HomeMy WebLinkAboutLand Use Plan 2.0 2018Page intentionally left blank.
Table of Contents Pender 2.0: Comprehensive Land Use Plan
i
ACKNOWLEDGEMENTS
Board of Commissioners
George Brown, Chairperson (District 3)
Fred McCoy, Vice-Chairperson (District 5)
Jackie Newton (District 4)
David Piepmeyer (District 2)
David Williams (District 1)
Planning Board
John Fullerton, Chairperson
Elaine Nalee, Vice-Chairperson
Walter Baker
Andrea Carter
Delva Jordan
Theo McClammy
Suzann Rhodes
Pender County
Kyle Breuer, AICP – Planning & Community Development Director
Pat O’Mahony – Senior Planner
805 S. Walker Street
Burgaw, NC 28425
Commissioner’s Advisory Committee
Joyce Owens (District 1)
Allie Sheffield (District 1)
Suzann Rhodes (District 2)
Paul Godridge (District 2)
Mark Walton (District 3)
Charles “Ed” Shuford (District 3)
Robert “Bob” Holm (District 4)
Sylvia Hall (District 4)
Ava Lane (District 5)
George “Rick” Garrett (District 5)
Technical Assistance By
Wes MacLeod, AICP, ASLA
Allen Serkin, AICP, CZO
Gideon Smith – Intern
Cape Fear Council of Governments
Table of Contents Pender 2.0: Comprehensive Land Use Plan
ii
TABLE OF CONTENTS
ACKNOWLEDGEMENTS......................................................................................................................................................................... I
TABLE OF CONTENTS .......................................................................................................................................................................... II
CHAPTER 1: INTRODUCTION ............................................................................................................. 1-1
PREFACE ............................................................................................................................................................................................. 1-1
INTRODUCTION TO THE LAND USE PLAN PROCESS ................................................................................................................... 1-1
WHAT IS A COMPREHENSIVE LAND USE PLAN? ........................................................................................................................... 1-1
COMPREHENSIVE LAND USE PLAN AND ZONING REGULATIONS ............................................................................................. 1-2
COMPREHENSIVE LAND USE PLAN AND COASTAL AREA MANAGEMENT ACT (CAMA) REGULATIONS ............................ 1-2
What Qualifies as a CAMA Regulated Development Project? ........................................................................................................... 1-3
What is an Area of Environmental Concern (AEC)? .............................................................................................................................. 1-3
LOCATION ......................................................................................................................................................................................... 1-4
HISTORY ............................................................................................................................................................................................ 1-4
PUBLIC INVOLVEMENT...................................................................................................................................................................... 1-6
Community Survey Results ............................................................................................................................................................................. 1-6
Public Input Meetings .................................................................................................................................................................................... 1-16
COMMUNITY CONCERNS AND ASPIRATIONS ............................................................................................................................ 1-21
VISION STATEMENT ........................................................................................................................................................................ 1-22
HOW TO USE THIS PLAN .............................................................................................................................................................. 1-22
CHAPTER 2: COMMUNITY PROFILE .................................................................................................. 2-1
INTRODUCTION ............................................................................................................................................................................... 2-1
POPULATION CHARACTERISTICS AND TRENDS ............................................................................................................................ 2-2
Permanent Population ...................................................................................................................................................................................... 2-2
Seasonal Population Estimates ..................................................................................................................................................................... 2-3
Seasonal Estimate by Housing & Vacation Unit ..................................................................................................................................... 2-4
Population Projections ...................................................................................................................................................................................... 2-5
Population by Age .............................................................................................................................................................................................. 2-6
HOUSING CHARACTERISTICS AND TRENDS .................................................................................................................................. 2-8
Housing Units by Type .................................................................................................................................................................................... 2-8
Housing Tenure............................................................................................................................................................................................... 2-10
Housing Trends ............................................................................................................................................................................................... 2-11
Housing Value ................................................................................................................................................................................................. 2-14
Housing Affordability ..................................................................................................................................................................................... 2-14
ECONOMIC INDICATORS ............................................................................................................................................................... 2-15
Income & Poverty Level ................................................................................................................................................................................ 2-15
Employment ..................................................................................................................................................................................................... 2-17
Educational Attainment ................................................................................................................................................................................ 2-20
Travel to Work ................................................................................................................................................................................................ 2-21
Agricultural Economy ..................................................................................................................................................................................... 2-22
Retail Sales ....................................................................................................................................................................................................... 2-24
SUMMARY ......................................................................................................................................................................................... 2-25
Statistics of Note ............................................................................................................................................................................................ 2-26
Table of Contents Pender 2.0: Comprehensive Land Use Plan
iii
CHAPTER 3: NATURAL SYSTEMS ANALYSIS……………………..……………………………………..3-1
INTRODUCTION ............................................................................................................................................................................... 3-1
AREAS OF ENVIRONMENTAL CONCERN ....................................................................................................................................... 3-1
ESTUARINE AND OCEAN SYSTEM ................................................................................................................................................... 3-2
Estuarine Waters .............................................................................................................................................................................................. 3-2
Estuarine/Coastal Shoreline ........................................................................................................................................................................... 3-3
Coastal Wetlands .............................................................................................................................................................................................. 3-4
Public Trust Areas .............................................................................................................................................................................................. 3-5
HAZARDS ........................................................................................................................................................................................... 3-6
Special Flood Hazard Areas .......................................................................................................................................................................... 3-6
Flooding Hot Spots & Drainage Concerns ................................................................................................................................................ 3-7
FEMA Flood Insurance ..................................................................................................................................................................................... 3-8
Hurricanes ........................................................................................................................................................................................................... 3-9
Significant Storm Events ............................................................................................................................................................................... 3-11
Storm Surge Areas ......................................................................................................................................................................................... 3-13
WATER QUALITY ........................................................................................................................................................................... 3-14
Shellfishing ........................................................................................................................................................................................................ 3-18
Primary Nursery Areas ................................................................................................................................................................................. 3-19
Cape Fear and White Oak River Basins ................................................................................................................................................ 3-20
LAND USE IMPACTS ON SURFACE WATER QUALITY ................................................................................................................ 3-20
PUBLIC WATER SUPPLY AND WELLHEAD PROTECTION AREAS .............................................................................................. 3-21
NON-COASTAL WETLANDS ........................................................................................................................................................ 3-22
NATURAL HERITAGE NATURAL AREAS ....................................................................................................................................... 3-24
AREAS CONTAINING ENDANGERED SPECIES .............................................................................................................................. 3-26
PRIORITY UPLAND HABITATS IN PENDER COUNTY .................................................................................................................. 3-26
SMOKE AWARENESS AREAS AND MANAGED AREAS .................................................................................................................. 3-27
BIODIVERSITY AND WILDLIFE HABITAT ASSESSMENT ................................................................................................................ 3-28
SOIL CHARACTERISTICS ................................................................................................................................................................. 3-29
AGRICULTURAL LANDS ASSESSMENT ........................................................................................................................................... 3-31
VOLUNTARY AGRICULTURAL DISTRICTS .................................................................................................................................... 3-32
FARMLAND CLASSIFICATION ......................................................................................................................................................... 3-33
Prime Farmland .............................................................................................................................................................................................. 3-33
Farmland of Statewide Importance.......................................................................................................................................................... 3-33
SUMMARY ......................................................................................................................................................................................... 3-34
GOALS, OBJECTIVES, AND POLICIES ............................................................................................................................................. 3-35
Introduction ...................................................................................................................................................................................................... 3-35
Water Quality and Natural Environment ............................................................................................................................................... 3-35
Natural Hazard Areas .................................................................................................................................................................................. 3-41
Agricultural Lands ........................................................................................................................................................................................... 3-42
CHAPTER 4: COMMUNITY FACILITIES AND SERVICES……………………………………………....4-1
INTRODUCTION ............................................................................................................................................................................... 4-1
WATER SUPPLY SYSTEM STATUS AND TRENDS ............................................................................................................................ 4-1
Water Supply System ...................................................................................................................................................................................... 4-1
Water Demand .................................................................................................................................................................................................. 4-2
WASTEWATER SYSTEM STATUS AND TRENDS ............................................................................................................................. 4-4
Public Wastewater Provider ........................................................................................................................................................................... 4-4
Other Wastewater Providers ......................................................................................................................................................................... 4-5
TRANSPORTATION SYSTEMS ........................................................................................................................................................... 4-6
Table of Contents Pender 2.0: Comprehensive Land Use Plan
iv
Existing Conditions ............................................................................................................................................................................................ 4-6
Traffic Counts ..................................................................................................................................................................................................... 4-8
Level of Service ................................................................................................................................................................................................... 4-9
Automobile Accident Locations................................................................................................................................................................... 4-12
Commuter Trips .............................................................................................................................................................................................. 4-12
Non-Motorized Transportation .................................................................................................................................................................. 4-13
Transit Service ................................................................................................................................................................................................. 4-14
Long Range Planning Initiatives and Future Improvements .............................................................................................................. 4-14
Hampstead Bypass ........................................................................................................................................................................................ 4-14
US 17 Median Installation (Superstreet) & Dan Owen Drive Improvements ........................................................................... 4-16
Pender County Collector Street Plan (2016) ......................................................................................................................................... 4-17
Comprehensive Transportation Plans ...................................................................................................................................................... 4-18
Pender County, Topsail Area, and Wilmington MPO ......................................................................................................................... 4-18
Cape Fear Regional Bicycle Plan (2017) ................................................................................................................................................ 4-19
NCDOT State Transportation Improvement Plan (2018-2027).................................................................................................... 4-21
RECREATIONAL OPPORTUNITIES & PUBLIC ACCESS FACILITIES ............................................................................................... 4-23
Parks and Recreation .................................................................................................................................................................................... 4-23
SCHOOLS ......................................................................................................................................................................................... 4-26
School Traffic ................................................................................................................................................................................................... 4-28
BROADBAND INTERNET ................................................................................................................................................................ 4-29
SUMMARY ......................................................................................................................................................................................... 4-30
GOALS, OBJECTIVES, AND POLICIES ............................................................................................................................................. 4-31
Introduction ...................................................................................................................................................................................................... 4-31
Infrastructure Carrying Capacity – Water & Wastewater Facilities ............................................................................................. 4-31
Water Facilities ............................................................................................................................................................................................... 4-32
Wastewater Facilities .................................................................................................................................................................................... 4-33
Transportation – Vehicular .......................................................................................................................................................................... 4-34
Transportation – Alternative Modes ........................................................................................................................................................ 4-37
Public Access .................................................................................................................................................................................................... 4-38
Parks and Recreation .................................................................................................................................................................................... 4-40
Schools ............................................................................................................................................................................................................... 4-42
Broadband Service ......................................................................................................................................................................................... 4-43
Coordinated Development ........................................................................................................................................................................... 4-43
CHAPTER 5: LAND USE AND GROWTH MANAGEMENT.…………………………………………....5-1
INTRODUCTION ............................................................................................................................................................................... 5-1
EXISTING LAND USE ANALYSIS ....................................................................................................................................................... 5-1
Source of Existing Land Use Analysis and Map ...................................................................................................................................... 5-1
Land Uses Identified in Unincorporated Pender County ...................................................................................................................... 5-1
EXISTING LAND USE ........................................................................................................................................................................ 5-5
Pender County .................................................................................................................................................................................................... 5-5
Union Planning Area – Existing Land Use ............................................................................................................................................... 5-6
Holly Shelter Planning Area – Existing Land Use ................................................................................................................................... 5-7
Burgaw Planning Area – Existing Land Use .............................................................................................................................................. 5-8
Caswell Planning Area – Existing Land Use .............................................................................................................................................. 5-8
Long Creek Planning Area – Existing Land Use ..................................................................................................................................... 5-9
Topsail Planning Area – Existing Land Use .............................................................................................................................................. 5-9
VACANT LAND ANALYSIS & DEVELOPMENT POTENTIAL ......................................................................................................... 5-11
Union Planning Area – Vacant Land by Zoning District ................................................................................................................... 5-13
Holly Shelter Planning Area – Vacant Land by Zoning District ....................................................................................................... 5-13
Table of Contents Pender 2.0: Comprehensive Land Use Plan
v
Burgaw Planning Area – Vacant Land by Zoning District ................................................................................................................. 5-13
Caswell Planning Area – Vacant Land by Zoning District ................................................................................................................. 5-14
Long Creek Planning Area – Vacant Land by Zoning District ......................................................................................................... 5-14
Topsail Planning Area – Vacant Land by Zoning District .................................................................................................................. 5-14
FUTURE LAND USE ......................................................................................................................................................................... 5-15
FUTURE LAND USE CATEGORIES .................................................................................................................................................. 5-15
HOW TO USE THE FUTURE LAND USE MAP AND CATEGORIES .............................................................................................. 5-15
REGIONAL MIXED USE ................................................................................................................................................................... 5-16
NEIGHBORHOOD MIXED USE ....................................................................................................................................................... 5-18
COMMERCIAL WATERFRONT ....................................................................................................................................................... 5-19
CIVIC ................................................................................................................................................................................................ 5-19
INDUSTRIAL ..................................................................................................................................................................................... 5-20
LIGHT INDUSTRIAL ......................................................................................................................................................................... 5-20
MEDIUM DENSITY RESIDENTIAL .................................................................................................................................................... 5-21
LOW DENSITY RESIDENTIAL ......................................................................................................................................................... 5-22
COASTAL RESIDENTIAL .................................................................................................................................................................. 5-23
RURAL AGRICULTURE .................................................................................................................................................................... 5-23
RECREATION ................................................................................................................................................................................... 5-24
CONSERVATION ............................................................................................................................................................................. 5-24
SUMMARY ......................................................................................................................................................................................... 5-26
GOALS, OBJECTIVES, AND POLICIES ............................................................................................................................................. 5-27
Introduction ...................................................................................................................................................................................................... 5-27
Land Use Compatibility ................................................................................................................................................................................ 5-27
Mixed Use Development: Commercial, Office, and Multi-Family .................................................................................................. 5-29
Industrial Uses, Business Development, and Tourism ........................................................................................................................ 5-30
Residential Development and Housing ................................................................................................................................................... 5-31
Rural Residential and Agriculture .............................................................................................................................................................. 5-32
Recreation and Conservation ...................................................................................................................................................................... 5-33
Historic and Cultural Resources ................................................................................................................................................................ 5-33
Planning Areas ................................................................................................................................................................................................. 5-34
Public Input ....................................................................................................................................................................................................... 5-35
CHAPTER 6: TOOLS FOR MANAGING DEVELOPMENT.…………………………………………....6-1
ROLE OF THE LAND USE PLAN IN LOCAL DECISIONS ............................................................................................................... 6-1
EXISTING DEVELOPMENT MANAGEMENT PROGRAM ................................................................................................................... 6-3
Pender County’s Land Development Regulations ................................................................................................................................... 6-3
ACTION PLAN AND IMPLEMENTATION SCHEDULE ..................................................................................................................... 6-4
APPENDIX A: DEFINITIONS AND ACTION WORDS
APPENDIX B: MAP DATA SOURCES
APPENDIX C: COMMUNTIY MEETING WORKSHEETS
LIST OF TABLES
TABLE 1.1 PENDER COUNTY PUBLIC INPUT MEETING RESULTS ............................................................................................... 1-17
TABLE 2.1 PENDER COUNTY INCORPORATED & UNINCORPORATED POPULATION (2010 & 2015) .................................. 2-2
TABLE 2.2 PENDER COUNTY PLANNING AREA & COMPARATIVE COUNTY POPULATION .................................................... 2-3
Table of Contents Pender 2.0: Comprehensive Land Use Plan
vi
TABLE 2.3 2015 SEASON POPULATION ESTIMATES – PENDER COUNTY ................................................................................... 2-4
TABLE 2.4 2045 POPULATION PROJECTIONS ................................................................................................................................ 2-6
TABLE 2.5 PENDER COUNTY HOUSING UNITS BY TYPE (2000 & 2015) .................................................................................. 2-9
TABLE 2.6 HOUSING UNIT BY TYPE (2015) ................................................................................................................................... 2-9
TABLE 2.7 HOUSING UNITS BY TENURE (2015) ......................................................................................................................... 2-10
TABLE 2.8 YEAR STRUCTURE BUILT (2015) ................................................................................................................................. 2-11
TABLE 2.9 HOUSING COST (2015) .............................................................................................................................................. 2-15
TABLE 2.10 TOP EMPLOYERS (2016 – QUARTER 2) ................................................................................................................... 2-18
TABLE 2.11 EMPLOYMENT BY INDUSTRY (2010 TO 2015) ........................................................................................................ 2-18
TABLE 2.12 PROJECTED EMPLOYMENT GROWTH, 2014 – 2024 – BRUNSWICK, NEW HANOVER, & PENDER
COUNTY (SOUTHEAST SUB-REGION) .......................................................................................................................................... 2-19
TABLE 2.13 EDUCATIONAL ATTAINMENT FOR POPULATION 25 YEARS OR OLDER (2015) ................................................ 2-20
TABLE 2.14 COMMUTING PATTERNS (2015) .............................................................................................................................. 2-22
TABLE 2.15 MEANS OF TRANSPORTATION TO WORK (2015) ................................................................................................ 2-22
TABLE 2.16 AGRICULTURE ECONOMIC STATISTICS (2015) ...................................................................................................... 2-23
TABLE 2.17 PENDER COUNTY CENSUS OF AGRICULTURE STATISTICS (2002 & 2012) ........................................................ 2-23
TABLE 2.18 PENDER COUNTY CENSUS OF AGRICULTURE STATISTICS (1992 – 2012) ......................................................... 2-24
TABLE 2.19 PENDER COUNTY RETAIL SALES (2000 TO 2016) ................................................................................................. 2-25
TABLE 2.20 COMPARATIVE COMMUNITY PROFILE STATISTICS ................................................................................................. 2-28
TABLE 3.1 HOUSING UNITS WITHIN SPECIAL FLOOD HAZARD AREAS (SFHAS), PENDER COUNTY, NC ......................... 3-6
TABLE 3.2 FLOOD INSURANCE POLICIES FOR PENDER COUNTY & NORTH CAROLINA (AS OF FEBRUARY 28, 2017) ...... 3-8
TABLE 3.3 LOSS STATISTICS FOR PENDER COUNTY & NORTH CAROLINA (1978-SEPTEMBER 2016) .................................. 3-9
TABLE 3.4 HURRICANES & THE SAFFIR-SIMPSON SCALE ............................................................................................................ 3-10
TABLE 3.5 APPROXIMATE IMPACT OF VARIOUS STORM LEVELS (ACRES IMPACTED) FOR FAST MOVING STORMS ............ 3-13
TABLE 3.6 WATER BODIES, CLASSIFICATIONS, AND WATER QUALITY ISSUES....................................................................... 3-16
TABLE 3.7 TYPES OF WETLANDS IN PENDER COUNTY, NC .................................................................................................... 3-24
TABLE 3.8 LIST OF NATURAL HERITAGE NATURAL AREAS IN PENDER COUNTY, NC ......................................................... 3-25
TABLE 3.9 PENDER COUNTY SOIL CHARACTERISTICS AND SUITABILITY ................................................................................ 3-30
TABLE 3.10 PRIME FARMLAND IN PENDER COUNTY, NC ......................................................................................................... 3-33
TABLE 3.11 FARMLAND OF STATEWIDE IMPORTANCE IN PENDER COUNTY, NC ................................................................. 3-34
TABLE 4.1 PENDER COUNTY MONTHLY WATER CONSUMPTION (2016) ............................................................................... 4-2
TABLE 4.2 PENDER COUNTY PROJECTED POPULATION AND WATER DEMAND (2016-2060) ............................................ 4-3
TABLE 4.3 PENDER COUNTY ANNUAL AVERAGE DAILTY TRAFFIC (2006 AND 2015) COUNTS ......................................... 4-8
TABLE 4.4 PENDER COUNTY BICYCLE AND PEDESTRIAN CRASHES (2010-2014) ................................................................. 4-14
TABLE 4.5 CTP ROADWAY RECOMMENDATIONS (2016) ........................................................................................................ 4-19
TABLE 4.6 PENDER COUNTY STATE TRANSPORTATION IMPROVEMENT PLAN PROJECTS (2018-2027) ............................ 4-22
TABLE 4.7 PENDER COUNTY SCHOOLS CAPACITY PROJECTIONS (2016-2027) ................................................................... 4-28
TABLE 5.1 EXISTING LAND USE CLASSIFICATIONS ....................................................................................................................... 5-1
TABLE 5.2 EXISTING LAND USE IN THE PLANNING JURISDICTION ............................................................................................. 5-5
TABLE 5.3 UNION PLANNING AREA EXISTING LAND USE (2017) ............................................................................................. 5-7
TABLE 5.4 HOLLY SHELTHER PLANNING AREA EXISTING LAND USE (2017) .......................................................................... 5-7
TABLE 5.5 BURGAW PLANNING AREA EXISTING LAND USE (2017) ......................................................................................... 5-8
TABLE 5.6 CASWELL PLANNING AREA EXISTING LAND USE (2017) ......................................................................................... 5-8
TABLE 5.7 LONG CREEK PLANNING AREA EXISTING LAND USE (2017) .................................................................................. 5-9
TABLE 5.8 TOPSAIL PLANNING AREA EXISTING LAND USE (2017) ......................................................................................... 5-11
TABLE 5.9 PENDER COUNTY – VACANT/RURAL LAND NOT IMPACTED BY WETLANDS BY ZONING DISTRICTS (2017)5-12
TABLE 5.10 PENDER COUNTY PLANNING AREAS – VACANT/RURAL LAND NOT IMPACTED BY WETLANDS BY ZONING
DISTRICTS (2017) ............................................................................................................................................................................ 5-12
TABLE 5.11 PENDER COUNTY PLANNING AREAS – VACANT/RURAL LAND NOT IMPACTED BY WETLANDS BY ZONING
DISTRICTS (2017) ............................................................................................................................................................................ 5-13
TABLE 6.1 SCHEDULE FOR IMPLEMENTING RECOMMENDED ACTIONS ...................................................................................... 6-4
Table of Contents Pender 2.0: Comprehensive Land Use Plan
vii
LIST OF FIGURES
FIGURE 1.1 WORD CLOUD BASED UPON ADDITIONAL COMMENTS PROVIDED .................................................................. 1-15
FIGURE 2.1 PENDER COUNTY PLANNING AREAS ......................................................................................................................... 2-1
FIGURE 2.2 MEDIAN AGE (2015) .................................................................................................................................................... 2-7
FIGURE 2.3 POPULATION BY AGE (2015) ...................................................................................................................................... 2-7
FIGURE 2.4 POPULATION BY AGE PROJECTIONS (2000-2030) .................................................................................................. 2-8
FIGURE 2.5 YEAR STRUCTURE BUILT (2015) ............................................................................................................................... 2-12
FIGURE 2.6 BUILDING PERMIT ACTIVITY: RESIDENTIAL – UNINCORPORATED PENDER COUNTY (2006 -2016) ............. 2-13
FIGURE 2.7 MEDIAN VALUE OF OWNER-OCCUPIED HOUSING (2015) .................................................................................. 2-14
FIGURE 2.8 MEDIAN HOUSEHOLD INCOME (2015) ................................................................................................................... 2-16
FIGURE 2.9 FAMILIES BELOW POVERTY LEVEL (2015) ................................................................................................................ 2-16
FIGURE 2.10 UNEMPLOYMENT RATE (%) (2007-2017) ............................................................................................................. 2-17
FIGURE 2.11 MEAN TRAVEL TIME TO WORK (2015)................................................................................................................. 2-21
FIGURE 2.12 TOTAL LAND IN PENDER COUNTY IN FARMS (ACRES) (1992 – 2012) ............................................................ 2-24
FIGURE 3.1 AN EXAMPLE OF A NORTH CAROLINA NATURAL ESTUARY .................................................................................. 3-3
FIGURE 3.2 75 FOOT ESTUARINE SHORELINE AEC, PENDER COUNTY, NC ............................................................................ 3-4
FIGURE 3.3 LOCALIZED FLOODING FOLLOWING MINOR RAIN EVENT, PENDER COUNTY, NC .......................................... 3-8
FIGURE 3.4 FLOODING IN BURGAW RESULTING FROM HURRICANE MATTHEW ................................................................... 3-11
FIGURE 3.5 FLOOD WATERS RESULTING FROM HURRICANE MATTHEW ................................................................................ 3-12
FIGURE 3.6 A CLUSTER OF OYSTERS IMPROVING THE WATER QUALITY OF THE SURROUNDING WATERS ..................... 3-19
FIGURE 3.7 AN EXAMPLE OF A RAIN GARDEN ............................................................................................................................ 3-21
FIGURE 3.8 DEPICTION AND DESCRIPTION OF HABITAT FRAGMENTATION .......................................................................... 3-29
FIGURE 3.9 PENDERLEA AGRICULTURAL LAND ........................................................................................................................... 3-32
FIGURE 4.1 PENDER COUNTY WATER TREATMENT PLANT ....................................................................................................... 4-3
FIGURE 4.2 CONSTRUCTION OF GREENHOUSE, CERTIFIED LAB, AND SUPPORTING FACILITIES FOR THE
COMMERCE PARK WWTP .............................................................................................................................................................. 4-4
FIGURE 4.3 EXISTING TRANSPORTATION NETWORK ALONG US 17 AND LACK OF CONNECTIVITY ................................. 4-7
FIGURE 4.4 EXAMPLE LEVEL OF SERVICE IMAGE (NON-MOTORIZED TRANSPORTATION INCLUDED FOR REFERENCE) ...... 4-10
FIGURE 4.5 MEMORIAL DAY WEEKEND TRAFFIC (2017) .......................................................................................................... 4-11
FIGURE 4.6 COMMUTER TRAFFIC FOR EMPLOYMENT – WILMINGTON MPO BOUNDARY ................................................... 4-12
FIGURE 4.7 STATEWIDE ECONOMIC IMPACT OF NON-MOTORIZED TRANSPORTATION ..................................................... 4-13
FIGURE 4.8 PROPOSED HAMPSTEAD BYPASS ALIGNMENT ......................................................................................................... 4-15
FIGURE 4.9 HAMPSTEAD BYPASS TRAFFIC VOLUME PROJECTIONS ........................................................................................... 4-16
FIGURE 4.10 US 17 MEDIAN INSTALLATION (SUPERSTREET) .................................................................................................... 4-17
FIGURE 4.11 PENDER COUNTY RECOMMENDED COLLECTOR STREETS .................................................................................. 4-17
FIGURE 4.12 CAPE FEAR REGIONAL BICYCLE PLAN (2017) ...................................................................................................... 4-20
FIGURE 4.13 TYPES OF RECOMMENDED BICYCLE FACILITIES .................................................................................................... 4-21
FIGURE 4.14 PENDER MEMORIAL PARK ........................................................................................................................................ 4-24
FIGURE 4.15 HAMPSTEAD KIWANIS PARK ................................................................................................................................... 4-24
FIGURE 4.16 MILLERS POND PARK ................................................................................................................................................ 4-25
FIGURE 4.17 HOLLY SHELTER SHOOTING RANGE ...................................................................................................................... 4-25
FIGURE 4.18 SOUTH TOPSAIL ELEMENTARY SCHOOL ................................................................................................................ 4-26
FIGURE 5.1 COMMERCIAL LAND USE (2017) ................................................................................................................................ 5-2
FIGURE 5.2 OFFICE & INSTITUTIONAL LAND USE – HEIDE TRASK HIGH SCHOOL (2017) .................................................... 5-2
FIGURE 5.3 INDUSTRIAL LAND USE – ACME SMOKED FISH OF NORTH CAROLINA (2017) ................................................... 5-3
FIGURE 5.4 MULTI-FAMILY RESIDENTIAL LAND USE (2017) ........................................................................................................ 5-3
FIGURE 5.5 SINGLE-FAMILY RESIDENTIAL LAND USE (2017) ....................................................................................................... 5-3
FIGURE 5.6 MANUFACTURED HOME LAND USE (2017) .............................................................................................................. 5-4
FIGURE 5.7 RECREATION LAND USE – MILLERS POND PARK (2017) ........................................................................................ 5-4
Table of Contents Pender 2.0: Comprehensive Land Use Plan
viii
FIGURE 5.8 RURAL AGRICULTURE LAND USE (2017) .................................................................................................................. 5-4
FIGURE 5.9 VACANT/INFILL LAND USE (2017) ............................................................................................................................. 5-5
LIST OF MAPS
Unless otherwise noted, maps are located at the end of each respective chapter.
MAP 1.1 LOCATION
MAP 2.1 PLANNING AREAS
MAP 3.1 AREAS OF ENVIRONMENTAL CONERN (AECS)
MAP 3.2 SPECIAL FLOOD HAZARD AREAS (SFHAS)
MAP 3.3 STORM SURGE FROM HURRICANES (FAST MOVING STORM)
MAP 3.4 SURFACE WATER CLASSIFICATIONS
MAP 3.5 COASTAL SURFACE WATER CLASSIFICATIONS & FISH NURSERY AREAS
MAP 3.6 COASTAL AND NON-COASTAL WETLANDS
MAP 3.7 NATURAL HERITAGE NATURAL AREA LOCATIONS
MAP 3.8 SMOKE AWARENESS AREAS & MANAGED AREAS
MAP 3.9 BIODIVERSITY AND WILDLIFE HABITAT ASSESSMENT
MAP 3.10 SEPTIC SYSTEM SUITABILITY
MAP 3.11 AGRICULTURAL LANDS ASSESSMENT & VOLUNTARY AGRICULTURAL DISTRICTS
MAP 3.12 FARMLAND CLASSIFICATIONS
MAP 4.1 WATER FACILITIES
MAP 4.2 WASTEWATER SERVICE FACILITIES & AVAILABILITY
MAP 4.3 TRAFFIC COUNTS
MAP 4.4 AUTOMOBILE ACCIDENTS
MAP 4.5 COASTAL TRAFFIC COUNTS AND AUTOMOBILE ACCIDENTS
MAP 4.6 CTP ROADWAY RECOMMENDATIONS (2016)
MAP 4.7 DRAFT STIP (2018-2027)
MAP 4.8 PARKS AND RECREATIONAL OPPORTUNITIES
MAP 4.9 COASTAL PARKS AND RECREATIONAL OPPORTUNITIES
MAP 4.10 COMMUNITY FACILITIES
MAP 4.11 COASTAL COMMUNITY FACILITIES
MAP 5.1 PENDER COUNTY EXISTING LAND USE
MAP 5.2 UNION PLANNING AREA EXISTING LAND USE
MAP 5.3 HOLLY SHELTER PLANNING AREA EXISTING LAND USE
MAP 5.4 BURGAW PLANNING AREA EXISTING LAND USE
MAP 5.5 CASWELL PLANNING AREA EXISTING LAND USE
MAP 5.6 LONG CREEK PLANNING AREA EXISTING LAND USE
MAP 5.7 TOPSAIL PLANNING AREA EXISTING LAND USE
MAP 5.8 PENDER COUNTY FUTURE LAND USE
MAP 5.9 UNION PLANNING AREA FUTURE LAND USE
MAP 5.10 HOLLY SHELTER PLANNING AREA FUTURE LAND USE
MAP 5.11 BURGAW PLANNING AREA FUTURE LAND USE
MAP 5.12 CASWELL PLANNING AREA FUTURE LAND USE
MAP 5.13 LONG CREEK PLANNING AREA FUTURE LAND USE
MAP 5.14 TOPSAIL PLANNING AREA FUTURE LAND USE
Table of Contents Pender 2.0: Comprehensive Land Use Plan
ix
Matrix of Required Elements Page
(A) Organization of the Plan: Include a matrix in the land use plan or
comprehensive plan that shows the location of the required elements. ix
(B) Community Concerns and Aspirations. The purpose of this element is to
provide an understanding of the underlying planning needs and desires of the
community.
