s Capital
Reserve fund. As development occurs throughout Town, sidewalk installation will be required as
outlined in the Town’s Zoning Ordinance and Subdivision Regulations. A majority of the budgeted
funds are being utilized to fill in gaps created through current and past development.
Stormwater Management
The Town of Kill Devil Hills prepared a Stormwater Management Plan in 2010, in an effort to reduce
flooding and non-point source pollution associated with stormwater runoff, thus protecting public and
private property and the resources crucial to the Town's economic viability and quality of life. Major
topics of the Plan included the following:
A. Regulations, criteria and policies to reduce the negative effects that filling a developing property
can have on adjacent already-developed land and Town rights-of-way.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
Page 4-8 9/14/2020 CAMA Land Use Plan
B. Increased use, in public and private projects, of Best Management Practices (BMP’s), especially
infiltrative BMP’s. A Stormwater Design Manual was suggested as a way of promoting
infiltrative practices, including perforated storm drainage pipes encased in filter fabric (“sock
drains”), depressed roadside swales and other areas where stormwater can collect and wait to
infiltrate.
C. Allowance of modest increases in residential lot coverage in exchange for engineered BMP’s.
D. More detailed standards for the “management” of 4.3 inches of rain (nominally, the 10-year, 2-
hour event) in non-residential areas, including special provisions when storage within sandy soil
is counted in addition to open storage volume, “freeboard” requirements on detention pond
banks in areas where pond overflow would be detrimental, etc.
E. Inclusion of stormwater elements into public projects whose primary purpose may be street
improvements or replacement of aged water distribution lines.
F. Clearer requirements that stormwater leaving a development site must be discharged to a
suitable outfall.
Significant strides have been made toward achievement of these objectives set forth in the 2010
Stormwater Management Plan.
For those affecting private development, most changes have been through policy and standards
changes, as opposed to ordinance amendments. The extensive use of pervious concrete parking
lot pavement in two major commercial developments in recent years is an example.
In the case of public projects, the principles of B and E above have been thoroughly integrated
into the design of the Town’s capital improvement projects.
Several million dollars of stormwater infrastructure have been accomplished in the last 10 years, and such
progress is programmed to continue well into the next decade in accordance with a schedule of projects
reviewed annually by the Street Improvement and Special Projects Committee, the Planning Board, and
the Board of Commissioners. Key elements of this long-range capital project planning, furthering the
objectives listed above are:
Significant capacity improvements in the main “trunks” of key stormwater systems in the area.
For example, these have included:
o A full ten-fold increase in the capacity of the Memorial Boulevard system from Ocean
Bay Boulevard northward to Woodmere Avenue and wrapping the Wright Memorial
property northward and westward to the NCDOT culvert under US 148 at Asheville
Drive. These improvements, accomplished in 2015, provide primary service to 150 acres
of land and secondary support to another 675 acres served primarily by the three ocean
outfalls.
o A two- to five-fold increase in the capacity of the drainage system drainage southward
from the Dare Centre, across the Town’s fire station/water storage and pumping
complex and on through the Publix and Lowe’s site (the latter accomplished by those
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
CAMA Land Use Plan 9/14/2020 Page 4-9
private developments). These improvements serve over 200 acres, with incremental
completion in 2012, 2018, and 2019.
o Extensions of these systems in 2020 and beyond will bring further improvements to their
more upstream reaches.
The use of smaller-diameter “sock drains,” typically with infiltration swales above them, has
characterized every street improvement project from 2010 on, and some even older. These
extremely cost-effective systems do convey stormwater to an outfall, but their even more
important purpose is to manage the groundwater table, often for 200’ or more to either side of the
pipe itself. For example, if the “sock drain” system, installed 3.5’ to 4’ deep, has lowered the
groundwater to 30” below the surface, the pores and that sandy soil is open to receive all the
runoff from a 10-inch rain event. Since such an event typically includes short-duration bursts of
very heavy rainfall rates, the provision of swales and other depressions above and near the “sock
drain” are needed so that excess runoff can “wait its turn” to infiltrate into the dry soil. This
strategy has been validated in several extreme rainfall events, either preventing flooding or, in
the remarkable Hurricane Matthew event, significantly reducing its severity and duration.
Accordingly, sock drain will continue to be a mainstay of the Town’s storm drainage/stormwater
management strategy.
The Hurricane Matthew event of October 8/9, 2016 deserves special mention. 13.7 inches of rain
were recorded to have fallen in Kill Devil Hills in less than a day, with about 13 inches falling
between 10 pm and 4 am. Incredibly, using the nomograph generated by the NOAA
Precipitation Frequency Data Server (PFDS), this represent the 2,000-year, 6-hour storm. The
Town Engineer has opined that these extreme rain events seem to be more frequent and more
severe than the past statistics which underlie the PFDS, and may be an effect of some degree of
climate change. In any case, regardless of exactly what Nature serves up, Town staff and Town
Engineer propose to continue stormwater management policies that:
o Aggressively address historical drainage problem areas,
o Promote infiltration for better water quality,
o Avoid high-groundwater events that worsen flooding, and
o Accomplish these goals through innovative, cost-effective approaches.
It should be noted that the Town of Kill Devil Hills does not experience any water quality or public health
problems related to non-point and point source stormwater distribution. This includes potential impacts
associated with the three (3) NCDOT ocean outfalls at Lake Club Drive, Martin Street, and Baum Street
and the Town’s Oregon Avenue ocean outfall.
Beach Nourishment
As noted in Section 3 of the plan, the Town of Kill Devil Hills recently completed the Town’s initial beach
nourishment effort involving 2.6 miles of beachfront. This project was completed in 2017 and has
established a wide stretch of beach that will assist in mitigating potential storm damage associated with
hurricanes, tropical storms, and nor’easters. Moving forward, the Town will monitor the project annually
in accordance with the Beach Nourishment Shore Protection Maintenance Plan adopted in August 2017.
S ECTION 4. P ROJECTIONS /F UTURE D EMAND
Page 4-10 9/14/2020 CAMA Land Use Plan
Renourishment is scheduled on a 5-year interval in the plan. Funding will be provided through the
County Beach Nourishment Fund (funds allocated through occupancy tax) and the Town’s Municipal
Service District associated with beach nourishment. It should also be noted that the North Carolina state
legislature has recently established a fund for coastal nourishment efforts. It has not yet been determined
how this fund will benefit the Town of Kill Devil Hills.
SUMMARY
It is estimated that by the year 2035, the peak seasonal population in Kill Devil Hills will increase
to 44,485.
The Town of Kill Devil Hills Police and Fire Departments would like to establish a Public Safety
Facility that would not only serve day-to-day needs, but will serve as an Emergency Operations
Center during hurricane events in excess of a category 2 storm.
The Town of Kill Devil Hills maintains 62.99 miles of public streets. Maintenance of these streets
is funded, in part, through the Powell Bill program while the majority of funding comes from the
Town’s Capital Reserve fund. Improvement of these streets is determined annually through the
Town’s appointed Street Improvement Special Project Committee.
The current Dare County Comprehensive Transportation Plan outlines a range of improvements
to US Highway 158 to address traffic congestion along the corridor, especially during peak
summer months.
It is anticipated that current water supply capacity, as outlined in Section 3 of the plan, will be
sufficient to support estimated demand through the planning period.
The Town of Kill Devil Hills does not operate a central sewer system; however, sewer service is
available through the private sewer service utility provider KDHWWTP, LLC.
S ECTION 5. F UTURE L AND U SE
CAMA Land Use Plan 9/14/2020 Page 5-1
INTRODUCTION
This section of the plan addresses Future Land Use including potential build-out of the Town of Kill
Devil Hills. The Future Land Use Map provides an illustration of the Town’s potential in terms of
development and growth. There is not a significant amount of vacant property available for
development within the Town of Kill Devil Hills. However, current uses of land as well as potential
redevelopment indicate that careful consideration should be given to the future uses of land throughout
the Town’s planning jurisdiction.
It should be noted that the following portions of the plan are based on the draft Future Land Use Map,
which makes the assumption that the existing zoning will primarily remain in place. The Conservation
District allows single-family residential use with a two-acre minimum lot size.
FUTURE LAND USE MAP
Methodology
The Future Land Use Map (Map 13) embodies the Town of Kill Devil Hills’ vision for future land use, and
should be used as a foundational guide for decisions concerning the zoning/rezoning of property. NCGS
160D-605 requires the following consistency statement with regard to zoning amendments, which shall
not be subject to judicial review:
1) A statement approving the zoning amendment and describing its consistency with an adopted
comprehensive plan and explaining why the action taken is reasonable and in the public interest.
2) A statement rejecting the zoning amendment and describing its inconsistency with an adopted
comprehensive plan and explaining why the action taken is reasonable and in the public interest.
3) A statement approving the zoning amendment and containing at least all of the following:
a. A declaration that the approval is also deemed an amendment to the comprehensive
plan. The governing board shall not require any additional request or application for
amendment to the comprehensive plan.
b. An explanation of the change in conditions the governing board took into account in
amending the zoning ordinance to meet the development needs of the community.
c. Why the action was reasonable and in the public interest.
S ECTION 5. F UTURE L AND U SE
Page 5-2 9/14/2020 CAMA Land Use Plan
If and when a zoning map amendment is requested and adopted upon recommendation of the Planning
Board and approval by the Board of Commissioners, the Future Land Use Map will be revised without
additional public hearing consistent with the rezoning action as defined in the North Carolina General
Statutes.
The future land use analysis includes five (5) Future Land Use categories (refer to Map 13). These sectors
are based on:
1) Current land use patterns;
2) Physical and man-made limitations;
3) Environmentally sensitive areas;
4) Input received from the Planning Board, public, and Town staff during development of the plan;
and
5) Future Land Use goals and implementing strategies.
Future Land Use Categories
The following provides a definition of each Future Land Use category as depicted on Map 13. It should
be noted that all future land use categories support water access facilities except for the Industrial
category.
Commercial
These portions of Town are dedicated to commercial land uses intended to provide goods, tourism-based
services, and businesses and professional services to both citizens and visitors. This district allows single-
family, duplex, and multi-family residential development as defined within the Town’s Zoning
Ordinance. Mixed use development is encouraged.
Corresponding Zoning Districts – Commercial (C)
Residential
These areas are planned primarily for single-family and duplex structures; however, multi-family (three
units or more) development is permitted (if land is available). This category includes many existing areas
that are already developed. It is the Town’s intent to encourage only residential in this future land use
category.
Low Density Residential: Three (3) units per acre (6 units if multi-family)
Medium Density Residential: Three (3) units per acre (6 units if multi-family) with allowances for
hotel/motel development, as well as commercial piers.
Corresponding Zoning Districts – Ocean Impact Residential (OIR), Low Density Residential (RL), High
Density Residential (RH), Government and Institutional – Private (G/I-Private)
S ECTION 5. F UTURE L AND U SE
CAMA Land Use Plan 9/14/2020 Page 5-3
Conservation
The Conservation district involves portions of Town that are considered environmentally sensitive.
Large portions of this district are protected from development through North Carolina state-owned deed
restrictions and/or environmental conditions. Lots must be a minimum of two (2) acres unless platted
prior to November 18, 1991. Lots platted prior to November 18, 1991, are “grandfathered” in. Uses
permitted in the Conservation district include single-family/duplex housing, parks, water dependent
recreation facilities, and churches, as outlined in the Town’s Zoning Ordinance.
Corresponding Zoning Districts – Maritime Forest Environmental District (MFED)
Industrial
These portions of Town are intended for use as light industrial facilities, which includes uses such as
machine shops, warehousing/storage, and other commercially-based light manufacturing operations.
This district provides a location on the Outer Banks for these facilities to serve the community. The
availability of land for these uses is limited.
Corresponding Zoning Districts – Light Industrial One (LI-1), Light Industrial Two (LI-2)
Government and Public Institutional
These portions of the Town of Kill Devil Hills are dedicated to governmental/office type uses. This
district includes both the Wright Brothers Memorial and the Town/County operational facilities. The
properties within this district are not currently available for private sector development.
Corresponding Zoning Districts – Government and Institutional – Public (G/I-Public)
Future Land Use Acreages
Table 18 provides a summary of acreages associated with the future land use map.
Table 18. Future Land Use
Land Use Acres % of Total
Commercial 944.2 30.3%
Conservation 539.6 17.4%
Industrial 95.9 3.1%
Low Density Residential 625.4 20.1%
Medium Density Residential 315.9 10.1%
Government & Public Institutional 591.8 19.0%
Total 3,112.8 100.0%
* See Introduction to this section, page 5-1.
Source: Dare County Tax Office, Town of Kill Devil Hills, HCP, Inc.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
ata
n
H
w
y
N
C
r
o
at
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailBickett StOcean Bay BlvdOcean Acres DrMartin StHayman BlvdBaum Bay DrSchoolhouse R
d Ocean Bay BlvdKitty Hawk Bay
Buzzard Bay
Oyster Point
Blount Bay
I 0 0.2 0.4 0.6 0.80.1 Miles
Albemarle Sound
Atlantic Ocean
Legend
Dare County
Kill Devil Hills Town Limits
Roads
Commercial
Conservation
Industrial
Low Density Residential
Medium Density Residential
Government/Public Institutional
Map 13. Future Land Use
Source: Town of Kill Devil Hills, Dare County
Future Land Use
Page 5-4
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-1
INTRODUCTION
This plan establishes goals and implementing actions for the land use/quality of life issues that will affect
Kill Devil Hills’ future. This section also responds to the NCAC 7B requirements for CAMA certified
land use plans. The stated actions are designed to address issues which have been identified by the staff,
Planning Board, Board of Commissioners, and citizens of Kill Devil Hills. The goals and implementing
actions will also assist Town officials in making long-range decisions in such areas as economic
development, provision of community services and facilities, transportation planning, community
preservation, environmental management, and CAMA regulatory requirements.