1-21
(1) Significant existing and emerging conditions: Describe the dominant
growth-related conditions that influence land use, development, water
quality, and other environmental concerns in the planning area.
1-7 to 1-
21
(2) Key issues: Describe the land use and development topics most
important to the future of the planning area. At a minimum, this
description shall include public access, land use compatibility,
infrastructure carrying capacity, natural hazard areas, water quality, and
may also include local areas of concern as described in Subparagraph
(D)(2) (Land Use Plan Management Topics) of the Rule.
1-7 to 1-
21
(3) A community vision: Describe the general physical appearance and form
that represents the local governments plan for the future. Include
objectives to be achieved by the plan and identify changes that may be
needed to achieve the planning vision.
1-22
(C) Existing and Emerging Conditions. The purpose of this element is to provide
a sound factual base necessary to support the land use and development
policies included in the plan. Describe the following:
2-1 to 2-
25
(1) Population, Housing and Economy. Include discussion of the following
data and trends:
2-1 to 2-
25
(a) Population: 2-1 to 2-8
(i) Permanent population growth trends using data from the two
most recent decennial Censuses; 2-2 to 2-3
(ii) Current Permanent and Seasonal Estimates; 2-2 to 2-5
(iii) Key population characteristics; 2-2 to 2-8
(iv) Age; 2-6 to 2-8
(v) Income; and 2-15 to 2-
16
(vi) Thirty Year Projections of Permanent and Seasonal Population in
five years increments. 2-6
(b) Housing stock: Estimate current housing stock, including permanent
and seasonal units, tenure, and types of units (single-family,
multifamily, and manufactured).
2-8 to 2-
15
(c) Local economy: Describe employment by major sectors and
community economic activity.
2-17 to 2-
20
(2) Natural Systems. Describe the natural features and discuss the
environmental conditions of the planning jurisdiction to include: 3-1
(a) Natural features 3-1
(i) Areas of Environmental Concern (AECs); 3-1 to 3-6
Table of Contents Pender 2.0: Comprehensive Land Use Plan
x
(ii) Soil characteristics, including limitations for septic tanks,
erodibility, and other factors related to development;
3-20 to 3-
21; 3-29
to 3-31; 3-
33 to 3-34
(iii) Environmental Management Commission (EMC) water quality
classifications (SC, SB, SA, HQW, and ORW) and related use
support designations, and Division of Marine Fisheries (DMF)
shellfish growing areas and water quality conditions;
3-14 to 3-
21
(iv) Flood and other natural hazards; 3-6 to 3-
12
(v) Storm surge areas; 3-13 to 3-
14
(vi) Non-coastal wetlands including forested wetlands, shrub-scrub
wetlands and freshwater marshes;
3-22 to 3-
24
(vii) Water supply watersheds or wellhead protection areas; 3-21 to 3-
22
(viii) Primary nursery areas; 3-19 to 3-
20
(ix) Environmentally fragile areas, such as, but not limited to
wetlands, natural heritage areas, areas containing endangered
species, prime wildlife habitats, or maritime forests; and
3-4 to 3-5;
3-24 to 3-
29
(x) Additional natural features or conditions identified by the local
government. N/A
(b) Environmental Conditions
(i) Water quality: 3-14 to 3-
22
(I) Status and changes of surface water quality, including impaired
streams from the most recent N.C. Division of Water
Resources Basin Planning Branch Reports, Clean Water Act
303 (d) List and other comparable data;
3-16 to 3-
17
(II) Current situation and trends on permanent and temporary
closures of shellfishing waters as determined by the Report
on Sanitary Survey by the Shellfish Sanitation and Recreational
Water Quality Section of the N.C. Division of Marine
Fisheries;
3-16 to 3-
20
(III) Areas experiencing chronic wastewater treatment system
malfunctions; and 3-18
(IV) Areas with water quality or public health problems related to
non-point source pollution. 3-18
(ii) Natural hazards:
(I) Areas subject to recurrent flooding, storm surges and high
winds; and
3-6 to 3-
14
(II) Areas experiencing significant shoreline erosion as evidenced
by the presence of threatened structures or public facilities. 3-2 to 3-4
(iii) Natural resources:
Table of Contents Pender 2.0: Comprehensive Land Use Plan
xi
(I) Environmentally fragile areas or areas where resource
functions are being impacted as a result of development; and
3-2 to 3-6;
3-14 to 3-
21; 3-24
to 3-26
(II) Valuable natural resource areas that are being impacted or
lost as a result of incompatible development. These may
include, but are not limited to the following: coastal wetlands,
protected open space, and agricultural land.
3-4 to 3-5;
3-26 to 3-
29; 3-31
to 3-34
(3) Existing Land Use and Development. Include a map and descriptions of
the following:
(a) Existing land use patterns, which may include the following
categories: Residential, commercial, industrial, institutional, public,
dedicated open space, vacant, agricultural, and forestry. Land use
descriptions shall include estimates of the land area allocated to each
land use and characteristics of each land use category.
5-1 to 5-
14
(b) Historic, cultural, and scenic areas designated by a state or federal
agency or by local government.
4-24 to 4-
27
(4) Community Facilities. Evaluate existing and planned capacity, location,
and adequacy of community facilities that serve the community’s existing
and planned population and economic base; that protect important
environmental factors such as water quality; and that guide land
development in the coastal area. These shall include:
4-1 to 4-
30
(a) Public and private water supply and wastewater systems. Describe
existing public and private systems, including existing condition and
capacity. Describe any documented overflows, bypasses, or other
problems that may degrade water quality or constitute a threat to
public health. Indicate future needs based on population projections.
Map existing and planned service areas.
4-1 to 4-5;
Map-End
of
Chapter 4
(b) Transportation systems. Map the existing and planned multimodal
systems and port and airport facilities. Describe any highway
segments deemed by the North Carolina Department of
Transportation (NCDOT) as having unacceptable service levels.
Describe highway facilities on the current thoroughfare plan or
facilities on the current transportation improvement plan. Describe
the impact of existing facilities on land use patterns.
4-5 to 4-
23; Map-
End of
Chapter 4
(c) Stormwater systems. Describe the existing public stormwater
management system. Identify existing drainage problems and water
quality issues related to point-source discharges of stormwater
runoff.
3-7; 3-18;
3-20 to 3-
21
(D) Future Land Use. This element of the plan is intended to guide the
development and use of land in a manner that achieves the goals of the
CAMA through local government land use and development policies,
including a future land use map.
5-15 to 5-
25; Maps
– End of
Chapter 5
(1) Policies
Table of Contents Pender 2.0: Comprehensive Land Use Plan
xii
(a) Community Concerns and Aspirations and Existing and Emerging
Conditions shall be considered in the development of local
government land use plan policies as required in 7B .0702 (b) and (c).
1-21 to 1-
23
(b) Policies shall be consistent with the goals of the CAMA, shall address
the CRC management topics for land use plans, and comply with all
state and federal rules.
1-1 to 1-4
(c) Policies that exceed use standards and permitting requirements found
in Subchapter 7H, State Guidelines for Areas of Environmental
Concern, shall be identified in the plan.
5-27 to 5-
35
(2) Land Use Plan Management Topics. The purposes of the CRC
management topics are to ensure that land use plans support the goals of
the CAMA, define the CRC’s expectations for land use policies, and
provide a basis for land use plan review and certification. In addition to
the management topics outlined below, plans may also include policies to
address local areas of concern. Each management topic includes two
components: a management goal and planning objectives.
3-36 to 3-
44; 4-32
to 4-44; 5-
27 to 5-35
(a) Public Access: 4-39 to 4-
40
(i) Management Goal: Maximize public access to the public trust
waters of the coastal region for residents and visitors. 4-39
(ii) Planning Objective: Implement policies and recommendations that
assure satisfactory access to public trust waters for all Pender
County residents and visitors.
4-39
(b) Land Use Compatibility: 5-27 to 5-
33
(i) Management Goal: Manage the physical growth and development
of Pender County by encouraging more intensive land uses in key
locations identified for such growth while preserving and
protecting the unique physical character and social assets of the
rural heritage and coastal habitat that makes the County a unique
place to live.
5-27
(ii) Planning Objective: Ensure that development and use of resources
balances protection of natural resources and agricultural lands
with economic development, avoids risks to public health and
welfare, and is consistent with the capability of the land.
5-27
(c) Infrastructure Carrying Capacity: 4-32 to 4-
35
(i) Management Goal: Ensure that public infrastructure systems are
sized, located, and managed to provide service to residents and
businesses and so the quality and productivity of Areas of
Environmental Concern (AECs) and other fragile areas are
protected or restored.
4-32
(ii) Planning Objective: Ensure that the location and capacity of public
infrastructure systems are consistent with the County’s growth
and development goals.
4-32
Table of Contents Pender 2.0: Comprehensive Land Use Plan
xiii
(d) Natural Hazard Areas: 3-41 to 3-
42
(i) Management Goal: Conserve and maintain barrier dunes, beaches,
flood plains, coastal wetlands, and other coastal features for their
natural storm protection functions and their natural resources
giving recognition to public health, safety, and welfare issues.
3-41
(ii) Planning Objective: The County shall be proactive in its efforts to
minimize damage and threats to public health and safety
associated with hurricanes, severe weather, and other hazards
and work to implement the Southeastern NC Regional Hazard
Mitigation Plan (2016).
3-41
(e) Water Quality: 3-36 to 3-
41
(i) Management Goals: Maintain, protect and where possible
enhance the natural environment and water quality in all coastal
wetlands, rivers, streams, and estuaries.
3-36
(ii) Planning Objective: The County shall take actions designed to
protect and where possible enhance and restore the water
quality and sensitive natural resources located in and adjacent to
the County’s Planning Jurisdiction.
3-36
(3) Future land use map. Depict the policies for growth and development,
and the desired future patterns of land use and land development with
consideration given to natural system constraints and infrastructure.
Include designations with descriptions of land uses and development.
Map – End
of
Chapter 5
(E) Tools for Managing Development. The purpose of this element is to describe
the management tools and actions the local government will use to
implement the land use plan.
6-1 to 6-
17
(1) Guide for land use decision-making. Describe the role of the land use
plan policies, including the future land use map, in local decisions
regarding land use and development.
6-1 to 6-3
(2) Existing development program. Describe the community’s existing
development management program, including local ordinances, codes,
plans, and policies.
6-3 to 6-4
(3) Action plan and implementation schedule. Describe the actions that will
be taken by the local government to implement policies that meet the
CRC’s Management Topic goals and objectives. Specify the fiscal year(s)
in which each action is anticipated to start and finish. Describe the
specific steps the local government plans to take to implement the
policies, including the adoption and amendment of local ordinances,
plans, and special projects. The action plan shall be used to prepare the
implementation status report for the land use plan.
6-4 to 6-
17
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-1
CHAPTER 1: INTRODUCTION
PREFACE
Growth in Pender County is representative of what is happening throughout much of coastal
North Carolina, where traditionally rural, agrarian communities are being challenged and
transformed by substantial development and land use change. Areas close to the Atlantic
Ocean, and the scenic rivers of eastern North Carolina are experiencing enormous
development interest and pressure. Transportation impacts, demands on the school system,
and the need for more public infrastructure and recreational opportunities have made handling
growth a significant procedural and budgetary challenge for the County. These various
community facilities, infrastructure, and services are all related to land use change and growth
management.
Over the next 20 to 30 years, Pender County leaders will be continuously confronted with land
use decisions that impact citizens and business owners. This plan should play an important role
in guiding officials and staff through those decisions.
INTRODUCTION TO THE LAND USE PLAN PROCESS
The comprehensive planning process provides the County the opportunity to assess where it is
today, where it wants to go in the future, and a means to identify growth challenges and
opportunities, while developing the tools to help manage development to achieve a more
predictable future. Pender 2.0, as the plan is referred to, is an update and modernization of the
2010 Comprehensive Land Use Plan.
Specifically, the land use planning process intends to:
• Establish goals, policies, and recommended actions based upon public input
• Provide the basis for development standards and regulations
• Establish the need for coordination among County departments, neighboring
Counties, NCDOT, Wilmington Urban Area Metropolitan Planning Organization
(WMPO), and with other local units of government on land use issues,
transportation impacts, and capital improvement projects
WHAT IS A COMPREHENSIVE LAND USE PLAN?
A comprehensive land use plan is the official land use policy document for the County and
should be used faithfully and consistently to facilitate orderly growth and development. As a
roadmap for growth, the plan should be used by County leaders, staff, citizens, private land
owners, and developers as the basis for evaluating short-term actions against long-term goals.
The plan should be used as a guide in developing and approving land development proposals and
for setting capital improvement plans and priorities. Overall, the plan seeks to convey
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-2
community-based values that set the framework for ever-evolving challenges, decisions, and
conflicts that arise from land development.
Assuming responsibility for the future is the first step in encouraging the kind of quality
development that will help ensure Pender County’s long term value as a place to live, work, and
play.
Having a plan improves the County’s ability to create more livable communities with significant
environmental, ecological, social, recreational, and economic benefits. To that end, plan goals
and policies seek to provide a balance of private and public interests in a coordinated,
cooperative, and fair manner.
COMPREHENSIVE LAND USE PLAN AND ZONING REGULATIONS
The comprehensive plan is not a regulatory document – it is a policy document containing non-
binding guidance and recommendations. In 2005, the state legislature amended planning general
statutes to strengthen the role of adopted plans in the consideration of zoning amendments.
North Carolina General Statutes (§ 153A-341) require county planning boards to include
written comments on the consistency of any proposed zoning map or text amendment with the
comprehensive plan and any other relevant plans (such as a small area plan, a corridor plan, or a
transportation plan) adopted by the governing board. A statement from the planning board that
the proposed amendment is inconsistent with a plan; however, does not preclude the governing
board from adopting the amendment.
The county governing board must also approve a statement on consistency with the
comprehensive plan before adopting or rejecting any proposed zoning amendment. The board
decision does not have to be consistent with the comprehensive plan, but any inconsistency
must be identified and explained. The board statement must also explain why the board
believes that the action taken is reasonable and in the public interest. In essence, this statutory
procedure implies that local governments across North Carolina must engage in comprehensive
planning if they wish to administer zoning regulations – though current legislation does not
explicitly state such. Within coastal counties; however, Coastal Area Management Act (CAMA)
land use plans are a statutory requirement.
COMPREHENSIVE LAND USE PLAN AND
COASTAL AREA MANAGEMENT ACT (CAMA) REGULATIONS
The Coastal Area Management Act (CAMA) of 1974
mandates all 20 coastal counties to have a land use plan and
requires permits for any development in specially designated
areas called Areas of Environmental Concern (AEC). Upon
adoption, this plan serves as the County’s official CAMA land
use plan. Regarding CAMA permitting, in Pender County,
AECs are generally those areas that are in close proximity to
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-3
water (ocean, ICWW, creeks, etc.) or marsh (wetlands). A CAMA permit must be acquired if a
development project meets all of the following conditions:
▪ The project is located within one of the 20 coastal counties of North Carolina
▪ The project is considered "development" under CAMA
▪ The project is within, or affects, an Area of Environmental Concern established
by the Coastal Resources Commission
▪ The project does not qualify for an exemption
WHAT QUALIFIES AS A CAMA REGULATED DEVELOPMENT PROJECT?
Besides construction of residential and commercial buildings in an Area of Environmental
Concern, “development" also generally includes activities such as dredging or filling coastal
wetlands or waters, and construction of marinas, piers, docks, bulkheads, oceanfront structures
and roads. The Coastal Area Management Act (§ 113A-103(5)(a)) defines a development project
as: "any activity in a duly designated area of environmental concern involving, requiring or
consisting of the construction or enlargement of a structure; excavation; dredging; filling;
dumping; removal of clay, silt, sand, gravel or minerals; bulkheading; driving of pilings; clearing or
alteration of land as an adjunct of construction; alteration or removal of sand dunes; alteration
of the shore, bank or bottom of the Atlantic Ocean or any sound, bay, river, creek, stream, lake
or canal."
WHAT IS AN AREA OF ENVIRONMENTAL CONCERN (AEC)?
According to the Division of Coastal
Management’s (DCM) CAMA Handbook for
Development, protecting and managing Areas of
Environmental Concern is the basis for the CAMA
permitting program. As stated previously, in
Pender County, the AECs are generally those
areas that are in close proximity to water (ocean,
ICWW, creeks, etc.) or marsh (wetlands) See
Map 3.1: Areas of Environmental Concern
(AECs) for more information.
A development project is likely in an AEC if it is:
▪ In, or on the shore of, navigable waters within the 20 coastal CAMA counties
▪ On a marsh or wetland
▪ Within 75 feet of the normal high water line along an estuarine shoreline
▪ Near the ocean beach (e.g. within 60’-120’)
▪ Near an inlet
▪ Within 30 feet of the normal high water level of areas designated as inland fishing waters
by the N.C. Marine Fisheries Commission and the N.C. Wildlife Resources Commission
▪ Near a public water supply
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-4
▪ Within 575 feet of Outstanding Resource Waters defined by the Environmental
Management Commission
For more information on the CAMA Handbook for Development in Coastal North Carolina,
and for mitigating steps required during development, please visit the Division of Coastal
Management website or contact the Pender County Planning and Zoning Department.
LOCATION
Pender County, the 5th largest in North Carolina based on total land area, is located on the
southern coast of the State. Pender County covers 556,624 acres (approximately 870 square
miles) of land area. Municipal corporate limits account for only 12,365 acres – 2.2% of total
county acreage. Combined municipal planning jurisdictions including corporate limits and
extraterritorial jurisdictions (ETJs) account for 24,492 acres – 4.5% of total county acreage. The
County planning jurisdiction (that area outside municipal corporate limits and ETJs) covers
531,682 acres (831 square miles) – 95.5% of total County acreage. See Map 1.1: Location for
more information.
Pender County boundaries are defined by the Atlantic
Ocean and seven surrounding counties: Duplin County
to the north; Sampson and Bladen Counties to the west;
Columbus, Brunswick, and New Hanover counties to the
south; and Onslow County to the east. The Town of
Burgaw serves as the county seat.
The topography of Pender County is level to gently
rolling with predominantly flat upland areas. Elevations
range from sea level on the coastline to 110 feet in the
northern portion of the County. The coastal portion of the County is traversed by the Atlantic
Intracoastal Waterway.
The proximity of eastern Pender County to the Atlantic Ocean and Intracoastal Waterway, the
City of Wilmington, and the interstate highway system has spurred significant growth in the
coastal portion of the County.
HISTORY
The first explorers discovered what is now Pender County in 1524. It was not until 1663 that
the Barbados commissioners explored the northeast branch of the Cape Fear River. They
named the community “Rocky Point,” which still remains today. While the area was settled by
1725, the County was not officially formed from New Hanover County until 1875. The Moores
settled the area to the south at New Brunswick. The Lord proprietors, looking for good
bottom land and tidal river transportation, settled a tract to the north for Welsh settlers.
Commercial success followed and large plantations were built during this time.
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-5
The people of the Pender area were fervent patriots during the Revolution and it was at
Moore’s Creek that they defeated the Scottish Highlanders/British Loyalists. President
Washington is said to have eaten dinner under the old live oak just south of Hampstead on his
way from New Bern to Wilmington. The old road that Washington followed was nothing more
than a carriage trail through the woods from Comfort and Richlands south.
After the Civil War, the County was still a part of
New Hanover. The plantation system had been
destroyed during the Reconstruction years, but it was
out of those politics that the County was created in
1875. Burgaw, the current county seat, was chartered
shortly thereafter in1879. In the 1870s, the majority of
residents worked in farming, clamming, fishing, milling,
salt making, and shingling.
During the 1890s, a railroad line was constructed between New Bern and Wilmington, roughly
parallel to what would become US Highway 17. The railroad company named the Coastal
Pender County stations Annandale and Hampstead. All manner of goods were transported to
and from the area by rail and residents could travel into Wilmington or New Bern for shopping
and trading.
The highway between Wilmington and New Bern was paved in 1927 and the Intracoastal
Waterway was dredged by 1930, offering new transportation options for Coastal Pender
County. Hoover Road was widened to a cart trail during President Hoover’s term and paved in
the late 1940s. NC 210 was paved during World War II in order to better connect Camp
Lejeune and Fort Bragg. Passenger service on the rail line between Wilmington and New Bern
operated until 1939; however, freight service continued until the 1980s.
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-6
PUBLIC INVOLVEMENT
Public involvement is vital to any land use planning process by ensuring that citizens and
stakeholders have the opportunity to express their concerns and aspirations regarding growth
and development in the County. Community involvement aids in formulating policies that are
consistent with the public’s wants, needs, and desires, and helps local leaders determine the
most important issues facing the County. A land use plan also conveys the importance of long-
range planning, the role the local government plays in managing development, the possible
impacts of unmanaged development, and the importance of preserving natural resources.
In total, seven public input meetings were held during the planning process – one per planning
area, with the exception of the Topsail Planning Area, where two meetings were held. The
input meetings established the public’s vision on key elements to include in the goals and
policies for managing growth and development. Aside from the public input meetings, multiple
meetings were held with the Commissioner’s Advisory Committee to discuss the land use
planning process, the necessary components of the plan, provide updates on the plan, and
receive input and comments. A third source of input came from interviews with stakeholders
throughout the County. The goal of these interviews was to gain an understanding on how
organizations believe future growth and development will affect Pender County’s communities,
future residents, and local business owners.
COMMUNITY SURVEY RESULTS
A significant source of public input came as a result of the community survey. The survey was
distributed to Pender County property owners and non-residents. It was made available
primarily online, but was also available in hard copy format. The survey was designed to
determine significant priorities for Pender County and to understand the public’s opinion
regarding growth management and development. The survey was made available in March of
2017 and remained open until August of 2017. In total, there were 1,374 responses to the
survey. Nearly 80% of the respondents were residents of unincorporated Pender County. The
results indicate that the respondents concerns focus on growth and development patterns and
preserving and protecting the natural environment. Survey responses are provided on the
following pages and the top ten priorities were developed based upon the 671 additional
comments that survey participants provided. Please note that the two colors used to represent
the results to Question 7 indicate the top three answers in red. The remaining results are blue.
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-7
Question 1: Please indicate your priorities for land use and development in Pender
County.
Based upon the 1,374 responses to the survey, the majority of respondents believe that
avoiding development in sensitive environmental areas (66%) and maintaining the area’s natural
beauty through the preservation of habitat, trees, and scenic vistas (59%) are the most
important priorities for land use and development in Pender County. Respondents also believe
that it is important to limit development to areas without drainage issues. The results from this
question also indicate that participants do not feel that mixed use development, such as retail
and offices close to residential uses, are important priorities for land use and development
throughout the County.
0%10%20%30%40%50%60%70%80%90%100%
Maintain the area's natural beauty through preservation of
habitat, trees, and scenic vistas
Avoid development in sensitive environmental areas
Limit development to areas not prone to drainage issues
Enhance open space and recreation facilities in urbanized
areas
Support bicycle/pedestrian facilities in new developments
Mixed use development - retail and offices close to
residential uses
Limit commercial strip development
Support agricultural activities
Conserve agricultural lands
Support and enhance culturally and historically significant
sites
Other (please specify)
Not at all Important Somewhat Important Important Most Important No Opinion
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-8
Question 2: What do you consider to be the most important role for the County to
play in influencing the character of development in the unincorporated areas of the
County?
Similar to the results of Question 1, respondents believe that protection of natural resources
and environmental quality are the most important factors for the County to consider when
influencing the character of development in the unincorporated areas of the County. The
second most important response expressed by survey participants is for the County to manage
the density of new development by regulating the size and layout of lots and buildings. Based
upon the results to this question, the respondents are relatively satisfied with the current land
development regulations – approximately 40% of participants believe that improving the
flexibility of County land development regulations is either not at all important or somewhat
important.
0%20%40%60%80%100%
Reduce conflicts by managing the location of single-family,
multi-family, and commercial development
Manage the density of new development by regulating the
size and layout of lots and buildings
Enhance the appearance of the County through
landscaping, sign, lighting, and architectural standards
Improve flexibility of County land development regulations
Protection of natural resources and environmental quality
Not at all Important Somewhat Important Important Most Important No Opinion
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-9
Question 3: What do you think are the most important issues regarding growth
and development in Pender County?
When asked about the most important issues regarding growth and development in Pender
County, the respondents believe that traffic and access to public services are of the highest
concern. Approximately 75% of responses demonstrate that mitigating traffic generated from
new development is the most important issue regarding growth and development in the
County. The second most important issue indicated by the results is the inadequacy of public
services, such as schools, police, and fire (65%). As suggested in Question 2, respondents do
not believe there is too much development regulation occurring within the County and there is
no need to improve the flexibility of land development regulations. Over 50% of the
respondents believe that burdensome development regulation is of no concern. Further, nearly
50% of respondents believe that lack of development regulation is one of the most important
growth and development issues in Pender County.
0%10%20%30%40%50%60%70%80%90%100%
Health and wellness of residents
Access to areas for walking and biking
Environmental protection requirements
Conservation of natural habitat
Stormwater runoff
Character of commercial development
Traffic generated from new development
Inadequate public services (i.e. schools, police, fire)
Limited water and sewer infrastructure
Limited internet access
Loss of rural lands and agriculture to development
Separation of residential and non-residential uses
Lack of development regulation
Too much development regulation
Not at all Important Somewhat Important Important Most Important No Opinion
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-10
Question 4: The County is made up of RURAL (i.e. Atkinson, Maple Hill, Currie)
and URBAN (i.e. US HWY 17, Burgaw, Rocky Point) areas. What type of
development should be encouraged or discouraged in the RURAL areas?
Because Pender County has characteristics of both rural and urban areas, it is important to
gauge how the public feels about the types of development in each of these respective areas.
Approximately 86% of the respondents encourage the development of small businesses that
serve the needs of residents in the rural areas of the County. Closely following is the
encouragement of parks, recreation, and open space opportunities, as well as continuing the
development/preservation of agricultural lands in the rural areas. Responses indicate that
participants would like to see single-family residential development, but discourage multi-family
development in the rural areas of the County.
0%10%20%30%40%50%60%70%80%90%100%
Single-family residential development
Multi-family development (i.e. apartments, condos, etc.)
Workforce housing
Senior housing
Small businesses that serve the needs of residents
Grocery stores, shopping centers, and large retailers
Entertainment (i.e. restaurants, theaters, nightlife, etc.)
Walkable development (i.e. residential and
commercial/office combined)
Health care providers
Industrial development
Business Parks
Agriculture
Parks, recreation, and open space opportunities
Encouraged Discouraged No Preference
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-11
Question 5: The County is made up of RURAL (i.e. Atkinson, Maple Hill,
Currie) and URBAN (i.e. US HWY 17, Burgaw, Rocky Point) areas. What type of
development should be encouraged or discouraged in the URBAN areas?
When considering how development should occur in the urban areas of Pender County,
respondents encourage the construction of parks, recreation, and open space opportunities, in
conjunction with supporting small businesses to serve the needs of residents. Nearly 90% of
respondents felt these two types of development are the most important in the urban areas of
the County. This percentage is slightly higher than the responses regarding the rural areas of
the County, but are still the top two responses to Questions 4 and 5. In regards to agricultural
development, the respondents do not encourage such as strongly as in urban areas. Finally, the
approximately 87% of participants encourage the expansion of health care providers within the
urban areas of Pender County. Industrial and multi-family development are the most
discouraged land use types in both the rural and urban areas of the County.
0%20%40%60%80%100%
Single-family residential development
Multi-family development (i.e. apartments, condos, etc.)
Workforce housing
Senior housing
Small businesses that serve the needs of residents
Grocery stores, shopping centers, and large retailers
Entertainment (i.e. restaurants, theaters, nightlife, etc.)
Walkable development (i.e. residential and
commercial/office combined)
Health care providers
Industrial development
Business Parks
Agriculture
Parks, recreation, and open space opportunities
Encouraged Discouraged No Preference
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-12
Question 6: Please indicate your priorities for economic growth in Pender County.
Respondents believe the growth of small businesses and retaining existing businesses are the
highest priorities for economic growth in Pender County. Closely following is preserving
historic and architectural resources and increasing water and sewer infrastructure. The results
express that industrial development is a low priority for economic growth and is discouraged.
Results were mixed from the Scotts Hill and Rocky Point area respondents regarding industrial
development, but there was an overwhelming discouragement of industrial development from
respondents in the Hampstead area. Over 50% of respondents discourage industrial
development and approximately 28% encourage this type of development.
0%10%20%30%40%50%60%70%80%90%100%
Increase arts and culture facilities
Preserve historic and architectural resources
Promote tourism
Enhance commercial areas
Encourage the growth of small businesses
Retain existing businesses
Recruit new businesses and industries
Retain existing agriculture/farms
Encourage industrial development
Increase water and sewer infrastructure
Encouraged Discouraged No Preference
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-13
Question 7: What are the most important areas for improvement regarding
transportation? (Please select as many as three)
When asked about the most important areas for improving transportation throughout the
County, over 70% of respondents expressed the need for the US 17 Hampstead Bypass. This is
also supported by additional comments provided by survey participants. Respondents also
believe that congestion and traffic safety on local roadways are both important areas for
improvement regarding transportation. The least important area to focus on is lighting on
roadways. Of the other responses, individuals expressed the need for sidewalks and bicycle
lanes along many of the roadways throughout the County. Respondents also expressed
concerns about the US 17 speed limit as being too high, which they feel contributes to the
number of accidents along the roadway. Another common response was that speed limit
enforcement needs to be increased.
0%20%40%60%80%
Traffic safety on local roadways
Congestion on local roadways
Need for additional public transit service
Need for additional bicycle and pedestrian facilities
Need for the US 17 Hampstead Bypass
Roadway drainage
Poor lighting
Conditions on existing roadways
Other (please specify)
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-14
Question 8: Which statement best describes your relationship to Pender County?
Question 9/10: What is your zip code? In what Township do you live?
Questions 8 through 10 of the survey ask participants to describe their relationship to Pender
County (residency status), provide their zip code, and provide the Township in which they
reside. Of all of the responses to the survey, over 79% of the respondents are residents of
unincorporated Pender County, while only 14% are residents of incorporated Pender County.
There was a very small percentage of responses from individuals that are seasonal/part-time
residents and non-residents. The largest amount of survey participants live within the Scotts
Hill, Burgaw, Hampstead, Holly Ridge/Surf City, and Rocky Point zip codes. The responses from
Question 10 indicate that over 50% of respondents live within the Topsail Township, nearly 8%
live within the Rocky Point Township, and approximately 6% live within the Burgaw Township.
However, over 25% of respondents were unsure of the Township in which they live.
0%20%40%60%80%
Resident of unincorporated Pender County (including
Hampstead, which is not a municipality)
Resident of incorporated Pender County (live in a
municipality)
Seasonal/part-time resident
Not a resident
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-15
Question 13: Please provide any other comments you have regarding the future of
Pender County.
The final question of the survey asks respondents to provide any other comments regarding the
future of Pender County. Of the 1,374 survey respondents, 671 provided additional comments.