This section of the plan includes specific implementing actions for each of the following areas of concern:
Public Access.
Land Use Compatibility.
Infrastructure Carrying Capacity.
Natural Hazard Areas.
Water Quality.
Local Concerns.
The responsibility for implementing the recommendations included in this plan belongs to the Kill Devil
Hills elected officials. The adoption of this plan is not the end but rather the beginning of a continuous
pragmatic process. Opportunity exists for the Town to provide positive direction to development as it
continues to occur. Some of the actions stated in this plan may be implemented in months while others
may require years to accomplish effectively. Planning is only as good as the commitment and abilities of
the people responsible for implementing the plan. Kill Devil Hills is fortunate to have involved citizens,
dedicated elected officials, and competent staff. It is expected that this benefit will continue into future
years.
Goals and implementing actions frequently utilize the following words: should, continue, encourage,
enhance, identify, implement, maintain, prevent, promote, protect, provide, support, and work. The intent of these
words is defined as follows:
Should: Follow an officially adopted course or method of action to implement the community
goals. Though not mandatory as “shall,” it is still an obligatory course of action unless clear
reasons can be identified that an exception is warranted. Town staff and Planning Board should
be involved at all levels from planning to implementation.
Continue: Follow past and present procedures to maintain desired goal, usually with Town staff
involved at all levels from planning to implementation.
Encourage: Foster the desired goal through Town policies. Could involve Town financial
assistance.
Enhance: Improve current goal to a desired state through the use of policies and Town staff at all
levels of planning. This could include financial support.
Identify: Catalog and confirm resource or desired item(s) through the use of Town staff and
actions.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-2 9/14/2020 CAMA Land Use Plan
Implement: Take actions to guide the accomplishment of the Plan recommendations.
Maintain: Keep in good condition the desired state of affairs through the use of Town policies and
staff. Financial assistance should be provided if needed.
Prevent: Stop described event through the use of appropriate Town policies, staff actions,
Planning Board actions, and Town finances, if needed.
Promote: Advance the desired state through the use of Town policies and Planning Board and
staff activity at all levels of planning. This may include financial support.
Protect: Guard against a deterioration of the desired state through the use of Town policies, staff,
and, if needed, financial assistance.
Provide: Take the lead role in supplying the needed financial and staff support to achieve the
desired goal. The Town is typically involved in all aspects from planning to implementation to
maintenance.
Support: Supply the needed staff support, policies, and financial assistance at all levels to achieve
the desired goal.
Work: Cooperate and act in a manner through the use of Town staff, actions, and policies to create
the desired goal.
PUBLIC INPUT
A successful planning process must have comprehensive, inclusive, and constructive input from the
public. The plan will serve the needs of Kill Devil Hills’ citizenry and should, therefore, be written on
their behalf. Throughout the planning process, multiple methods were used to solicit public input. The
Town’s Planning Board, made up of key community representatives and citizens, was tasked with
steering the consultant throughout the process. In addition to input received from the Planning Board,
the results of the 2007 and 2017 public input surveys were analyzed. The 2007 public input survey was
mailed to 5,985 property owners; the survey was completed by 1,488 property owners. The 2017 public
input survey was disseminated via SurveyMonkey (an online survey software); approximately 1,600
responses were received. Appendix G provides a summary comparison of the 2007 and 2017 results.
Overall, citizen opinion has not dramatically change since 2007 with the exception of off-shore oil
exploration which was strongly opposed in 2017. The 2017 survey was completed by a slightly younger
group than the 2007 likely due to the electronic survey versus the paper survey done in 2007. Town-wide
meetings were also used to gather citizen input.
Project Website
At the outset of the project, a website dedicated to the preparation of the CAMA Land Use Plan was
established (http://plankdh.com/). All information concerning plan development was posted on the
website. The website provided continuous access for the public to obtain information and provide input.
As of August 22, 2018, there had been 1,087 visitors to the website.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-3
Public Meetings
The Planning Board conducted five (5) meetings to review/discuss the preparation of the CAMA Land
Use Plan:
February 20, 2018
April 17, 2018
May 15, 2018
June 19, 2018
September 18, 2018
On July 19, 2018, the Board of Commissioners and Planning Board conducted a joint public input/project
review meeting. The policies/strategies proposed for this plan were reviewed. A Planning Board
meeting was conducted on July 21, 2020, to allow the public an opportunity to review and comment on
the draft plan prior to the public hearing held on September 14, 2020. All meetings were advertised and
open to the public.
GOALS
The following planning process goals have been heavily influenced by public input/opinion received
during the planning process and the input of the Planning Board. An annual review of these goals
should be conducted by the Board of Commissioners, and adjusted, if necessary, as implementation is
accomplished.
Goal 1: Support public involvement in the governance of Kill Devil Hills.
Goal 2: Promote and protect a family values and beach atmosphere.
Goal 3: Promote fiscal responsibility and the value of taxpayer dollars.
Goal 4: Preserve the Town’s natural resources.
Goal 5: Achieve strategies which promote appropriate development and redevelopment.
Goal 6: Promote better citizen understanding of land use planning.
Goal 7: Preserve Kill Devil Hills’ residential areas.
Goal 8: Support Kill Devil Hills’ local economy as a year-round community.
Goal 9: Support actions to diversify Kill Devil Hills’ local economy.
Goal 10: Support infrastructure which will adequately serve the Town’s future.
Goal 11: Protect recreational water quality.
Goal 12: Promote public beach access.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-4 9/14/2020 CAMA Land Use Plan
POLICIES REGARDING LAND USE AND DEVELOPMENT IN AEC’S
The Town of Kill Devil Hills accepts state and federal law regarding land uses and development in
AEC’s. By reference, all applicable state and federal regulations are incorporated into this document. No
policies exceed the use standards and permitting requirements found in Subchapter 7H, State Guidelines
for Areas of Environmental Concern. However, the Town of Kill Devil Hills does not consider the
following issue to be relevant at this time within its planning jurisdiction: Peat or Phosphate Mining’s
Impact on any Resource.
The Areas of Environmental Concern and Fragile Areas within the Town’s planning jurisdiction include
the following:
Public trust areas as defined in 15A NCAC 7H.0207 public trust areas.
404 wetland jurisdiction determinations (can only be made by Corps of Engineers personnel
through individual on-site analysis).
Fragile Areas.
Estuarine waters as defined in 15A NCAC 7H.0206.
Coastal shorelines as defined in 15A NCAC 7H.0209.
Coastal wetlands AEC as defined in 15A NCAC 7H.0205.
Ocean hazard area AEC (ocean erodible AEC) as defined in 15A NCAC 7H.0304.
Small water supply watershed AEC as defined in 15A NCAC 7H.0405.
For the issuance of CAMA permits within areas of environmental concern, the state’s minimum
acceptable use standards are defined by 15A NCAC 7H. A local unit of government must adopt policies
which are, at a minimum, equal to and consistent with the state’s minimum use standards.
The second area of land use plan application is that of establishing policies to guide the jurisdiction’s
local planning. This situation may apply both within areas of environmental concern where CAMA
regulations apply and in non-CAMA regulated areas of the Town’s planning jurisdiction. Non-CAMA
related recommendations must be implemented with local land use ordinances such as zoning or
subdivision ordinances. If this plan recommends that the average residential density should be three
dwelling units per acre within a particular area, then that density must be achieved through local zoning
ordinance or other regulatory control. (This should not be confused with the interaction of the land use
plan with the CAMA regulations and 15A NCAC 7H use standards).
The final area of application is that of “Consistency Review.” Proposals and applications for state and
federal assistance or requests for agency approval or projects are normally reviewed against a
jurisdiction’s land use plan to determine if the project is consistent with local policies. Inconsistencies of a
project with local policies could serve as grounds for denial or revision of a project. For example, an
individual or agency may request state or federal funding to construct a 30-unit low-to-moderate income
housing project. If the proposed location of the project is within an area in which this land use plan states
that the residential density should not exceed two dwelling units per acre, the project may be judged to
be inconsistent with the local land use plan.
Note the following policy clarifications:
No policy is subordinate to another.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-5
All management topics have equal status.
The future land use map may show some areas in a developed category which may also include
sensitive habitats or natural areas. The intent is that development should be designed/permitted
to protect these areas through utilization of concepts such as cluster development.
Development/project approval will be based on project design which avoids substantial loss of
important habitat/environmentally sensitive areas.
The US Army Corps of Engineers maintains jurisdiction over freshwater wetlands.
LAND USE PLAN MANAGEMENT TOPICS
A key objective of any comprehensive plan is the creation of a robust and achievable set of goals, policies,
and implementing actions. These items should support implementation of the future land use map.
Implementation of these strategies is the responsibility of the Town’s elected officials, staff, and citizens.
Decisions made as a result of this plan should serve to enhance the quality of life for residents, support
long-term economic growth, and promote viable land use and development patterns. This plan serves as
the Town’s overall comprehensive plan and provides for compliance with the CAMA Land Use Plan
requirements.
CAMA Land Use Plans must support the goals of CAMA, define the CRC’s expectations for the land use
policies, and provide a basis for land use plan review and certification. Goals, policies, and implementing
actions are provided for each of the following CAMA management topics: Public Access, Land Use
Compatibility, Infrastructure Carrying Capacity, Natural Hazard Areas, and Water Quality, in addition
to other local areas of concern. These strategies apply to the Town’s entire planning jurisdiction. Please
note: Policies and Implementing Actions are numbered consecutively throughout this document with the
letter “P” denoting a policy and the letter “I” denoting an implementing action.
This plan is intended to support Kill Devil Hills’ vision statement (page 1-9). No negative impacts are
anticipated by the implementation of the goals, policies, and implementing actions which are included in
this plan. All implementing actions are prioritized/scheduled by: high; medium; low; or continuing. The
scheduling for these priorities following plan adoption is: high - within 2 fiscal years (FY2018-2019 to
FY2019-2020); medium - 3 to 5 fiscal years (FY2020-2024); low - 6 to 8 fiscal years (FY2025-2027);
continuing - a daily implementing action. This schedule is subject to annual reviews and update of this
Plan.
Note: It is intended that all policies are consistent with applicable State and Federal requirements when
State and Federal requirements apply.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-6 9/14/2020 CAMA Land Use Plan
Public Access
Public access is important to the Town for the provision of recreational access and as a contributor to the
Town’s tourism industry and quality of life.
Management Goal: Maximize public access to the beaches and the public trust waters of the coastal
region.
Planning Objectives: Policies that address access needs and opportunities, with strategies to develop
public access and provisions for all segments of the community, including persons with disabilities. For
oceanfront communities, establish access policies for beach areas targeted for nourishment.
Policies:
P.1 The Town supports the provision of access to the shoreline for residents and visitors of Kill Devil
Hills, including persons with disabilities.
P.2 The Town supports improving its shoreline accessibility.
Implementing Actions:
I.1 Support the recommendations of the Shoreline Access Plan, including acquisition of land and
improvements to access facilities including parking, paths, and dune crossovers. The Town favors
updating the Shoreline Access Plan every five years as necessary. Schedule: Continuing.
I.2 Continue to seek out grant funding for the establishment of new beach and estuarine access sites
through the Town’s jurisdiction. Special attention will be given to providing access to handicapped
individuals. Schedule: Continuing.
I.3 Maintain public access within the beach renourishment area to meet the US Army Corps of Engineers
standards for participation in beach nourishment projects. Schedule: Continuing.
I.4 Monitor the use of personal watercraft and consider regulations for sound and ocean operation, if
deemed appropriate. Schedule: Continuing.
I.5 Support channel maintenance activities in surrounding waters, particularly at the Dock Street public
boat ramp and including partial local funding when necessary. Schedule: High.
Land Use Compatibility
Land use compatibility is always an important issue as the Town seeks to balance growth with the
protection of valuable natural resources. As development occurs, the Town desires to protect its
maritime forest, estuarine, and extensive sensitive natural and open space areas. The future land use
map reflects the concentration of future development.
Management Goal: Ensure that development and use of resources or preservation of land balance
protection of natural resources and fragile areas with economic development, while avoiding risks to
public health, safety, and welfare.
Planning Objectives: Policies that characterize future land use development patterns and establish
mitigation criteria and concepts to minimize conflicts.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-7
Policies:
P.3 The Town does not support heavy industry within its borders but supports commercial services and
light industry in zoning districts where such uses are considered appropriate. It should be noted that
zoning will be carried out through local implementation controls (zoning/subdivision regulations).
P.4 The Town supports redevelopment of developed areas only after review of plans for consistency with
the Town’s adopted plans and regulations. Redevelopment should enhance the appearance of the Town
and improve the community atmosphere.
P.5 The Town supports the regulation of land uses of unincorporated land within one mile of the Town’s
jurisdictional limit and is not opposed to participating in friendly annexations if favorable to the Town.
P.6 The Town supports the efforts of the Historic Landmarks Commission to identify and designate the
Town’s historic structures.