Figure 1.1 was prepared using these additional comments to show their relative importance
and frequency by font size. The larger words indicate a larger number of responses/importance
regarding the future of Pender County. Some of the highlighted comments pertain to the
growth and development occurring throughout the County, particularly in Hampstead, and the
need for infrastructure improvements and the Hampstead Bypass. Other frequent comments
are related to traffic conditions, traffic control, and the need for increased school system
capacity. Many Respondents strongly believe that a development moratorium should be
considered until the roadway issues and school system capacity are addressed as they are
concerned about the overcrowding of the existing schools and the strain it puts on the
surrounding communities. The respondents also expressed that the construction of storage
facilities, dollar stores, and gas stations should cease, particularly in the eastern portion of the
County. The respondents do not encourage any type of development that takes away the
natural beauty and character of the County. Respondents also commented on the existing
agricultural lands and the need for preservation of such.
Figure 1.1: Word Cloud Based Upon Additional Comments Provided
Source: Cape Fear Council of Governments
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-16
PUBLIC INPUT MEETINGS
One public input meeting was held in each planning area of the County, with the exception of
the Topsail Planning Area where two meetings were held. The meetings serve to gather input
about the public’s concerns and aspirations for the future of Pender County. The results of the
facilitated discussion and public input exercise are provided in Table 1.1: Pender County
Public Input Meeting Results. Individuals in attendance participated in a group exercise where
they voiced their planning area’s assets, issues, and desires. The public input responses are
sorted by the number of times mentioned, starting with the responses that were mentioned
most. All comments from the seven public meetings are included in Appendix C.
The Union Planning Area Public Input Meeting was held on May 18, 2017 in the Penderlea
Homestead Museum Annex Building. Nearly 15 citizens and steering committee members
attended in total. The public indicated their greatest assets, listed by importance, are the
preservation of the natural setting, Penderlea School, their culture, presence of wildlife, and
their community feeling. They indicated that issues within the planning area include poor
drainage of creeks and ditches, lack of/poor internet service, and increased flooding caused by
beavers. Finally, the public desires to continue preserving agricultural lands and to widen and
resurface roadways.
The Holly Shelter Planning Area Public Input Meeting was held on August 10, 2017 at the Maple
Hill Resource Center. Approximately 35 citizens and steering committee members attended
this meeting. Citizens ranked their major assets consider them to be the closeness of the
community, the quiet natural setting, access to churches, the access to water and sewer
facilities, fire and EMS services, and medical clinics. They also believe an asset is home
ownership. The issues within this planning area include poor drainage, limited job availability,
lack of activities for children, limited shopping options, and taxes. Residents desire an increase
in senior housing, an increase in job availability, a recreation center, and a lesser distance to
schools.
The Caswell Planning Area Public Input Meeting was held on August 24, 2017 at the Moores
Creek Missionary Baptist Church. There were 35 citizens and steering committee members in
attendance. The assets of this planning area are Moores Creek National Battlefield, access to
the Black River and Cape Fear River, and the new retail stores that have recently been
constructed. Attendees noted that the issues deal with roadway width and maintenance. Finally,
residents desire the expansion of internet and cable services, a community center, increased
law enforcement and fire departments, grocery stores, and family services and activities.
The first Topsail Planning Area Public Input Meeting was held on June 1, 2017 at the Alston W.
Burke Center at Cape Fear Community College Surf City Campus. There were approximately
10 citizens and steering committee members in attendance. Based upon the group exercise
results, the individuals view the availability of land and quality of schools as their top assets.
With the projected increase in population over the next ten to twenty years, they believe their
greatest issue is traffic congestion and connectivity. The residents of the Topsail Planning Area
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-17
desire additional parks and recreational opportunities, entertainment options, and the
construction of bicycle and pedestrian facilities.
The second Topsail Planning Area Public Input Meeting was held on June 15, 2017 in the
Hampstead Annex Auditorium. This meeting had the highest attendance with approximately 60
citizens and steering committee members present. Attendees believe that the quality of schools,
the natural setting (waterways and gamelands), recreational opportunities, sense of community
safety and feeling, the rural character of the area, and the low cost of living are all their top
assets. It was expressed that there are issues with stormwater runoff, limited school system
capacity, roadway network quality, traffic congestion, and access to County services. Residents
of the Topsail Planning Area desire the construction of the Hampstead Bypass, retaining the
“small town feel”, the construction of bicycle and pedestrian facilities, and increased roadway
and safety.
The Long Creek Planning Area Public Input Meeting was held on July 27, 2017 at Heide Trask
High School and The Burgaw Planning Area Public Input Meeting was held on September 7,
2017 in the Board of County Commissioners Meeting Room, located in the Administration
Building. Despite significant advertising and notification, neither meeting garnered any
attendance.
See Table 1.1 for a summary of input received during the community meetings.
Table 1.1: Pender County Public Input Meeting Results
Source: Cape Fear Council of Governments and Pender County
Score Assets – What is important to residents
11 Natural Setting Preservation
10 Quality of Schools
9 Community Feeling and Safety
9 Recreational Opportunities and Water Access
5 Wildlife, Habitat, and Diversity
3 Water and Sewer Facilities
3 Access to Churches
3 Medical Clinic Availability
2 Rural Character
2 Culture of County
2 Fire & EMS Services
2 Land Availability
2 Low Cost of Living
2 Home Ownership
2 Access to New Retail Stores
1 Access to Public Services
1 Existing Structures
1 Roadway Network and Low Traffic
1 Natural Setting and Gamelands
1 Tourism
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-18
1 Housing Values
1 Shellfish Waters
1 Low Crime Rate
1 County Annex
1 Privacy
1 Communication
1 Parade
1 Agricultural assets
1 Slow Development Pace
1 Taxes
1 Post Office
1 Rosenwald Schools
1 Water plant
1 US HWY 421 Development
Score Issues – Concerns of residents
15 Drainage, Stormwater Runoff, and Flooding
9 Roadway Quality and Traffic Congestion
7 School System Capacity, Growth Preparation, and Distance from Schools
4 Lack of Employment Opportunities and Poverty Rate
3 Lack of Youth Activities
2 Inadequate Internet Service
2 2015 Property Tax Increase
2 Limited County Services
1 High Taxes and Insurance Prices
1 Lack of Park, Public Facilities, and Beach and Water Access
1 Limited Access to Shopping Centers
1 Solar Farm Development
1 Intersection of Union Rescue and Crooked Run
1 Quality and Pace of Development
1 Too Many Dollar Stores
1 Fear of Change
1 Public Water Supply and Water Treatment
1 Limited Law Enforcement, Fire Service, EMS Services, and Healthcare Options
1 Public Transportation
1 Gas Prices
1 Pedestrian Facilities
1 Business Losses with Lack of Planning
1 Unincorporated Areas
1 Rental housing
1 Beavers Increasing Flooding
1 Limited Internet service
1 Grants for children
1 Isolation during natural events
1 County commissioners
1 Seasonal traffic
1 Funding for area needs
Hurricane Matthew response
1 Community cooperation
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-19
1 Land use for needs of residents
1 Landing area for emergency services
1 Trucks on roads
1 Commercial Farming and Related Pollution
1 Racing
Score Desires – Wishes of residents
7 Increase Roadway Capacity and Safety, including the Construction of the
Hampstead Bypass
6 Provide/Expand Bicycle and Pedestrian Facilities
5 Increase Parks & Recreational Opportunities
5 Expand Internet and Cable Services
4 Increase the Number of Community Centers
3 Preserve Agricultural Lands
3 Increase Law Enforcement
3 Increase Job Availability
3 Additional Schools/Increase School System Capacity
3 Provide Additional Entertainment Services
2 Retain “Small Town Feel”
2 Construct Additional Fire Departments
2 Increase Senior Housing Availability
2 Increase the Number of Grocery Stores
1 Control Property Taxes
1 Large Residential Lots for Developments
1 Preservation of School History
1 Historic Preservation, Cultural Preservation, and Land Conservation
1 Improve Drainage and Mitigate Stormwater Regulations
1 Limit Hog Farming
1 Access to Waterways
1 Retail/Outlets and Diverse Shopping Options While Encouraging Local
Businesses
1 Comprehensive/Modern Traffic Plan
1 Public Service Centers (Not Linear Growth on US 17)
1 Emphasize Farming Community and Link Produce to Production
1 Public Transit and Public Parking
1 Healthcare options
1 Housing options beyond single-family
1 Town Center
1 Holly Shelter event center
1 Hotels/Motels
1 Stricter Pollution Regulations
1 No multi-family dwellings, unless they are spread out
1 Livestock restrictions in neighborhoods
1 Increase library services
1 Development moratorium
1 Increase Law Enforcement, Fire Service, EMS Serv ices, and Healthcare Options
1 Mowing roadsides
1 Trash and Recycling Services
1 Notification of meetings
1 Rezoning US HWY 17 corridor to all commercial
1 Revision of Collector Streets (commercial)
1 More public recreation/water access
1 Preservation of wildlife habitats
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-20
1 Buffers between housing and wetlands
1 Community wastewater
1 Incorporation of Hampstead
1 Public Roads for new neighborhoods
1 Economic development plan/committee
1 SOS program
1 Agricultural processing center
1 Vocational programs
1 Form a committee to work with NCDOT for drainage issues
1 Upgrade the community center
1 Community Center Upgrades (More lighting Surrounding)
1 Better understanding of tax money usage and control
1 Country store
1 Educational Services and Tutoring center
1 Adult programs
1 Resource center for seniors
1 Updated medical center
1 Youth programs
1 Commercial development (Blueberry Rd./US HWY 421)
1 Industry
1 Walking trails
1 Restaurants
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-21
COMMUNITY CONCERNS AND ASPIRATIONS
VISION STATEMENT
The Vision Statement for Pender County is intended to be a general and brief statement about
the County’s main preferences for future growth. The Vision Statement is based on a
consensus of the views of community citizens and community representatives.
Top 10 Public Input Priorities
The survey results and comments provided by respondents indicate important elements that
residents of Pender County would like to see addressed. Based on all public input, the top ten
public input priorities were developed and prioritized by importance. It should be noted that
these priorities are goals and intentions of the survey respondents and are to serve merely as a
resource. These priorities are by no means a mandate for future funding or policy change. The
priorities are listed in order of significance.
1. Preserve, enhance, and maintain Pender County’s coastal habitat and agricultural
landscape.
2. Prioritize traffic congestion reduction and improve/increase connectivity along the US 17
corridor to support residential communities and businesses.
3. Ensure there is adequate school capacity to accommodate the projected increase in
population and continue to prioritize high-quality education.
4. Manage development in coordination with existing and future roadway networks to
provide safe and uncongested travel within and outside of the County.
5. Prioritize enhanced stormwater management and retention for new development, while
supporting programs to rectify drainage concerns in existing communities.
6. Expand current water and wastewater services to better serve the existing community,
future residents, and local business owners of Pender County.
7. Support development that retains the County’s quaint, small-town feel and history.
8. Develop and expand broadband internet service access to better serve the citizens and
local business owners of the County.
9. Provide bicycle and pedestrian facilities that promote the safety of both motorized and
non-motorized users.
10. Increase the number of parks, recreational opportunities, and public trust water access
locations to promote a high quality of life for the County’s residents.
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-22
To maximize the utility and scope of the Vision Statement, community priority issues, local
citizen input, and the preferences of the local government were all considered during the
statement creation process.
HOW TO USE THIS PLAN
Pender County’s Comprehensive Land Use Plan, Pender 2.0, serves a variety of functions and
the plan for the future contains a broad range of:
• Goals: A general statement indicating a desired end or the direction the County will
follow to achieve that end.
• Objectives: Direction toward the attainment of a particular goal.
• Policies: A statement identifying the County’s position regarding the pursuit of a goal
or objective.
• Recommended Actions: A statement outlining a specific course of action the County
may pursue to implement goals and policies. Recommended actions are not used in
review of development proposals, text amendments, and/or rezoning requests.
Collectively, the goals, policies, and recommended actions provide a long range planning
function, but also help to guide day to day operations. The daily functions relate primarily to the
decisions of actions of elected and appointed officials and administrative staff.
For the Board of Commissioners, the comprehensive land use plan contains County policies
and provides guidance when making decisions regarding future land use and development,
public access, protecting the environment, mitigating natural and manmade hazards, or ensuring
that infrastructure and services are adequate to serve residents and seasonal visitors. While the
plan’s policies do not have the same status as zoning regulations, except in matters related to
development or land uses within Areas of Environmental Concern (AECs), the policies and
recommended actions and the future land use map help guide decisions on future ordinances
and zoning decisions.
In addition to guiding development decisions, the Board of Commissioners may use the plan’s
policies and recommended actions when making decisions on the County’s capital improvement
2017 Vision Statement
Protect Pender County’s coastal and agricultural heritage through strategic growth management
by focusing development in key locations to minimize impacts to transportation systems, natural
habitats, and existing neighborhoods. Continue to support and offer exceptional schooling to all
Pender County students and provide services to enhance local employment opportunities that
will reduce commute times and traffic congestion for the County’s workforce. Lastly, maintain
the quality of life that makes Pender County a community that is a desirable place for visitors
and residents alike.
Chapter 1: Introduction Pender 2.0: Comprehensive Land Use Plan
1-23
plan (CIP) and its annual operating budgets. The County Planning Board will use the plan and its
policies to determine the consistency of project plans and development proposals with
community goals and objectives. Its policies will also guide decisions on whether to grant or
deny requests for such things as ordinance amendments, conditional zoning amendments,
special use permits, or the approval of site plans.
Another important use of the plan is for consistency determinations by the Division of Coastal
Management (DCM) for major permits issued pursuant to CAMA regulations. Other state and
federal agencies will use the plan to determine the consistency of their projects and programs
with the policies contained in this plan.
Lastly, the plan is a useful tool for developers and property owners because it provides
guidance on the types of land use and development that are desired within the community. The
plan’s policies and recommendations may help developers craft proposals that are consistent
with the County’s goals, thereby increasing the likelihood that these projects will be approved.
The plan also provides information that will help owners and developers better understand the
capabilities and limitations of their property or may assist community members in supporting or
opposing projects within the community.
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverCape
F
e
a
r Riv
e
r
Northeast Cape Fear RiverIntracoastal WaterwayAtlantic Ocean
Sampson County
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Bladen County
Sampson County
New Hanover County
Duplin County
Columbus County
Brunswick County
Atlantic OceanM a p 1 . 1 : L o c a t i o n
0 1.5 3 4.50.75 MilesN
County Boundary
Game Lands
Municipal Boundaries
Extraterritorial Jurisdiction
Corporate Limits
Pender 2.0:Comprehensive Plan
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-1
CHAPTER 2: COMMUNITY PROFILE
INTRODUCTION
This chapter of the land use plan identifies important community characteristics and
demographic trends that warrant consideration when formulating policies and long-term
growth strategies. The following analysis provides information on the population, housing, and
economic characteristics of Pender County. Such information is intended to allow staff and
officials to make growth management decisions based on an understanding and knowledge of
where the County has come from, where it is today, and where it may be heading. Because the
County spans such a large area, and contains a diverse array of community types, demographic
figures and statistics were developed for planning areas that encompass specific geographic
locations within the County. Six planning areas were developed to allow for more detailed
analysis of trends and characteristics throughout the county. See Figure 2.1 for more
information. These data were administered by a special private data provider. Moreover, three
counties – Brunswick County, New Hanover County, and Duplin County – were selected to
provide a comparative analysis to demographics within Pender County. The three counties
were selected due to their similarities to Pender County, with Brunswick County exhibiting a
comparable rural to urban transition and exponential growth, New Hanover County that of a
more developed/urban coastal community, and Duplin County representative of the rural
heritage found throughout much of Pender County.
Figure 2.1: Pender County Planning Areas
Source: Cape Fear Council of Governments and Pender County
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-2
The current population size, both permanent and seasonal, and the level to which it will change
during the planning period can help estimate the development pressure that may impact fragile
environmental ecosystems, rural heritage landscapes, prime farmland, and coastal resources. In
addition, demands placed on infrastructure (roads, sewer, stormwater, community services, etc.)
are directly related to growth in population and development. As a result, staff and officials can
use the information contained herein as a resource for decision making.
NOTE: Data and statistics contained in this chapter are derived from a number of sources.
Figures for years beyond 2015 are considered projections. Statistics are sourced from the US
Census Bureau/American Community Survey, PCensus, NC Office of State Budget and
Management (NCOSBM), and NC Commerce among others (sources are provided with each
respective table and/or figure). It should be noted that the North Carolina Office of State
Budget and Management provides annual population figures for each local government
jurisdiction in the state. Typically, this number differs from the population figure sourced from
the US Census Bureau’s American Community Survey and PCensus, which is software/data that
allows for demographic analysis of unique features such as the Planning Areas contained within
this land use plan. For example, the County’s 2015 population according to the NCOSBM is
57,941, while the US Census Bureau reports the population to be 57,611, and PCensus
estimates the population at 56,569. Statistics, facts, and figures related to housing, income, and
employment will be sourced from the US Census Bureau’s American Community Survey,
PCensus (Planning Areas), and NC Commerce. The NCOSBM does not provide statistics
relating to housing, income, or employment.
POPULATION CHARACTERISTICS AND TRENDS
PERMANENT POPULATION
Table 2.1 : Pender County Incorporated & Unincorporated Popu lation (2010 & 2015)
Source: NCOSBM
Jurisdiction April 2010 July 2015 Amount Percent
Town of Atkinson 299 329 30 10.03%
Town of Burgaw 3,872 4,050 178 4.60%
Town of St. Helena 389 420 31 7.97%
Town of Surf City(Part) 1,561 1,753 192 12.30%
Town of Topsail Beach 368 401 33 8.97%
Town of Wallace(Part - Airport) 0 0 0 0%
Town of Watha 190 214 24 12.63%
Total Incorporated Jurisdictions 6,679 7,167 488 7.3%
Total Unincorporated County 45,522 50,775 5,253 11.54%
Total Countywide 52,201 57,941 5,740 11.17%
From 2010 to 2015, Pender County’s population increased dramatically - a trend that has
continued since the 1970s when fewer than 20,000 residents called the county home. In fact,
since 1970, the County’s population has more than tripled, with much of the growth occurring
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-3
in the coastal areas. According to the NC Office of State Budget and Management, population
growth in the unincorporated portion of the County was greater than that experienced in the
municipal jurisdictions from 2010 to 2015. This is especially important to note as it further
clarifies and confirms the tremendous growth and development pressures experienced in the
Hampstead area/US 17 corridor over the last five years. Nevertheless, even the more rural
municipalities of Atkinson, Watha, and St. Helena all experienced growth.
Table 2.2: Pender County Planning Area & Comparative County Population
Source: US Census Bureau/2015 American Community Survey, PCensus, & NCOSBM
Population
Estimates
Union
Planning
Area #1
Holly
Shelter
Planning
Area #2
Burgaw
Planning
Area #3
Caswell
Planning
Area #4
Long
Creek
Planning
Area #5
Topsail
Planning
Area #6
Pender
County
Brunswick
County
New
Hanover
County
Duplin
County
2015 6,608 2,388 8,939 4,474 9,917 24,243 57,941* 115,926 213,091 59,453
2010 6,391 2,298 8,540 4,233 9,441 21,303 52,205 107,431 202,667 58,505
2000 5,965 2,168 7,589 3,886 7,573 13,898 41,079 73,143 160,307 49,063
Growth
2010-2015
(%)
3.40% 3.92% 4.67% 5.70% 5.05% 13.80% 10.98% 7.91% 5.14% 2%
Growth
2000-2010
(%)
7.14% 5.98% 12.53% 8.92% 24.66% 53.29% 27.08% 46.88% 26.42% 19%
*As mentioned previously, the county population total is derived from PCensus differs from that of NCOSBM/US Census. Accordingly, when
totaling the Planning Area populations it does not equal 57,941.
As shown in Table 2.2, population growth in the County outpaced that of New Hanover,
Brunswick, and Duplin Counties from 2010 to 2015. Of particular note, is the finding that
within all of the County’s Planning Areas, population growth occurred from 2000 to 2015. This
statistic contrasts much of what has occurred in the more rural communities across North
Carolina, where population decline, rather than population growth, has been the norm.
Accordingly, the five Planning Areas northwest of the Topsail Planning Area all exhibit
characteristics more akin to a rural, rather than urban, community. Population growth is
projected to continue throughout the county and southeastern North Carolina. From 2010 to
2015, the County population growth rate was nearly twice that of North Carolina as a whole,
notwithstanding the significant population growth experienced statewide. Moreover, more than
90% of the population growth experienced from 2010 to 2015 came as a result of migration to
the County – people moving to the area and becoming new residents.
SEASONAL POPULATION ESTIMATES
When planning for infrastructure, housing, commerce, and recreation, it is important to
consider the impact of vacationers, visitors, and temporary residents visiting the area on a
seasonal basis. While only a portion of the unincorporated County is likely impacted by
seasonal residents it is still important to note. Typically, the seasonal population has the
greatest impact on services and resources from Memorial Day to Labor Day.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-4
Persons who reside in the County for the majority of the year, or refer to it as their primary
residence, make up the permanent population. Whereas, persons who temporarily vacation or
visit for at least one night in the area during the peak season comprise the seasonal population.
The permanent population plus the seasonal population (including day-trippers) make up the
peak population. The seasonal overnight population accounts for only the permanent and
seasonal population and not day-trip visitors. While there is no standard method for tabulating
seasonal population for a given jurisdiction, there are few methods that can be used to estimate
the population. Refer to Table 2.3 for additional information.
SEASONAL ESTIMATE BY HOUSING & VACATION UNIT
According to 2015 Census data, there were an estimated 3,826 vacant units occupied for
seasonal use throughout all of Pender County, including the beach towns of Surf City and
Topsail Beach. To establish the seasonal overnight population for the entire County, average
household size or persons per unit must be utilized. Based on Census data, there are
approximately 2.5 persons per household in the County for permanently occupied housing
units. Typically, in seasonal housing units, the person per household total is more than double
that of the permanent rate and even higher for beachfront communities with rental housing. As
such, the additional seasonal population estimate is based upon 5 persons per household in the
unincorporated County and 8 persons per household in the beach towns.
Table 2.3 : 201 5 Seasonal Population Estimates – Pender County
Source: US Census Bureau, NCDOT, & Cape Fear Council of Governments
2015 Seasonal Population Estimates
Housing Units Persons per Unit Total Population
Seasonal Housing – Surf City & Topsail Beach (2,953)* 8** 22,443
Seasonal Housing – County with Beach Towns Excluded
(873)* 5 4,147
Total Seasonal Overnight Population Estimate 26,590
Peak Annual Daily Traffic Increase (US 17) Persons per Vehicle Total Population
4,500 (varies) 3*** 13,500
Total Peak Seasonal Population Estimate (seasonal overnight + day visitors) 40,090
2015 Countywide Total Seasonal Population (permanent + seasonal overnight + day-trip visitors)
98,031 persons (57,941 + 26,590 + 13,500)
2015 Unincorporated County Total Seasonal Population (permanent + seasonal overnight + day-trip visitors)
68,422 persons (50,775 + 4,147 + 13,500)
*The estimated number of seasonal units is based on the percentage established in the 2010 Census. Seasonal
housing estimates are not available for 2015.
**This persons per household figure (8), was calculated based on a report of the Greater Topsail Island Area
seasonal population estimates from the UNC Carolina Population Center.
***This estimate is based on average vehicle occupancy between 2 and 4 persons and should not be viewed as
exact. As such, the day trip visitor estimation may vary depending on the number of occupants per vehicle.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-5
The peak seasonal overnight estimate is derived by assuming 95% occupancy of the vacant
seasonal housing units and does not include estimates for hotel/motel occupancy. Again, this
estimate should not be viewed as exact. Calculating seasonal population figures is an imperfect
science at best. Additionally, it is estimated by the NC Department of Transportation
(NCDOT) that traffic counts along US 17 increase by roughly 4,500 vehicles a day. In effect,
these additional vehicles capture some of the day trip visitors traveling through or visiting the
county and is used to calculate such. It should be noted the peak seasonal population is more
likely to occur on summer holidays such as Memorial Day, July 4th, and Labor Day.
According to the figures calculated for seasonal overnight population, when added to the
permanent population, there are approximately 84,531 persons in Pender County during the
summer months – equating to a 45% increase in population. When excluding the estimated
seasonal population in the beach towns (Surf City and Topsail Beach), it is estimated that more
than 4,000 additional residents inhabit the coastal areas (Hampstead/US 17 corridor) of
unincorporated Pender County – an increase of nearly 20%.
When accounting for day-trip visitors and traffic, it is estimated that throughout the entire
County – on a peak day in the summer – there is nearly 100,000 persons living in or visiting the
area. However, the total seasonal population is reduced when estimated for only the
unincorporated County at 68,422 persons. Nevertheless, both figures still amount to a
substantial population increase – nearly doubling throughout the entire County. Again, these
figures should not be viewed as exact, but rather should be used as an estimate to determine
the potential impacts on services and infrastructure during the seasonal months or timeframe.
POPULATION PROJECTIONS
Much like seasonal population estimates, population projections can vary widely due to
intervening factors such as the strength of the economy, availability of jobs, and housing prices.
Population projections identify potential challenges and needs that may confront a local
government in the near future. This is especially true in Pender County, where the NCOSBM
and US Census has determined it to be the fifth fastest growing county in state from 2010 to
2015 and the 92nd fastest growing County in the country (there are 3,241 counties in the US).
The County’s abundant natural resources, low cost of living, and proximity to Wilmington and
Jacksonville/Camp Lejeune will continue to drive population growth for years to come. Yet, just
how much growth can be expected can only be estimated.
The NCOSBM provides twenty-year population projections for each County in North Carolina
through the State Demographer (population projections are not available for smaller
geographies such as municipalities or townships). The State Demographer’s population growth
estimate for Pender County indicates population increase will occur primarily from migration
into the County, while natural growth from births will be minimal. The Division of Coastal
Management (DCM) requires as part of the land use planning process a population projection
for thirty, rather than twenty years. To account for the additional ten years of population
projections, the NCOSBM/State Demographer’s linear projection is applied through the year
2045.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-6
Table 2.4 : 20 4 5 Population Projections
Source: NCOSBM & Cape Fear Council of Governments
2045 Population Projections
Population Estimates Pender
County Brunswick County New Hanover
County Duplin County
2045 Projection 93,846 216,691 318,058 59,867
2040 Projection 87,941 201,058 300,947 59,867
2035 Projection 82,566 186,128 278,612 59,866
2030 Projection 76,410 170,230 264,016 59,866
2025 Projection 70,254 154,332 249,424 59,866
2020 Projection 64,102 138,430 234,826 59,866
2015 Population 57,941 115,926 213,091 59,453
2010 Population 52,205 107,431 202,667 58,505
2000 Population 41,079 73,143 160,307 49,063
Population Growth/Projections
Growth 2015-2045 (%) 61.97% 86.92% 49.26% 0.70%
Growth 2015-2020 (%) 10.63% 19.41% 10.20% 0.69%
*2045 Unincorporated County Population Projection: 83,578.
According to the population projections provided in Table 2.4, Pender County is anticipated
to experience a population growth rate of nearly 62% or an increase of more than 35,000
residents by 2045. It should be noted, however, that this projection applies to the entirety of
the County.
To estimate the approximate increase of population in the unincorporated County, we can
assume that a similar ratio of incorporated to unincorporated population will exist in 2045.
Thus, approximately 88% of the population growth will be allocated to the unincorporated
portion of the County – equating to an increase of 32,803 persons or the addition of nearly
three new unincorporated County residents per day for the next thirty years. Even still, growth
in Pender County is anticipated to fall behind that of Brunswick County where the population is
projected to nearly double by 2045. New Hanover County is projected to trail both Pender
and Brunswick County in terms of population growth over the next thirty years, while all three
counties are forecasted to add population at a much higher rate than the state as a whole.
More rural Duplin County is not projected to grow over the next thirty years. Such a trend
could also be similar for communities in the northern portion of Pender County as the majority
of population growth is anticipated south of Burgaw and along the US 17 corridor.
POPULATION BY AGE
The age of a community’s population is important in determining future health care needs,
school facility expansion requirements, and economic development considerations among other
things. In Pender County, the median age is slightly over 42, whereas in North Carolina as a
whole, that number is 38.4 years of age. In Pender County, the state, and nationwide, median
age figures have shown an increase over the last decade. Pender County’s median age is only
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-7
slightly above that of the state and is generally in line with neighboring counties of New
Hanover and Duplin County. Within Pender County, the Long Creek Planning Area has the
lowest median age and Topsail the highest.
Figure 2.2 : Median Age (2015)
Source: US Census Bureau & PCensus
Figure 2.2 displays the 2015 Pender County and North Carolina population distributed by age.
Population throughout the County is distributed fairly evenly and generally consistent with that
of the state overall. Surprisingly, despite a large influx of retirement-age residents, the Baby
Boomer age cohort does not account for the largest age group, but is significantly higher than
that of North Carolina overall. The County also has a smaller percentage of its population in
the millennial age group than does the state, indicating out-migration for college graduates and
young workers.
Figure 2.3 : Popu lation by Age (2015)
Source: US Census & PCensus
41.9
41.6
39.9
44.2
37.8
44.3
38.4
34 36 38 40 42 44 46
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
North Carolina
6.70%
25.10%
26.78%
15.83%
25.59%
5.90%
20.80%
27.30%
20.00%
26.00%
0.00%5.00%10.00%15.00%20.00%25.00%30.00%
Greatest Generation (75+)
Baby Boomers (55 - 74)
Generation X (35 - 54)
Millenial (20 - 34)
Generation Z (Younger than 20)
North Carolina Pender County
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-8
Over the next ten to fifteen years, the County is forecasted to have a substantial increase in the
number of residents above the age of 65 (see Figure 2.4). This trend is also projected to
occur in Brunswick and New Hanover Counties. According to the NCOSBM, the increase in
school age children is only moderate and below that of the population increase for persons
aged 18 to 64. As median age of the population continues to increase over the next thirty
years, this segment of the County’s population will demand specialized services to meet
retirement needs, including independent and assisted facilities, high quality health care, and both
passive and active recreational opportunities.
Figure 2.4: Population by Age Projections (2000 -2030)
Source: NCOSBM
HOUSING CHARACTERISTICS AND TRENDS
Analyzing the existing housing stock enables the community, elected officials, and planners to
get an overall picture of the range of housing opportunities available or needed in the
jurisdiction. Other housing attributes such as the age of the structure, owner versus renter
occupation, and housing value, act as indicators to the nature and characteristic of the existing
housing stock and can be considerations when formulating development policies.
HOUSING UNITS BY TYPE
From 2000 to 2015, the total number of single-family homes increased by 5,353 units –
accounting for the most significant share of the housing unit growth over those 15 years (see
Table 2.5). Additionally, the share of housing units that are classified as manufactured homes
decreased from 2000 to 2015 and no growth of such was experienced, implying that certain
areas of the county may have been redeveloped with stick-built or modular single-family homes.
2,410
7,117
25,775
5,780
3,075
9,183
35,712
9,971
4,131
10,809
44,745
16,725
0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000
Under 5 Years
5-17 Years (School Age)
18-64 Years (Working Age)
65+ Years (Retirement Age)
Population
2000
2015
2030
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-9
Table 2.5 : Pender County Housing Units by Type (2000 & 2015)
Source: US Census Bureau
Housing Unit Type
Year 2000 Year 2015 Percent
Growth/Decline
from 2000 to 2015 Number Percentage Number Percentage
1-unit, detached (Single-family
home) 12,235 58.80% 17,588 64.97% 43.75%
1-unit, attached (Duplex) 256 1.20% 563 2.08% 119.92%
Manufactured home 7,328 35.20% 7,260 26.82% -0.93%
Boat, RV, van, etc. 37 0.14% 36 0.13% -2.70%
Multi-family
2 units 198 1.00% 323 1.19% 63.13%
3 or 4 units 197 0.90% 133 0.49% -32.49%
5 to 9 units 189 0.90% 526 1.94% 178.31%
10 to 19 units 164 0.80% 322 1.19% 96.34%
20 or more units 194 0.90% 320 1.18% 64.95%
Total 20,798 100% 27,071 100% 30.16%
Throughout the Pender County Planning Areas and neighboring jurisdictions, single-family
homes account for the greatest percentage of housing units. Compared with Brunswick and
New Hanover County, Pender County has a higher percentage of manufactured homes and a
smaller percentage of multi-family housing. As mentioned previously, the share of manufactured
housing in the County appears to be declining in favor of stick-built or modular single-family
homes. The Topsail and Union Planning Areas have the greatest percentage of housing classified
for single-family use.
Regarding multi-family housing, the Burgaw and Topsail Planning Areas have the greatest
percentage of such. This is for two reasons; (1) the availability of wastewater infrastructure to
support more dense housing and (2) the condo/apartment housing demand along the coast,
particularly in the Surf City area. However, the percentage of multi-family housing is still less
than 10% of the total. New Hanover County, in which the City of Wilmington and three beach
towns are located, has over quarter of its housing units dedicated to a multi-family use. See
Table 2.6 for more information.
Table 2.6 : Housing Units by Type (2015)
Source: US Census Bureau & PCensus
Housing Unit
Type
Union
Planning
Area #1
Holly
Shelter
Planning
Area #2
Burgaw
Planning
Area #3
Caswell
Planning
Area #4
Long
Creek
Planning
Area #5
Topsail
Planning
Area #6
Pender
County
Brunswick
County
New
Hanover
County
Duplin
County
1 Unit Detached
(Single-family home) 64.40% 55.81% 64.30% 57.76% 55.36% 66.16% 64.97% 63.76% 60.74% 57.00%
Boat, RV, Van,
etc. 0.03% 0.00% 1.48% 0.00% 0.00% 0.00% 0.13% 0.10% 0.01% 0.23%
Manufactured
Home 35.53% 39.18% 25.44% 41.32% 42.21% 21.05% 26.82% 23.02% 4.82% 36.68%
Multi-family
2 Units 0.00% 0.22% 0.04% 0.82% 0.01% 3.67% 1.19% 1.37% 3.04% 1.18%
3 or 4 Units 0.01% 0.00% 1.01% 0.00% 0.00% 0.95% 0.49% 2.66% 3.57% 2.24%
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-10
5 to 19 Units 0.00% 4.33% 5.81% 0.00% 0.92% 3.71% 3.13% 4.92% 12.89% 0.32%
20 to 49 Units 0.00% 0.47% 1.88% 0.00% 0.05% 1.45% 1.18% 1.67% 6.38% 1.70%
Multi-family
Subtotal 0.01% 5.02% 8.74% 0.82% 0.98% 9.78% 5.99% 10.62% 25.88% 5.44%
Total 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
HOUSING TENURE
In Pender County, nearly 75% of the total housing units are occupied year-round. Of the
occupied housing units, the vast majority are owned and only a small percentage are occupied
as year-round rental housing units. The high percentage of vacant housing units is due primarily
to seasonal housing units utilized for vacation purposes. As such, the Topsail Planning Area has
the greatest percentage and total number of vacant housing units. Of the 6,941 vacant units, it
is estimated that 3,826 units in the County are used for seasonal vacation uses, with the
remaining 3,115 classified as vacant for other reasons (see Table 2.7).
The Holly Shelter Planning area has the second lowest occupancy rate at 80.85%, which may be
an indication of potential dilapidated housing issues as vacant seasonal housing is likely not the
cause for such. In Brunswick County, the presence of six coastal communities is the primary
cause for the high number of vacant housing units – accounting for more than 31,000 or nearly
40% of the total housing stock.
Table 2.7 : Year Round Housing Units by Tenure (2015)
Source: US Census Bureau & PCensus
Count
Union
Planning
Area #1
Holly
Shelter
Planning
Area #2
Burgaw
Planning
Area #3
Caswell
Planning
Area #4
Long
Creek
Planning
Area #5
Topsail
Planning
Area #6
Pender*
County
Brunswick
County
New
Hanover
County
Duplin
County
Occupied
Housing Units
(Owner &
Renter)
2,652 967 3,290 1,829 3,587 9,668 20,130 49,193 88,403 21,946
Owner-
Occupied 2,103 755 2,232 1,490 2,746 7,689 15,490 37,423 50,638 14,911
Renter-
Occupied 549 212 1,058 339 841 1,979 4,640 11,770 37,765 7,035
Vacant 388 229 437 366 383 4,611 6,941 31,219 15,738 3,638
Total 3,040 1,196 3,727 2,195 3,970 14,279 27,071 80,412 104,141 25,584
Percentage
Union
Planning
Area #1
Holly
Shelter
Planning
Area #2
Burgaw
Planning
Area #3
Caswell
Planning
Area #4
Long
Creek
Planning
Area #5
Topsail
Planning
Area #6
Pender
County
Brunswick
County
New
Hanover
County
Duplin
County
Occupied
Housing Units
(Owner &
Renter)
87.24% 80.85% 88.27% 83.33% 90.35% 67.71% 74.36% 61.18% 84.89% 85.78%
Owner-
Occupied** 69.18% 63.13% 59.89% 67.88% 69.17% 53.85% 57.20% 46.54% 48.62% 58.28%
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-11
Renter-
Occupied** 18.06% 17.73% 28.39% 15.44% 21.18% 13.86% 17.14% 14.64% 36.26% 27.50%
Vacant 12.76% 19.15% 11.73% 16.67% 9.65% 32.29% 25.64% 38.82% 15.11% 14.22%
Total** 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
*Housing unit totals for Pender County are based upon US Census Bureau estimates.
**Percentages of owner-occupied and renter-occupied housing are based upon the total number of housing units.
***The percent total calculation is the sum of owner-occupied, renter-occupied, and vacant housing units.
HOUSING TRENDS
Since 1980, Pender County has experienced a dramatic increase in the number of housing units,
with each decade seeing an acceleration in the number of new housing units constructed. In
fact, as shown in Table 2.8, more than 70% of the County’s housing stock has been built since
1980. From 2000 to 2009, more than 7,000 new housing units were built in Pender County
despite the economic downturn that occurred in the latter half of the decade. Of the 3,607
new housing units built from 2000 to 2009 in the Topsail Planning Area, only 1,496 were
constructed in the beach towns of Surf City and Topsail Beach. Accordingly, along the US 17
corridor and Hampstead area more than 2,000 housing units were constructed during that time
(see Table 2.8).
Housing unit growth has also been significant within the Long Creek Planning Area where more
than 2,000 units have been built since 1990. More moderate growth rates have been
experienced throughout the other Planning Areas, but growth in housing units has occurred
nonetheless (see Table 2.8 and Figure 2.5). When compared to other southeastern NC
counties, it is clear that Pender County is having similar development pressures. Astoundingly,
in Brunswick County, nearly 30,000 housing units were built from 2000 to 2009 – a number
greater than the entirety of the Pender County housing stock. Similar to the Planning Areas in
the northern portion of the county, Duplin County saw only modest housing development
growth over the last few decades and actually experienced a decline in housing growth in the
2000s when compared to the 1990s.
Table 2.8 : Year Structure Built (2015)
Source: US Census Bureau & PCensus
Year Built
Union
Planning
Area #1
Holly
Shelter
Planning
Area #2
Burgaw
Planning
Area #3
Caswell
Planning
Area #4
Long
Creek
Planning
Area #5
Topsail
Planning
Area #6
Pender
County
Brunswick
County
New
Hanover
County
Duplin
County
2010 or later* 113 54 224 110 150 1,238 694 2,176 1,778 36
2000 to 2009 370 251 488 340 767 3,607 7,078 28,820 22,137 3,828
1990 to 1999 687 321 856 467 1,243 3,527 6,911 19,036 26,392 5,576
1980 to 1989 530 189 530 447 588 2,954 4,515 14,936 17,342 3,819
1970 to 1979 446 142 612 298 526 1,353 3,045 8,183 12,967 4,421
1960 to 1969 221 88 489 194 242 741 1,458 4,141 7,691 2,278
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-12
1950 to 1959 237 57 194 99 170 683 1,403 1,626 5,589 2,360
1940 to 1949 125 58 112 105 76 101 719 773 4,173 1,227
1939 or
earlier 311 35 222 134 208 76 1,248 721 6,072 1,539
Total 3,040 1,196 3,727 2,195 3,970 14,279 27,071** 80,412 104,141 25,584
*The number of housing units within the “2010 or later” category does not capture the true number of housing
units constructed since 2010. Lag time involved in data updates results in a lower total unit count.
**Housing unit totals for Pender County are based upon US Census Bureau estimates.
As shown in Figure 2.5, it is clear that tremendous housing growth has occurred over the last
thirty years in Pender County and southeastern NC – particularly along the coast. It should be
noted that some lag time occurs in Census data that may not capture a true picture of recent
housing development, specifically for units built after 2010. To supplement this data, building
permit information was acquired for the unincorporated portion of the County from 2006 to
2016.
Figure 2.5 : Year Structure Built (2015)
Source: US Census Bureau & PCensus
According to data obtained from the Pender County Planning and Community Development
Department, building permit activity for new construction residential uses varied significantly
3.70%
4.55%
6.00%
4.99%
3.78%
8.67%
2.56%
2.71%
12.18%
21.01%
13.11%
15.48%
19.31%
25.26%
26.15%
35.84%
21.26%
14.96%
22.61%
26.82%
22.97%
21.29%
31.32%
24.70%
25.53%
23.67%
25.34%
21.79%
17.43%
15.80%
14.21%
20.35%
14.81%
20.69%
16.68%
18.57%
16.65%
14.93%
14.67%
11.90%
16.43%
13.58%
13.24%
9.48%
11.25%
10.18%
12.45%
17.28%
0%10%20%30%40%50%60%70%80%90%100%
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
Pender County
Brunswick County
New Hanover County
Duplin County
2010 or later 2000 to 2009 1990 to 1999 1980 to 1989 1970 to 1979
1960 to 1969 1950 to 1959 1940 to 1949 1939 or Earlier
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-13
from 2006 to 2016 (see Figure 2.6). Prior to the housing downturn, nearly 500 new single-
family homes were permitted in 2006. In 2009 and 2010, that number dropped to 127 before
seeing a steady year over year increase in new housing starts. In 2015, 452 new single-family
housing units were permitted, clearly indicating the strength of the new construction housing
market in the County. From 2006 to 2016, the County experienced an overall reduction in
permits for new manufactured housing, another indication of the strength of the housing
market for stick-built and/or modular housing. While the trend showing a reduction in
manufactured housing can be viewed overall as positive, it should be mentioned that the loss of
such housing options increase barriers to homeowners and renters looking for more affordable
options.
Figure 2.6 : Bui lding Permit Activity : Residential – Unincorporated Pender County
(2006 - 2016)
Source: Pender County Planning & Zoning
476
441
262
127 127 160
206
307
355
452 440
228
183
123
107 116
93 102
86 88 93
109
0
50
100
150
200
250
300
350
400
450
500
Year 2006 Year 2007 Year 2008 Year 2009 Year 2010 Year 2011 Year 2012 Year 2013 Year 2014 Year 2015 Year 2016
Single-family Home (stick-built & modular)Manufactured Home Multi-family/Duplex
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-14
HOUSING VALUE
According to Census data, and as shown in Figure 2.7, housing values in Pender County are in
line with the state as a whole and generally much less than neighboring coastal counties. Across
the Planning Areas, housing values vary significantly. The Caswell Planning Area, which
encompasses the southwest portion of the county, has the lowest median housing values in the
County at $97,772, whereas the highest housing values are found in the Topsail Planning Area.
Similar to other demographic characteristics of the Planning Areas in the northern portion of
the County, Duplin County has a significantly lower median housing value than the Topsail
Planning Area and the County as a whole.
Figure 2.7 : Median Value of Owner -Occupied Housing (2015)
Source: US Census Bureau & PCensus
HOUSING AFFORDABILITY
Housing affordability is an increasing concern nationwide. For home buyers, cost of living may
be a key component in a decision to locate within a particular community. For analysis
purposes, it is difficult to obtain a precise picture of housing affordability in any jurisdiction.
However, most measures of housing affordability consider 30% of gross income an
allowable/affordable expenditure for housing. For homeowners, the cost includes mortgage
payments, taxes, insurance, and utilities. For renters, the cost only includes rent and utilities.
Compared with North Carolina, in Pender County the incidence of cost-burdened
homeowners is much higher than the state overall (see Table 2.9). In most jurisdictions across
the state, renters have a higher occurrence of affordability burdens than do homeowners.
However, in Pender County nearly 60% of homeowners allocated more than 30% of their
income to housing costs compared with less than 50% of renters. Nevertheless, both statistics
are troubling as residents in nearly 6,500 of the County’s housing units (4,621 homeowners &
1,828 rental units) are currently experiencing housing costs which may limit their ability to save
for retirement, purchase medical or child care, and/or spend money on leisure activities. In
$102,500
$125,509
$118,213
$97,772
$113,923
$222,225
$153,400
$182,500
$214,300
$87,900
$154,900
$0 $50,000 $100,000 $150,000 $200,000 $250,000
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
Pender County
Brunswick County
New Hanover County
Duplin County
North Carolina
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-15
general, since 2000 the incidence of cost burdened homeowners and renters has increased
dramatically across the country.
Table 2.9 : Housing Cost (2015)
Source: US Census Bureau
Monthly Cost as Percentage of Household Income
Owner-Occupied Housing
Percent of Income Pender County North Carolina
30% or more 58.1% 43.1%
Renter-Occupied Housing
Percent of Income Pender County North Carolina
30% or more 48.8% 50.6%
ECONOMIC INDICATORS
Economic factors such as household income, poverty level, educational attainment, and
employment are key indicators in a community’s economic vitality and growth potential. Those
factors are further expounded in this section of Chapter 2.
INCOME & POVERTY LEVEL
Median household income in Pender County, $44,628, compares favorably to that of the state
overall. However, within several of the Planning Areas income levels fall significantly behind that
of the state and the County as a whole. The median household income in the Topsail Planning
Area is higher than the County and the state overall. The Long Creek, Holly Shelter, and the
Union Planning Area all have median household incomes that are more indicative of a rural
community and are all similar to the median household income figure for Duplin County -
$35,035. Lastly, median household incomes in Brunswick and New Hanover County are both
higher than that of Pender County. See Figure 2.8 for more information.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-16
Figure 2.8 : Median Household Income (2015 )
Source: US Census & PCensus
The number of families living below the poverty level is also a key indicator for the economic
wellbeing of a given community. Similar to income statistics, Pender County overall has a similar
percentage of families living below the poverty as the state. According to 2015 U.S. Census
data, North Carolina’s poverty line is approximately $17,357 per year. These figures vary more
significantly at the Planning Area scale, where the Holly Shelter area has nearly twice the
percentage of families living below the poverty level as the County overall, indicating economic
hardships of residents in that Planning Area. The poverty rate for families in Brunswick County
is similar to that of Pender County, whereas Duplin County has a much higher percentage of
families living below the poverty level at 18.9%. Again, similarities between Duplin County and
the non-coastal Planning Areas are evident in the poverty statistics. See Figure 2.9 for more
information.
Figure 2.9 : Families Below Poverty Level (2015)
Source: US Census Bureau & PCensus
$35,509
$34,010
$41,334
$34,299
$48,220
$54,407
$44,628
$46,859
$50,088
$35,035
$46,868
$0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
Pender County
Brunswick County
New Hanover County
Duplin County
North Carolina
17.07%
24.52%
14.26%
12.26%
10.87%
8.77%
12.80%
12.31%
11.39%
18.90%
12.80%
0.00%5.00%10.00%15.00%20.00%25.00%30.00%
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
Pender County
Brunswick County
New Hanover County
Duplin County
North Carolina
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-17
EMPLOYMENT
Pender County has labor force participation rate of 59%, which means that of the residents
above the age of 16, approximately 60% are part of the labor force. In this statistic, the County
compares favorably with the state overall as North Carolina has a labor force participation rate
of 62.8%. Additionally, for Pender County, there are a much larger number of workers who live
in the County then there are jobs – these residents commute to another location for
employment. In fact, there are nearly twice as many workers as jobs in the County1. As a result,
commute times are typically longer and transportation impacts are more substantial,
particularly for workers commuting to New Hanover County, where more than a third of the
County’s labor force is employed.
According to NC Commerce statistics, since the economic downturn in 2008, the
unemployment rate in Pender County has slowly improved from a high of 12.8% in 2010, to
5.8% as of early 2017. Despite the significant improvement, the unemployment rate still has not
fallen to the pre-recession level of less than 5% (see Figure 2.10).
Figure 2.10: Unemployment Rate (%) (2007 - 2017)
Source: NC Commerce
As of the second quarter of 2016, the top employer in the County in the Pender County school
system followed by the Pender County government. This finding is similar to that of other rural
counties across the state where often the top employers are the school system and/or local
government. The largest private employer in the county is the 86-bed Pender Memorial
Hospital located in Burgaw.
1 There are 23,242 workers that live in Pender County compared with 10,432 jobs in the county (Source: US
Census).
4.8
5.4
11.2
12.8 11.8 11.7
11.1
8.3
6.6 6.4
5.8
0
2
4
6
8
10
12
14
Year 2007 Year 2008 Year 2009 Year 2010 Year 2011 Year 2012 Year 2013 Year 2014 Year 2015 Year 2016 Year 2017
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-18
Table 2.1 0 : Top Employers (2016 – Quarter 2)
Source: NC Commerce
Rank Company Name Industry Employment
Range
1 Pender County Schools Education & Health Services 500-999
2 Pender County NC Public Administration 250-499
3 NC Dept. Of Public Safety Public Administration 250-499
4 Pender Memorial Hospital Inc. Education & Health Services 250-499
5 Gomez Harvesting Llc. Natural Resources & Mining 100-249
6 Pender EMS And Fire Inc. Education & Health Services 100-249
7 LL Building Products (A Corp) Manufacturing 100-249
8 Caroline's Blueberries Llc. Natural Resources & Mining 100-249
9 Food Lion Trade, Transportation, & Utilities 100-249
10 Wal-Mart Associates Inc. Trade, Transportation, & Utilities 100-249
According to 2015 Census data and as shown in Table 2.11, retail trade was the industry with
the greatest number of employees closely followed by healthcare/social assistance and
construction. The industry with the highest median salary in 2015 was Utilities. The lowest
paying industry in the County is Accommodation/food services, which accounts for 6.5% of the
total employment base. From 2010 to 2015, the number of County residents employed in the
Construction industry declined by more than 7%, even with a significant increase in residential
building activity during that time. Also of note is the more than 20% decline in the number of
residents employed in the agriculture, forestry, fishing, and hunting industry.
Generally, when compared with the state, median salary figures in Pender County are roughly
consistent – with some industries having a higher salary than the state and others a lower rate
of pay. This statistic is generally positive for the County, as more counties in eastern North
Carolina are seeing salary improvements that place them in line with the state median.
Table 2.1 1 : Employment by Industry (2010 to 2015)
Source: US Census Bureau
Industry
Pender
County
(2010)
Pender County (2015)
Pender County
Employment
Change (2010 to
2015)
North Carolina (2015)
Employees Employees % Total
Employees
Median
Yearly Salary % Change % Total
Employees
Median Yearly
Salary
Agriculture/Forestry/
Fishing/Hunting 572 442 1.90% $18,418 -22.73% 1.27% $21,527
Mining 33 2 0.01% - -93.94% 0.11% $49,980
Utilities 375 466 2.00% $62,446 24.27% 0.87% $55,849
Construction 3,018 2,795 12.03% $27,086 -7.39% 6.71% $28,790
Manufacturing 2,378 2,273 9.78% $45,774 -4.42% 12.47% $36,299
Wholesale Trade 683 643 2.77% $31,311 -5.86% 2.70% $40,367
Retail Trade 3,568 3,317 14.27% $20,297 -7.03% 11.79% $21,002
Transportation/
Warehousing 580 780 3.36% $39,394 34.48% 3.40% $38,293
Information 308 268 1.15% $37,399 -12.99% 1.82% $42,427
Finance/Insurance 443 504 2.17% $33,125 13.77% 4.53% $51,415
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-19
Real
Estate/Rental/Leasing 698 466 2.00% $33,775 -33.24% 1.75% $34,085
Professional/Technic
al Services 886 1,093 4.70% $45,436 23.36% 5.89% $55,486
Management of
Companies and
Enterprises
10 0 0.00% - -100.00% 0.09% $65,825
Administrative/
Waste Services 845 1,308 5.63% $20,670 54.79% 4.33% $21,572
Educational Services 1,449 1,470 6.32% $34,382 1.45% 9.28% $33,767
Healthcare/Social
Assistance 2,582 2,819 12.13% $30,381 9.18% 14.20% $32,254
Arts/Entertainment/
Recreation 234 442 1.90% $23,534 88.89% 1.78% $18,387
Accommodation/
Food Services 1,185 1,503 6.47% $10,575 26.84% 7.66% $12,673
Other Services
(Excluding Public
Administration)
850 1,426 6.14% $20,220 67.76% 4.89% $22,076
Public Administration 1,052 1,225 5.27% $43,880 16.44% 4.47% $41,956
Total 21,749 23,242 100% N/A 6.86% 100% N/A
Based upon data prepared by NC Commerce for the Southeast Sub-region– which includes
Brunswick County, New Hanover County, and Pender County – by 2024 the two occupations
projected to have the greatest increase in jobs are food preparation/service and retail
salespersons (see Table 2.12). Both employment types are low-skill and low wage. The
number of registered nurses are also anticipated to increase by nearly 30% or 885 employees
by 2024. This occupation requires a bachelor degree and pay is much higher than the other top
five job-growth occupations. General Managers and nursing assistants are the only other
occupations which require higher education. The other occupations included in Table 2.12
only require minimal to moderate on-the-job training and a high school diploma or less. Please
note only occupations projected to have the most job growth (top 15) are included in Table
2.12.
Table 2.1 2 : Projected Employment Growth 201 4 to 202 4 – Brunswick, New Hanover, &
Pender County (Southeast Sub -Region)
Source: NC Commerce
Occupation Title
2014
Employment
Estimate
2024
Employment
Estimate
Net
Change
Percent
Change
Annual
Median
Wage
Education Level Required
Combined Food
Preparation and
Serving Workers,
Including Fast Food
6,796 8,882 2,086 30.69 $17,864 No formal educational
credential
Retail Salespersons 6,423 7,537 1,114 17.34 $21,869 No formal educational
credential
Home Health Aides 2,112 3,207 1,095 51.85 $20,537 No formal educational
credential
Registered Nurses 3,165 4,050 885 27.96 $56,973 Bachelor's degree
Waiters and
Waitresses 3,949 4,786 837 21.2 $18,128 No formal educational
credential
Cashiers 4,665 5,392 727 15.58 $18,162 No formal educational
credential
Customer Service
Representatives 3,164 3,887 723 22.85 $30,596 High school diploma or
equivalent
Nursing Assistants 2,036 2,703 667 32.76 $21,996 Postsecondary non-degree
award
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-20
Cooks, Restaurant 1,827 2,470 643 35.19 $20,903 No formal educational
credential
Office Clerks, General 2,914 3,393 479 16.44 $27,112 High school diploma or
equivalent
First-Line Supervisors
of Food Preparation
and Serving Workers
1,560 2,017 457 29.29 $31,128 High school diploma or
equivalent
Childcare Workers 1,528 1,971 443 28.99 $20,129 High school diploma or
equivalent
General and
Operations Managers 1,870 2,295 425 22.73 $95,843 Bachelor's degree
Janitors and Cleaners,
Except Maids and
Housekeeping
Cleaners
1,923 2,339 416 21.63 $20,416 No formal educational
credential
Secretaries and
Administrative
Assistants, Except
Legal, Medical, and
Executive
2,245 2,641 396 17.64 $30,987 High school diploma or
equivalent
Total 46,177 57,570 11,393 N/A N/A N/A
EDUCATIONAL ATTAINMENT
The level of training and education of a community’s workforce is a vital component of
economic development efforts. The educational attainment of a community – the highest level
of education completed – can be highly indicative of a population’s health, employment, and
income level. A more educated community tends to have increased workforce productivity and
involvement in society. In Pender County, outside of the Topsail Planning Area, the percentage
of residents with a Bachelor’s Degree or higher is much lower. As shown in Table 2.13, the
Caswell Planning Area has the highest percentage of residents without a high school diploma or
GED as nearly 30% of the population above the age of 25 did not finish high school. Compared
with Brunswick County and New Hanover County, Pender County has a less educated
workforce overall. However, in the more rural Duplin County, educational attainment figures
are much more dire, where more than a quarter of residents over the age of 25 are without a
high school diploma or GED.
Table 2.1 3 : Educational Attainment for Population 25 Years or Older (2015)
Source: US Census Bureau & PCensus
Education
Union
Planning
Area
Holly
Shelter
Planning
Area
Burgaw
Planning
Area
Caswell
Planning
Area
Long
Creek
Planning
Area
Topsail
Planning
Area
Pender
County
Brunswick
County
New
Hanover
County
Duplin
County
Less than
9th grade 359 65 457 348 568 248 2,091 3,691 3,911 5,527
Some High
School, no
diploma
719 192 607 552 520 946 3,430 8,148 8,019 5,515
High School
Graduate
(or GED)
1,734 574 2,165 1,172 2,645 4,609 12,032 24,226 31,718 11,886
Some
College, no
degree
948 450 1,630 574 1,554 4,285 9,156 20,707 33,134 8,712
Associate
Degree 367 143 536 256 687 1,441 3,666 8,744 13,899 3,638
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-21
Bachelor's
Degree 322 143 604 156 476 4,069 5,408 14,935 35,433 2,867
Graduate or
Professional
Degree
92 73 206 98 154 1,643 2,760 8,228 17,596 1,356
Total 4,541 1,638 6,208 3,156 6,604 17,242 38,543 88,679 143,710 39,501
Percent
Less than
High School 23.74% 15.69% 17.14% 28.52% 16.47% 6.92% 14.32% 13.35% 8.30% 27.95%
Percent
Bachelor's
Degree or
Higher
9.1% 13.2% 13.0% 8.0% 9.5% 33.1% 21.2% 26.1% 36.9% 10.7%
TRAVEL TO WORK
As shown in Figure 2.11, Pender County workers travel more than 28 minutes to reach their
place of employment on average. Compared with North Carolina and nearby counties, Pender
County has a higher travel time to work. Within the county, workers in the Caswell Planning
Area have the longest commute time at more than 32 minutes.
Figure 2.1 1 : Mean Travel Time to Work (2015)
Source: US Census Bureau & PCensus
As discussed previously, the majority of Pender County’s labor force is employed outside of the
County. According to Census data, nearly 15,000 of the County’s more than 23,000 workers
travel to another county for employment (see Table 2.14). Conversely, in neighboring New
Hanover County, nearly 90% of the labor force works within the County boundary. See
Chapter 4 for a more detailed discussion of commute patterns.
29.5
32.3
29.9
32.6
28.6
29.7
28.1
23.7
20.4
25.3
23.9
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0
Union Planning Area
Holly Shelter Planning Area
Burgaw Planning Area
Caswell Planning Area
Long Creek Planning Area
Topsail Planning Area
Pender County
Brunswick County
New Hanover County
Duplin County
North Carolina
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-22
Table 2.14: Commuting Patterns (2015)
Source: US Census Bureau
Place of Work Pender County New Hanover County
Count % of Total Count % of Total
Worked in county of residence 8,541 36.75% 91,588 89.60%
Worked outside county of residence 14,433 62.10% 9,318 9.12%
Worked outside state of residence 268 1.15% 1,318 1.29%
Total 23,242 100.00% 102,224 100.00%
Similar to neighboring counties and the state overall, the vast majority of workers in Pender
County drove alone to their place of employment (see Table 2.15). Where the County does
differ from the state is in the number of commuters that choose to carpool at 14.4% compared
with only 10% across North Carolina. Though not shown in Table 2.15, within the Planning
Areas the means of transportation to work is rather similar, except for the Holly Shelter
Planning Area, in which more than 20% of workers choose to carpool.
Table 2.1 5 : Means of Transportation to Work (2015)
Source: US Census Bureau
Transportation Mode Pender
County Brunswick County New Hanover
County
Duplin
County North Carolina
Drove Alone 78.50% 79.63% 78.42% 77.49% 81.10%
Car Pooled 14.40% 13.26% 9.30% 17.58% 10.00%
Public Transportation 0.10% 0.40% 0.99% 0.02% 1.10%
Walked 1.10% 0.73% 1.87% 1.48% 1.80%
Bicycle 0.30% 0.02% 0.99% 0.00% 0.20%
Other Means 1.30% 1.19% 1.60% 0.96% 1.10%
Worked at Home 4.30% 4.77% 6.84% 2.48% 4.70%
Total 100% 100% 100% 100% 100%
AGRICULTURAL ECONOMY
Agriculture continues to make a major contribution to the local economy in Pender County.
According to the NC Department of Agriculture, the agricultural industry contributed over
$162 million dollars to the local economy in 2015 and ranked 22nd out of 100 counties in
agricultural economic output (See Table 2.16). Refer back to Table 2.11 to see the
percentage of total agricultural employment in the County. Primary agricultural products
produced in the County include hay, tobacco, and wheat. Other agricultural sectors include
the production of livestock including broilers (poultry), cattle, beef cows, turkeys, hogs and pigs.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-23
Table 2.1 6 : Agriculture Economic Statistics (2015)
Source: NC Department of Agriculture
Cash Receipts Dollars State Rank
Livestock, Dairy, and Poultry $124,752,117 20
Crops $37,999,76 42
Government Payments* $170,405 62
Total $162,922,290 22
*The Census of Agriculture defines government payments as payments received from the Conservation Reserve
Program (CRP), Wetlands Reserve Program (WRP), Farmable Wetlands Program (FWP), or Conservation Reserve
Enhancement Program (CREP) plus government payments received from Federal, State, and local programs other
than the CRP, WRP, FWP, and CREP, and Commodity Credit Corporation loans.
From 2002 to 2012, Pender County was the only county in southeastern North Carolina to
increase the number of operating farms (2012 is the latest available year in the Census of
Agriculture). During that time, the size of the farms decreased in size, highlighting greater
interest in smaller boutique farm operations. From 2002 to 2012, the total number of farms
operating on less than 50 acres increased from 43 to 172, or by 300%. In addition, the market
value of products sold per farm increased from 2002 to 2012.
Table 2.1 7 : Pender County Census of Agriculture Statistics (2002 & 2012)
Source: Census of Agriculture
Market Value of Agricultural Products Sold per Farm (2002 & 2012)
Year 2002 Year 2012 % Change
$343,451 $518,068 50.84%
Number of Farms
Year 2002 Year 2012 % Change
296 335 13.18%
Acres in Farms
Year 2002 Year 2012 % Change
62,714 55,775 -11.06%
Average Size of Farm
Year 2002 Year 2012 % Change
212 166 -21.70%
The loss of farmland over the last thirty years in Pender County is consistent with the
tremendous amount of growth and development that has been experienced. From 1992 to
2012, the County lost more than 9,300 acres of farmland an amount roughly equivalent to
more than 7,200 football fields (see Figure 2.12).