P.7 The Town supports maintenance of its traditional low-profile skyline and image by limiting building
height. The Town supports maintaining the building height in the commercial and light industrial
zoning districts as well as the lower height regulations in the residential and oceanfront zoning districts.
P.8 The Town supports the use of alternative energy resources for both residential and non-residential
property owners. The Town supports offshore wind farms.
P.9 The Town supports maintaining low-density residential development (3 units per acre or 6 units per
acre for multi-family) in the vicinity of the Wright Brothers National Historic Site along those portions of
US 158 not zoned commercial. Vicinity is defined as those areas within direct proximity of the Wright
Brothers memorial. It should be noted that zoning will be carried out through local implementation
controls (zoning/subdivision regulations).
P.10 The Town will maintain its three-tier approach to land use and housing mix, with land west of US
158 used primarily for its permanent population residing in detached single-family dwellings. For land
use east of NC 12, development of single-family homes, hotels, and multi-family structures for vacation
rentals will be acceptable. Commercial zoning districts between the two highways will continue to
contain single-family dwellings used in a commercial application as short-term vacation rentals as well as
private residences. It should be noted that zoning will be carried out through local implementation
controls (zoning/subdivision regulations).
P.11 It is Town policy that the Community Appearance Commission will advise the Board on
improvements to the community’s appearance, including studies and recommendations as may be
necessary to enhance the NC 12 and US 158 corridors.
P.12 The Town supports enhancement to and the preservation of its family beach atmosphere and thus,
does not encourage the construction, establishment, location, or operation of adult establishments within
its borders or jurisdiction. However, the Town will permit those establishments in compliance with
Town codes.
P.13 The Town encourages public participation in all land use decisions and procedure development
processes and encourages citizen input via its boards, commissions, and agencies.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-8 9/14/2020 CAMA Land Use Plan
P.14 The Town supports the concept of a Town center or creation of walkable community areas.
P.15 The Town, through the implementation of this plan, supports growth and development in a manner
that will promote economic development while protecting the Town’s fragile and natural resource areas.
Implementing Actions:
I.6 Protect identified areas of archaeological or historical significance. Schedule: Continuing.
I.7 Encourage recreational activities including fishing and discourage commercial agriculture, forestry,
and mining. Schedule: Continuing.
I.8 Support the concept of streetscape planning along US 158 including lighting, landscaping, signage,
design standards, traffic calming, sidewalks and other multi-modal improvements to create a uniform
corridor. Schedule: High.
I.9 Support regulation of signs through the Town’s zoning ordinance. Town supports minimal use of
LED signage and does not support signs using LCD or similar technologies. Schedule: High.
I.10 Work to accommodate the installation and use of alternative energy equipment and resources
through amendments to the Town Zoning and Subdivision Ordinances. Potential text amendments will
consider potential impacts on adjoining property owners regarding the installation and use of alternative
energy. Schedule: High.
I.11 Support efforts to provide workforce housing within the Town boundaries. Schedule: High.
I.12 Study the impacts that may result from the placement of fill material and consider regulations with
standards to mitigate impacts found to be detrimental to the Town. Schedule: Medium.
I.13 Continue to monitor and assess all impacts of large single-family homes in Kill Devil Hills. Schedule:
Continuing.
I.14 Consider an update to the Town’s current Zoning, Subdivision, and Flood Damage Prevention
Ordinances in an effort to streamline the development process and reduce the potential for land use
conflicts. The ordinance updates will focus on the best land use practices and overall protection of public
and private infrastructure. Schedule: High.
I.15 Support the current regulatory efforts to maintain a moderate growth rate. The Town also supports
government action to promote redevelopment and to make the Town a more desirable place to live and
locate. Schedule: Medium.
I.16 Develop regulations to control outdoor display and storage of merchandise. Schedule: Low.
I.17 Support improvements to the aging residential housing stock. Schedule: Low.
Infrastructure Carrying Capacity
Diversification of the Town’s economy is dependent upon maintaining and providing adequate
community and infrastructure services. In addition, future Town capital improvements plans will
strongly influence the location of future land uses.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-9
Management Goal: Ensure that public infrastructure systems are sized, located, and managed so the
quality and productivity of AECs and other fragile areas are protected or restored.
Planning Objectives: Policies that establish service criteria and ensure improvements minimize impacts
to AECs and other fragile areas.
Policies:
P.16 The Town supports the establishment of a publicly-owned community-wide wastewater treatment
system within the Government and Institutional Zone without surface water discharge of effluent for the
protection of the health, safety, and welfare of the citizens of Kill Devil Hills and not to promote increased
dwelling density. It should be noted that zoning will be carried out through local implementation
controls (zoning/subdivision regulations).
P.17 The Town supports the use of package treatment plants in the interim if they are affixed to the units
they serve and if both the package treatment plants and the units they serve are located within the
boundaries of Kill Devil Hills. The Town supports requiring periodic and regular inspection of private
septic systems.
P.18 The Town supports exactions and system development fees from developers for required services
and infrastructure improvements necessary to address impacts created by development.
P.19 The Town opposes the placement of public and multi-service energy facilities other than carefully
planned substations within Town borders and supports the placement of new and replacement
distribution utility lines underground. The Town supports one electric transmission corridor within its
municipal boundaries.
P.20 The Town supports a “pay as you go” policy for the construction and improvements of streets as
may be necessary to improve traffic flow and drainage. The Town is not opposed to the concept of
alternative funding policies including special assessments.
P.21 The Town advocates a public transportation system which addresses the needs of its seasonal
population, seniors, and year-round residents.
P.22 The Town supports the installation of multi-modal transportation facilities. Potential facilities
should include shared bike lanes, dedicated bike lanes, sidewalks, and multi-use trails. Sidewalks should
be established on all major thoroughfares including US 158 and NC 12.
P.23 The Town supports the provision of adequate, accessible, well-maintained public recreational
facilities.
P.24 The Town supports consolidation of services through inter-local agreements and contracts when
services can be provided more cost efficiently through such agreements.
P.25 The Town supports the development of infrastructure in a manner that will minimize impacts to
AECs and other fragile areas, including Ocean Hazards AEC (Ocean Erodible Area), Coastal Shorelines
AEC (Public Trust Shoreline and Estuarine Shoreline), Coastal Wetlands AEC, Public Trust Areas AEC,
Estuarine Waters AEC, and the Fresh Pond AEC. Factors to be considered include size, extent, location,
and management/maintenance plans.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-10 9/14/2020 CAMA Land Use Plan
Implementing Actions:
I.18 Support the economical and efficient provision of potable water to its citizens and the construction
and maintenance of facilities as necessary. Continue to rely on the Dare County Water Department for
providing water. Work with Dare County to study additional and alternative water sources including
maintenance of the Fresh Pond as a potable water source. Schedule: High.
I.19 Support the concept of requiring those who generate the demand to pay for street improvements that
may be necessary to provide for safe traffic movement. Schedule: Continuing.
I.20 Support updates to the Street Improvement Master Plan, creating a comprehensive approach to right
of way planning to include all forms of transportation, utility and stormwater needs. Schedule: Medium.
I.21 Support the expeditious completion of the following inter-jurisdictional road improvement projects
by the NC Department of Transportation:
Projects necessary to mitigate drainage problems and provide pedestrian and bicycle amenities
along NC 12 and US 158.
Replace all wire and pole signals with mast arm signals.
Projects necessary to improve the entire SR 1217 corridor including improvements to facilitate
bicycle and pedestrian traffic.
Complete the four-laning of US 64 from Raleigh to the coast.
Construction of “Mid-County Bridge” across the Currituck Sound.
Resurfacing/redesign/reconstruction of US 158.
Pedestrian crossings at signalized intersections on NC 12 and US 158.
Support planning for seasonal public transportation. Schedule: High
I.22 Continue to levy fees and exactions for development and infrastructure improvements. Consider
new fees where appropriate to address impacts created by development. Schedule: Continuing.
I.23 Support curbside recycling and the current system of the Town’s drop-off recycling center. Schedule:
Continuing.
I.24 Review and encourage implementation of the 2012 Albemarle Regional Bicycle Transportation Plan
and update when NCDOT funds become available. Schedule: Low.
I.25 Install multi-modal transportation facilities as new development occurs, streets are resurfaced, and
through local investment as dictated by the Town’s annual budget. These facilities should focus on
establishing connectivity between bicycle and pedestrian infrastructure which currently exists
throughout the Town’s corporate limits. Solutions for various locations will be determined based on
suitability and need. Special attention will be given to portions of Town where connectivity among
existing facilities is lacking as well as beach and estuarine access points, parks, and community facilities.
The Town will continue to fund construction of these facilities through the annual budget, Powell Bill
funding, and grant funding (when available). Schedule: Medium.
I.26 Support organized recreational activities and recommendations of the Recreational Facilities Plan.
The Town favors updating the Recreational Facilities Plan at least every five years or as necessary.
Schedule: Low.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-11
I.27 Support planning for public transportation on the Outer Banks including bus routes and stops to be
considered with future roadway improvements. Schedule: Low.
I.28 Continue to maintain a Capital Reserve Fund that will be based on an annually approved Capital
Improvements Plan. The Town will plan for the timely and conservatively cost-effective provisions of
major capital improvements and services based on anticipated growth and demand. Schedule:
Continuing.
Natural Hazard Areas
The preservation of natural hazard areas is important to the Town’s quality of life and the economy. The
Town must deal with a range of issues associated with natural hazards, from hurricane preparation to
beach nourishment and management.
Management Goal: Conserve and maintain barrier dunes, beaches, floodplains, and other coastal
features for their natural storm protection functions and their natural resources giving recognition to
public health, safety, and welfare issues.
Planning Objectives: Policies that establish mitigation and adaptation concepts and criteria for
development and redevelopment, including public facilities, and that minimize threats to life, property,
and natural resources resulting from erosion, high winds, storm surge, flooding, or other natural hazards.
Policies:
P.26 The Town supports the guidelines of the Coastal Area Management Act (CAMA) and the associated
policies of the Coastal Resources Commission (CRC) but reserves the right to oppose specific sections of
CAMA and proposed rules or rule changes. The Town is opposed to any additional AEC designations or
the extension or enlargement of any existing AEC designations within its borders.
P.27 The Town supports US Army Corps of Engineers regulations as applicable, reserving the right to
oppose any proposed modifications to existing regulations. The Town supports properly permitted
mitigation activities.
P.28 The Town supports the maintenance and management of maritime forests and supports the use of
locally adopted management guidelines.
P.29 The Town supports the protection of fragile areas such as the Fresh Pond AEC and supports
measures to mitigate potential adverse effects of industrial uses.
P.30 The Town supports long-term efforts to maintain and enhance the public trust beach through
funding of a beach nourishment project using Federal, State, and local funds.
P.31 The Town will consider establishing a higher regulatory standard for flood damage prevention
including flood development requirements within the “X” flood zone and increased freeboard
requirements in Special Flood Hazard Areas.
P.32 The Town supports the Dare County Emergency Management Plan.
P.33 The Town supports a post-disaster fund of state monies to supplement Federal disaster relief aid to
be allocated to North Carolina communities that have been declared major disasters.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-12 9/14/2020 CAMA Land Use Plan
Implementing Actions:
I.29 Continue to attend CRC meetings and submit opposition to regulations that will adversely affect
development in Kill Devil Hills. Schedule: Continuing.
I.30 Continue to monitor regulatory changes of USACOE and submit opposition to regulations that will
adversely affect development in Kill Devil Hills. Schedule: Continuing.
I.31 Continue to participate in the CAMA permitting process with the provision of a local permit officer.
Schedule: Continuing.
I.32 Require private owners of land in maritime forests to retain the natural wooded condition of their
property in accordance with the Town zoning regulations. Schedule: Continuing.
I.33 Support the development of a passive/public recreation area located within and adjacent to Fresh
Pond. These facilities may include both water recreation and open space uses such as walking trails and
picnic shelters. Seek grant funding as well as work with the Town of Nags Head in these efforts.
Schedule: Medium.
I.34 Support the preservation of the current undeveloped estuarine islands under the jurisdiction of Kill
Devil Hills. Schedule: Continuing.
I.35 Support the continued construction of properly permitted estuarine bulkheads. Schedule:
Continuing.
I.36 Support the construction and revegetation of oceanfront sand dunes and oppose the mining of island
dunes. Schedule: Continuing.
I.37 Support Dare County’s efforts in a storm protection project involving Kill Devil Hills, Duck,
Southern Shores, Kitty Hawk, and Nags Head. The Town also favors non-structural responses to erosion
such as acquisition of existing endangered structures, setbacks for new construction, and measures as
may be necessary to protect property endangered due to erosion so severe that non-structural responses
are impractical or ineffective. Schedule: High.
I.38 Require that individual property owners bear the cost of site-specific protection measures and
mitigation costs when such measures cause damage to public beaches and down-drift property owners.
Schedule: Continuing.
I.39 Support emergency measures such as emergency dunes and sand placement in response to storm
events. Schedule: Continuing
I.40 Support the following:
Annual awareness campaigns and evacuation exercises.
Bridge and road improvements as may be necessary to increase traffic flow on evacuation routes.
Continuation of a full-time Dare County Emergency Management Coordinator and an annual
update of the Dare County Hurricane Evacuation Master Plan and Disaster Assessment Team
Personnel Roster.
Erection of evacuation route identification signs during hurricane season. Schedule: High.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-13
I.41 Hold annual meeting for development community to provide updates on local, state, and federal
floodplain regulations. Schedule: Continuing.