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-24
Figure 2.1 2 : Total Land in Pender County in Farms (Acres) (1992 - 2012)
Source: Census of Agriculture
As shown in Table 2.18, from 1992 to 2012 the number of primary occupation farmers has
not significantly increased or decreased. Accordingly, NC Commerce has listed farming as one
of the few occupations projected to decline over the next ten years. Moreover, the average age
or farmers in Pender County is 55.7, thus creating a potential void in the number of future farm
operators as current farmers approach retirement. According to the 2012 Census of
Agriculture, primary occupation is broken up into two classifications: Farming and other.
Farming is defined as the operator spent 50% or more of his/her worktime during 2012 in
farming operations. Other is defined as the operator spent less than 50% of his/her worktime
during 2012 in farming operations.
Table 2.1 8 : Pender County Census of Agriculture Statistics (1992 to 2012)
Source: Census of Agriculture
Primary Occupation 1992 1997 2002 2007 2012
Farming 186 165 183 163 167
Other Occupation 145 118 113 194 168
RETAIL SALES
Another major indicator of the economic vitality of a community is retail sales activity.
According to NC Commerce, there are 365 retail business in Pender County. The capture of
65,136
68,861
62,714 61,571
55,775
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
1992 1997 2002 2007 2012
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-25
retail sales dollars is essential to local government fiscal stability and growth. The combined
sales tax rate for Pender County is 6.75%. This is the total of state and county sales tax rates.
The North Carolina state sales tax rate is currently 4.75%. The Pender County sales tax rate is
2%. Since the economic downturn in 2008, gross retail sales in Pender County have steadily
increased. From fiscal year 2008/09 to fiscal year 2015/16, gross sales increased by 85%. It
should be noted that sales tax revenues only make up a small portion of the County’s revenue,
but are a vital source nonetheless.
Table 2.19: Pender County Retail Sales (2000 to 2016)
Source: NC Department of Revenue
Fiscal Year Total Gross Sales Annual Change Percent Change
2000-2001 $237,452,326 * *
2001-2002 $246,350,309 $8,897,983 3.70%
2002-2003 $263,564,643 $17,214,334 7.00%
2003-2004 $291,638,318 $28,073,675 10.70%
2004-2005 $359,339,939 $67,701,621 23.20%
2005-2006 $227,022,142 ($132,317,797) -36.80%
2006-2007 $244,815,739 $17,793,597 7.80%
2007-2008 $241,845,086 ($2,970,653) -1.20%
2008-2009 $217,794,180 ($24,050,906) -9.94%
2009-2010 $243,046,719 $25,252,539 11.59%
2010-2011 $263,642,919 $20,596,200 8.47%
2011-2012 $286,409,398 $22,766,479 8.64%
2012-2013 $294,332,860 $7,923,462 2.77%
2013-2014 $313,074,552 $18,741,692 6.37%
2014-2015 $359,173,557 $46,099,005 14.72%
2015-2016 $403,279,198 $44,105,641 12.28%
SUMMARY
Pender County is currently experiencing tremendous growth and development pressures along
the coast and the US 17 corridor. This area is in the midst of growing pains that result from the
transition from a rural to urban/suburban community. Conversely, while change along the
coastal Pender is swift, and appears excessive to many residents, the more rural areas of the
County north and west of US 17 are experiencing minimal development. As a result, County
staff and officials are forced to manage growth in one area of the County while simultaneously
supporting efforts to bolster economic development in the other. This dynamic is evident when
analyzing and cataloging demographic data throughout the County.
Perhaps the most similar comparable depiction of the County, from a demographic standpoint,
is the state of North Carolina as a whole. Similar to North Carolina, the County has both
urban and rural areas that suffer from entirely different issues related to population growth and
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-26
economic development. Both issues require unique solutions that must be tailored to meet the
needs of current and future Pender County residents.
STATISTICS OF NOTE:
Population Characteristics and Trends
▪ Since 1970, the Pender County’s population has more than tripled, with much of the growth
occurring in the coastal areas.
▪ Population growth in Pender County outpaced that of New Hanover, Brunswick, and
Duplin Counties from 2010 to 2015.
▪ From 2010 to 2015, the County population growth rate was nearly twice that of North
Carolina as a whole, notwithstanding the significant population growth experienced
statewide.
▪ According to the figures calculated for seasonal overnight population, when added to the
permanent population, there are approximately 84,531 persons in Pender County during
the summer months – equating to a 45% increase in population.
▪ When accounting for day-trip visitors and traffic, it estimated that throughout the entire
County – on a peak day in the summer – there is nearly 100,000 persons living in or visiting
the area.
▪ Pender County is anticipated to experience a population growth rate of nearly 62% or an
increase of more than 35,000 residents by 2045.
▪ Approximately 88% of population growth will be allocated to the unincorporated portion of
the County – equating to an increase of 32,803 persons or the addition of nearly three new
unincorporated County residents per day for the next thirty years.
▪ Pender County has a smaller percentage of its population in the millennial age group (20 to
34) than does the state, indicating out-migration for college graduates and young workers.
▪ Over the next ten to fifteen years, the County is forecasted to have a substantial increase in
the number of residents above the age of 65.
Housing Characteristics and Trends
▪ The share of manufactured housing in the County appears to be declining in favor of stick-
built or modular single-family homes.
▪ From 2000 to 2009, more than 7,000 new housing units were built in Pender County
despite the economic downturn that occurred in the latter half of the decade.
▪ The Caswell Planning Area, which encompasses the southwest portion of the county, has
the lowest median housing values in the County at $97,772, whereas the highest housing
values are found in the Topsail Planning Area at $222,225.
▪ Residents in nearly 6,500 of the County’s housing units (4,621 homeowners & 1,828 rental
units) are currently experiencing housing costs which may limit their ability to save for
retirement, purchase medical or child care, and/or spend money on leisure activities.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-27
Economic Indicators
▪ Median household income in Pender County, $44,628, compares favorably to that of the
state overall. However, within several of the Planning Areas income levels fall significantly
behind that of the state and the County as a whole.
▪ The Holly Shelter area has nearly twice the percentage of families living below the poverty
level as the County overall, indicating economic hardships of residents in that Planning Area.
▪ There are nearly twice as many workers as jobs in Pender County. As a result, commute
times are typically longer and transportation impacts are more substantial, particularly for
workers commuting to New Hanover County, where more than a third of the County’s
labor force is employed.
▪ According to NC Commerce statistics, since the economic downturn in 2008, the
unemployment rate in Pender County has slowly improved from a high of 12.8% in 2010, to
5.8% as of early 2017.
▪ The lowest paying industry in the County is accommodation/food services, which accounts
for 6.5% of the total employment base.
▪ Generally, when compared with the state, median salary figures in Pender County are
roughly consistent – with some industries having a higher salary than the state and others a
lower rate of pay. This statistic is generally positive for the County, as more counties in
eastern North Carolina are seeing salary improvements that place them in line with the
state median.
▪ Compared with Brunswick County and New Hanover County, Pender County has a less
educated workforce overall.
▪ According to Census data, nearly 15,000 of the County’s more than 23,000 workers travel
to another county for employment. Conversely, in neighboring New Hanover County,
nearly 90% of the labor force works within the County boundary.
▪ According to the NC Department of Agriculture, the agricultural industry contributed over
$162 million dollars to the local economy in 2015 and ranked 22nd out of 100 counties in
agricultural economic output.
▪ From 2002 to 2012, Pender County was the only county in southeastern North Carolina to
increase the number of operating farms.
▪ The average age of farmers in Pender County is 55.7, thus creating a potential void in the
number of future farm operators as current farmers approach retirement.
▪ Since the economic downturn in 2008, gross retail sales in Pender County have steadily
increased. From fiscal year 2008/09 to fiscal year 2015/16, gross sales increased by 85%.
Please see Table 2.20 for a comparative analysis of demographic statistics across the Planning
Areas, neighboring counties, and North Carolina.
Chapter 2: Community Profile Pender 2.0: Comprehensive Land Use Plan
2-28
Table 2.2 0 : Comparative Community Profile Statistics
Source: US Census Bureau, PCensus, and NCOSBM.
Planning
Areas
%
Population
Growth
2000 -2015
2015
Median
Age
2015
% of Single
Family
Housing
2015
% of
Manufactured
Housing
2015
% of
Multi-
family
Housing
%
Structure
Built
2000 -
2009
Median
Value of
Owner-
Occupied
Housing
2015
2015
Median
Household
Income
2015
Families
Below
Poverty
Union
Planning
Area # 1
10.78% 41.9 64.40% 35.53% 0.01% 12.18% $102,500 $35,509 17.07%
Holly
Shelter
Planning
Area #2
10.15% 41.6 55.81% 39.18% 5.02% 21.01% $125,509 $34,010 24.52%
Burgaw
Planning
Area #3
17.79% 39.9 64.30% 25.44% 8.74% 13.11% $118,213 $41,334 14.26%
Caswell
Planning
Area #4
15.13% 44.2 57.76% 41.32% 0.82% 15.48% $97,772 $34,299 12.26%
Long
Creek
Planning
Area #5
30.95% 37.8 55.36% 42.21% 0.98% 19.31% $113,923 $48,220 10.87%
Topsail
Planning
Area #6
74.44% 44.3 66.16% 21.05% 9.78% 25.26% $222,225 $54,407 8.77%
Pender
County 41.05% 42.1 64.97% 26.82% 5.99% 26.15% $153,400 $44,628 12.80%
Brunswick
County 58.49% 50.0 63.76% 23.02% 10.62% 35.84% $182,500 $46,859 12.31%
New
Hanover
County
32.93% 37.8 60.74% 4.82% 25.88% 21.26% $214,300 $50,088 11.39%
Duplin
County 21.18% 38.8 57.00% 36.68% 5.44% 14.96% $87,900 $35,035 18.90%
North
Carolina 22.31% 38.4 65.23% 13.37% 17.50% 20.63% $154,900 $46,868 12.80%
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-1
CHAPTER 3: NATURAL SYSTEMS ANALYSIS
INTRODUCTION
Preserving the quality of life of Pender County residents and visitors is an important factor to
consider as the population increases and development occurs throughout the area. To do so, a
coordinated balance between development, preservation of agricultural working lands, and
environmentally sensitive areas must be a goal for the County. The purpose of this chapter is to
describe and analyze the natural resources, environmental conditions, and agricultural lands as
they exist today in Pender County. The chapter concludes with goals, policies, and
recommended actions for preserving quality of life principles for County residents. More
specific land use goals and policies are included in Chapter 5.
North Carolina’s Coastal Area Management Act (CAMA) establishes provisions for rational and
integrated coastal resource management. County wide land use plans utilize the regulation of
Areas of Environmental Concern (AECs) to set the foundation for North Carolina’s coastal
resource management program. These set forth actions allow state and local governments to
retain and complement the state’s coastal resources. Local governments, however, are granted
significant flexibility when developing policies and taking actions to protect them. Moreover, the
majority of Pender County is not impacted by CAMA AECs, thus requiring local land use
regulation for the desired level of preservation for environmentally sensitive or prime
agricultural lands. The following sections in this chapter provide an overview of the unique and
varied natural systems throughout the County.
AREAS OF ENVIRONMENTAL CONCERN
The State Guidelines for Areas of Environmental Concern (15A NCAC 7H, or regulations
governing development for AECs) require that local land use plans give special attention to the
protection of AECs. CAMA charges the Coastal Resources Commission (CRC) with the
responsibility for identifying the areas—water and land—in which undisciplined or conflicting
development might result in irreversible damage to the environment. An AEC is an area of
natural importance designated by the CRC that may be easily destroyed by erosion or flooding.
It may also have environmental, social, economic, or aesthetic values worthy of protection.
There are four categories of AECs:
▪ Estuarine and Ocean Systems
▪ Ocean Hazard Systems
▪ Public Water Supplies
▪ Natural and Cultural Resource Areas
Estuarine and Ocean Systems are found throughout the unincorporated areas of Pender
County. Ocean Hazard Systems are only found in the Town of Surf City and the Town of
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-2
Topsail Beach and therefore are not included as part of this plan. Public Water Supplies and
Natural and Cultural Resource Areas are not found in Pender County and are also excluded.
The need for CAMA planning and regulations is essential to preserving the quality of life of the
County’s residents and visitors because of the ever-changing coastline and its fragile wetlands
and soils. The transition from aquatic habitats to uplands are fragile wetland areas that can be
easily erodible through storm and weather events. Such events naturally exert strong forces on
the coastal system. These wetland systems and the wildlife and plants they support, clean the
water and provide for the fishing and tourism industry. If managed correctly, these dynamic
coastal wetlands, beaches, and dunes can protect the County’s communities from storm
damage.
ESTUARINE AND OCEAN SYSTEMS
The Estuarine and Ocean Systems AEC is a broad category that includes the County’s brackish
sounds, marshes, and surrounding shorelines. The system includes the following components:
▪ Estuarine waters;
▪ Estuarine/coastal shorelines;
▪ Coastal wetlands; and
▪ Public trust areas.
ESTUARINE WATERS
Estuaries are typically found where rivers and streams flow into the Atlantic Ocean and/or the
Intracoastal Waterway (ICWW). They are unique and essential for coastal life because they
serve as transition zones between fresh and salt water. Barrier islands protect estuaries from
wind and wave energy. Estuaries also serve as a water filtration system by removing sediments,
nutrients, and pollutants before they reach the ocean. The resulting cleaner water benefits
marine life and the people that inhabit the surrounding area. Estuaries also assist in flood
control, with porous salt marsh soils and grasses absorbing flood waters and dissipating storm
surges. They provide natural barriers between the land and the ocean.
Estuarine waters include all waters of the Atlantic Ocean within the boundary of North
Carolina, and all waters of the bays, sounds, rivers, and tributaries seaward of the dividing line
between coastal fishing waters and inland fishing waters (NCGS 113A-113(b)(2)). Pender
County’s estuarine waters include the ICWW, and portions of the Cape Fear River, Northeast
Cape Fear River, Black River, and others. Estuaries are extremely productive natural systems
that are vital to marine life, coastal tourism, and recreation. See Map 3.1: Areas of
Environmental Concern (AECs).
Estuarine waters in and around the County provide important habitat for a diverse range of
shellfish, birds, and other forms of marine wildlife. Mud and sand flats, eel grass beds, salt
marshes, submerged vegetation flats, and clam and oyster beds are important habitat features of
an estuarine system. They provide nursery areas and serve as habitat for a variety of marine and
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-3
benthic species. The North Carolina Wildlife Resources Commissions (NCWRC) defines
benthic as relating to, or of the bottom surfaces of bodies of water. Generally speaking,
development activities which are water dependent and require water access and cannot
function elsewhere (e.g. simple access structures, structures to prevent erosion, boat docks,
marinas, wharves, and mooring piling) may be allowed within this AEC. Figure 3.1 provides an
example of a natural estuary.
Figure 3.1: An Example of a North Carolina Natural Estuary
Source: North Carolina Division of Coastal Management
ESTUARINE/COASTAL SHORELINE
The estuarine shoreline is the non-ocean shoreline, extending from the normal high water level
or normal water level along the estuarine waters, estuaries, sounds, fresh and brackish waters,
and public areas (15NCAC 7H.0209). For areas not located in Outstanding Resource Waters
(ORW), the estuarine shoreline is defined as 75 feet landward from mean high water line
(MHWL). These areas are highly susceptible to wind, water, and development erosion.
Development in these areas pose a threat to water quality and can increase the chance of
shorefront erosion. Figure 3.2 is a picture of the ICWW from within a 75 foot Estuarine
Shoreline AEC in Hampstead. For ORW waters, the distance is 575 feet. In Pender County,
there are three locations where ORWs are found. Specifically, development within estuarine
shoreline AECs may not exceed an impervious coverage limit of 30% (25% for ORW AECs) or
be located within 30 feet of the normal high water level. CAMA permits control development
within the shoreline areas. There are approximately 15.2 square miles of estuarine shorelines in
Pender County. See Map 3.1: Areas of Environmental Concern (AECs).
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-4
Figure 3.2: 75 Foot Estuarine Shoreline AEC, Pender County, NC
Source: Cape Fear Council of Governments
COASTAL WETLANDS
CAMA specifically defines coastal wetlands as any salt marsh or other marsh subject to regular
or occasional flooding by lunar tides and contains some, but not necessarily all of the following
marsh plant species: Cord Grass, Black Needlebrush, Glasswort, Salt Grass, Sea Lavender,
Bulrush, Saw Grass, Cat-tail, Salt Meadow Grass, and Salt Reed Grass. This definition does not
include flooding by tides associated with hurricanes, tropical storms, or severe weather events
(15A NCAC 07H.0206). Refer to page 3-22 for a description of non-coastal wetlands.
The U.S. Army Corps of Engineers (USACE)/Clean Water Act defines wetlands as those areas
inundated and saturated by surface or ground water at a frequency and duration to support a
prevalence of vegetation typically adapted for life in saturated soil conditions (this includes
CAMA defined coastal wetlands). Wetlands include a variety of natural systems such as
marshes, swamps, and pocosins. While they may not all look the same, they share certain
characteristics such as wetland vegetation, hydric soils, and hydrologic features. The United
States Department of Agriculture Natural Resources Conservation Service (USDA NRCS)
defines hydric soils as soils formed under conditions of saturation, flooding, or ponding long
enough during the growing season to develop anaerobic conditions. Wetlands have significant
values that support the unique lifestyle and quality of life enjoyed by Pender County residents
and visitors. These values include:
▪ Water Storage: Wetlands are able to store heavy rain, surface runoff, and flood
waters, thereby reducing downstream flooding.
▪ Shoreline Stabilization: Ground cover and roots of wetland plants help hold soil in
place and prevent sedimentation and nutrient transport.
▪ Water Quality: Wetlands plants can enhance water quality by removing pollutants
from surface water runoff.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-5
▪ Wildlife and Aquatic Habitat: The variety of plants, hydrologic, and soil conditions
associated with wetlands provide abundant food and cover for animal populations
and support a number of endangered species and other rare plants and animals.
▪ Recreation and Education: The rich array of plants and animals supported by wetlands
provide significant consumptive and non-consumptive use values such as hunting,
fishing, bird watching, kayaking, etc.
Conserving wildlife habitat and maintaining as much mature, swamp, bottomland, and floodplain
forest as possible will reduce the severity of natural hazards and the extent of inland flooding. In
Pender County, the conservation of the natural habitats in and around the Angola Bay and
Holly Shelter Game Lands reduces the severity of flooding in the Cape Fear and the Northeast
Cape Fear Rivers. According to the United States Environmental Protection Agency (US EPA),
conserving one acre of wetlands prevents three acres of flooding.
According to mapping developed by the Division of Coastal Management (DCM), Pender
County has coastal wetlands of the brackish saltwater variety. Throughout the County, coastal
wetlands cover 7,476 acres. They are mostly found along the ICWW and Topsail Island Sound.
Coastal wetlands are considered to be unsuitable for all development activities and other land
uses that alter their natural functions.
PUBLIC TRUST AREAS
Public trust areas include coastal waters and the submerged tidal lands below the mean high
water line (MHWL). The water and submerged tidal lands are held in trust for the public to use
through activities such as fishing, swimming, and boating. These areas will often overlap with
estuarine waters, but they also include many inland fishing waters. As general guidance, the
following lands and waters are considered to be public trust areas:
▪ All waters of the Atlantic Ocean and the lands underneath, from the MHWL
seaward to the state's official boundary three miles offshore;
▪ All tidally influenced waters and associated submerged lands below the MHWL;
▪ All navigable natural water bodies and the lands underneath from the normal high
water line seaward (Navigable waters include anything you can float a canoe in).
This does not include privately owned lakes where the public doesn't have access
rights;
▪ All water in artificially created water bodies that have significant public fishing
resources and are accessible to the public from other waters; and
▪ All waters in artificially created water bodies where the public has acquired rights by
prescription, custom, usage, dedication, or any other means.
Accordingly, Pender County’s public trust waters include all estuarine waters, their tributaries,
and the Atlantic Ocean. It is the state’s policy to ensure that the public is able to maintain
access to these submerged tidal waters since they are held in trust. All development,
structures, and land uses that interfere with the public’s right to the access and use of these
waters is inconsistent with state policy. Throughout the state’s coastal communities, the degree
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-6
to which development is required to provide access to public trust areas varies significantly.
Ultimately, the provision or requirement for such falls to the local government and is codified
within zoning or subdivision regulations. In Pender County, there are no regulations in place to
require public access to public trust areas. Navigation channels, piers, marinas, and bulkheads to
control erosion are examples of uses that are frequently considered to enhance the public’s use
of these public trust areas.
HAZARDS
Due to its geographic location, the coastal region is susceptible to a variety of natural hazards
such as flooding, hurricanes, and storm surge. These hazards are summarized in the following
sections.
SPECIAL FLOOD HAZARD AREAS
The Special Flood Hazard Area is defined as an area of land that has a 1% chance of being
inundated by a flood in any given year. The 100-year floodplain is the accepted benchmark for
defining flood hazard areas. Approximately 37% of Pender County’s housing units lie within the
100-year flood plain. See Map 3.2: Special Flood Hazard Areas (SFHAs). The floodplain in
Pender County is mapped including:
▪ AE zones: Special flood hazard areas inundated by the 100-year flood (one percent
chance of a hundred year flood event in alluvial plains or riverine systems);
▪ VE zones: Special flood hazard areas inundated by the 100-year flood (one percent
chance of a hundred year flood event); coastal floods with velocity hazards (typically
3 foot wave action); and
▪ 500-year Floodplain: Areas subject to a 0.2 percent chance of flooding in any given
year.
Preliminary flood maps have been prepared for the County and are anticipated to be adopted in
the near future. (Note: Upon adoption, all facts and figures related to the SFHAs will be
updated.)
Table 3.1: Housing Units Within Special Flood Hazard Areas (SFHAs), Pender County, NC
Source: Cape Fear Council of Governments GIS, Pender County GIS, NC Flood Maps, US Census Bureau
Special Flood Hazard
Areas* Countywide Housing Units Percentage of Countywide
Housing Units
500-year Floodplain 794 2.60%
AE Zone 3,690 12.08%
VE Zone 1,749 5.72%
Total in SFHAs 6,223 20.40%
Special Flood Hazard
Areas*
Number of Incorporated
Housing Units
Percentage of Incorporated
Housing Units
500-year Floodplain 367 4.67%
AE Zone 2,474 31.46%
VE Zone 1,666 21.18%
Total in SFHAs 4,507 57.30%
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-7
* Current flood maps.
Table 3.1 presents the incorporated and the unincorporated housing units that are situated
within various flood zones. The housing unit totals presented above utilize Pender County GIS
address point data, which indicates there are 30,558 housing units, 7,865 in the incorporated
areas and 22,693 in the unincorporated areas (Note: these numbers differ from the US Census
data housing unit total). Of these housing units, over 12% or 3,690 are located in the AE zone
and nearly 6% or 1,749 are located in the VE flood zone. Approximately 20.5% or 6,223 housing
units in the incorporated and the unincorporated areas of Pender County are susceptible to
flooding.
According to preliminary flood maps prepared for Pender County along the coastal areas and
creeks adjoining the ICWW, the Special Flood Hazard Areas are projected to increase in many
locations. Low lying areas throughout the inland portion which are not currently in Special
Flood Hazard Areas are projected to see an increase in the extent in which they cover.
FLOODING HOT SPOTS & DRAINAGE CONCERNS
Within the flood hazard areas, some portions of the County have experienced a greater
frequency of flooding than others. Based on past flood events throughout the County, the
Northeast Cape Fear River tends to flood more frequently than the Black River. Whitestocking
Road and Shaw Highway are two roads in the County that typically experience flooding from
the Northeast Cape Fear River. However, the riverine flooding effects of Hurricane Matthew
were most significant along the Black River in southwest Pender County. The Black River is a
50 mile long tributary of the Cape Fear River. This area is a portion of the County that many
major streams converge.
Prior to the enactment of the 1972 Clean Water Act, and subsequent adoption of North
Carolina stormwater rules and regulations, development was generally not subject to any
particular requirements for the mitigation of stormwater. Many developments, however, were
constructed with drainage easements and the like to prevent localized flooding and convey
stormwater. A stormwater drainage easement is typically denoted on a recorded plat showing
where stormwater runoff must be allowed to flow across the property, either through open
ditches or through an underground pipe system. Accordingly, over time drainage ditches,
easements, and mechanisms to mitigate stormwater in developments constructed prior to the
1970s have been modified, filled, or outright forgotten. As a result, even minor rain events can
impact these areas. In the future, the County desires to educate residents, real estate agents,
developers, and Homeowners Associations (HOAs) about this important topic and potential
solutions to prevent localized drainage issues and flooding.
Special Flood Hazard
Areas*
Number of
Unincorporated Housing
Units
Percentage of
Unincorporated Housing
Units
500-year Floodplain 427 1.88%
AE Zone 1,216 5.36%
VE Zone 83 0.37%
Total in SFHAs 1,726 7.61%
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-8
Figure 3.3: Localized Flooding following Minor Rain Event, Pender County, NC
Source: Cape Fear Council of Governments
FEMA FLOOD INSURANCE
According to the Federal Emergency Management Agency (FEMA), there are 4,406,664 flood
insurance policies nationwide. Flood insurance is available in 19,859 participating communities
nationwide. Pender County has 4,938 policies in force valued at over $1.2 billion. Since 1978,
there have been 3,970 documented losses with payments exceeding $37,250,170 in the
incorporated areas, and 783 documented claims with payments exceeding $15,274,495 in the
unincorporated areas. Documented claims for incorporated areas include the municipalities of
Burgaw, Surf City, and Topsail Beach. Pender County has accounted for more than 5% of the
total documented flood claims experienced statewide since 1978. Tables 3.2 and 3.3 present
these findings.
Table 3.2: Flood Insurance Policies for Pender County & North Carolina (As of February 28,
2017)
Source: FEMA, Insurance Policies: https://bsa.nfipstat.fema.gov/reports/1011.htm
Jurisdiction Policies In-Force Insurance In-Force
Atkinson 2 $385,000
Burgaw 62 $13,562,000
Saint Helena 1 $110,000
Surf City 2,167 $520,087,000
Topsail Beach 1,130 $293,306,100
Watha 2 $205,400
Total Incorporated 3,364 $827,655,500
Total Unincorporated 1,574 $406,712,600
Total Pender County 4,938 $1,234,368,100
North Carolina 130,104 $31,979,619,600
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-9
Table 3.3: Loss Statistics for Pender County & North Carolina (1978 – September
2016)
Source: FEMA, Loss Statistics: http://bsa.nfipstat.fema.gov/reports/1040.htm#37
One way to help minimize flood claims and lower insurance premiums is to participate in the
National Flood Insurance Program's (NFIP) Community Rating System (CRS). The CRS is a
voluntary incentive program that recognizes and encourages community floodplain management
activities that exceed the minimum NFIP requirements. Any community in full compliance with
the minimum NFIP requirements may apply to join the CRS. As a result, flood insurance
premiums are discounted to reflect the reduced flood risk resulting from the community
meeting the three goals of the CRS: (1) reduce flood losses; (2) facilitate accurate insurance
rating; and (3) promote the awareness of flood insurance.
For CRS participating communities, flood insurance premiums are discounted in increments of
five percent. A class 1 community receives a 45 percent premium discount, while a Class 9
community receives a 5 percent discount (a Class 10 is not participating in the CRS and
receives no discount). The CRS classifications for local communities are based on 18 creditable
activities, organized under four categories: (i) public information; (ii) mapping and regulations;
(iii) flood damage reduction; and (iv) flood preparedness. There are 994 communities receiving
flood insurance premium discounts based on their implementation of local mitigation, outreach,
and educational activities that go beyond minimum NFIP requirements. While premium
discounts are one benefit of participating in the CRS, the real benefit is that these activities help
save lives and reduce property damage. The Town of Topsail Beach is the only incorporated
area in Pender County that participates in the CRS. Their CRS class is 6, meaning flood
insurance premium rates are discounted by 20%. Pender County does not participate in the
CRS.
HURRICANES
Due to the geographic location of Pender County, hurricanes pose a significant threat to the
residents and visitors of the County. A hurricane is a cyclonic storm that originates in tropical
ocean waters. As a hurricane develops, barometric pressure at its center falls while winds
increase. Winds at or exceeding 39 miles per hour result in a named tropical storm that is
closely monitored by the National Oceanic and Atmospheric Administration’s (NOAA’s)
National Hurricane Center. When winds exceed 74 miles per hour, it becomes a hurricane.
Hurricanes are judged by their power according to the Saffir-Simpson Scale. This measure of
Jurisdiction Total Claims Total Payment
Burgaw 18 $189,762
Surf City 1,779 $15,512,241
Topsail Beach 2,173 $21,548,167
Total Incorporated 3,970 $37,250,170
Total Unincorporated 783 $15,274,495
Total Pender County 4,753 $52,524,665
North Carolina 83,119 $1,206,076,029.15
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-10
the power of a hurricane classifies hurricanes according to a sliding scale from 1 to 5 (with
category 5 storms as the most severe). Since hurricanes derive their strength from warm ocean
waters, they generally deteriorate in intensity when they make landfall. The forward momentum
at the time of landfall can range from just a few miles per hour to upwards of 40 miles per
hour. The forward motion, combined with the counterclockwise surface flow make the front
right quadrant of the hurricane the most dangerous in terms of damaging winds and storm
surge. Table 3.4 describes each category of hurricanes, their respective wind speed, the types
of damages to expect, and the storm surge heights associated with each category.
Table 3.4: Hurricanes & the Saffir-Simpson Scale
Source: National Hurricane Center: http://www.nhc.noaa.gov/aboutsshws.php & HurricaneZone.net
http://www.hurricanezone.net/articles/saffirsimpsonscale.html
Category
Wind
Speed
(mph)
Types of Damage Storm Surge
1 74-96
Very dangerous winds will produce some damage:
Well-constructed frame homes could have damage to roof, shingles, vinyl
siding and gutters. Large branches of trees will snap and shallowly rooted
trees may be toppled. Extensive damage to power lines and poles likely
will result in power outages that could last a few to several days.
Storm surge 3 to 5 feet above
normal. Low lying roads
inundated. Minor pier damage.
2 96-110
Extremely dangerous winds will cause extensive damage:
Well-constructed frame homes could sustain major roof and siding
damage. Many shallowly rooted trees will be snapped or uprooted and
block numerous roads. Near-total power loss is expected with outages
that could last from several days to weeks.
Storm surge 6 to 8 feet above
normal. Low lying roads
inundated. Low lying escape
routes cut by rising water two
to four hours before storm’s
arrival. Considerable pier
damage. Marinas flooded.
Evacuation of some shoreline
and low lying areas required.
3 111-129
Devastating damage will occur:
Well-built framed homes may incur major damage or removal of roof
decking and gable ends. Many trees will be snapped or uprooted, blocking
numerous roads. Electricity and water will be unavailable for several days
to weeks after the storm passes.
Storm surge 8 to 12 feet above
normal. Serious flooding at
coast and many smaller
structures near the coast
destroyed. Larger structures
near the coast damaged by
battering waves and floating
debris.
4 130-156
Catastrophic damage will occur:
Well-built framed homes can sustain severe damage with loss of most of
the roof structure and/or some exterior walls. Most trees will be snapped
or uprooted and power poles downed. Fallen trees and power poles will
isolate residential areas. Power outages will last weeks to possibly months.
Most of the area will be uninhabitable for weeks or months.
Storm surge 13 to 18 feet above
normal. Major damage to lower
floors of structures near the
shore due to flooding and
battering by waves and floating
debris. Major beach erosion.
5 157+
Catastrophic damage will occur:
A high percentage of framed homes will be destroyed, with total roof
failure and wall collapse. Fallen trees and power poles will isolate
residential areas. Power outages will last for weeks to possibly months.
Most of the area will be uninhabitable for weeks or months.
Storm surge possibly greater
than 18 feet above normal.
Major damage to lower levels of
all structures less than 15 feet
above mean sea level
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-11
SIGNIFICANT STORM EVENTS
In the past 20 years, Pender County has been impacted by significant hurricane events. In
particular, Hurricanes Floyd and Matthew resulted in catastrophic flooding and property
damage that the County and affected residents are still recovering from.
On September 16, 1999, Hurricane Floyd, a category 2 hurricane, made landfall near
southeastern, North Carolina. On September 15, 1999, federal resources and funds were made
available to support hurricane response efforts in North Carolina under an emergency
declaration issued by President Clinton. Floyd’s torrential rains produced record-breaking
flooding and caused rivers to rise over 20 feet above flood stage. It has been estimated that
over 7,000 homes were destroyed, 56,000 homes were damaged, 17,000 homes were deemed
unlivable, and nearly 87,000 individuals registered for financial assistance from FEMA. This
storm was a 500-year flood event that has been named The Flood of the Century. To date,
Hurricane Floyd remains the single greatest disaster in North Carolina’s history. Some
residents of Pender County, impacted by Floyd, are still in the final stages of mitigation efforts
experienced as a result of the extreme flooding experienced throughout the County.
On October 8, 2016, Pender County experienced catastrophic flooding as a result of Hurricane
Matthew. Over the course of October 8 and October 9, Hurricane Matthew brought more
than 15 inches of rainfall to areas of North Carolina. Governor McCrory requested FEMA
assistance on October 9, 2016, and FEMA declared a major disaster (DR-4285) for 50 North
Carolina counties on October 10, 2016. Preliminary estimates reveal approximately 88,000
homes were damaged and more than 4,400 were completely destroyed throughout the state.
Figures 3.4 and 3.5 depict areas in Pender County that were affected by flooding from
Hurricane Matthew.
Figure 3.4: Flooding in Burgaw Resulting from Hurricane Matthew
Source: Pender County
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-12
Figure 3.5: Flood Waters Resulting from Hurricane Matthew
Source: Pender County
FEMA’s Individual Assistance (IA) and Individuals and Households Program (IHP) help the public
directly following a Presidential disaster declaration by providing financial help or direct services
to those who have necessary expenses and serious needs if unable to provide for themselves. In
North Carolina, nearly 82,000 households applied for help from FEMA. These funds help
individuals, families, and small business owners recover from Hurricane Matthew. As of May 16,
2017, 962 households in Pender County applied for financial assistance from FEMA.
FEMA’s Public Assistance (PA) grant program provides federal assistance to government
organizations and certain private nonprofit (PNP) organizations following a Presidential disaster
declaration. The PA grant program allows communities to promptly respond to and recover
from major disasters. Specifically, grant assistance for debris removal, life-saving emergency
protective measures, and the repair, replacement, or restoration of disaster-damaged publicly-
owned facilities, and the facilities of certain PNP organizations is available through this program.
As of May 12, 2017, Pender County has submitted 10 PA projects.
Much of Pender County received up to 6 inches of rainfall during the two week span of
Hurricane Matthew, while the southwest portion of the County received up to 15 inches of
rainfall. Aside from the increased amount of rainfall, this area is known for severe drainage
issues, and this characteristic led to serious home and small business damages. These drainage
issues can be attributed to the relatively low elevations and the merging of major riverine
systems. Due to drainage issues, southwest Pender County experienced several road closures
from water overtopping, including sections of NC-210, NC-53, and several secondary roads.
The County is particularly active in the Hazard Mitigation Grant Program (HMGP). The
purpose of the HMGP is to help communities implement hazard mitigation measures following
a Presidential Major Disaster Declaration and reduce the risk of loss of life and property from
future disasters. A substantial number of homes and structures located in the Special Flood
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-13
Hazard Area and impacted by storm events have been elevated, relocated, or mitigated through
buyout programs to lessen the impacts of future flood damage in the County.
STORM SURGE AREAS
Since more than 20% of Pender County’s housing units are located within flood zones, certain
areas of the incorporated and unincorporated areas of the County are particularly vulnerable to
storm surges and corresponding erosion, wave action, flooding, high winds, and beach
washover associated with hurricanes. NOAA’s National Hurricane Center defines storm surge
as an abnormal rise of water generated by a storm, over and above the predicted tides. Storm
surge is water pushed toward the shore by the force of winds swirling around the hurricane or
low-pressure meteorological system. The advancing surge combines with the normal tides to
create the hurricane storm tide otherwise known as the storm surge. As a result, the mean
high water line (MHWL) can rise by 15 feet or more. The rise in water level causes severe
flooding in coastal areas, particularly when a storm surge coincides with high tide. Wind and
wave action is then superimposed on this storm surge water level.
The speed and strength of a storm is important in estimating the impact of the storm and can
be determined by the National Oceanic and Atmospheric Administration (NOAA) Sea, Lake,
and Overland Surges from Hurricanes (SLOSH) model. Waves and currents associated with
storm surge may cause extensive damage as water weighs approximately 1,700 pounds per
cubic yard. Periods of prolonged wave action can demolish any structure not specifically
designed to withstand such forces. Table 3.5 displays the acreage of land and percentage of the
County impacted by storm surge for a fast moving hurricane at various storm levels. The areas
subject to storm surges are depicted graphically on Map 3.3: Storm Surge from Hurricanes
(Fast Moving Storm).
Table 3.5: Approximate Impact of Various Storm Levels (Acres Impacted) for Fast Moving Storms
Source: NOAA National Hurricane Center; Cape Fear Council of Governments GIS
Storm Category Countywide Land Impacted
(Acres) Countywide Percentage
1-2 63,737 11.30%
3 83,154 14.75%
4-5 115,280 20.44%
Total 262,171 46.49%
Storm Category Incorporated Land
Impacted (Acres)
Percentage of
Incorporated County
1-2 30,171 5.35%
3 36,644 6.50%
4-5 56,437 10.01%
Total 123,252 21.86%
Storm Category Unincorporated Land
Impacted (Acres)
Percentage of
Unincorporated County
1-2 33,566 5.95%
3 46,510 8.25%
4-5 58,843 10.43%
Total 138,919 24.63%
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-14
In efforts to protect the coast from storm surge related damage, oyster beds and marsh
vegetation can be placed along the living shoreline. Restoring oyster reefs and vegetation
complexity can promote sediment accretion that builds up wetlands and uplands. These
complex substrates and diverse wetland vegetation trap sediments and can lead to eventual
upland expansion.
WATER QUALITY
The relative condition of surface water and its ability to support marine life and recreational
activities is an important contributing factor to quality of life for County residents.
Development has a direct impact on surface water quality as any increase in impervious surface
can increase the amount of runoff that terminates in adjacent waterbodies. Surface waters
should contain a balanced amount of nutrients and have normal fluctuations in salinity and
temperature. They should also have plenty of oxygen and little suspended sediment so that
marine life can breathe and receive enough sunlight to grow. Monitoring changes in North
Carolina’s water quality is important because of the impacts it has on the ecosystem, tourism,
and quality of life. Nationwide, the tourism industry loses close to $1 billion dollars each year,
mainly through losses in fishing and boating activities, as a result of water bodies that have been
affected by nutrient pollution and harmful algal blooms. In 2015, the overall tourism economic
impact in Pender County alone – mostly attributed to coastal recreational tourism supported
by pristine natural habitat and clean waters – exceeded $90 million dollars and resulted in a tax
savings per resident of nearly $200 dollars (Source: NC Department of Commerce).
Data collected by the NC Department of Environment Quality (NCDEQ) helps scientists and
regulatory agencies evaluate changing water quality conditions. Factors affecting water quality
include:
▪ Nutrients: While essential for plants and animals, they can be harmful if there is an
overabundance;
▪ Sediments: Can cloud the water and hamper the growth or even kill aquatic plants;
▪ Water temperature: Changes in normal water temperatures can affect when animals
and plants feed, reproduce and migrate;
▪ Salinity: Changes in salinity can adversely affect a wide range of marine life;
▪ Dissolved oxygen: Is essential for animals living within the water body. Reduced levels
of dissolved oxygen (e.g., due to an algae bloom or eutrophic conditions) can
adversely affect marine life; and
▪ Contaminants and other pollutants: There are a variety of other contaminants and
pollutants that can adversely affect the growth, survival, and reproduction of marine
and benthic organisms.
As a strategy for the management of North Carolina’s waters, the NCDEQ’s Division of Water
Resources (DWR) assigns classifications to all surface water bodies which identifies the
supported uses. See Map 3.4: Surface Water Classifications and Map 3.5: Coastal Surface
Water Classifications & Fish Nursery Areas. The primary classifications are:
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-15
▪ C: Waters protected for uses such as secondary recreation, fishing, wildlife, fish
consumption, aquatic life including propagation, survival and maintenance of
biological integrity, and agriculture. Secondary recreation includes wading, boating,
and other uses involving human body contact with water where such activities take
place in an infrequent, unorganized, or incidental manner.
▪ B: Waters protected for all Class C uses in addition to primary recreation. Primary
recreational activities include swimming, skin diving, water skiing, and similar uses
involving human body contact with water where such activities take place in an
organized manner or on a frequent basis.
▪ SC: All tidal salt waters protected for secondary recreation such as fishing, boating,
and other activities involving minimal skin contact; fish and noncommercial shellfish
consumption; aquatic life propagation and survival; and wildlife.
▪ SB: Tidal salt waters protected for all SC uses in addition to primary recreation.
Primary recreational activities include swimming, skin diving, water skiing, and
similar uses involving human body contact with water where such activities take
place in an organized manner or on a frequent basis.
▪ SA: Tidal salt waters that are used for commercial shellfishing or marketing purposes
and are also protected for all Class SC and Class SB uses. All SA waters are also
High Quality Waters (HQW) by supplemental classification.
Additional supplemental water quality classifications include:
▪ High Quality Waters (HQW): Supplemental classification intended to protect waters
which are rated excellent based on biological and physical/chemical characteristics
through Division monitoring or special studies, primary nursery areas designated by
the Marine Fisheries Commission, and other functional nursery areas designated by
the Marine Fisheries Commission.
▪ Outstanding Resource Waters (ORW): All outstanding resource waters are a subset of
High Quality Waters. This supplemental classification is intended to protect unique
and special waters having excellent water quality and being of exceptional state or
national ecological or recreational significance.
▪ Swamp Waters (SW): Supplemental classification intended to recognize those waters
which have low velocities and other natural characteristics which are different from
adjacent streams.
▪ Nutrient Sensitive Waters (NSW): Supplemental classification intended for waters
needing additional nutrient management due to being subject to excessive growth of
microscopic or macroscopic vegetation.
▪ +: A plus (+) sign identifies waters that are subject to a special management strategy
specified in 15A NCAC 2B .0225, the Outstanding Resource Waters (ORW) rule.
Water quality classifications vary slightly within Pender County. Table 3.6 provides a listing of
water bodies within Pender County that are classified by the NC Division of Environmental
Quality, along with their assigned classifications and water quality issues. Twelve of the water
bodies are currently listed as High Quality Waters (HQWs) and three as Outstanding Resource
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-16
Waters (ORWs). Map 3.4: Surface Water Classifications and Map 3.5: Coastal Surface Water
Classifications and Fish Nursery Areas provide the locations of these water bodies.
Table 3.6: Water Bodies, Classifications, and Water Quality Issues
Source: NC Division of Environmental Quality & Cape Fear Council of Governments GIS
Stream Name Description Class Water Quality Issues
Banks Channel From New Topsail Inlet to Topsail
Sound SA; HQW Shellfish Growing Area-
Prohibited (Fecal, SH, SA)
Batts Mill Creek (Barlow
Creek) From source to Intracoastal Waterway SA; HQW
Shellfish Growing Area-
Conditionally Approved
Closed (Fecal, SH, SA)
Beckys Creek (Bishops
Creek)
From 0.5 miles inland of ICWW to
Intracoastal Waterway SA; HQW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Black River From source to Cape Fear River C; Sw, ORW:+ N/A
Burgaw Creek From Osgood Branch to Northeast
Cape Fear River C; Sw Copper (7 g/l, AL, FW)
Cape Fear River
From raw water supply intake at Federal
Paper Board corporation (Riegelwood)
to Bryant Mill Creek
C; Sw Benthos Fair (Nar, AL,
FW)*
County Line Branch From source to Batts Mill Creek SA; HQW
Shellfish Growing Area-
Conditionally Approved
Closed (Fecal, SH, SA)
Futch Creek From 0.35 miles inland of Intracoastal
Waterway to ICWW SA; HQW Shellfish Growing Area-
Prohibited (Fecal, SH, SA)
Intracoastal Waterway From Morris Landing to the eastern
mouth of Old Topsail Creek SA; ORW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Lillington Creek From source to Northeast Cape Fear
River C; Sw pH (4.3 su, AL, Sw)
Long Creek From source to Cypress Creek C; Sw Benthos Severe (Nar, AL,
FW)*
Mill Creek (Betts Creek) From source to Intracoastal Waterway SA; HQW Shellfish Growing Area-
Prohibited (Fecal, SH, SA)
Mill Pond From source to Holly Shelter Creek C; Sw pH (4.3 su, AL, Sw)
Mullet Run From source to Virginia Creek SA; HQW
Shellfish Growing Area-
Conditionally Approved
Closed (Fecal, SH, SA)
Nixons Creek From source to Intracoastal Waterway SA; HQW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Old Mill creek From source to Intracoastal Waterway SA; HQW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Old Topsail Creek From 0.5 miles inland of Intracoastal
Waterway to ICWW SA; HQW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Topsail Sound Conditional area at Surf City marina SA; HQW
Shellfish Growing Area-
Conditionally Approved
Closed (Fecal, SH, SA)
Topsail Sound and Middle
Sound ORW Area North of ICWW SA; ORW
Shellfish Growing Area-
Conditionally Approved
Open (Fecal, SH, SA)
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-17
Stream Name Description Class Water Quality Issues
Virginia Creek From 0.75 miles inland of ICWW to
Intracoastal Waterway SA; HQW
Shellfish Growing Area-
Conditionally Approved
Closed (Fecal, SH, SA)
*Refer back to page 3-3 for the definition of benthic.
Water Quality Issues Descriptions:
▪ Shellfish Growing Area – Prohibited: Based fecal coliform criteria to protect shellfish
harvesting in Class SA waters. No Sanitary Survey; point source discharges; marinas;
data do not meet criteria for Approved, Conditionally Approved or Restricted
Classification.
▪ Shellfish Growing Area – Conditionally Approve Open: Based fecal coliform criteria to
protect shellfish harvesting in Class SA waters. Sanitary Survey indicates an area can
meet approved area criteria for a reasonable period of time, and the pollutant event is
known and predictable and can be managed by a plan. These areas tend to be open
more frequently than close.
▪ Shellfish Growing Area – Conditionally Approve Closed: Based fecal coliform criteria to
protect shellfish harvesting in Class SA waters. Sanitary Survey indicates an area can
meet approved area criteria for a reasonable period of time, and the pollutant event is
known and predictable and can be managed by a plan. These areas tend to be closed
more frequently than open.
▪ Copper (7 g/l, AL, FW): Numeric water column criteria to protect aquatic life in all NC
fresh waters
▪ Benthos Fair (Nar, AL, FW): Based on narrative criteria to protect aquatic life in fresh
water
▪ pH (4.3 su, AL, Sw): Numeric water column criteria to protect aquatic life in waters with
Swamp supplemental classification
▪ Fecal: presence of fecal coliform
▪ SH: Shellfish harvesting
▪ SA: SA Water Classification
▪ Nar: Narrative Standard
▪ AL: Aquatic life
▪ FW: Fresh water
▪ su: Salinity units
▪ Sw: Swamp waters
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-18
SHELLFISHING
There are a number of waters in and adjacent to coastal Pender County that are closed to
shellfishing. These closures are due primarily to stormwater runoff and other non-point sources
of pollution, both from within Pender County and surrounding counties located within the
watershed. Closed shellfish areas are locations where shellfish harvesting is prohibited by law
due to unsafe levels of pollutants caused by conditions such as wastewater discharge and non-
point source stormwater runoff. Within the proximity of Topsail Island, shellfishing is
prohibited in portions of the Intracoastal Waterway and also in many of the estuaries.
Conditional areas are typically open to shellfishing, but may be closed following a significant
rainfall event because of the resultant runoff. There are also several prohibited shellfishing sites
located in Hampstead. NCDEQ’s Division of Marine Fisheries website provides maps depicting
prohibited shellfishing locations in Pender County.
Figure 3.6 displays a cluster of oysters that continuously filters the surrounding water and
helps enhance water quality. Oyster reefs create important feeding grounds and nursery areas
for many other commercially and recreationally important fish species. Shellfish not only
enhance North Carolina’s waters, but also provide economic impacts such as business revenue
and jobs for contractors, fishermen, and freight workers. In 2016, over 40 million pounds of
shellfish were harvested in North Carolina, valuing at approximately $61.4 million. Of the all
shellfish species, approximately 654,000 pounds of oysters were landed, with an economic value
over $4 million, and nearly 25.5 million pounds of hard, soft, and peeler blue crab were landed,
with an economic value over $24 million. However, oyster landings and blue crab landings were
negatively affected by poor water quality and shellfishing closures following Hurricane Matthew.
Oyster landings decreased by approximately 25.3% and hard blue crabs, soft blue crabs, and
peeler blue crabs experienced a decrease of 20.4%, 25.1%, and 36.9%, respectively (NCDEQ).
Even without the effects of Hurricane Matthew, the oyster fisheries are 15% of what they were
in 2000 (NCWRC).
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-19
Figure 3.6: A Cluster of Oysters Improving the Water Quality of the Surrounding Waters
Source: North Carolina Oyster Blueprint
PRIMARY NURSERY AREAS
Salt marshes and estuaries along the North Carolina coast also serve as nursery grounds for 90
percent of fish species. North Carolina was the first state to protect these fragile ecosystems.
The nursery system in North Carolina contains three categories:
▪ Primary nursery areas;
▪ Secondary nursery areas; and,
▪ Special secondary nursery areas.
Primary nursery areas are found within Topsail Island, Lea-Hutaff Island, Surf City, and southern
sections of both the Cape Fear River and Northeast Cape Fear River. Primary nursery areas
are generally located in the upper portions of creeks and bays. These areas are usually shallow
with soft, muddy bottoms and are surrounded by marshes and wetlands. See Map 3.5: Coastal
Surface Water Classifications & Fish Nursery Areas. Low salinity levels and abundance of food
make these areas ideal for young fish and shellfish. To protect juveniles, many commercial
fishing activities are prohibited in primary nursery areas including the use of trawl nets, seine
nets, dredges, or any mechanical devices used to harvest clams and oysters. Violators face
substantial penalties if these prohibited areas are not taken into consideration. There are
approximately 15,598 acres of primary fish nursery areas within Pender County.
Secondary nursery areas are generally located in the lower portions of creek and bays. Young fish
and shellfish (primarily blue crabs and shrimp) move into these waters as they grow and
develop. Trawling is not allowed in secondary nursery areas either. There are approximately
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-20
119 acres of permanent secondary nursery areas in Pender County, which are located in Mill
Creek (Betts Creek), Virginia Creek, and Old Topsail Creek.
Special secondary nursery areas are located adjacent to secondary nursery areas but are closer to
open waters of sounds and the ocean. When juvenile species are abundant, these waters are
closed to trawling for a majority of the year. There is one special secondary nursery area
located in Pender County. This area is located within the ICWW, from the Topsail Island
Bridge to the Pender County/Onslow County boundary and covers approximately 252 acres.
Each of these three nursery areas are shown on Map 3.5: Coastal Surface Water
Classifications & Fish Nursery Areas.
CAPE FEAR AND WHITE OAK RIVER BASINS
The Cape Fear River Basin is North Carolina’s largest river basin and is one of four river basins
located entirely within the state. The basin originates in Chatham County where the Deep and
Haw Rivers combine, which is below the B. Everett Jordan Dam. The river, streams, and
tributaries drain over 9,000 square miles of land. Prior to 2009, Pender County was completely
within the Cape Fear River Basin, however, the boundary of the basin has been altered to
reflect the natural flow of water, rather than following political boundaries. Currently, the Cape
Fear River Basin is located within the inland areas of Pender County and White Oak River Basin
is located within coastal areas of the County. These river basins are displayed on Map 3.4:
Surface Water Classifications and Map 3.5: Coastal Surface Water Classifications & Fish
Nursery Areas.
LAND USE IMPACTS ON SURFACE WATER QUALITY
Almost all land uses, which are in close proximity and drain to surface water bodies, can have
an effect on water quality. Impervious surfaces such as streets, parking lots, curbs, gutters,
ditches and swales all convey stormwater (non-point source pollution) to local surface waters.
Piped outfalls and drainage systems convey untreated stormwater from existing impervious
surfaces to area surface waters. In order to mitigate these impacts, several coastal communities
in southeastern NC are retrofitting their stormwater outfall pipes and drainage systems to
allow water to convey into the ground – rather than into adjacent surface waters – by
perforating piping systems and installing rain gardens to increase groundwater infiltration. The
NC Coastal Federation is currently working with the Town of Wrightsville Beach on a similar
project. Figure 3.7 shows an example of existing turf areas that have been re-purposed into
garden areas that capture polluted stormwater before it reaches the adjacent recreational
surface waters.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-21
Figure 3.7: An Example of a Rain Garden
Source: United States Environmental Protection Agency
Infill development of individual residential lots also contributes to the untreated volume of
stormwater runoff conveyed to surface waters. While retro-fitting existing stormwater systems
by engineered solutions can be expensive and difficult to apply equitably among existing
development (i.e. having to evaluate what type of pollutant load in the stormwater comes off
different properties and at what volume), there are steps the County can take to inform citizens
of already developed properties how to better contain stormwater runoff on a site by site basis.
Such homeowner practices could include simple steps such as having “rain barrels” at the ends
of roof gutters to collect rain water, or diverting gutter spouts to drain over grass or other
vegetated areas rather than onto driveways or other impervious surfaces. Homeowner
landscaping practices, if applied at a sufficient scale, could have a beneficial impact on the volume
and pollutant load of stormwater runoff entering local surface waters. These Low Impact
Development (LID - a land planning and engineering design approach to manage stormwater
runoff through the use of on-site natural features to protect water quality) practices can be
utilized throughout the County. A customized approach to the use of LID techniques can be
identified as part of a Watershed Restoration Plan. Such a plan would identify appropriate
mitigation measure to reduce runoff volumes as a means to enhance water quality. Funding is
available annually to complete such plans through the NCDEQ.
Fertilizers and pesticides used on the local golf courses may also reach local surface waters if
not properly managed and applied. Land uses along waterfronts which do not have engineered
stormwater retention or vegetated buffers of at least 30 feet can also contribute to surface
water pollution by allowing stormwater runoff to reach surface waters untreated.
PUBLIC WATER SUPPLY AND WELLHEAD PROTECTION AREAS
There is one public water supply watershed in Pender County located along the Cape Fear
River in Southwest Pender County. Within this watershed, the State restricts septic tank
permits to lots that are a minimum of 40,000 square feet (15 NCAC 18C 1211). Map 3.4:
Surface Water Classifications depicts this area. The Safe Drinking Water Act Amendments of
1986 set forth requirements for states to develop Wellhead Protection Programs (WHPPs).
These programs serve as a pollution prevention and management program implemented to
protect underground drinking water sources. Even though WHPPs are not mandatory for
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-22
North Carolina, they are viewed as a valuable supplement to existing state groundwater
protection programs. The Safe Drinking Water Act defines a Wellhead Protection Area as, “the
surface and subsurface area surrounding a water well, or wellfield, supplying a public water
system, through which contaminants are reasonable likely to move toward and reach such
water well or wellfields.” The Towns of Burgaw and Topsail Beach are the only portions of
Pender County that have wellhead protection areas.
NON-COASTAL WETLANDS
Section 404 of the Federal Water Pollution Control Act (“the Clean Water Act”) defines
wetlands as “areas that are inundated or saturated by surface water or ground water at a
frequency and duration sufficient to support, and that under normal circumstances do support,
a prevalence of vegetation adapted to life in saturated soil conditions.”
“Any person, firm, or agency (including Federal, State, and local government agencies) planning
to work in navigable waters of the United States, or discharge (dump, place, deposit) dredged
or fill material in waters of the United States, including wetlands, must first obtain a permit
from the Army Corps of Engineers (USACE).” If an activity requires a USACE ‘404’ permit, the
state of North Carolina requires that a ‘401’ water quality certification be obtained as well. The
‘401’ certification is basically a verification by the State that a given project will not degrade
waters of the State or otherwise violate water quality standards.
Within Pender County, there are 302,976 acres of non-coastal wetlands. The largest type of
non-coastal wetland is pocosin, which makes up approximately 35% of the total non-coastal
wetlands. Pocosins are often referred to as Carolina Bays, which are elliptical depressions in the
land. Managed pinelands are the second largest non-coastal wetland in Pender County, which
make up approximately 25% of the non-coastal wetlands in the area. The remaining types of
non-coastal wetlands and their acreage can be found in Table 3.7. A description of the types of
wetlands found in Pender County is below and can be seen on Map 3.6: Coastal and Non-
Coastal Wetlands.
Bottomland Hardwood/Riverine Swamp Forest – Riverine forested or occasionally
scrub/shrub communities usually occurring in floodplains, that are semi-permanently to
seasonally flooded. In bottomland hardwood systems, typical species include oaks
(overcup, water, laurel, and swamp chestnut), sweet gum, green ash, cottonwoods,
willows, river birch, and occasionally pines. In swamp forest systems, typical species
include cypress, black gum, water tupelo, green ash, and red maple.
Human Impacted Wetlands – Areas of human impact have physically disturbed the
wetland, but the area is still a wetland. Impoundments and some cutovers are included
in this category, as well as other disturbed areas such as power lines.
Depressional Swamp Forest – Very poorly drained non-riverine forested or occasionally
scrub/shrub communities that are semi-permanently or temporarily flooded. Typical
species include cypress, black gum, water tupelo, green ash, and red maple. These are
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-23
distinguished from riverine swamp forests in the data by having a hydrogeomorphic
(hgm) class of flat (f).
Estuarine Shrub/Scrub – Any shrub/scrub vegetation dominated habitat subject to
occasional flooding by tides, including wind tides (whether or not the tidewaters reach
the marshland areas through natural or artificial watercourses).
Hardwood Flat – Poorly drained interstream flats not associated with rivers or
estuaries. Seasonally saturated by a high water table or poor drainage. Species vary
greatly but often include sweet gum and red maple.
Headwater Swamp – Wooded, riverine systems along first order streams. These include
hardwood dominated communities with moist soil most of the year. Channels receive
their water from overland flow and rarely overflow their own banks.
Managed Pineland – Seasonally saturated, managed pine forests occurring on hydric soils.
This wetland category may also contain non-managed pine forests occurring on hydric
soils. Generally these are areas that were not shown on National Wetland Inventory
maps. These areas may or may not be jurisdictional wetlands.
Pine Flat – Palustrine (non-tidal), seasonally saturated pine habitats on hydric (saturated)
soils that may become dry for part of the year, generally on flat or nearly flat areas that
are not associated with a river or stream system. This category does not include
managed pine systems.
Pocosin – Palustrine (non-tidal) scrub/shrub communities (i.e. non-Estuarine
Scrub/Shrub) dominated by evergreen shrubs, often mixed with pond or loblolly pines.
Typically occur on saturated, acid, nutrient poor, sandy or peaty soils; usually removed
from large streams; and subject to periodic burning.
Freshwater Marsh – Herbaceous areas which are flooded for extended periods during
the growing season. Included in this are marshes within lacustrine systems, some
managed impoundments, some Carolina Bays, and non-tidal other non-tidal marshes (i.e.
marshes which do not fall into the Salt/Brackish Marsh category). Typical communities
include species of sedges, millets, rushes and grasses not specified in the coastal wetland
regulations.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-24
Table 3.7: Types of Wetlands in Pender County, NC
Source: US Fish & Wildlife Service National Wetlands Inventory
Types* Acres Percent of
Total
Pocosin 109,572 35.29%
Managed Pineland 76,820 24.74%
Bottomland Hardwood & Riverine Swamp Forest 60,934 19.93%
Pine Flat 33,893 10.92%
Depressional Swamp Forest 9,828 3.17%
Hardwood Flat 8,319 2.68%
Headwater Swamp 1,246 0.40%
Freshwater Marsh 872 0.28%
Estuarine Shrub/Scrub 854 0.27%
Human Impacted 637 0.21%
Salt/Brackish Marsh (Coastal Wetlands) 7,481 2.41%
Total 310,457 100%
*Determination of permit requirements is subject to on-site field visit.
NATURAL HERITAGE NATURAL AREAS
The North Carolina Natural Heritage Program (NCNHP) compiles the NCDEQ’s list of natural
areas as required by the Nature Preserves Act. The NCNHP inventories, catalogues, and
facilitates protection of the rarest and most outstanding elements of the natural diversity of our
state and are given priority ranks that indicate the degree of their importance for conservation.
This includes plants and animals that are rare, or natural communities that merit special
consideration as land use decisions are made. The information generated by this program
supports informed evaluations of the trade-offs between biological diversity and development
projects before plans are finalized. The information also facilitates the establishment of
priorities for protecting North Carolina’s most significant natural heritage areas. Further, it
provides planners, landowners, developers, and other decision-makers with information and
maps to focus incentives to conserve wildlife habitats and corridors.
Pender County contains 40 Natural Heritage Natural Areas (NHNAs), spanning nearly 140,000
acres. Of these 140,000 acres of NHNAs, approximately 27,643 acres are within private lands
and approximately 42,143 acres are within public lands. The remaining 70,214 acres are within
Managed Areas throughout the County. See Table 3.8 and Map 3.7: Natural Heritage Natural
Area Locations for the complete list of Natural Heritage Areas in Pender County. For more
detailed information on the NHNAs, refer to the Natural Heritage Inventory of Pender
County, North Carolina.