I.42 Initiate an education program to inform the public about the danger of flooding and how to prevent
property damage. Schedule: High.
I.43 Continue to participate in the Community Rating System (CRS) to educate and make the community
safer from flood risks and to reduce premiums for federal flood insurance. Schedule: Continuing.
I.44 Continue to update and maintain the Town’s Hurricane Preparedness Plan annually and conduct
annual disaster preparedness exercises. Schedule Continuing.
I.45 Implement the mitigation strategies defined in the Albemarle Regional Hazard Mitigation Plan (see
Appendix B). Continue to work with surrounding communities on the 5-year updates of the Regional
HMP. Schedule: Medium.
I.46 Participate in the federal Hazard Mitigation Grant Program to elevate severe repetitive loss
structures. Schedule: High.
I.47 Update priorities for the issuance of permits after a disaster to reflect priorities such as life safety
services, essential public utilities and services, and repair of storm damage. Seek to educate and
encourage those applying for building permits to exceed minimum regulatory standards (both flood
prevention and construction standards) to increase resiliency during and after a storm event. Schedule:
Continuing.
I.48 Support the concept of wildlife management within the Town limits. Partner with The Nature
Conservancy to manage deer and other wildlife as appropriate. Schedule: Continuing.
Water Quality
Water quality is important to the Town’s qualify of life and economic development. Water quality
impacts the Town’s natural assets and the activities of the Town’s population. Preservation of the Town’s
water quality demands proper management of stormwater runoff.
Management Goal: Maintain, protect, and where possible, enhance water quality in all coastal wetlands,
rivers, streams, and estuaries.
Planning Objectives: Policies that establish strategies and practices to prevent or control nonpoint source
pollution and maintain or improve water quality.
Policies:
P.34 The Town supports mitigation of adverse impacts associated with stormwater runoff within Town
limits.
P.35 The Town supports Federal, State, and local efforts for navigational dredging projects.
P.36 The Town is opposed to seismic testing and off-shore drilling for either exploration for, or
production of, either oil or gas, and/or the location of onshore support facilities for such activities.
P.37 The Town supports voluntary water conservation measures.
S ECTION 6. G OALS AND S TRATEGIES
Page 6-14 9/14/2020 CAMA Land Use Plan
P.38 The Town opposes floating homes and the residing upon moored vessels in public trust waters
adjacent to Kill Devil Hills.
Implementing Actions:
I.49 Continue to implement and update, as necessary, the Stormwater Management Plan. Schedule: High.
I.50 Promote stormwater management on single-family dwellings through Best Management Practices to
minimize effects. Schedule: Continuing.
I.51 Enforce stormwater regulations for all non-single/two-family residential development. Schedule:
Continuing.
I.52 Oppose permit denial for navigational dredging projects if such denial is based on the presence of
submerged aquatic vegetation. Schedule: Continuing.
I.53 Preserve recreational water quality through implementation of the Stormwater Master Plan.
Schedule: Continuing.
I.54 Provide comments to State agencies when appropriate regarding offshore leases, protective policies,
and revenue streams. Schedule: Continuing.
Local Areas of Concern
In addition to the CRC Management Topics outlined above, CAMA guidelines also allow for the
inclusion of policies to address local areas of concern. The following provides strategies which address
concerns and/or issues unique to the Town of Kill Devil Hills.
Policies:
P.39 The Town supports tourism and its recognition as an industry. The Town supports measures that
promote and enhance its public image.
P.40 The Town supports measures to provide continuous affordable insurance for Outer Banks residents
and property owners. The Town opposes insurance increases solely targeted at coastal areas and
supports equitable rates statewide validated by data.
P.41 The Town supports architectural and design standards for all development and redevelopment other
than single-family and duplex dwellings.
P.42 The Town supports seasonal restrictions on beach driving and limiting driving to daylight hours.
Implementing Actions:
I.55 Support the continued provision of quality, affordable health care and the continued operation of a
full-service hospital in Dare County. Schedule: Medium.
I.56 Support the construction of additional educational facilities as may be necessary. Schedule: Low.
I.57 Retain existing vegetation on lots and parcels to the extent practicable. The Town will support
preservation of existing vegetation. Schedule: Low.
S ECTION 6. G OALS AND S TRATEGIES
CAMA Land Use Plan 9/14/2020 Page 6-15
I.58 Encourage citizen involvement through the Town’s website, email communications, and attendance
and participation at public meetings. Schedule: Low.
I.59 Sustain the tourist economy and diversification of workforce including expanding medical and
educational facilities. Encourage development by increasing land use intensities in selective opportunity
areas using environmentally sustainable techniques. Schedule: Medium.
I.60 Continue participation with NC-20 to lobby for equitable insurance premiums. Schedule:
Continuing.
S ECTION 7. T OOLS FOR M ANAGING D EVELOPMENT
CAMA Land Use Plan 9/14/2020 Page 7-1
GUIDE FOR LAND USE DECISION MAKING
It is intended that this document be an integral part of the Kill Devil Hills decision-making process
concerning future land use. This document should be consulted prior to any decision being made by the
Kill Devil Hills staff, Planning Board, and/or Board of Commissioners concerning land use and
development.
EXISTING MANAGEMENT PROGRAM
The existing management program includes the following plans/ordinances:
CAMA Land Use Plan
Flood Damage Prevention Ordinance
Subdivision Ordinance
Zoning Ordinance
Storm Hazard Mitigation Plan
Stormwater Management Plan
Shoreline Access Plan
Recreational Facilities Plan
Street Improvement Master Plan
Peddler and Itinerant Vendors/Special Events Ordinance
Local Historical Sites
Nuisance Ordinance
The Town maintains a full-time Planning and Inspections Department which includes a Planning
Director, two full-time planners, zoning administrator, two building inspectors and a code enforcement
officer. The Department administers, reviews, and advises on local, state, and federal grants. In addition,
the Town has a Planning Board and Board of Adjustment which provide legislative and quasi-judicial
oversight of the land use related plans and ordinances. The Town’s Board of Commissioners has final
approval authority for all plans/ordinances, except for Board of Adjustment decisions.
CONTINUING PLANNING PROCESS
This plan provides the framework upon which zoning and subdivision regulations and the capital
improvements plan should be based. In fact, the preparation of a land use plan and map is mandated by
North Carolina legislation as a prerequisite for zoning for both cities and counties.
Specifically, in implementing this plan, the following should serve as guiding land use/planning
principles:
Consider the future land use map as part of the policies included in this plan.
Consult this plan, including the future land use map, during the deliberation of all rezoning
requests and proposed text amendments.
S ECTION 7. T OOLS FOR M ANAGING D EVELOPMENT
Page 7-2 9/14/2020 CAMA Land Use Plan
Consider the following in deliberation of all zoning petitions:
o All deliberations should consider this plan’s goals, implementing strategies, and future
land use map.
o All uses that are allowed in a zoning district must be considered. A decision to rezone or
not to rezone a parcel or parcels of property cannot be based on consideration of only one
use or a partial list of the uses allowed within a zoning district.
o Requests for zoning changes should not be approved if the requested change will result
in spot zoning. Spot zoning is a form of discriminatory zoning whose sole purpose is to
serve the private interests of one landowner instead of furthering the welfare of the entire
community as part of an overall zoning plan. Spot zoning is based on the arbitrary and
inappropriate nature of a rezoning change rather than, as is commonly believed, on the
size of the area being rezoned.
o Zoning which will result in strip development should be discouraged. Strip
development is a mélange of development, usually commercial, extending along both
sides of a major street. Strip development is often a mixture of auto-oriented enterprises
(e.g., gas stations, motels, and food stands), and truck-dependent wholesale and light
industrial enterprises. Strip development may severely reduce traffic-carrying capacity
and disrupt traffic flow of abutting streets by allowing for excessive and conflicting curb
cuts.
o Access management should be considered in all land use/zoning decisions.
o The concept of uniformity should be supported in all zoning deliberations. Uniformity is
a basic premise of zoning which holds that all land in similar circumstances should be
zoned alike; any different circumstances should be carefully balanced with a
demonstrated need for such different treatment.
o Specifically, the Planning Board and Board of Commissioners should ask the following
questions:
Is the request in accordance with this plan? Zoning regulations shall be made in
accordance with the Town’s Comprehensive Plan (NCGS 160A-383). When
adopting or rejecting any zoning amendment, the Board of Commissioners shall
also approve a statement describing whether its action is consistent with the
Town’s Comprehensive Plan and any other officially adopted plan that is
applicable, and briefly explaining why the Board of Commissioners considers the
action taken to be responsible and in the best public interest.
Will the request have a serious adverse impact on traffic circulation and other
infrastructure?
Will the request have an adverse impact on other Town services, including police
protection, fire protection, or public works?
S ECTION 7. T OOLS FOR M ANAGING D EVELOPMENT
CAMA Land Use Plan 9/14/2020 Page 7-3
Is there a good possibility that the request, as proposed, will result in lessening
the use of adjacent properties?
Will the request, as proposed, cause serious noise, odors, light, activity, or
unusual disturbances?
Does the request raise legal questions such as spot zoning, hardship, or violation
of precedents?
Does the request adversely impact water quality or other natural resources?
Will the request adversely impact beach maintenance or access?
Following adoption of this plan, the Town may implement the following to ensure effective citizen
participation:
Encourage diverse public participation and citizen input in all land use decisions and procedure
development processes, and encourage citizen input.
Publicize all meetings of the Planning Board and Board of Adjustment through newspaper
advertisements, public service announcements, internet notices, and on the Town’s website.
Utilize broad-based advisory committees to assess and advise the Town on special planning
issues/needs, including implementation of this plan.
All Planning Department activities will be available on the Town’s website.
At a minimum, update this plan every five to seven years.
LAND USE PLAN AMENDMENTS
At which time the Town of Kill Devil Hills CAMA Land Use Plan needs to be amended, the Town will
apply the guidelines for Land Use Plan Amendments under Subchapter 7B, Section 0800 of the North
Carolina Administrative Code. A brief summary of those guidelines is provided below.
The Land Use Plan may be amended as a whole by a single resolution or in parts by successive
resolutions. The successive resolutions may address geographical sections, county divisions, or
functional units of subject matter.
The Town must hold a public hearing of which the public has been properly notified.
Copies of the proposed amendment(s) must be available for review at the Town Hall during
designated hours.
The executive secretary or a designated agent of the Coastal Resources Commission shall be
given notice of the public hearing, a copy of the proposed amendment(s), and a reason for the
amendment(s).
Amendments must be consistent with the Coastal Resources Commission’s Land Use Planning
Guidelines (15A NCAC 7B) and, if possible, with the Land Use Plans of adjacent jurisdictions.
S ECTION 7. T OOLS FOR M ANAGING D EVELOPMENT
Page 7-4 9/14/2020 CAMA Land Use Plan
If possible, the Town shall adopt the plan amendments expeditiously following the close of the
public hearing.
The Town will provide the executive secretary of the Coastal Resources Commission with a copy
of the amended text or maps, certification of local government adoption, and documentation that
it has followed the public hearing process required in GS 113A-110.
CITIZEN PARTICIPATION
For the preparation of this plan, the Kill Devil Hills Board of Commissioners adopted a citizen
participation plan. A copy of that plan is included as Appendix A. Following adoption of this plan, Kill
Devil Hills will implement the following to ensure adequate citizen participation:
The Town will encourage public participation in all land use decisions and procedural
development processes while encouraging citizen input via its boards and commissions.
Kill Devil Hills will advertise all meetings of the Town’s Planning Board and Board of
Adjustment through newspaper advertisements, public service announcements, internet notices,
and on the Town’s website.
The Town will, at least annually, conduct a joint meeting of the Board of Commissioners and the
Town’s Planning Board to identify planning issues/needs.
Ensure that the membership of all planning related and ad hoc advisory committees has a cross-
section of Kill Devil Hills’ citizenry.
A PPENDIX A. C ITIZEN P ARTICIPATION P LAN
CAMA Land Use Plan 9/14/2020 Page A-1
INTRODUCTION
The Town of Kill Devil Hills has initiated the preparation of an updated CAMA Land Use Plan (CAMA
LUP) for the Kill Devil Hills planning area. The final document will serve as comprehensive plan for
future public investment to achieve the community’s overall vision. The intent of this project is to draft a
plan that will maintain the positive attributes of the existing Plan, while identifying new and strategic
development goals and policies, and new and strategic public initiatives supported by the community.
Recognizing that a collaborative effort with the public is essential, the initial step in the planning process
is the adoption of this Citizen Participation Plan (CPP) by the Kill Devil Hills Board of Commissioners.
Approval of the CPP was accomplished on January 31, 2018.
RESPONSIBILITY
The Town of Kill Devil Hills Planning Board will supervise the preparation of the CAMA Land Use Plan
Update. The town’s staff and consultant will serve in an advisory capacity to the Planning Board. The
updated CAMA Land Use Plan will be drafted by Holland Consulting Planners, Inc., the town’s
consultant. Final approval will be by the Town of Kill Devil Hills Board of Commissioners.
MEETINGS
All Planning Board meetings will be conducted in an open format which will encourage public
involvement/engagement. The Planning Board will conduct up to five (5) work sessions to prepare the
draft CAMA Land Use Plan Update. At a minimum, the following meetings will be conducted
throughout the plan preparation process:
Up to five (5) work sessions with the Planning Board and one (1) joint work session with the
Board of Commissioners will be conducted. At each meeting, the location, date, and time of the
succeeding meeting will be determined.
A mid-project public review meeting to report overall project status and to obtain public input on
progress to date. This meeting will be scheduled approximately five (5) months into the project,
and will provide a summary of all data and issues identification obtained to date in the process.
Submittal of draft plan to the Planning Board by the consultant.
Submit the plan to the Board of Commissioners for work session and consideration prior to
submittal to the Division of Coastal Management.
Following review and comments by the Division of Coastal Management, present the final plan
at a public hearing.
PUBLIC NOTIFICATION
As public bodies, all meetings of the Planning Board and Board of Commissioners are conducted in an
open and transparent manner. All meetings are open to the public and Kill Devil Hills citizens are
encouraged to attend and participate.
A PPENDIX A. C ITIZEN P ARTICIPATION P LAN
Page A-2 9/14/2020 CAMA Land Use Plan
To ensure public awareness of the CAMA LUP project, meeting times and dates, project updates, and
public participation opportunities, and to increase ease of access to CAMA LUP-specific information, we
proposed the following:
The project team will create and maintain an interactive CAMA LUP-dedicated website to both
collect and disseminate information. The website will be especially valuable in reaching out to
non-resident property owners. Project progress, public notifications, and the draft plan will be
posted on this website for ease of public review and comment.
Development of a public information video using Staff, the consultant, elected officials, Planning
Board members for broadcast on the CurrentTV, and placement on the CAMA LUP website, and
the Town’s Facebook page and www.kdhnc.com website.
Legal and commercial advertising will be placed in The Coastland Times, the Outer Banks
Sentinel, and the on-line newspaper, Outer Banks Voice. Additionally, all advertisements will be
placed on the specialized CAMA LUP-dedicated website, the KDH website, www.kdhnc.com,
the Town’s Facebook pages (Administration, Police, and Fire/Ocean Rescue), posted on all Town
bulletin boards, and electronically distributed.
Sign-up sheets will be placed in the Kill Devil Hills Administration Building at all departmental
public greeting areas, at the Dare County Public Library, 400 Mustian Street, Kill Devil Hills, at
all meetings of public bodies and other groups held at the Town Hall, for interested persons and
groups to register to receive electronic messaging, including meeting notifications, update
information, and opportunities for review of the CAMA Land Use Plan Update. Similar
opportunities for registration will be placed on the Town’s website and Facebook pages. Staff
will transmit lists updates to the consultant on an at-least bi-weekly basis. Individuals who place
their names on this list will be mailed or emailed notices announcing meeting times for review of
the CAMA Land Use Plan Update.
The Town will utilize email and electronic communications on all aspects of the public
participation program to public distribution lists, civic groups, interested groups and
organizations.
DISSEMINATION OF INFORMATION
The following procedures will be utilized to ensure the availability of information:
Copies of the draft CAMA LUP will be available for public review in the Planning or
Administration Departments in the Administration Building, 102 Town Hall Drive; and the Dare
County Library, 400 Mustian Street.
Using the sites and methods of public notification provided in the Public Notification section, the
availability of the draft plan will be publicly announced and the draft document will be posted
for public review and/or printing. Information regarding the location of the online document
will be included in all published notices of Planning Board meetings, and communicated at all
meetings of the Board of Commissioners.
A PPENDIX A. C ITIZEN P ARTICIPATION P LAN
CAMA Land Use Plan 9/14/2020 Page A-3
As they are readied for discussion, sections of the draft plan will be provided to the Planning
Board prior to any meetings at which they will be discussed. Planning Board meetings materials,
as well as Board of Commissioners meetings materials, are all posted on the Town’s website and
linked to the Administration Facebook page, for public information and review.
Copies of the draft CAMA LUP or sections of the draft plan may also be obtained from the
Planning or Administration Departments, in the Administration Building, 102 Town Hall Drive.
PUBLIC COMMENT
Throughout the process, the public will have the following opportunities for input:
At each Planning Board meeting, time will be allocated for public comment, both written and
oral, which includes the opportunities for questions.
At any time during the preparation of the draft plan, the public may submit written or email
comments. Information on how to submit such comments will be provided on public notices and
advertisements, Facebook pages, and websites.
The town-wide mid-project status meeting/public input session, Planning Board work sessions,
open house, and public hearing will all provide additional opportunities for public input and
questions.
SCHEDULE
The CAMA Land Use Plan planning process will utilize the following schedule:
Phase Project Task Timeframe
Phase I: • Issue Notice to Proceed
• Project Initiation/Public Involvement Strategy
December 2017
December 2017-January 2018
Phase II: • Research and Analysis January-April 2018
Phase III: • Plan Format/Development May 2018-February 2019
Phase IV: • Submit plan to the NC Division of Coastal
Management for review and comment (75-day
review period required)
• Public Hearing
March 2019-March 2020
September 2020
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐32 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status CUR72 Preserve natural environmental features to naturally absorb water run‐off and serve as wind buffers. Flooding, DroughtHighCurrituck County PlanningGeneral FundCompleted with the adoptedamendments to the Unified Development Ordinance. CUR73 Continue communicating with other counties about hazard mitigation. All HazardsMediumCurrituck County Emergency Management General FundCompleted.CUR74 Continue to work on requirement for a real estate disclosure statement for home buyers and renters. FloodingMediumGeneral Fund, Local Real Estate Commission Incomplete. Developing working relationship with Real Estate Commission to garner support for providing disclosure. Table 7.2.5 Dare County Mitigation Strategies Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status DAR1 Identify Funding to improve stormwater drainage and land management preparation for flooding Hurricanes, Nor’easters, Severe Thunderstorms, Floods MediumDare County PlanningGeneral Fund, Grant Funds Seek funding from mitigation sources at state/fed level. Utilize academic partners to leverage combined assessment revenues. DAR2 Identify problem areas and prioritize projects to improve drainage systems throughout the county. Hurricanes, Nor’easters, Severe Thunderstorms, Floods HighDare County PlanningGeneral FundActively pursue damage assessment using GIS mapping techniques after each significant event DAR3 Enforce ordinances that prevent fill or structures without a drainage plan. Hurricanes, Nor’easters, Severe Thunderstorms, Floods HighDare County PlanningGeneral FundRoutinely Enforce the Dare Countyflood ordinance regulations for fill in the VE flood zones. DAR4 Assist property owners with safe and efficient clean up after storm events by implementing yearly contract with debris removal services Hurricanes, Nor’easters, Severe Thunderstorms, Floods MediumDare County Planning, Dare County Soil and Water Board General Fund, Grant Funds Continue yearly contract renewal with debris removal services. Compose media template for public outlining county debris plan and debris pick‐up separation of items Seek FEMA/state funding for reimbursement after storm events DAR5 Increase the number of properties that meet and exceed the published Base Flood Elevations Hurricanes, Nor’easters, Severe Thunderstorms, Erosion, Flood, Tsunami HighDare County Planning, Dare County Emergency Management General FundAll new structures permitted under County’s review have to meet or exceed the published Base Flood Elevations and based on annual permitting reports meet strategy. DAR6 Utilize existing post storm information and GIS mapping to identify the most vulnerable structures in the County. Hurricanes, Nor’easters, Severe Thunderstorms, Erosion, Flood, Tsunami HighDare County Planning, Dare County Emergency Management General Fund, Grant Funds County participate in Regional Plan that has vulnerability review of structures in County, will seek additional grant funding for mitigation of vulnerable structures identified.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐33 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status DAR7 Implement a repetitive loss plan to reduce the potential damage from future events. Hurricanes, Nor’easters, Severe Thunderstorms, Erosion, Flood, Tsunami HighDare County Planning, Dare County Hurricane Recovery General Fund, Grant Funds Additional grant funding to elevate 44 homes secured by Dare County after Hurricane Irene, work on elevation to be completed by 2015 DAR10 Identify and prioritize funding to mitigate vulnerable structures and develop the repetitive loss plan Hurricanes, Nor’easters, Severe Thunderstorms, Erosion, Flood, Tsunami HighDare County Planning Emergency Management GeneralFund, Grant Funds Repetitive loss map/plan identified as CRS goal for 2015 update, incomplete. DAR11 Implementation and Enforcement of CAMA Use Standards for Coastal Wetland AECs as Identified under 15NCAC7H, Section 0205 and 0208 Hurricanes, Nor’easters, Flood MediumDare County PlanningGrant FundsDare County continues to provide LPO assistance in unincorporated Dare County. County per CAMA has adopted Land Use Plan. All development within AEC may require CAMA major permit and must be consistent with County’s adopted plan. DAR12 Continue to Administer the CAMA Local Enforcement Program and Maintain the Staff Necessary for this Work Hurricanes, Nor’easters, Flood MediumDare County PlanningGeneral FundCounty provides Local Permit Officerassistance in unincorporated Dare County. DAR13 Refer Applicants to U.S. Army Corps of Engineers Permit Program, Specifically Section 404 Hurricanes, Nor’easters, Flood MediumDare County PlanningGeneral FundAs needed for individual development projects and subdivision projects County refers Applicants to U.S. Army Corps of Engineers Permit Program, Specifically Section 404 for Wetland development DAR14 Facilitate Implementation of Permit Program for Wetland Management Hurricanes, Nor’easters, Flood MediumDare County PlanningGeneral Fund, Grant Funds Incomplete, No local wetland permit program established, refer all applicants to US Army Corps of Engineers. DAR15 Protect transportation routes and improve traffic flow along NC 12. Improve NC 12 to a two lane road and coordinate traffic signals. Hurricanes, Nor’easters, Flood MediumDare County Planning, Dare County Emergency Management, NCDOT NCDOTAnnually attend RPO meetings that make recommendations for the State’s Transportation Improvement Program. Funding that is programmed in STIP has to meet the criteria and recommended as Regional, Statewide project. DAR16 Advocate the replacement of the Bonner Bridge. Hurricanes, Nor’easters, Flood, Erosion HighDare County Planning, Dare County Emergency Management, NCDOT NCDOTNCDOT working to replace bridge; lawsuits from environmental courts have resulted in delays, no action. DAR17 Establish secondary water supplies/points for fire protection efforts. Hurricanes, Nor’easters, Flood, Wildfire MediumDare County Fire MarshalGrant FundsNew Action, funding to be sought.DAR18 Acquire generators or other forms of redundant power supply to ensure that critical facilities and infrastructure remain operational where normal power supply is not available All HazardsMedium Dare County Fire MarshallGrant FundsNew Action, funding to be sought.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐34 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status DAR19 Require Realtors to disclose flood zones. Develop and maintain relations with Real Estate Community and provide outreach and educational opportunities. Provide access to floodplain maps and floodplain information for the Real Estate Community. Hurricanes, Nor’easters, Flood MediumDare County PlanningGeneral FundExpanded outreach includes Real Estate community and receives feedback on planned brochures. Completed: Flood disclosure required on Real Estate Disclosure Forms. DAR20 Enhance NFIP information by distributing NFIP brochures and including up to date flood maps on the County website. Hurricanes, Nor’easters, Flood MediumDare County Planning, Dare County GIS General FundCompleted.DAR21 Coordinate with NC Floodplain Mapping on public dissemination of updated floodplain maps. Hurricanes, Nor’easters, Flood HighNC Floodplain Mapping, Dare County Planning General FundUpdated Flood maps are posted on County’s website. DAR22 Continue to participate in the Community Rating System. Look for additional activities to implement to improve Class rating. Hurricanes, Nor’easters, Flood HighDare County PlanningGeneral FundActively engages the CRS committee for Dare County. Annually do mailings that address drainage methods and storm recovery activities to the public. DAR23 Continue participation in Storm Ready program. Hurricanes, Nor’easters, Flood HighDare County Emergency Management General FundNew ActionDAR24 Develop Emergency Response Plan for Road/Bridge LossBridge Collapse, Transportation Infrastructure Failure HighDare County Emergency Management, NCDOT General FundCounty staff works closely with NCDOT officials and annually advocate at RPO meetings bridge/road improvements for State’s Transportation Improvement Plan. DAR25 Advocate for Beach Replacement Hurricanes, Nor’easters, Flood, Erosion HighDCBC/Manager Grant FundsAnnuallybrief localrepresentatives in State Legislature, invited to attend County’s budget retreat. DAR26 Circulate brochures on all hazards identified in the risk assessment to educate the public on protective actions that they can prepare for in their disaster plans. All HazardsLowDare County Emergency Management General FundCRS outreach activities completed annually, brochures available in Planning offices. Expanded activities to include all hazards. Expanded outreach includes Real Estate community and receives feedback on planned brochures. Brief annually local representatives in State Legislature, invited to attend County’s budget retreat. Flood maps are posted on County’s website. DAR27 Conduct annual outreach activities to increase awareness of all potential hazards that affect Dare County. All HazardsMediumDare County Emergency Management, Dare County Planning General FundNew ActionDAR28 Prioritize and Fund Critical Drainage Projects that improve stormwater drainage and land management preparation for flooding. Hurricanes, Nor'easters, Flooding, Thunderstorms, Tidal Flooding HighDare County Planning Grant FundGrants funds are secured when available to assist homeowners with drainage improvements. Received grants funds from Department of Agriculture for “snag and drag” cleanup of ditches in Wanchese. Phase 1 completed in fall 2014 and Phase 2 scheduled for mid‐2015.