There are several natural heritage natural areas of exceptional and very high importance
identified within Pender County. There are 107,908 acres of significant natural areas with
exceptional importance and 22,246 acres of significant natural heritage areas with very high
importance.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-25
Table 3.8: List of Natural Heritage Natural Areas in Pender County, NC
Source: North Carolina Natural Heritage Program
Site Name Acres Percent
Acreage Rating
421 Sand Ridge 5,388 3.88% 1 - Exceptional
Angola Bay 29,105 20.93% 1 – Exceptional
Angola Creek Flatwoods 254 0.18% 2 – Very High
B.W. Wells Savanna 121 0.09% 2 – Very High
Bear Garden 3,928 2.83% 3 – High
Big Colly Swamp 505 0.36% 4 – Moderate
Black River Aquatic Habitat 209 0.15% 6 – Unranked
Black River Cypress Swamp 1,360 0.98% 1 – Exceptional
Blake Savannah 108 0.08% 5 – General
Bryant Mill (Greenbank) Bluff 2 0.002% 1 – Exceptional
Canetuck Loop Road Sandhills 480 0.35% 5 – General
Clarks Landing Coastal Goldenrod Site 677 0.49% 2 – Very High
Colvins Bay 2,224 1.60% 5 – General
Colvins Creek Sand Ridge Mesic Slopes 59 0.04% 2 – Very High
Cones Folly 2,929 2.11% 2 – Very High
Futch and Foy Creeks Natural Area 61 0.04% 5 – General
Holly Shelter Game Land 48,552 34.92% 1 – Exceptional
Lea Island/Hutaffs Beach 4,851 3.49% 2 – Very High
Lower Black River Swamp 10,342 7.44% 2 – Very High
Maple Hill School Road Savannah 34 0.02% 3 – High
McLean Savannah 904 0.65% 1 – Exceptional
Moores Creek Floodplain 162 0.12% 1 – Exceptional
Moores Creek National Battlefield 38 0.03% 2 – Very High
Neils Eddy Landing 0.33 0.0002% 2 – Very High
Northeast Cape Fear River Floodplain 16,645 11.97% 1 – Exceptional
Parkers Savannah 19 0.01% 2 – Very High
Rocky Point Marl Forest 653 0.47% 1 – Exceptional
Rocky Point Sandhills 218 0.16% 2 – Very High
Sandy Run Swamp and Savannahs 785 0.56% 1 – Exceptional
Shaken Creek Savannah 1,262 0.91% 1 - Exceptional
Shaky Bay Sandhills 294 0.21% 2 – Very High
Shelter Swamp Creek Flatwoods 2,668 1.92% 1 – Exceptional
Sidbury Road Savannah 2 0.001% 3 – High
Southwest Ridge Savannah 1,198 0.86% 3 – High
Surf City Maritime Forest 108 0.08% 4 – Moderate
The Neck Savannah 393 0.28% 1 – Exceptional
Topsail Sound Maritime Forests 2,179 1.57% 2 – Very High
Upper Black River Bottomlands 29 0.02% 1 – Exceptional
Watkins Savannah 265 0.19% 2 – Very High
Webbtown Road Savannah 20 0.01% 4 - Moderate
Total 139,028 100%
Note: Natural Heritage Natural Areas include both public and privately owned properties.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-26
AREAS CONTAINING ENDANGERED SPECIES
Endangered species describe plant or animal species in danger of extinction within the
foreseeable future throughout a significant portion of its range. The term “threatened species”
is used when a plant or animal is deemed likely to become endangered within the foreseeable
future throughout all or a significant portion of its range. Areas that contain, or are likely to
contain, endangered species in the Pender County include the dry sand areas of the oceanfront
beach, dunes, and the marshes along the estuarine shoreline, as well as within the Holly Shelter
and Angola Bay Game Lands. Areas adjacent to the Cape Fear River and Northeast Cape Fear
River are also classified as areas containing endangered species. Endangered animals identified
within Pender County include various types of birds, including the Piping plover and the Red-
cockaded woodpecker, and a variety of sea turtles, including the Leatherback sea turtle and
Loggerhead sea turtle. In order to help preserve endangered wildlife, turtle nesting areas are
marked each year in order to protect the nests. It is important to keep in close contact with
state and local agencies charged with protecting endangered species, and sightings of rare and
endangered plants and animals should be reported.
PRIORITY UPLAND HABITATS IN PENDER COUNTY
The North Carolina Wildlife Resources Commission (NCWRC), along with several other
federal and state agencies, conservation organizations, and stakeholders, developed a
comprehensive planning tool to help conserve and enhance the state’s full array of fish and
wildlife species and their habitats. Throughout the development process, the NCWRC worked
with expert biologists to identify fish and wildlife Species of Greatest Conservation Need
(SGCN). A few species that are included in the SGCN category and found in Pender County
are the Atlantic sturgeon, Shortnose sturgeon, West Indian manatee, Diamondback terrapin,
Wilson’s plover, and American oystercatcher.
Aside from the species previously stated, Pender County is home to more than 100 land-living
wildlife Species of Greatest Conservation Needs. Because there is an abundance of
conservation land throughout the County, focus should be placed on conserving Conservation
Need Priority Habitat types that are not protected. The North Carolina Wildlife Action Plan
Conservation Opportunity Areas Tool demonstrates that the highest priority habitats of
Conservation Need, in Pender County, are maritime forests and dry longleaf pine forests that
connect with floodplain and wetland systems. Pender County contains one of the top five places
to conserve unprotected maritime forest blocks and unprotected beaches. The area northeast
of Burgaw and adjacent to the Game Lands is one of the five best places to conserve dry
longleaf pine forest on the coastal plain. These habitats and areas, floodplain forests, and
wetlands should be a focus of resource conservation policies. The remaining priority upland
habitat type in the County is mesic hardwood forest.
The primary habitats of greatest conservation need south of US 17 are upland maritime forests,
coastal wetlands, and estuaries. The Painted bunting depends entirely on the maritime forest
trees and shrubs for breeding on the North Carolina coast. The species requires at least five
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-27
acres of diverse shrub layer to breed. Ten acres is ideal. According to the NCWRC, their
populations have decline by approximately 60% in the last thirty years. As development occurs,
landscaping comprised of wax myrtles and other native coastal shrubs will aid in protecting the
Painted bunting population.
SMOKE AWARENESS AREAS AND MANAGED AREAS
Smoke awareness areas are locations that are most likely to experience smoke from prescribed
burning. These areas are indicated by a half mile buffer around the perimeter of lands managed
with fire. Prescribed burning is used to reduce hazardous fuel buildups, which provides
increased protection to the County’s residents, homes, and natural habitats. This method is
also useful in controlling disease among young pines, improving wildlife habitat, and preserving
endangered plant and animal species. The Florida Forest Service finds that for every one dollar
spent on prescribed burning to prevent wildfires, over two dollars in taxes are saved in reduced
fire emergency response. Most prescribed burns occur on smaller units within larger tracts of
managed lands and are conducted by agencies and organizations to protect communities from
wildfire and to restore managed wildlife habitat. Managed areas are a diverse collection of
properties and easements where conservation of biodiversity and ecosystem function are
among the goals of the land management programs. This collection of conservation areas are
useful when making decisions about conservation, land management, land use planning, and
recreation. There are approximately 155,000 acres of managed areas throughout Pender
County. Prescribed burning is conducted only under conditions that favor maximum vertical
smoke dispersion, thus minimizing any impacts to public safety. The majority of smoke
awareness areas in Pender County are within Holly Shelter Games Land and a half mile outside
of its boundaries. There are several smaller areas in the south and southwestern portion of the
County that are designated smoke awareness areas. See Map 3.8: Smoke Awareness Areas &
Managed Areas.
Since prescribed burning takes place throughout the County, it is important to note and define
the Wildland/Urban Interface (WUI). A WUI is the area where homes and communities meet
undeveloped wildland vegetation. These areas have an increased chance of experiencing
wildfires, which can be dangerous or destructive to lives and property. To reduce the potential
for wildfire damage, firewise landscaping can be implemented to create survivable space by
selecting, placing, and maintaining plants around one’s home to make it less vulnerable to such.
Survivable space is the area extending outward from the home 30 feet or more to serve as a
buffer to slow or stop a wildfire.
BIODIVERSITY AND WILDLIFE HABITAT ASSESSMENT
Biodiversity describes the variation of life forms within a given ecosystem and is used to
measure the health of the ecosystem. Both terrestrial and aquatic ecosystem are made up of
co-dependent communities of organisms and environments that provide important ecosystem
and economic services to the residents and visitors of Pender County. Some key ecosystem
functions include supporting the hydrologic cycle, the cycling of nutrients, filtering pollutants,
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-28
fixing carbon, producing oxygen, supporting plants, animals, and fungal species, pollination and
gene dispersal, and generating soils. The main focus areas for biodiversity and wildlife habitat
are terrestrial and aquatic habitats, landscape function, habitat connectivity, wetlands, and
stream buffers. Habitat connectivity is decreasing across Pender County due to habitat
fragmentation, which occurs when connected natural areas are disjointed by habitat removal,
land use changes and development, and increased infrastructure. When any of these processes
occur, the landscape is bisected into smaller, more isolated habitat resulting in population level
changes to native species. For areas where more development is desired near sensitive habitat
areas, built areas should be placed outside of and at least 350 feet from habitats.
The most important biodiversity areas in Pender County are Angola Bay Game Land, Holly
Shelter Game Land, Topsail Island’s South End, Lea-Hutaff Island, the Black River, the Cape Fear
River, and the Northeast Cape Fear River. See Map 3.9: Biodiversity and Wildlife Habitat
Assessment. The areas in green also correspond with the Natural Heritage Natural Areas, as
shown on Map 3.7: Natural Heritage Natural Area Locations. Figure 3.8 depicts examples of
habitat fragmentation and describes habitat fragmentation in greater detail.
Figure 3.8: Depiction and Description of Habitat Fragmentation
Source: 1000 Friends of Florida, Benjamin Pennington and the NC Wildlife Commission Green Growth Toolbox
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-29
SOIL CHARACTERISTICS
The last detailed soil survey for Pender County was created in 1985 by the Soil Conservation
Service. That report, Soil Survey of Pender County, North Carolina, identifies 43 soil series
located within the County. The soil classifications and suitability can be found in Table 3.9 and
Map 3.10: Septic System Suitability.
Soils series found throughout Pender County include Murville, Croatan, and Bohicket. The
Murville soil series makes up approximately 11% of Pender County’s soils. Murville soils are
nearly level and are on flat or slight depressional areas on Coastal Plain uplands and stream
terraces. They are formed in wet sandy marine or fluvial sediments with less than 2 percent
slopes. Murville soils can be found adjacent to the Game Lands and in the southwestern and
southeastern areas of the County. Murville soils are very limited for small commercial
development and septic tank absorption fields. The Croatan soil series makes up approximately
10% of Pender County’s soils and can be found on the lower and middle Coastal Plain at
elevations above 25 feet. The soils are formed under very poorly drained conditions that
contain herbaceous and woody aquatic plant remains, with a slope range from 0 to 2 percent.
Croatan soils can be found mainly in the Game Lands and a few areas in the southwestern
portion of the County. These soils are also very limited for small commercial development and
septic tank absorption fields.
Rains soil series makes up roughly 8.5% of Pender County’s soils and located in the lower,
middle, and upper coastal plains on flats, depressions, or Carolina bays. In Pender County, Rains
soils can be found in the southwestern and western areas. Tidal marsh soils are Bohicket silty
clay loam, are nearly level, and are very poorly drained. Bohicket soils make up approximately
0.2% of the soils in Pender County and can be found in Scotts Hill, Hampstead, Topsail Beach,
and Surf City. Generally, tidal marsh areas have very limited suitability for development. Soil
scientists with the Natural Resources Conservation Service (NRCS) have developed a list of
soil properties that are known to be important for septic tank filter fields. These soil properties
include depth to water table, depth to bedrock, soil permeability, slope and susceptibility to
downslope movement, and flooding and ponding. Map 3.10: Septic System Suitability depicts
areas that may pose constraints for permitting of septic systems.
Table 3.9: Pender County Soil Characteristics and Suitability
Source: National Resource Conservation Service; Cape Fear Council of Governments
Soil Type Hydric
Soil Acres Percent
Acreage
Small
Commercial
Development
Septic Tank
Absorption
Fields
Composite
Rating
Alpin No 19,001 3.37% Not
Limited
Very
Limited
Somewhat
Limited
Altavista No 887 0.16% Very
Limited
Very
Limited
Very
Limited
Autryville Yes 16,140 2.86% Not
Limited
Somewhat
Limited
Somewhat
Limited
Aycock Yes 1,379 0.24% Not
Limited
Somewhat
Limited
Somewhat
Limited
Aycock Yes 2,600 0.46% Not
Limited
Somewhat
Limited
Somewhat
Limited
Baymeade Yes 10,620 1.88% Not
Limited
Very
Limited
Not
Limited
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-30
Soil Type Hydric
Soil Acres Percent
Acreage
Small
Commercial
Development
Septic Tank
Absorption
Fields
Composite
Rating
Bohicket, tidal No 1,047 0.19% Very
Limited
Very
Limited
Very
Limited
Carteret, tidal Yes 6,446 1.14% Very
Limited
Very
Limited
Very
Limited
Chewacla & Chastain Yes 10,408 1.85% Very
Limited
Very
Limited
Very
Limited
Croatan Yes 57,403 10.18% Very
Limited
Very
Limited
Very
Limited
Dorovan Yes 11,364 2.02% Very
Limited
Very
Limited
Very
Limited
Exum Yes 11,613 2.06% Somewhat
Limited
Very
Limited
Very
Limited
Exum - Urban Yes 764 0.14% Somewhat
Limited
Very
Limited
Very
Limited
Foreston Yes 22,429 3.98% Somewhat
Limited
Very
Limited
Somewhat
Limited
Goldsboro No 29,946 5.31% Somewhat
Limited
Very
Limited
Somewhat
Limited
Grantham Yes 11,107 1.97% Very
Limited
Very
Limited
Very
Limited
Grifton Yes 8,143 1.44% Very
Limited
Very
Limited
Very
Limited
Invershiel/ Pender Yes 1,088 0.19% Very
Limited
Very
Limited
Very
Limited
Johns Yes 3,845 0.68% Very
Limited
Very
Limited
Very
Limited
Kalmia No 771 0.14% Not
Limited
Very
Limited
Somewhat
Limited
Kenansville Yes 2,501 0.44% Not
Limited
Very
Limited
Somewhat
Limited
Kureb Yes 3,579 0.63% Not
Limited
Very
Limited
Somewhat
Limited
Leon Yes 30,360 5.38% Very
Limited
Very
Limited
Very
Limited
Liddell Yes 25,225 4.47% Very
Limited
Very
Limited
Very
Limited
Lumbee Yes 4,271 0.76% Very
Limited
Very
Limited
Very
Limited
Mandarin Yes 4,566 0.81% Somewhat
Limited
Very
Limited
Somewhat
Limited
Marvyn & Craven Yes 6,164 1.09% Very
Limited
Somewhat
Limited
Somewhat
Limited
Meggett No 1,780 0.32% Very
Limited
Very
Limited
Very
Limited
Muckalee Yes 34,493 6.12% Very
Limited
Very
Limited
Very
Limited
Murville Yes 61,322 10.87% Very
Limited
Very
Limited
Very
Limited
Newhan Yes 612 0.11% Very
Limited
Very
Limited
Very
Limited
Corolla Yes 678 0.12% Very
Limited
Very
Limited
Very
Limited
Corolla - Urban Yes 1,232 0.22% Very
Limited
Very
Limited
Very
Limited
Norfolk - 0 to 2% slope No 8,108 1.44% Not
Limited
Somewhat
Limited
Not
Limited
Norfolk - 2 to 6% slope Yes 13,177 2.34% Not
Limited
Very
Limited
Somewhat
Limited
Onslow Yes 3,170 0.56% Somewhat
Limited
Very
Limited
Somewhat
Limited
Pactolus Yes 18,336 3.25% Very
Limited
Very
Limited
Very
Limited
Pantego Yes 6,530 1.16% Very
Limited
Very
Limited
Very
Limited
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-31
Soil Type Hydric
Soil Acres Percent
Acreage
Small
Commercial
Development
Septic Tank
Absorption
Fields
Composite
Rating
Pits, marl No 1,323 0.23% Not
Rated
Not
Rated
Not
Rated
Rains Yes 46,856 8.31% Very
Limited
Very
Limited
Very
Limited
Torhunta Yes 23,087 4.09% Very
Limited
Very
Limited
Very
Limited
Water No 10,520 1.87% Not
Rated
Not
Limited
Not
Rated
Woodington Yes 29,050 5.15% Very
Limited
Very
Limited
Very
Limited
Total 563,938 100%
AGRICULTURAL LANDS ASSESSMENT
Agriculture land is important for economic development and environmental stability of Pender
County. The North Carolina Department of Agriculture and Consumer Services (NCDA&CS)
administer the Agricultural Development and Farmland Preservation Trust Fund (ADFP) to
support the purchase of agricultural conservation easements and transaction costs, fund private
and public enterprise programs that promote profitable and sustainable farms through the
development and implementation of plans for food and fiber products, agritourism activities,
marketing and sales of agricultural products, and fund farmland conservation agreements
targeted at the active production of food, fiber, and other agricultural products. In order to
administer the funds, the ADFP Trust Fund Advisory Board developed an agricultural
assessment tool to help prioritize the preservation of important agricultural lands in North
Carolina. This data and tool is displayed on Map 3.11: Agricultural Lands Assessment &
Voluntary Agricultural Districts.
Figure 3.9: Penderlea Agricultural Land
Source: Pender County
The Overall Agricultural Score is made up of three separate evaluations: Government Policy,
Agribusiness Infrastructure, and Soils. The Overall Agricultural Score is based upon a Tier
system from Tier 1 through Tier V. The points for each respective evaluations are summed and
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-32
parcels in Tier I are considered the highest priority for conservation of working farmland.
Pender County received Overall Agricultural Scores in Tiers II through V. Of the 4,750 parcels
identified in the Agricultural Lands Assessment, approximately 80% are Tier II lands, signifying
the high value of an abundance of farmlands throughout the County. Generally, the Tier II lands
can be found in the northwestern, north eastern, and central portions of the County. Most of
the Tier III lands can be found in the southwestern, and south central portions of the County,
while some can be found intermittently throughout Tier II lands in the northern portion of the
County. Due to minimal Tier IV and Tier V lands, these parcels can be difficult to see on Map
3.11. There are 2 Tier IV parcels which are located southeast of the I-40/NC 210 interchange
in Rocky Point. The 9 Tier V parcels can be found in Hampstead, near County Club Drive,
Sloop Point Road, as well as near Surf City’s Corporate Limits boundary.
VOLUNTARY AGRICULTURAL DISTRICTS
The purpose of the Voluntary Agricultural District (VAD) Program is to encourage and
promote the preservation and protection of farmland from non-farm development. In 2008, the
Pender Soil and Water Conservation District (SWCD) submitted a formal request for the
Pender County Board of Commissioners to instruct the SWCD to begin developing a VAD
Ordinance and an Agricultural Advisory Board to implement the provisions of the ordinance.
The Pender County Board of Commissioners approved the VAD ordinance in December of
2010 and appointed five members to the Agricultural Advisory Board. The Board holds public
hearings on public projects likely to have an impact on agricultural operations, reviews and
approves applications for qualifying farmland, establishes the agricultural districts, and performs
other related tasks or duties assigned by the County. VAD members may be eligible for
farmland preservation funds, present-use tax value assessments, waived water and sewer
assessment, and increased protection from nuisance suits. VADs are primarily located in the
western and central portions of Pender County. Locations of VADs in Pender County can be
seen on Map 3.11: Agricultural Lands Assessment & Voluntary Agricultural Districts.
FARMLAND CLASSIFICATIONS
PRIME FARMLAND
The United States Department of Agriculture’s Natural Resources Conservation Service defines
prime farmland as land with the best physical and chemical composition for producing food,
feed, forage, fiber, and oilseed crops. The land is characteristic of soil quality, growing season,
and moisture supply necessary to produce economically consistent high yields of crops.
Generally, prime farmlands have sufficient and stable water supply from precipitation or
irrigation, acceptable acidity or alkalinity, acceptable salt and sodium content, minimal rocks,
and a favorable temperature and growing season. Pender County contains 72,739 acres of
prime farmland, which are generally found in the western and northwestern portions of the
County. See Table 3.10 for the prime farmland soil types and Map 3.12: Farmland
Classifications for the locations of prime farmland throughout the County.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-33
Table 3.10: Prime Farmland in Pender County, NC
Source: United States Department of Agriculture’s Natural Resources Conservation Service
Prime Farmland Soil Type Acres Percent of Total
Altavista fine sandy loam, 0-3% slopes 887 1.22%
Aycock loam, 0-3% slopes 1,379 1.90%
Aycock loam, 3-6% slopes 2,600 3.57%
Exum loam, 0-2% slopes 11,613 15.97%
Goldsboro fine sandy loam, 0-2% slopes 29,946 41.17%
Invershiel-Pender complex, 0-2% slopes 1,088 1.50%
Kalmia loamy fine sand, 0-2% slopes 771 1.06%
Norfolk loamy fine sand, 0-2% slopes 8,108 11.15%
Norfolk loamy fine sand, 2-6% slopes 13,177 18.12%
Onslow loamy fine sand 3,170 4.36%
Total 72,739 100%
FARMLAND OF STATEWIDE IMPORTANCE
Farmland of statewide importance lands include lands that are characteristic of producing
economically consistent high yields of crops, such as food, feed, fiber, forage, and oil seed crops.
The criteria used to classify farmland of statewide importance is determined by appropriate
state agencies. There are 59,634 acres of farmland of statewide importance within Pender
County, which are generally located in the southeastern, northeastern, central portions of the
County, as well as intermittently among prime farmlands. See Table 3.11 for farmland of
statewide importance soil types and Map 3.12: Farmland Classifications for locations of
farmland of statewide importance.
Table 3.11: Farmland of Statewide Importance in Pender County, NC
Source: United States Department of Agriculture’s Natural Resources Conservation Service
Farmland of Statewide Importance Soil Type Acres Percent of Total
Autryville fine sane, 1-4% slopes 16,140 27.07%
Baymeade fine sand, 1-4% slopes 10,620 17.81%
Foreston loamy fine sane 22,429 37.61%
Kenansville fine sane, 0-4% slopes 2,501 4.19%
Marvyn and Craven soils, 6-12% slopes 6,164 10.34%
Meggett loam 1,780 2.98%
Total 59,634 100%
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-34
SUMMARY
Listed below is a summary of findings for Pender County.
• According to the US Fish and Wildlife Service National Wetlands Inventory,
approximately 55% of land in Pender County has wetland characteristics.
• According to the North Carolina Flood Mapping Program, approximately 20.4% or
6,223 of Pender County’s housing units lie within the Special Flood Hazard Areas.
• Pender County has accounted for more than 5% of the total documented losses
experienced statewide since 1978.
• Hurricane Matthew made landfall in North Carolina on October 8, 2016 and resulted in
approximately 6-15 inches of rainfall in certain areas of the County. As of May 16, 2017,
962 households in Pender County applied for financial assistance from FEMA.
• Of the 20 major water bodies within Pender County, twelve are currently listed as High
Quality Waters (HQW) and three as Outstanding Resource Waters (ORW).
• There are a number of waters in and adjacent to coastal Pender County that are closed
to shellfishing due primarily to stormwater runoff and other non-point sources of
pollution.
• Pender County contains 40 Natural Heritage Natural Areas, spanning nearly 140,000
acres. Of these areas, there are 107,906 acres of significant natural areas with
exceptional importance.
• Endangered animals identified within Pender County include various types of birds,
including the Piping plover and the Red-cockaded woodpecker, and a variety of sea
turtles, including the Leatherback sea turtle and Loggerhead sea turtle.
• Pender County contains approximately 155,000 acres of managed areas and are typically
areas considered for prescribed burning where conservation of biodiversity and
ecosystem function are among the goals of the land management programs.
• Based upon soil characteristics, there may be constraints for permitting septic systems
in Pender County.
• Of the 4,750 parcels identified in the NC Agricultural Lands Assessment, approximately
80% are Tier II lands, signifying the high value of an abundance of farmlands throughout
the County.
• Pender County contains 72,739 acres of prime farmland and 59,634 acres of farmland of
statewide importance.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-35
GOALS, OBJECTIVES, AND POLICIES
INTRODUCTION
The County has established a set of land use and development related policies to act as
guidelines during any official decision making process. These policies and goals reflect the
comments and concerns received during the public involvement process and provide citizens,
property owners, and developers with a predictability of official actions. Goals, policies, and
recommended actions in this chapter relate to natural systems including water quality, natural
hazards, and agricultural lands. Two CAMA management topics are covered in the policy
section herein: Water Quality and Natural Hazard Areas. It should be noted that these topic
areas are developed as part of the Division of Coastal Management’s 7B Land Use Planning
Guidelines.
Please note the following concerning the usage and definition of a Goal, Objective, Policy, and
Recommended Action. Each of these terms are intended for a specific component of the
implementation and utility of this land use plan. See below for more information:
• Goal: A general statement indicating a desired end or the direction the County will
follow to achieve that end.
• Objective: Direction toward the attainment of a particular goal.
• Policy: A statement identifying the County’s position regarding the pursuit of a goal or
objective.
• Recommended Action: A statement outlining a specific course of action the County
may pursue to implement goals and policies. Recommended actions are not used in
review of development proposals, text amendments, and/or rezoning requests.
Refer to Appendix A for Definitions of actions words contained within the policy section.
WATER QUALITY AND NATURAL ENVIRONMENT
Goal 3.1: Maintain, protect and where possible enhance the natural environment and water
quality in all coastal wetlands, rivers, streams, and estuaries.
Objective 3.1: Protect the Water Quality and Natural Environment of Pender
County: The County shall take actions designed to protect and where possible enhance and
restore the water quality and sensitive natural resources located in and adjacent to the
County’s Planning Jurisdiction.
Policy 3.1.A: Surface Water Quality: The County shall continue to protect and
enhance the water quality of the estuarine and riverine system.
Recommended Action 3.1.A.1: Monitor NC DEQ Surface Water
Classifications for any changes that identify a degradation of water bodies. When
a change results in a lower surface water quality designation, the County in
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-36
partnership with applicable agencies or municipalities, will take steps to study
and identify the reason for such change.
Policy 3.1.B: Outstanding Resource Waters: The County shall continue to
enforce the use standards outlined in 15A NCAC 07H .0209 (f) for Outstanding
Resource Waters.
Recommended Action 3.1.B.1: Consider establishing an overlay district for
the CAMA 575 foot Outstanding Resource Waters AEC buffer to encourage
enhanced mitigation of stormwater runoff and preservation of tree canopy.
Policy 3.1.C: Riparian Buffers: The County supports the preservation and/or
installation of vegetated buffers adjacent to all streams, rivers, marshes, and estuarine
waters in the County, with the intent of reducing the flow of nutrients and other
contaminants into area surface waters.
Recommended Action 3.1.C.1: Consider identifying incentives for new
subdivisions whereby riparian buffers are increased in size from the standard 30
foot buffer and identify strategies to limit land disturbance and tree removal
within these areas.
Policy 3.1.D: Stormwater Runoff: The County shall continue to enforce the
stormwater management requirements contained in the UDO.
Recommended Action 3.1.D.1: Explore opportunities to increase the
requirements for stormwater management for all types of development. In doing
so, the County should adopt stormwater regulations to account for fill (including
standalone lots), impervious coverage limits, and the designation of a design
storm year. Such requirements should identify regulations for the construction
phase (i.e. erosion and sedimentation control) and post-construction phase (i.e.
stormwater control).
Recommended Action 3.1.D.2: Consider modifying applicability
requirements for stormwater management that are more stringent than those
outlined by 15A NCAC 02H .1019, whereby 10,000 square feet of impervious
surface or greater than an acre of disturbance triggers stormwater mitigation.
Recommended Action 3.1.D.3: Consider establishing a stormwater/ditch
maintenance program coordinated through the County Public Works
Department and with the NC Department of Transportation.
Recommended Action 3.1.D.4: Consider establishing a percent reduction
goal in overall stormwater runoff volume. For example, the County will reduce
stormwater runoff volumes by 10% by 2025.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-37
Recommended Action 3.1.D.5: Develop a Stormwater Management Master
Plan with a principle focus on reduction of stormwater runoff volumes.
Partnership with regional local governments or agencies may be required.
Policy 3.1.E: Stormwater Discharges from County Sources: Where practicable,
the County shall eliminate stormwater discharges resulting from county activities.
Where elimination is not possible, the County shall mitigate the sources of stormwater
discharges to the maximum extent practicable.
Recommended Action 3.1.E.1: Expand efforts to identify and eliminate
stormwater discharges resulting from County building, facilities, and activities.
For example, downspout disconnection to impervious surfaces and the
installation of rain gardens can substantially reduce stormwater runoff discharges.
Policy 3.1.F: Watershed Restoration: Where practicable, the County shall
encourage protection and enhancement of surface water quality through
implementation of Watershed Restoration Plans. As stated previously, water-based
recreation helps to support the $90 million dollar economic impact of tourism in
Pender County.
Recommended Action 3.1.F.1: Establish partnerships with Pender County
municipalities (if necessary) to develop a Watershed Restoration Plan(s).
Partnership with regional local governments or agencies may be required.
Recommended Action 3.1.F.2: Pursue grant funds to assist in developing a
Watershed Restoration Plan. Pursuant to Section 205(j)/604(b) of the Clean
Water Act, the Division of Water Resources will award grant funds to Regional
Commissions and Councils of Government for to carry out water quality
management and planning projects, including, but not limited to:
• Identifying most cost effective and locally acceptable facility and non-point
source measures to meet and maintain water quality standards;
• Developing an implementation plan to obtain state and local financial and
regulatory commitments to implement measures developed to meet
water quality standards; and
• Determining the nature, extent, and cause of water quality problems in
various areas of the state.
Recommended Action 3.1.F.3: Ensure that the Watershed Restoration Plan
contains the nine minimum elements required to receive EPA Section 319 funds
for implementation of capital improvements projects.
Policy 3.1.G: Water Supply Watersheds: The County shall continue to enforce
the Water Supply Watershed Overlay Districts contained in the UDO.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-38
Policy 3.1.H: Low Impact Development (LID): The County supports Low Impact
Development practices. Such LID practices may include retaining/infiltrating most of the
runoff on-site, maximizing the use of permeable pavements, reducing the amount of
impervious coverage, and clustering housing to allow a profitable development density
while maximizing open space and minimizing wildlife habitat fragmentation.
Recommended Action 3.1.H.1: Explore options for implementing incentives
for developers that utilize low-impact development (LID) techniques to manage
the potential impacts of stormwater runoff.
Recommended Action 3.1.H.2: Consider requiring LID techniques for
development located within the CAMA 575 foot Outstanding Resource Waters
AEC.
Policy 3.1.I: Prime Wildlife Habitats: The County shall continue to protect its
prime wildlife habitats, where possible, by enforcing the CAMA permitting program,
open space requirements, and the Flood Damage Prevention Ordinance.
Recommended Action 3.1.I.1: The County shall consider requiring all
rezoning/conditional zoning petitions to be reviewed in relation to the
Biodiversity/Wildlife Habitat Assessment and the NC Wildlife Resources
Commission Habitat Conservation Recommendations.
Policy 3.1.J: Environmental Planning: The County shall continue to require the
inclusion of environmental features in the development review.
Recommended Action 3.1.J.1: Consider expanding the definition of
“environmental features” to include Areas of Environmental Concern (AECs),
Significant Natural Heritage Areas (SNHAs), Natural Heritage Element
Occurrences (NHEOs), Smoke Awareness Areas, and Prime Farmland soils.
Recommended Action 3.1.J.2: Consider providing the information
referenced in Recommended Action 3.1.K.1 on the County’s GIS website.
Recommended Action 3.1.J.3: Consider developing a green infrastructure
plan that identifies a network of natural lands and open spaces and provides
ecosystem conservation as well as alternative transportation modes through
trails and greenways. Such a plan should guide the preservation of open space for
new development where identified.
Recommended Action 3.1.J.4: Consider establishing a green infrastructure
committee composed of local government staff and natural resource
professionals whose main purpose is to implement the green infrastructure plan
and coordinate natural resources conservation among all local plans, ordinances,
and departments.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-39
Policy 3.1.K: Open Space: The County shall continue to require the designation of
Open Space in accordance with the subdivision of land.