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐35 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status DAR29 Educate the public with assistance with safe and efficient clean up after storm events. Hurricanes, Nor'easters, Flooding, Thunderstorms, Tidal Flooding HighDare County PlanningGeneral FundDare completes annual CRS outreach activity in August to all property owners in unincorporated Dare County. Additionally, a flood damage response placket to be used immediately following a flood event will be developed later this summer as part of our CRS outreach activities. DAR30 Fund and implement assistance to property owners with safe and efficient clean up after storm events. Hurricanes, Nor'easters, Flooding, Thunderstorms, Tidal Flooding HighDare County PlanningGeneral FundDare County hasastorm debris agreement with a private contractor already in place should storm event occur. This allows for pre‐positioning of equipment and personnel before event for faster responses to affected areas. DAR31 Develop plan to increase the number of properties that meet and exceed Base Flood Elevation (BFE). Hurricanes, Nor'easters, Flooding, Thunderstorms, Coastal Erosion, Tidal Flooding, Tsunami HighDare County PlanningGeneral FundFlood Prevention Ordinance revised in January 2014 to require 1‐foot freeboard for all new construction and substantial improvements. All utilities and ductwork must also be elevated to comply with 1‐foot freeboard. Submission of elevation certificate to verify compliance with 1‐foot freeboard is required. DAR32 Prioritize funding to increase the number of properties that meet and exceed BFE. Hurricanes, Nor'easters, Flooding, Thunderstorms, Coastal Erosion, Tidal Flooding, Tsunami HighDare County PlanningGeneral Fund, Grant Funds Elevation of hazard mitigation grant currently underway ‐‐ 44 homes to be elevated by end of 2016 with funding secured after Hurricane Irene. Full‐time staff is employed to oversee grant project. Structures are all elevated to be consistent with freeboard requirement of Dare County Flood Prevention Ordinance. DAR33 Lobby State Legislators to require realtors to disclose flood zones. Hurricanes, Nor'easters, Tidal Flooding, Flooding MediumDare County Planning General FundWork with Dare’s elected representatives in NC House and NC Senate for the consideration of legislation requiring disclosure standards for all real estate transactions including for sale by owners and long‐term lease agreements.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐36 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status DAR34 Lobby local realtors board to require realtors to disclose flood zones Hurricanes, Nor'easters, Tidal Flooding, Flooding MediumDare County Planning General FundInclusion of representatives from real estate industry on CRS committee for outreach activity. Development of disclosure brochures for distribution at local realtors’ offices planned as part of 2015 CRS outreach activities. Amendments to flood ordinance, zoning ordinance and subdivision ordinance adopted in February 2015 requiring disclosures of flood hazard/CBRA zoning on all new plats, site plans, and at time of building permit issuance. DAR35 Circulate Brochure on NFIP to enhance NFIP information.Hurricanes, Nor'easters, Tidal Flooding, Flooding HighDare County PlanningGeneral FundCRS outreachactivities completed annually; brochures available in Planning offices. Links to NFIP information posted on Dare County webpage as part of CRS outreach activities. DAR36 Put Flood Maps on the County's Website to enhance NFIP information. Hurricanes, Nor'easters, Tidal Flooding, Flooding HighDare County PlanningGeneral FundFlood zone layeravailable on Dare County GIS, link to flood maps also on Dare County webpage. DAR37 Continue to Participate in CRS Activities to enhance NFIP information. Hurricanes, Nor'easters, Tidal Flooding, Flooding HighDare County PlanningGeneral FundDare County remains an active participant in the CRS program, implementation of new activities to maintain current class 8 ranking with possible increase to class 7 are being developed. Development of PPI, enhanced webpage, freeboard, non‐conversion deed restrictions are examples of some activities already adopted or in development. DAR38 Update FIRM to enhance NFIP information. Hurricanes, Nor'easters, Tidal Flooding, Flooding HighDare County PlanningGeneral FundAnticipated August 2015 release of new FIRMS for Dare County, with procedures implemented by Dare County for adoption of new FIRMS and associated flood ordinance revisions as part of mapping initiative by end of 2016.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐44 Table 7.2.7 Town of Kill Devil Hills Mitigation Strategies Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status KDH1 Continue to enforce the zoning ordinance and amend when necessary Hurricanes, Nor’easters, Floods, Erosion HighPlanning Dept., Board of Commissioners, Building Inspect. General FundIncomplete; KDH shall continue to monitor the zoning ordinances to enforce and amended based on community needs. KDH2 Provide technical assistance to customers/citizens and continue to enforce current flood hazard ordinance. Hurricanes, Nor’easters, Floods, Erosion HighPlanning Dept., Building Inspector, Board of Commissioners General FundCustomers provided technical assistance and flood damage prevention ordinance is enforced; BFE violations were corrected and others in process. KDH3 Support efforts to preserve natural areas. Hurricanes, Nor’easters, Floods, Erosion HighPlanning Dept. General FundThe Town took no action other than to maintain ownership of its natural areas. KDH4 Continue to implement the stormwater management plan. Hurricanes, Nor’easters, Floods, Erosion MediumPlanning Dept., Public ServicesGeneral FundPlan was updated; concepts and Drainage projects were implemented. KDH5 Continue mowing drainage ditches and conduct normal maintenance and storm event driven maintenance. Hurricanes, Nor’easters, Floods, Erosion HighPublic Services, NCDOTGeneral FundDitch maintenance schedule implemented which included pre & post storm events. KDH6 Monitor changes to the State Building Code and modify local regulations as necessary to minimize damage. All HazardsHighPlanning Dept., Building InspectorGeneral FundInspectors accomplished annual training and enforced revisions to building codes. KDH7 Expedite permitting for the relocation of repetitive loss situations. Hurricanes, Nor’easters, Floods, Erosion LowPlanning Dept. General FundNo repetitive loss relocation opportunities were present. KDH8 Encourage repetitive loss properties to consider acquisition as a possible solution. Hurricanes, Nor’easters, Floods, Erosion LowPlanning Director, Board of Commissioners Grant FundsThe Town took no action other than outreach efforts. KDH9 Building Elevation – Continue enforcing the base flood elevation requirement of the Town’s Flood Damage Prevention Ordinance. Hurricanes, Nor’easters, Floods, Erosion HighAsst. Planning Director, Building Inspector General FundRequired documentation for new construction and additions to existing structures. KDH10 Maintain outreach efforts and continue making flood insurance available to the Town’s residents. Hurricanes, Nor’easters, Floods, Erosion HighPlanning Dept., Town ClerkGeneral FundOutreach included flood insurance and Biggert‐Waters Insurance Reform and Grimm Waters Acts information. KDH11 Continue ongoing beach nourishment efforts. Hurricanes, Nor’easters, Floods, Erosion HighPlanning Director, Board of Commissioners General FundTown contracted with a Consultant to provide permitting and offshore sand search information. KDH12 Continue to utilize the zoning ordinance and the Land Use Plan to protect wetlands, implement and enforce CAMA AEC regulations and refer applicants to US Army Corps of Engineers for Section 404 wetlands. Hurricanes, Nor’easters, Floods, Erosion HighUS Army Corps of Engineers, Planning Dept., NCDENR General FundContinued awareness of wetland protection, but no implementation at this time. KDH13 Continue to support coastal barrier protection efforts by the State. Hurricanes, Nor’easters, Floods, Erosion HighCAMA, Planning Dept.General FundContinued awareness of coastal barrier, but no implementation at this time.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐45 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status KDH14 Continue to enforce local and state regulations. Hurricanes, Nor’easters, Floods, Erosion HighPlanning Dept. General FundThrough plan approvals, site inspections and reporting to State. KDH15 Support local CAMA officer with compliance efforts within the AECs. Hurricanes, Nor’easters, Floods, Erosion HighCAMA LPO General FundRemained active with training and implemented the CAMA Local Permit Officer Program. KDH16 Preserve surface water quality and enhance water quality through stormwater management and zoning. Hurricanes, Nor’easters, Floods, Erosion MediumPlanning Dept., Public ServicesGeneral FundStormwater management plan was updated with a greater focus on water quality. KDH17 Continue to enforce the Maritime Forest Environmental Zoning District. Hurricanes, Nor’easters, Floods, Erosion, Wildfire HighPlanning Dept. General FundEnforced the Maritime Forest Environmental District Ordinance. KDH18 Facilitate a safe and efficient evacuation and where possible, reduce damage. All HazardsHighDare County Control GroupGeneral FundParticipated with Dare County Control group for evacuation. KDH19 Coordinate efforts to expedite reconstruction and rebuilding efforts in cooperation with Dare County Emergency Management staff. All HazardsHighPlanning Dept. General FundParticipated with Dare County and Town staff for reconstruction and rebuilding efforts. KDH20 Coordinate efforts to expedite recovery. All HazardsHighPlanning Dept., Board of Commissioners General FundCoordinated efforts within its own organization and with State and local agencies. KDH21 Take appropriate actions to prevent and/or minimize damages to critical facilities. Use generators or other forms of redundant power to ensure that critical facilities and infrastructure remain operational. All HazardsHighPolice, Fire & Rescue, Public Works, NC Dominion Power General FundTrain for preparedness, response and recovery and to protect critical facilities by utilizing shutters on windows. Accomplished scheduled maintenance of Town drainage ditches. KDH22 Work with NCDOT Strategic Office of Planning to enhance and construct infrastructure for evacuation. All HazardsHighPlanning Dept. General FundNo action at this time.KDH23 Implement Water Systems Master Plan. WildfireHighPublic Services, Water Department General FundNo action taken.KDH24 Develop ongoing protocols to assure the maintenance of critical public services. All HazardsMedium Police, Fire & Rescue, Public Works, Dare County Emergency Management Water FundTownDepartments were exercised and trained for preparedness, response and recovery. KDH25 Continue protection efforts concerning the Fresh Pond and maintain liaison with NC Division of Coastal Management concerning the development of the Kill Devil Hills Land Use Plan. Hurricanes, Nor’easters, Flood, Winter Storm HighPlanning Dept., CAMAGeneral FundContinued awareness for Fresh Water Pond AEC, although no longer used as a potable water source. KDH26 Continue to implement the stormwater management plan. Hurricanes, Nor’easters, Flood, Erosion MediumPublic Services General FundPlan Updated with concepts implemented through site plan review. KDH27 Encourage beach nourishment as a storm protection measure and search for funding. Hurricanes, Nor’easters, Flood, Erosion HighBoard of Commissioners, Dare County Commissioners General FundContracted with Consultant to provide permitting and offshore supplementals for beach nourishment. KDH28 Maintain updated flood map information for citizens and customers. Hurricanes, Nor’easters, Flood, Erosion HighNC Division of Emergency Management, Planning Dept. NCEMProvided information to citizens through public outreach and customers.
Albemarle Regional Hazard Mitigation Plan Section 7: Mitigation Strategies Page‐46 Action # Description/Strategy Hazard(s) Addressed Relative Priority Lead Agency / Department Potential Funding Source Implementation Status KDH29 Compile and maintain current information in the Kill Devil Hills Floodplain Management Library. Hurricanes, Nor’easters, Flood, Erosion MediumCRS Coordinator General FundContinued awareness to maintain the Floodplain Management Library; Scanning documents to enhance digital archives. KDH30 Continue to utilize technical assistance from state and federal agencies and private consultants to provide appropriate technical assistance to citizens and customers. All HazardsHighBuilding Inspector, Planning Dept.General FundContinues to utilize outside resources. KDH31 Initiate outreach projects to inform the public on Town and County initiatives that will reduce hazard related losses of property and life. All HazardsMediumPlanning Dept., Dare County Emergency Management General FundContinued annual outreach projects through joint mailings, public library and Town website. KDH32 Work with print, radio, and television media to effectuate outreach efforts in cooperation with Dare County and neighboring municipalities to educate the public on additional hazards identified in the risk assessment. All HazardsMediumPlanning Dept., Dare County Emergency Management General FundProvided printed information and continues to air a hurricane awareness video for television and provided website updates for its citizenry. KDH33 Develop updated floodplain map for public dissemination(New Strategy). Hurricanes, Nor’easters, Flood, Erosion MediumPlanning Dept. General FundThe Town continuesto maintain updated flood maps and provide information to citizens through public outreach and customers (New Strategy). KDH34 Continue to participate in CRS (New Strategy). Hurricanes, Nor’easters, Flood, Erosion HighPlanning Dept. General Fund(New Strategy).KDH35 Circulate brochure specifically on NFIP (New Strategy).Hurricanes, Nor’easters, Flood, Erosion MediumPlanning Dept. General Fund(New Strategy).KDH36 Conduct contractor's meeting as a refresher to local developers and industry professionals on floodplain regulations and required documentation (New Strategy). Hurricanes, Nor’easters, Flood, Erosion MediumPlanning Dept. General Fund(New Strategy).
(Prohibited areas are hatched)
ALBEMARLE SOUND-COLLINGTON AREA
Locator Map
I-15
I-2
Colington Area
NAD83NC State Plane
0 2.51.25 Miles
I-16
I-4
H-2
H-1
I-15
I-4
DesignatedShellfishHarvestingAreas
Identifier
Boundary
ProhibitedAreas
A-1
Boundary
Area
Area I-2 COUNTIES: CURRITUCK,CAMDEN, DARE, TYRELL
(SEE NEXT PAGE FOR AREA DESCRIPTIONS.)
APPENDIX D. PROHIBITED TERRITORY
ALBEMARLE SOUND - COLLINGTON AREA PROHIBITED CURRITUCK, CAMDEN, DARE, TYRRELL COUNTIES Area I-2 (Map 3) (Prohibited Areas are Hatched)
(a) Albemarle Sound – All those waters north of a line beginning at a point 35º 54.7283' N -75º 46.0781' W near Redstone Point; running northeasterly following the William B. Umstead Memorial Bridge across Croatan Sound to a point 35º 55.6360' N -75º 43.4169' W on Roanoke Island; running northerly following the shoreline to a point 35º 56.3553' N -75º 43.1208' W near the Fort Raleigh National Historic Site; running northeasterly across Roanoke Sound to a point 35º 58.2858' N -75º 40.0005' W near Manns Point and Nags Head Woods on Bodie Island, to include all of Albemarle Sound, Currituck Sound, North River, Pasquotank River, Little River, Perquimans River, Bull Bay and Alligator River.
Page 1 of 4
KILL DEVIL HILLS -- Street And Drainage Improvements Recommendations 2/6/18
FY 2018-19 Project Condition Rating Length Remarks
Street Drainage WM Total
Pine Gove Trail Poor 46.3 2,170 50% drainage $167 $87 $10 $264
Quail Lane Poor 42.0 3,160 65% drainage $243 $164 $15 $423
Goldie Street Fair3 56.4 150 $12 $0 $12
Harrington Lane (Burns to Pine Grove)Poor 38.3 510 100% drainage $39 $41 $15 $95
Shay Street (Quail to Dean)Poor 41.0 320 100% drainage $25 $26 $50
Pine Cone Court Fair3 54.0 180 $14 $0 $14
Pine Needle Court Poor 42.3 180 $14 $0 $14
Heather Lane Poor 46.0 320 100% drainage $25 $26 $50
6,990 $538 $343 $40 $921
6,160 1.17 miles Poor
FY 2019-20 Project
Condition Rating Length Remarks Street Drainage WM Total
$278 $143 $30 $451
Hayman Cir W to Bay; extend drainage; 1.5" overlay Poor 43.0 3,260 $179 $130 $25
Plymouth Ave, overlay Poor 39.4 180 $99 $13 $5
Sixth Avenue &Town Hall Drive Poor 2,370 $341 $95 $50 $486
Town Hall Dr, overlay; drain Poor 45.4 1,030 $113 $41 $25
Sixth Av (Airstrip to Baum), overlay & drain Poor 46.6 1,340 $228 $54 $25
FY 2020-21
FALL Project Condition Rating Length Remarks Street Drainage WM Total
First Flight Village 3 / Landings 3 F3-Poor 48±3,460 $242 $138 $50 $431
Cedar Dr, Captains Ln, Teakwood Ln, Captains Cir; ex WM is PVC; overlay & drainage
SPRING Project
Between the Highways 2,264 $283 $91 $103 $477
Overlay E Helga, E Fourth w Drainage Poor 41±1,130 $90 $45 $25
Build Briggs w Drainage Poor 26 234 $40 $9 $25
E Dean St, overlay Poor 50 300 $51 $12 $26
E Martin St, overlay Poor 51 600 $102 $24 $27
Total for FY 2020-21:$907
FY 2021-22 and beyond
(provided not as a formal recommendation, just to stimulate future thinking)
Condition Rating Length Remarks Street Drainage WM Total
Memorial Blvd Drainage Trunk, Phase 2 3,250 $260 $445 $50 $755
Carlton, Corrigan, Clark, DW's, "SOD"; overlay Mem.F1, F2, P
Memorial Blvd Drainage Trunk, Phase 3 3,300 $330 $150 $480
Martin thru Carolyn; parallel 30", WM adjustments
Wrightsville Blvd Poor 46 5,340 $427 $214 $299 $940
Goddard to Carolyn; overlay, sock drain; upgrade 60% of WM
$169 $223 $146 $538
W Third: extend drainage 1.5" overlay Poor 43.3 1,194 $72 $186 $121
Seminole St (W Third to Indian)Poor 46 930 $98 $37 $25
W Sportsman & Dock 3,546 $333 $142 $266 $741
W Sportsman Dr Poor 46 2,997 $240 $120 $240
Dock Street Poor 26.6 549 $93 $22 $26
Ocean Acres WM Replacement F3-Poor 55±10,500 $420 $50 $588 $1,058
Replace All AC with PVC; overlay streets; drainage done urgently 2010-12. Pavement issue, Ocean Acres Dr from 2012
TOTAL OF 6 PROJECTS:$1,610 $1,404 $1,499 $4,512
AVERAGE SIZE:$752
Preliminary Cost
(Including design and construction
administration. All costs in $000.)
Preliminary Cost
(Including design and construction
administration. All costs in $000.)
Preliminary Cost
(Including design and construction
W Third St (US 158 to Creek; extend drainage);
Hayman Blvd & Plymouth Ave
Preliminary Cost
(Including design and construction
administration. All costs in $000.)
Whispering Pines; sock drain tying into adjacent systems; overlay all streets
Page 2 of 4
KILL DEVIL HILLS -- Street And Drainage Improvements Recommendations 2/6/18
Note: Older project printed small to save space; more recent ones larger on next page.
2005 Fall Project (May 2003)
Street Street Condition Length Status
Eighth Ave (Martin to Airstrip)Semi-improved 450 Completed
Ninth Ave (Martin to Airstrip)Poor 400 Completed 400Culvert repairs Not applicable Completed
2006 Spring Project (May 2003)
Street Street Condition Length Comments
West Baum St Unimproved 600 No Award Spring 05, Fall 05, Spring 06
W. Fresh Pond/ W. Lake Drive Connector Poor 380 Completed 780
Creek St (Third to Indian)Drainage 600 Completed Cardinal St (800 Block)Drainage 425 Completed
2006 Fall Project (May 2003)3,650
Street Street Condition Length Comments
Sir Walter Rd Poor 1,920 Completed 2,700
Princess Anne Dr (Camellia to First)Poor 720 Completed 3,420
Camellia Dr (Sir Walter to Princess Anne)Poor 350 Completed 3,770East Landing Dr (Cove to US 158)Poor 660 Completed; overlay 4,430
2007 Spring Project (2007 rating)3,520
Street Street Condition Length Comments
Seagate Ct Poor 100 Completed 4,530
Sea Village La Poor 500 Completed 5,030
Sea Wing Ct Poor 100 Completed 5,130
Raymond Ave (Wilkinson to Arch)Poor 1,625 Completed 6,755
Raymond Ave (Arch to Town Line)Fair 3 600 No Award Spring 07, built 2013
E. Chowan St (NC 12 to Raymond)Poor 595 Completed 7,350E. Sothel St (NC 12 to Raymond)Poor 600 Completed 7,950
2007-08 Project (2007 rating)3,650
Street Street Condition Length Comments
Bay Dr (Nixonton to Town Line)Poor 2,350 Includes Multi-Purpose Trail 10,300
Bay Dr (Hayman to Nixonton)(Drainage)Good 1,300 Drainage only; future trailVarious Drainage Projects (also listed Drainage Only below)
2008-09 Project (2007 rating)6,482
Street Street Condition Length Comments
St. Louis St (Susan to Bay)Poor 41.4 1,426 Completed 11,726
Wallace St (Susan to Lee)Poor 22.6 717 Completed 12,443
Truxton St (Lee to Bay)Poor 43.8 744 Completed 13,187
Wilkinson St (Lee to Bay)Poor 44.4 1,253 Completed 2.73 14,440
Lee Ave (Wilkinson to Cameron)Fair3 54.0 2,342 Completed
Palmetto St (Lee to Bath)Poor 22.0 529 No Award Winter 08, built 2014E Avalon Drainage, Phase 3 (also listed Drainage Only below)Complete; New Bern Street portion not awarded Winter 08
2009-10 Project (2007 rating)4,126
Street Street Condition Length Comments
W First St (Canal to Ketch)Poor 50.6 566 w/MP Trail; Completed 15,006
W First St (Ketch to Landing)Excellent 97.1 1,764 w/MP Trail; CompletedW First St (Landing to south end)Poor 46.1 1,796 w/MP Trail; Completed 16,802
2010-11 Project (2007 rating)Phase 1A completed, stormwater only, on urgent basis 3,655
Street Street Condition Length Comments
Ocean Acres Dr (158 to Copley W)Fair3 59.0 2,800 Stormwater infiltration only 16,802
Harrington Lane (OA to Burns)Good 89.0 250 Stormwater infiltration only
Bell Avenue (OA to Burns)Fair1 71.0 250 Stormwater infiltration only
Gunas Dr (portion n of OA)Fair1 75.0 135 Stormwater infiltration onlyBurns Dr (short portions)Fair3 59.0 220 Stormwater infiltration only
Fall FY 2011-2012 Project
SW AREA (Ocean Acres) Stormwater, Phase 2 Street Condition Length Comments
Ocean Acres Drive Fair3 59.0 3,050 1.5" Overlay only
Ocean Acres Drive Poor 49.0 800 2" Overlay only 17,602
Burns Drive Fair3 60.4 900 stormwater only
Harrington Ave (Burns-Gunas)Fair2 67.0 250 stormwater only
Gunas Drive Fair1 75.0 700 stormwater only
Copley Drive Fair1 77.0 400 stormwater only
Jones Court Poor 43.0 150 2" Overlay only 17,752Adjust WM and remove 9 "jumpers"6,250
Spring FY 2011-12 Project Condition Length Remarks
Pirates Loop Poor 47.0 709 full reconstruction; grade change 18,461
Coral Drive Poor 48.4 302 full reconstruction 18,763
Harpoon Drive Poor 48.4 241 overlay 19,0041,252
Fall FY 2012-13 Project Condition Length Remarks
Parkwood Area (road reconstruction & drainage)
Parkwood Dr Poor 50.4 1,352 full reconstruction 20,356
Maple Ct Fair 2 70.0 223 overlay
Myrtle Ct Poor 48.4 227 overlay 20,583
Elm Ct Fair 3 52.4 245 overlay
Telegraph Ct Fair 3 52.4 400 overlay4,951
Spring FY 2012-13 Projects Condition Length Remarks
Bay Drive Multi-Use Path, Phase 2
Bay Drive (Avalon to Wilkinson)Good 86.2 2,555 full reconst., first 2 blocks
Bay Drive (Wilkinson to Nixonton)Fair 2 41.7 415 overlay 20,583
Raymond Ave (Arch to Town Line)Fair 3 54.0 6003,570
Blocks Below Summarize Previous Years' Projects
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Poor Streets Fixed This Season: 1,252 ft
Poor Streets Fixed This Season: 4,140 ft
Poor Streets Fixed This Season: 0 ft
Poor Streets Fixed This Season: 1,579 ft
Poor Streets Fixed This Season: 2,362 ft
Cumulative Length,
Poor Streets Fixed
Poor Streets Fixed This Season: 950 ft
Cumulative Length,
Poor Streets Fixed
Poor Streets Fixed This Season: 400 ft
Poor Streets Fixed This Season: 2,350 ft
Poor Streets Fixed This Season: 0 ft
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Poor Streets Fixed This Season: 380 ft
Poor Streets Fixed This Season: 3,650 ft
Poor Streets Fixed This Season: 3,520 ft
Page 3 of 4
KILL DEVIL HILLS -- Street And Drainage Improvements Recommendations 2/6/18
Previous Years' Projects (continued from previous page)
FY 2013-14 Project: NW Area 2 Condition Length Remarks
Nixonton Street Poor 42.0 1,039
Bath Street Poor 40.4 948
Mary Hill Court Poor 46.0 367 26,666
Columbia Avenue Poor 37.4 777 5.05 miles
Jean Court Poor 46.0 374
Shiloh Street Poor 42.0 1,159
Truxton Street Poor 50.0 890
Wilkinson St (Columbia to 158)Fair1 73.0 725
Palmetto St (Lee to Bath)(Alternate?)Poor 22.0 529
6,808 6,083 ft poor
FY 2014-15 Project: N KHShores Condition Length Remarks
Memorial Blvd. (Wright-Woodmere)Poor 29.2 1,965
Memorial Blvd. (48" pipe replacing ex. culverts)1,080 1,080' is part of 1,965'
Aviation Avenue Excellent 95.6 550 28,631
Pinehurst Avenue Fair1 73.6 550 5.42 miles
Sutton Avenue Good 81.4 550
Carlow Avenue Good 90.8 550
Raleigh Avenue Fair2 68.4 945 158 to NC12
Baker Avenue Excellent 95.6 550
Ferris Avenue Fair1 71.2 550
2,910 1,965 ft poor
FY 2015-16: Northwest Area, Phase 3, Wrightsville, Memorial, Sioux Drainage and E & W Eighth
Condition Length Remarks
Memorial Blvd. (Baum - halfway to Corrigan)Poor 37.4 200 bid Sep 14; not awarded
Wrightsville Blvd (Eighth to north end)Poor 38.6 738 bid Sep 14; not awarded 32,596
Cameron Street Poor 45.4 1,865 6.17 miles
Susan Drive Poor 48.4 1,160
E Eighth Street Fair3 54.6 1,025 Nags Head 50% share: $0
W Eighth St Fair2 67.0 1,417 Nags Head 50% share: $100
6,405 3,965 ft poor
FY 2016-17: Clark/Blue Jay St, Mustian St, Carlton Ave, Cooke Pl, Anchor Ct, Schooner Ct
Condition Length Remarks
W Clark Street Poor 48.0 1,396 begin Dec 16, complete Apr 17
Blue Jay Street begin Dec 16, complete Apr 17 36,561
Mustian Street Poor 43.8 1,625 begin Dec 16, complete Apr 17 6.92 miles
W Carlton Ave Poor 43.8 401
Cooke Place Poor 42.0 262 begin Dec 16, complete Apr 17
Anchor Court Poor 44.4 79 begin Dec 16, complete Apr 17
Schooner Court Fair2 56.4 200 begin Dec 16, complete Apr 17
3,963 3,965 ft poor
FY 2017-87: Bay Drive Multi-Use Path, Phases 3 & 4 (completion expected June 2018)
Condition Length Remarks
Canal Dr, W First to Indian Good 81.0 1,325 36,561
Bay, Indian to Avalon Fair3 58.2 4,275 6.92 miles
5,600 0 ft poor
Drainage Only Areas Completed
Street or Area Comments
06-07, East Avalon, Phase 1 Residential property Flooding Avalon Street ONLY, not whole project; Completed Fall 04
07-08, Cardinal St Residential property Flooding Completed Spring 06
07-08, Creek St Residential property Flooding Completed Spring 06
07-08, Cedar Dr Residential property Flooding Completed Spring 06
06-07, East Avalon, Phase 2 Residential property Flooding Completed Winter 07-08
Second St / Princess Anne Dr Residential property Flooding Completed Winter 07-08
Martin St / Blue Jay St Commercial property flooding Completed Winter 07-08
Baum St / Memorial Ave Failing CMP, roadway damage Completed Winter 07-08
East Fresh Pond Dr Residential property Flooding Completed Winter 07-08
East Holly St Open ditch; safety issues Completed Winter 07-08
08-09, East Avalon, Phase 3 Residential property Flooding Completed Winter 08-09, except New Bern St
10-11, Southwest Area, Phase 1A Residential property Flooding Completed Summer 10
10-11, Southwest Area, Phase 2 Residential property Flooding Completed Fall 11
14-15. NKHS, Memorial Ditch Phase 1 Failing CMP; develop backbone Completed Spring 15
15-16, Sioux Street Drainage Residential property Flooding Completed Winter 15-16; owners provided easements
07-08, denotes Plan Year (FY) per Albemarle & Assoc. 2005 Multiyear Drainage Plan; ND = Not Determined
Drainage Only Areas Remaining
Street or Area Comments
Memorial Ave Ditch, Phases 2 & 3 Flooding; culvert failure Continue 2-mile Master Plan; ocean outfall reliever. Ph. 1 done 14-15.
Third St 1200 Complete E portion with Street work.
09-10, Quail La / Shay / Dean St Some work by Town forces 2010
07-08, denotes Plan Year (FY) per Albemarle & Assoc. 2005 Multiyear Drainage Plan; ND = Not Determined
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
(per Albemarle & Associates 2005 Multiyear Drainage Plan)
(per Albemarle & Associates 2005 Multiyear Drainage Plan)
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Cumulative Length,
Poor Streets Fixed
Nature of Problem
Nature of Problem
Page 4 of 4
KILL DEVIL HILLS -- Street And Drainage Improvements Recommendations 2/6/18
POOR Streets Remaining (after completion of 2017/18 projects; 2017 rating, bold dropped to Poor in 2017)
FY 2018-2019
FY 2019-2020
E. HELGA ST Poor 900 LA
BRIGGS ST (South of Arch)Poor 234 LA
PLYMOUTH AVE Poor 180 LA
W. HAYMAN BLVD. (Including Circle, to Bay)Poor 3,260 LA
RANDOM ST (Concrete)Poor 512 LA
W. SPORTSMAN DR Poor 2,997 LA
DOCK ST (Concrete)Poor 549 LA
E. FOURTH ST Poor 230 LA
SEMINOLE ST (W Third to Indian)Poor 930 LA
W. THIRD ST (US 158 to Creek)Poor 1,194 LA
CAPTAIN'S CIR Poor 410 LA
TEAKWOOD LN Poor 320 LA
CEDAR DR (W First to W First)Poor 1,890 LA
TOWN HALL DR Poor 1,030 LA
WRIGHTSVILLE BLVD (Goddard to Carolyn)Poor 5,340 LA
MEMORIAL BLVD (1228 S to Martin)Poor 1,540 C
SIXTH AVE (Baum to Airstrip)Poor 1,340 LA
E. MARTIN ST Poor 600 LA
E. DEAN ST Poor 300 LA
SHAY ST (Dean to Quail)Poor 428 LA
PINE GROVE TR (Quail to Goldie)Poor 1,607 LA
QUAIL LN (Pine Grove to Heather+)Poor 2,814 LA
PINE NEEDLE CT Poor 157 LA
HARRINGTON AVE Ocean Acres to Pine Grove)Poor 900 LA
HEATHER LN Poor 320 LA
BURNS DR Poor 3,660 LA
POND ST Poor 152 LA
Total miles falling to Poor w/2017 Street Rating:3.77 miles 19,890
Poor (2017) Streets After 17-18 Project 6.40 miles Up from 2.63 miles in January, 2017 Recommendation, due to re-rating33,794 ft
In "Poor Streets Remaining," streets highlighted with the following colors of
shading are recommended on the first page for the following Fiscal Year:
Type (C
ollector
or L ocal
A ccess)
A PPENDIX F. NCDOT L EVEL OF S ERVICE
CAMA Land Use Plan 9/14/2020 Page F-1
LEVEL OF SERVICE TARGETS
The North Carolina Department of Transportation (NCDOT) has developed a grading system for each
transportation mode that defines how well that mode meets public needs. The level of performance of
each mode is ranked from LOS A to LOS F. Generally, a modal network rated at an optimum LOS A
would provide excellent quality conditions, very convenient service, and wide availability of service, but
possibly at an unattainable cost to build, maintain, and operate. An improved, above average system,
with LOS B rating, would provide good quality conditions, convenient service, and good availability of
service, and with a higher return on investment than could be obtained for LOS A investment. A
transportation system at LOS C is veering toward broader safety concerns, deferred maintenance, and
congestion and land access issues that constrain economic opportunity. On a system-wide basis, the
existing quality of North Carolina’s transportation system is LOS C.
In addition to providing context, the table on the next page identifies:
Average optimal overall LOS A for each mode.
Average desired overall Target LOS for each mode.
Average current overall LOS for each mode.
A PPENDIX F. NCDOT L EVEL OF S ERVICE
Page F-2 9/14/2020 CAMA Land Use Plan
LOS Targets
Level of
Service
General
Condition Highways
Public
Transporta-
tion
Aviation Bicycle/
Pedestrian Ferries Passenger
Rail Ports*
A
EXCELLENT
High quality
conditions, very
convenient
service, widely
available
Very smooth
roads,
minimum
congestion
Frequent
service and
good
geographic
coverage
No safety
issues
Many and
varied bike
and
pedestrian
routes
No ferry
delays
Good
cross-
state rail
service
No safety
issues
B
ABOVE
AVERAGE
Good quality
conditions,
convenient
service, good
availability
Generally
smooth
roads, some
congestion
Good bus
service
Some safety
issues
Some bike
routes
Periodic
ferry
delays
Decent
state rail
service
Some safety
issues
C
AVERAGE
Minimally
acceptable
conditions,
minimally
convenient
service,
moderate
availability
More rough
roads,
potholes &
deficient
bridges,
common
congestion
Infrequent
service and
limited
geographic
coverage
Many safety
issues
Scattered
bike routes
Frequent
ferry
delays
Limited
state rail
service
Many safety
issues
D
BELOW
AVERAGE
Poor facility
conditions, very
minimal service,
limited
availability
Many rough
roads, broad
congestion
Barebones
service
Many safety
issues
Few bike
routes
Frequent
ferry
delays
Poor state
rail
service
Many safety
issues
F
FAILING
Deteriorated
facility
conditions,
spotty and
irregular
services, very
limited
availability
Widespread
rough roads,
potholes &
deficient
bridges,
widespread
congestion
Very
restricted
service
Widespread
safety issues
No bike
routes
Regular
and long
ferry
delays
No state
rail
service
Widespread
safety issues
Shaded cells denote optimal overall modal level of service (LOS A), based on degree to which modal systems would
provide the best possible quality of service, as defined by performance standards.
Shaded cells denote current overall modal level of service, as determined by NCDOT as part of its 10-Year Project
Prioritization process, based on degree to which modal systems meet defined performance standards.
Shaded cells denote current overall modal level of service, as determined by NCDOT as part of its 10-Year Project
Prioritization process, based on degree to which modal systems meet defined performance standards.
* Ports came under NCDOT management in 2012, and LOS has not yet been rated.
N
V
ir
ginia
D
a
r
e
T
r
ail
S
C
r
o
at
a
n
H
w
y
N
C
r
o
a
t
a
n
H
w
y
S
V
ir
ginia
D
a
r
e
T
r
ailBickett StOcean Bay BlvdOcean Acres DrMartin StHaym an BlvdBaum Bay DrSchoolhouse R
d Ocean Bay BlvdKitty Hawk Bay
Buzzard Bay
Oyster Point
Blount Bay
I 0 0.2 0.4 0.6 0.80.1 Miles
Albemarle Sound
Atlantic Ocean
Legend
Dare County
Kill Devil Hills Town Limits
Vacant Parcels
Roads
FLU
Commercial
Conservation
Industrial
Low Density Residential
Medium Density Residential
Government & Institutional
Source: Town of Kill Devil Hills, Dare County
Appendix H.Future Land Use Vacant Parcels
APPENDIX I. SOIL CHARACTERISTICS CAMA Land Use Plan 9/14/2020 Page I-1 Map Symbol Soil Series Dwellings without Basements Local Roads and Streets Septic Tank Absorption Fields BnD Beaches-Newhan complex, 0 to 25 percent slopes Very limited: flooding, slope Very limited: flooding, depth to saturated zone, slope Very limited: flooding, depth to saturated zone, seepage (bottom layer), filtering capacity CnA Conaby muck, 0 to 2 percent slopes, rarely flooded Very limited: flooding, depth to saturated zone Very limited: depth to saturated zone, flooding Very limited: depth to saturated zone, seepage (bottom layer), flooding CoB Corolla fine sand, 0 to 6 percent slopes, rarely flooded Very limited: flooding, depth to saturated zone Somewhat limited: flooding, depth to saturated zone Very limited: depth to saturated zone, filtering capacity, seepage (bottom layer), flooding CrB Corolla-Duckston complex, 0 to 6 percent slopes, rarely flooded Very limited: flooding, depth to saturated zone Somewhat limited: flooding, depth to saturated zone Very limited: depth to saturated zone, filtering capacity, seepage (bottom layer), flooding CuA Currituck mucky peat, 0 to 1 percent slopes, frequently flooded Very limited: subsidence, flooding, depth to saturated zone, organic matter content Very limited: depth to saturated zone, subsidence, flooding, low strength Very limited: flooding, depth to saturated zone, seepage (bottom layer), subsidence DtA Duckston fine sand, 0 to 2 percent slopes, occasionally flooded Very limited: flooding, depth to saturated zone Very limited: depth to saturated zone, flooding Very limited: flooding, depth to saturated zone, filtering capacity, seepage (bottom layer) DuE Dune land, 2 to 40 percent slopes Very limited: slope Very limited: slope Very limited: filtering capacity, seepage (bottom layer), slope DwE Dune land-Newland complex, 2 to 40 percent slopes Very limited: flooding, slope Very limited: slope, flooding Very limited: filtering capacity, seepage (bottom layer), slope, flooding FrD Fripp fine sand, 2 to 30 percent slopes Very limited: slope Very limited: slope Very limited: seepage (bottom layer), filtering capacity, slope HoA Hobonny muck, 0 to 1 percent slopes, frequently flooded Very limited: ponding, subsidence, flooding, depth to saturated zone, organic matter content Very limited: ponding, depth to saturated zone, subsidence, flooding, low strength Very limited: flooding, ponding, depth to saturated zone, subsidence, slow water movement NeC Newhan fine sand, 0 to 10 percent slopes Very limited: flooding Somewhat limited: flooding Very limited: filtering capacity, seepage (bottom layer), flooding NhC Newhan-Corolla complex, 0 to 10 percent slopes Very limited: flooding, depth to saturated zone Somewhat limited: flooding Very limited: filtering capacity, seepage (bottom layer), flooding NuC Newhan-Urban land complex, 0 to 10 percent slopes Very limited: flooding Somewhat limited: flooding Very limited: filtering capacity, seepage (bottom layer), flooding
APPENDIX I. SOIL CHARACTERISTICS Page I-2 9/14/2020 CAMA Land Use Plan Map Symbol Soil Series Dwellings without Basements Local Roads and Streets Septic Tank Absorption Fields OsA Osier fine sand, 0 to 2 percent slopes, rarely flooded Very limited: flooding, depth to saturated zone Very limited: depth to saturated zone, flooding Very limited: depth to saturated zone, seepage (bottom layer), filtering capacity, flooding OuB Ousley fine sand, 0 to 5 percent slopes, rarely flooded Very limited: flooding, depth to saturated zone Somewhat limited: flooding, depth to saturated zone Very limited: depth to saturated zone, filtering capacity, seepage (bottom layer), flooding PsB Psamments, 0 to 6 percent slopes Not limited Not limited Very limited: seepage (bottom layer), filtering capacity