Recommended Action 3.1.K.1: Consider revising the density calculations to
remove preserved open space from the calculation.
Recommended Action 3.1.K.2: Consider including a minimum passive open
space requirement where environmental features are present and remove the
50% maximum designation.
Recommended Action 3.1.K.3: Consider providing specific standards for the
provision of open space to include such things as habitat connectivity and tree
preservation. Habitat connectivity should encourage the dedication of large
contiguous tracts of land, typically 10 acres at a minimum, with a minimum
average width of 500 feet and separation from building activity of at least 350
feet and conservation of natural open space that is at least 300 feet wide
between environmental features will be encouraged to better ensure that wildlife
can travel between core wildlife habitats. Where such cannot be reasonably
provided, a payment in-lieu fee should be provided to the County for the future
dedication of park land that will protect wildlife habitat, while also providing an
amenity for the general public and residents of the subject development.
Recommended Action 3.1.K.4: Consider establishing a ‘Resource
Conservation Incentive District’ located to the south of US 17, in and adjacent
to floodplain forests along streams and rivers and adjacent to and between Game
Lands. South of US 17, maritime forest blocks of five to ten acres should be set-
aside from development and connected to wetlands and forest in the floodplain
where practicable.
Recommended Action 3.1.K.5: In concert with NC Wildlife Resources
Commission, consider evaluating a program to rezone rural areas to a base
density of no greater than one unit per three or more acres. A density of one
unit per three acres has been shown to raise property values in rural areas.
Within these areas consider allowing for a density bonus to conserve at least 50
percent of the site.
Recommended Action 3.1.K.6: Compile a GIS database of all designated
open space and consider providing such on the County’s GIS website or available
through the Planning and Community Development Department.
Policy 3.1.L: Tree Preservation: The County shall continue to require tree
preservation for significant trees.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-40
Recommended Action 3.1.L.1: Consider expanding the applicable
development types – rather than zoning districts – that require tree
preservation.
Recommended Action 3.1.L.2: Consider removing the exemption for tree
surveys/preservation in Special Flood Hazard Area (SFHAs), Areas of
Environmental Concern (AECs), wetland buffers, and stream buffers.
Recommended Action 3.1.L.3: Consider a provision that allows for an
applicant to display a tree protection area without the individual designation of
each tree species and size.
Recommended Action 3.1.L.4: Consider enhancing mitigation for the
removal of significant trees, as defined in the UDO, such that the caliper of trees
removed is equivalent to that replaced.
Policy 3.1.M: Forestry: The County shall continue to support forestry as a means to
maintain prime wildlife habitat areas, provided significant adverse impacts on natural
resource systems are fully mitigated.
Recommended Action 3.1.M.1: Encourage the use of the NC Division of
Forestry, Forestry Best Management Practices Manual to Protect Water Quality.
Policy 3.1.N: Protection of Wetlands: The County shall continue to protect
freshwater wetlands, marshes, and 404 wetlands within its planning jurisdiction in
accordance with applicable laws and regulations.
Policy 3.1.O: Commercial and Recreational Fisheries: The County supports
federal and state projects which increase the productivity of coastal and estuarine
waters. Projects such as dredging to increase flushing along tidal waters, oyster
reseeding programs, and properly constructed artificial reefs will be supported.
Policy 3.1.P: Shellfishing Waters: The County supports and promotes the activities
of the State’s Shellfish Management Program. The County promotes estuarine water
quality through its soil erosion and sedimentation provisions and by supporting the
CAMA permitting regulations.
Policy 3.1.Q: Marsh Damage from Bulkhead Installation: The County
encourages minimizing damage to existing marshes by maintaining the natural living
shoreline instead of bulkhead installation or seawalls where possible.
Recommended Action 3.1.Q.1: Consider providing outreach and education
to homeowners regarding the impacts of failing bulkheads to surface waters and
property damage.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-41
NATURAL HAZARD AREAS
Goal 3.2: Conserve and maintain barrier dunes, beaches, flood plains, coastal wetlands, and
other coastal features for their natural storm protection functions and their natural resources
giving recognition to public health, safety, and welfare issues.
Objective 3.2: Protect Against Damage from Hurricanes, Severe Weather or
Other Hazards: The County shall be proactive in its efforts to minimize damage and threats
to public health and safety associated with hurricanes, severe weather, and other hazards and
work to implement the Southeastern NC Regional Hazard Mitigation Plan (2016).
Policy 3.2.A: Hazard Mitigation Planning: The County supports proactive hazard
mitigation planning. The Comprehensive Land Use Plan and the Hazard Mitigation Plan
should be consistent with one another. The Southeastern NC Regional Hazard Mitigation
Plan policies are formally included as reference herein as part of the policy of the
County’s Comprehensive Land Use Plan.
Policy 3.2.B: Discouragement of Hazardous Development: The County shall
use a variety of methods, including CAMA setback requirements, the Flood Damage
Prevention Ordinance, and the Flood Hazard Overlay to discourage the development of
property that can be reasonably foreseen as potentially hazardous.
Policy 3.2.C: Flood Prone Areas: The County shall permit development in the 100-
year flood zones, provided that all new construction and substantial improvements
comply strictly to the County’s Flood Damage Prevention, which has been adopted in
conjunction with County’s participation in the National Flood Insurance Program.
Policy 3.2.D: Flood Insurance: The County shall take actions necessary to reduce
the cost of flood insurance to property owners by maintaining or improving the
Community Rating System Status (CRS). Note: The County is not a current participant
in CRS.
Recommended Action 3.2.D.1: Consider participating in the Community
Rating System Status (CRS) as a means to reduce flood insurance rates. As part
of this participation, County staff should be continuously trained on the steps
that can be taken to improve the CRS rating.
Policy 3.2.E: Land Acquisition: The County supports the acquisition of property
that is unsuitable for development due to flooding hazards when such acquisition serves
a useful public purpose such as for land preservation, access to public trust areas, or as a
community resource.
Recommended Action 3.2.E.1: Consider establishing a formalized procedure
for evaluating potential land acquisition projects, which also considers wildlife
habitat conservation, prior to such.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-42
Policy 3.2.F: High Winds: The County supports enforcement of the NC State
Building Code. The County shall continue to require construction design standards to
meet the minimum required wind loads.
Policy 3.2.G: Manmade Hazards: Pender County strives to reduce the hazards of
the Henderson Field/Wallace Airport through implementation of its airport minimum
standards ordinance which restricts land uses and building heights in the surrounding
vicinity.
Policy 3.2.H: Minimize Potential Fire Damage: The County supports controlled
burn operations to reduce the risk of damage from wildfires.
Recommended Action 3.2.H.1: Consider establishing an overlay district
within Smoke Awareness Areas and/or the Wildland/Urban Interface zone to
require Firewise Landscaping practices.
Policy 3.2.I: Public Education: The County supports provisions to ensure that the
public is aware of the risks of different types of natural hazards in order to reduce their
personal exposure to natural hazards.
Recommended Action 3.2.I.1: Consider establishing a public education
program designed to help inform the public about their exposure to natural
hazards and actions they can take to mitigate potential damage to public health,
safety, and property from natural disasters. This includes, but is not limited to:
▪ Ensure the local library maintains documents about flood insurance, flood
protection, floodplain management, and natural and beneficial functions of
floodplains. Many documents are available free of charge from the Federal
Emergency Management Agency (FEMA);
▪ Encourage builders, developers, and architects to become familiar with the
NFIP’s land use and building standards;
▪ Provide local real estate agents with handouts advising potential buyers to
investigate potential flood hazards for the property they are considering
purchasing;
▪ Advertise the availability of flood insurance on an annual basis; and,
▪ Post hazard related information on the County’s website and distribute
appropriate educational materials and other social media outlets.
AGRICULTURAL LANDS
Goal 3.3: Ensure that those who depend upon working lands for their living are able to
continue working the land and that prime farmland is preserved where possible (Please note:
additional policies and recommended actions addressing agriculture are included in Chapter 5:
Land Use & Growth Management).
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-43
Objective 3.3: The County shall be proactive in developing policies and recommendations
that allow for the continued operation of working farms and preservation of prime agricultural
lands.
Policy 3.3.A: Voluntary Agricultural Districts: The County shall continue to
support and expand the Voluntary Agricultural District (VAD) program. VAD members
may be eligible for farmland preservation funds, present-use tax value assessments,
waived water and sewer assessments, and increased protection from nuisance suits.
Policy 3.3.B: Present Use Tax Value: The County shall continue to support the
present use tax value program.
Recommended Action 3.3.B.1: Consider partnering with NC State or an
appropriate agency or consultant to prepare a Return on Investment (ROI)
analysis for the various land use types that exist in the County, including
agricultural lands.
Policy 3.3.C: Agricultural Preservation: The County shall continue to support the
preservation of agricultural working lands.
Recommended Action 3.3.C.1: Pursue grant funds available through the NC
Department of Agriculture Development and Farmland Preservation Trust to
complete a farmland preservation plan.
Recommended Action 3.3.C.2: Explore options for the creation of a Prime
Agricultural Land Overlay district to help preserve and protect agricultural lands
for future use.
Recommended Action 3.3.C.3: Consider establishing a guidance manual for
the siting and/or installation of solar panels/farms that will address such things as
incentives, prime farmland soils, land clearing, stormwater management and
decommissioning.
Recommended Action 3.3.C.4: Consider investing in a consumer education
campaign that highlights the benefits of buying local produce, beef, poultry, pork,
and fish. The County should also inform consumers of the locations where they
can purchase these products.
Policy 3.3.D: Cooperative Extension: The County shall continue to support NC
Cooperative Extension efforts in development of alternative crops including promoting
new farm crops, developing alternate farming methods, making effective use of
farmlands; encouraging local restaurants to utilize local crops and supporting farmers’
markets and heritage tourism.
Recommended Action 3.3.D.1: Consider providing resources to help
develop, promote, and support alternative farming methods in identified prime
agricultural areas.
Chapter 3: Natural Systems Analysis Pender 2.0: Comprehensive Land Use Plan
3-44
Policy 3.3.E: USDA Beaver Management Assistance Program: The County shall
continue to support the USDA Beaver Management Assistance Program as a means to
protect and preserve agriculture and forestry.
Recommended Action 3.3.E.1: Consider developing a public outreach
program to educate residents about the potential benefits of the Beaver
Management Assistance Program.
Recommended Action 3.3.E.2: Consider developing a map to identify known
beaver issue areas to assist with targeted outreach for the program.
Surf City
Topsail Beach
Island Creek RoadHoover
RoadCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point Loop RoadHolly Shelter Game Land
AB210
AB210
AB50
£¤17
£¤17
Lea-Hutaff Island Banks ChannelIntracoastal WaterwayOld Topsail Creek Mill Creek(Betts Creek)Nixons Creek
Mullet Run
Virginia Creek Beckys Creek (Bishops Creek)Old Mill
C
r
e
e
k
Batts Mill Creek (Barlow Creek)
County Line Branch
Topsail Sound &Middle Sound ORW AreaIntracoastal WaterwayFutch Cree
k
Factory
R
o
a
d
Wa
s
h
i
n
g
t
o
n
A
c
r
e
s
R
o
a
d
G
r
a
n
d
v
i
e
w
D
r
i
v
e
U
n
i
o
n
B
e
t
h
e
l
R
o
a
d
Sl
o
o
p
P
o
i
n
t
L
o
o
p
R
o
a
d Wat
t
s
L
a
n
d
i
n
g
R
o
a
d
AB210
Mill
C
r
e
e
k
R
o
a
d
AB210
Harrison
C
r
e
e
k
R
o
a
d
Sidb
u
r
y
R
o
a
d
New Hanover County
Onslow County
Atlantic Ocean3.1:Areas of Environmental Concern (AECs)Pender County Boundary
Game Lands
Waterbody
Swamp/Marsh
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Areas of Environmental Concern
Coastal Wetlands
75 Foot Estuarine Shoreline AEC*
575 Foot Estuarine Shoreline AEC (ORWs)
*75 Foot Estuarine Shoreline AECs are found throughout the mainland portions of the County, but the area shown is the primary location of these AECs.
0 0.7 1.4 2.10.35 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverNo
r
t
h
e
a
s
t
C
a
p
e
F
e
a
r
R
i
v
e
r
Cape Fear
River
Onslow County
Black
R
i
v
e
r
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover CountyBrunswick County
Bladen County
Duplin County
Columbus County Atlantic OceanAtlantic OceanMap 3.2: Special Flood Hazard Areas (SFHAs)Pender County Boundary
Game Lands
Waterbody
Swamp/Marsh
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Special Flood Hazard Area (SFHA)
0.2% Annual Chance
AE Zone
VE Zone
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverNortheast Cape Fear RiverCape Fear
River
Black Rive
r
Black Rive
r
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40
Onslow County
New Hanover County
Sampson County
Brunswick County
Bladen County
Columbus County
Duplin County
Atlantic Ocean3.3: Storm Surge from Hurricanes (Fast Moving Storm)Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Storm Surge from Hurricanes (Fast Moving Storm)
Category 1 & 2 Storm
Category 3 Storm
Category 4 & 5 Storm
Onslow County
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Banks ChannelNi
x
o
n
s
C
r
e
e
k
Topsail Sound &Middle Sound ORW AreaOld Topsail Creek Mill Creek(Betts Creek)Futc
h
C
r
e
e
k Batts Mill Creek (Barlow Creek)County Line BranchOld Mill Creek
B
e
c
k
y
s
C
r
e
e
k
(B
i
s
ho
p
s
C
r
e
e
k
)
Vir
g
i
n
i
a
C
r
e
e
k
Mu
l
l
e
t
R
u
n
Northeast Cape Fear RiverBlack River
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40
Intracoastal WaterwayCape Fear River
B
u
r
g
aw
C
r
e
e
k
Long CreekTopsail SoundLillington Creek
Mi
l
l
P
o
n
d
Onslow County
Sampson County
New Hanover County
Bladen County
Brunswick County
Duplin County
Columbus County Atlantic Ocean3 . 4 : S u r f a c e W a t e r C l a s s i f i c a t i o n s
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Watershed
Water Supply Watershed
Surface Water Classifications*
B;Sw
C;Sw
C;Sw,ORW:+
SA;HQW
SA;ORW
SB
WS-IV
Onslow County
See Map 3.5 for more detail
*See Chapter 3 for more information about surface water classification descriptions.Cape Fear River BasinWhite Oak River Basin0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Lea-Hutaff Island
Topsail Beach
Surf City
Topsail Beach
Island Creek RoadHoover
RoadCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Banks ChannelNixons Creek
Topsail Sound &Middle Sound ORW AreaOld Topsail Creek Mill Creek(Betts Creek)Futch Cree
k
Batts Mill Creek (Barlow Creek)
County Line Branch
Old Mill
C
r
e
e
k
Beckys Creek (Bishops Creek)Virginia Creek
Mullet Run
Topsail SoundIntracoastal WaterwayIntracoastal WaterwaySloop Point Loop RoadHolly Shelter Game Land
AB210
AB210
AB50
£¤17
£¤17
Lea-Hutaff IslandCape Fear River BasinWhite Oak River BasinAtlantic OceanNew Hanover County
Onslow County
Atlantic Ocean3.5: Coastal Surface Water Classifications & Fish Nursery Areas*See Chapter 3 for more information about surface water classification descriptions.
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Surface Water Classifications*
C;Sw
SA;HQW
SA;ORW
SB
Fish Nursery Areas
Primary Nursery Areas
Permanent Secondary Nursery Areas
Special Secondary Nursery Areas
0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadCape Fea
r
R
i
v
e
r
Black River
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Duplin County
Bladen County
Brunswick County
Columbus County Atlantic OceanMap 3.6: Coastal and Non-Coastal WetlandsPender County BoundaryMunicipal BoundariesCorporate LimitsExtraterritorial JurisdictionCoastal Wetlands*Coastal WetlandsNon-Coastal Wetlands*Bottomland Hardwood & Riverine Swamp ForestDepressional Swamp ForestEstuarine Shrub/ScrubHardwood FlatHeadwater SwampPine FlatPocosinFreshwater MarshHuman ImpactedManaged Pineland
Onslow County
*See Chapter 3 for descriptions of each wetland type.
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadCape Fea
r
R
i
v
e
r
Black River
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Duplin County
Bladen County
Brunswick County
Columbus County Atlantic OceanMap 3.6A: Coastal and Non-Coastal WetlandsPender County BoundaryMunicipal BoundariesCorporate LimitsExtraterritorial JurisdictionCoastal WetlandsNon-Coastal Wetlands
Onslow County
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadCape Fear
R
i
v
e
r
Black
R
i
v
e
r
Black
R
i
v
e
r ¬«25
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40
¬«17
¬«2
¬«25¬«19 ¬«1
¬«18
¬«5
¬«32
¬«13 ¬«30
¬«15
¬«37
¬«8
¬«34
¬«21
¬«29
¬«12
¬«6
¬«11
¬«27
¬«36
¬«31
¬«39
¬«3
¬«28
¬«22
¬«7
¬«4
¬«9
¬«35
¬«14
¬«16
¬«23
¬«20
¬«38
¬«40
¬«26
¬«33
¬«10
¬«24
Bladen County
Onslow County
Sampson County
Duplin County
Atlantic OceanMap 3.7: Natural Heritage Natural Area LocationsNatural Heritage Natural Areas
1. 421 Sand Ridge
2. Angola Bay
3. Angola Creek Flatwoods
4. B.W. Wells Savanna
5. Bear Garden
6. Big Colly Swamp
7. Black River Aquatic Habitat
8. Black River Cypress Swamp
9. Blake Savanna
10. Bryant Mill (Greenbank) Bluff
11. Canetuck Loop Road Sandhills
12. Clarks Landing Coastal Goldenrod Site
13. Colvins Bay
14. Colvins Creek Sand Ridge Mesic Slopes
15. Cones Folly
16. Futch and Foy Creeks Natural Area
17. Holly Shelter Game Land
18. Lea Island/Hutaffs Beach
19. Lower Black River Swamp
20. Maple Hill School Road Savanna
21. McLean Savanna
22. Moores Creek Floodplain
23. Moores Creek National Battlefield
24. Neils Eddy Landing
25. Northeast Cape Fear River Floodplain
26. Parkers Savanna
27. Rocky Point Marl Forest
28. Rocky Point Sandhills
29. Sandy Run Swamp and Savannas
30. Shaken Creek Savanna
31. Shaky Bay Sandhills
32. Shelter Swamp Creek Flatwoods
33. Sidbury Road Savanna
34. Southwest Ridge Savanna
35. Surf City Maritime Forest
36. The Neck Savanna
37. Topsail Sound Maritime Forests
38. Upper Black River Bottomlands
39. Watkins Savanna
40. Webbtown Road Savanna
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverCape Fea
r
R
i
v
e
r Northea
s
t
Cape
Fea
r
R
iver
Black River
Black Ri
v
e
r
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County Atlantic OceanMap 3.8: Smoke Awareness Areas & Managed AreasCounty Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Managed Areas
Managed Areas
Smoke Awareness Areas*
Smoke Awareness Areas
*Source: North Carolina Natural Heritage Program
Onslow County
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadCape Fe
a
r
R
i
v
e
r Northea
s
t
Cape
Fea
r
R
iver
Northeast Cape Fear RiverBlack River
Black Rive
r
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County Atlantic OceanMap 3.9: Biodiversity and Wildlife Habitat AssessmentCounty Boundary
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Biodiversity & Wildlife Habitat Assessment
9-10 (Maximum - Most Important)
8
7
6
5
2-4
1 (Moderate)
0 (Unrated)
Impervious surface >20%
Onslow County
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverCape Fea
r
R
i
v
e
r Northea
s
t
Cape
Fea
r
R
iver
Black River
Black R
i
v
e
r
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County Atlantic OceanM a p 3 . 1 0 : S e p t i c S y s t e m S u i t a b i l i t y
County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Hydric Soils
Very poorly drained*
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
*May pose constraints to septic systems.
Onslow County
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverCape Fear
R
i
v
e
r Northea
s
t
Cape
Fea
r
R
iver
Black River
Black River
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County Atlantic OceanMap 3.11: Agricultural Lands Assessment & Voluntary Agricultural DistrictsCounty Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Total Agricultural Score
Tier II - Very High Priority
Tier III - High Priority
Tier IV - Moderate Priority
Tier V - Low Priority
Voluntary Agricultural Districts
Voluntary Agricultural Districts
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Onslow County
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadNortheast Cape Fear RiverCape Fea
r
R
i
v
e
r Northea
s
t
Cape
Fea
r
R
iver
Black River
Black Ri
v
e
r
£¤17
£¤17
£¤117
£¤421
£¤117
£¤117
£¤421
£¤117£¤421
AB11
AB210
AB11
AB50
AB11
AB53
AB50
AB11
AB210
AB133
AB210
AB50
AB53
AB53
§¨¦40
§¨¦40 Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County Atlantic OceanM a p 3 . 1 2 : F a r m l a n d C l a s s i f i c a t i o n s
County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Farmland Classifications
Prime Farmland
Farmland of Statewide Importance
0 1.5 3 4.50.75 MilesN
Pender 2.0:Comprehensive Plan
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-1
CHAPTER 4: COMMUNITY FACILITIES AND SERVICES
INTRODUCTION
Community facilities and services are vital to supporting economic development and quality of
life, and are necessary to provide for the continued growth and development facing the County.
The CAMA planning guidelines encourage the coastal communities to evaluate the location and
adequacy of community facilities that protect important environmental factors and that attract
land development in the coastal area. This chapter provides analysis and information pertaining
to each item listed below.
• water supply systems;
• wastewater systems;
• transportation systems;
• recreational opportunities and public access facilities;
• schools; and
• broadband service (internet)
WATER SUPPLY SYSTEM STATUS AND TRENDS
WATER SUPPLY SYSTEM
Throughout Pender County, there are approximately 270 miles of water lines, ranging in size
from 2 to 16 inches, serving customers and residents – 30 miles of which were installed in
2016. See Map 4.1: Water Facilities for the location of these lines. Of these water lines,
approximately 20% are made of ductile iron and approximately 80% are made of Polyvinyl
Chloride (PVC). In 2016, Pender County Utilities served 16,431 customers with centralized
water, with the remaining residents utilizing personal groundwater wells or other providers for
water service. The County has a finished water storage capacity of 3.5 million gallons, which is
available to equalize permanent and seasonal water demands, reduce pressure fluctuations in
the distribution system, and provide reserves for firefighting, power outages, and other
emergencies.
Prior to 2000, the majority of County residents received their drinking water from private
groundwater wells. In 2000, Pender County Utilities began constructing water infrastructure to
provide centralized water service to residents. Initially, the water was sourced from the Town
of Wallace through a series of unused groundwater wells that previously serviced a textile mill.
In 2012, Pender County Utilities finished construction of a 2 million gallon per day (MGD)
permitted capacity water treatment plant on US 421 to allow for treatment of raw water
sourced from the Cape Fear River as part of a purchase agreement with the Lower Cape Fear
Water and Sewer Authority (LCFWSA). The LCFWSA pumps surface water from the King’s
Bluff Reservoir, located up-river from Lock and Dam No. 1 on the Cape Fear River.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-2
In June of 2017, it was made public that the toxin GenX was introduced into the Cape Fear
River. Being that GenX is an unregulated substance, efforts are underway to better understand
the impacts that GenX has on the County’s drinking water and health of residents.
WATER DEMAND
The water supplied by the LCFWSA is treated at the Pender County Water Treatment Plant,
which has a 2 MGD permitted capacity. According to data obtained from the Local Water
Supply Plan (2016), December accounted for the lowest water demand at 0.969 MGD and July,
the greatest, at 1.341 MGD. Water demand is the highest in the summer months, which is
consistent with the influx of seasonal visitors and residents. In addition, irrigation use is typically
higher in the warmer months. It should be noted that water utilized for irrigation purposes is
also considered potable water. Table 4.1 displays County water consumption figures for 2016
and Figure 4.1 depicts the existing water treatment plant.
Table 4.1: Pender County Monthly Water Consumption (2016)
Source: NC Division of Water Resources, Pender County, Cape Fear Council of Governments
Month-Year Average Daily Use (MGD) Percent of Permitted Capacity
Jan-16 1.033 51.65%
Feb-16 1.035 51.75%
Mar-16 1.136 56.80%
Apr-16 1.141 57.05%
May-16 1.165 58.25%
Jun-16 1.307 65.35%
Jul-16 1.341 67.05%
Aug-16 1.284 64.20%
Sep-16 1.208 60.40%
Oct-16 1.193 59.65%
Nov-16 1.117 55.85%
Dec-16 0.969 48.45%
Average 1.161 58.05%
In 2016, the County did not experience any water capacity issues. In fact, for most of the year
there is significant unrealized demand and available capacity. Currently, the County has an
agreement with the Town of Surf City to allow for the purchase 100,000 gallons per day (0.100
MGD) for regular use and the Town of Wallace to purchase 1.200 MGD for emergency use.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-3
Figure 4.1: Pender County Water Treatment Plant
Source: Cape Fear Council of Governments
According to projections outlined in the Local Water Supply Plan, the County should have
sufficient capacity to serve residents and businesses through the year 2060. However, it should
be noted that the population projection outlined in the Local Water Supply Plan is greater
(132,272) than that projected by using the State demographers growth rate in Chapter 2 of the
Land Use Plan (113,346). It can be estimated that with the addition of seasonal visitors, it is
more prudent to plan for more substantial population growth and therefore the higher
population estimate is valid. Despite the difference in population projections, and possible
impact on water demand, the County has ample supply through its primary water source (Cape
Fear River) to allow for an increase in the current purchase agreement if necessary. It should be
noted that the Local Water Supply Plan calls for the purchase of an additional 8 MGD from the
LCFWSA to meet water demand by 2060.
In light of the County’s water supply planning and expansion, water consumption demands
within the County river basins will increase above the interbasin transfer limit of 2 MGD. To
allow for such a transfer, an Interbasin Transfer (IBT) Certificate is required per NCGS 243-
215.22. In March of 2016, the County notified the Environmental Management Commission
(EMC) of its intent to request an IBT Certificate to allow for more substantial water transfers.
Pender County and its co-applicants requested an authorized transfer between designated IBT
river basins, from the Cape Fear River to the South River, Northeast Cape Fear River, and
New River basins of up to an average of 15 MGD. This transfer amount is based on updated
water use projections to year 2060. Table 4.2 provides the County’s projected population and
water demand through 2060.
Table 4.2: Pender County Projected Population and Water Demand (2016-2060)
Source: NC Division of Water Resources – Local Water Supply Plan (2016), NCOSBM, Cape Fear Council of Governments 2016 2020 2030 2040 2050 2060
Year-Round
Customers* 16,431 68,600 86,400 101,800 118,100 132,272
Total Available
Supply (MGD) 6.0 6.0 6.0 14.0 14.0 14.0
Total Demand
(MGD) 1.161 2.035 3.435 5.435 7.753 9.553
Demand as
Percent of Supply 19% 34% 57% 39% 55% 68%
*The Land Use Plan uses the State demographer’s growth rate that results in a lower 2060 population than
provided in the Local Water Supply Plan (2016).
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-4
WASTEWATER SYSTEM STATUS AND TRENDS
PUBLIC WASTEWATER PROVIDER
Pender County currently owns and operates the Rocky Point Sewer Collection System, Maple
Hill Septic Tank Effluent Pump (STEP) System, and the Pender Commerce Park Treatment
Plant. The Rocky Point Sewer Collection System provides non-residential wastewater service
from US 117 to the New Hanover County Line to NC-210, NC-210 from US 117 to Heidi
Trask High School, and NC-133 from US 117 to Little Kelly Road. Wastewater is collected
from this system and sent to the Cape Fear Public Utility Authority (CFPUA) for treatment.
The County has an agreement with CFPUA to allow for the collection of 250,000 gallons per
day (0.25 MGD). Only 8% of the 250,000 gallons per day is currently used. Accordingly, there is
a need to increase flow and customers served by the Rocky Point collection system. In the
future, the County should explore opportunities to provide service to residential development.
The Maple Hill STEP system has a capacity of 42,000 gallons per day (0.042 MGD) and the
service area uses approximately 35.7% of its capacity. This system was installed with grant funds
provided by the Clean Water Management Trust Fund (CWMTF) and the Rural Center for the
purpose of eliminating failing septic systems and straight pipe discharges. The County does not
foresee any capacity issues in this area over the next 10 to 20 years.
Figure 4.2: Construction of Greenhouse, Certified Lab, and Supporting Facilities for the Commerce
Park WWTP
Source: Cape Fear Council of Governments
In June of 2015, Pender County Utilities began construction of a wastewater treatment plant
(WWTP) at the Commerce Park that utilizes an ecological treatment approach that has a
different look, feel, and smell when compared to the typical activated sludge treatment plants.
This cutting-edge facility will treat more water to a higher quality, produce less sludge, and
mitigate odors in a more compact footprint than a typical WWTP. This facility is expected to
be operational by late 2017. The system’s initial design capacity is 0.500 MGD, which will
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-5
accommodate the existing Commerce Park operations. Depending on the build-out of the
commerce park, future plant expansions will be added in 3 to 4 MGD increments, up to 11
MGD. See Map 4.2: Wastewater Service Facilities & Availability for the location of these
facilities.
OTHER WASTEWATER PROVIDERS
Other than the existing Pender County facilities listed previously, and the soon to be
operational Pender Commerce Park WWTP, County residents rely on individual private
wastewater providers for service or on-site septic systems. These wastewater providers and
facilities are listed below:
• Aqua Resources
• Old North State Water Company
• Pluris
• Utilities Inc.
In December 2015, Pluris completed construction of the Pluris Membrane Bioreactor WWTP
to serve the Blake Farm Development along US 17 and Sidbury Road. The WWTP has a
current permitted capacity of 250,000 gallons per day, with a 3 MGD total capacity for the
entire Blake Farm Development footprint and other customers along the US 17 corridor.
However, currently, the system only has 400 customers with a flow of 48,000 gallons per day,
which is less than 20% of the available capacity. See Map 4.2: Wastewater Service Facilities &
Availability for the water service availability from private providers.
Over the past thirty years much discussion has surrounded the need, or lack thereof, to
provide centralized wastewater facilities Countywide. Current demands are met through a
combination of on-site septic systems, public centralized wastewater, and private systems. The
following is an excerpt from the 1987 Pender County Land Use Plan that highlights this ongoing
issue that the County will continue to face:
When citizens were asked about a County sewer system, of the 616 responses, 412 favored a
County sewer system, 112 were not sure, and 92 were against a County sewer system in
rapidly growing areas of the County. Again, because of relatively small population projections
and current low density of development, individual septic tanks should be adequate during the
planning period. However, the County may begin to look at alternative ways to serve the faster
growing areas near the more ecologically sensitive parts of the County.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-6
TRANSPORTATION SYSTEMS
Understanding the relationship between transportation systems and land use planning is vital to
fostering a desirable quality of life for County residents. Planning for where we live, work, and
play, should coincide with the design of transportation networks. In addition, planning that
considers not just the automobile, but also the pedestrian and cyclist, will result in better
quality development and more attractive places to live.
Pender County is a member of the Wilmington Metropolitan Planning Organization (MPO) and
also a member of the Cape Fear Rural Planning Organization (RPO) which includes the counties
of Pender, Brunswick, and Columbus. The Wilmington MPO boundary in Pender County
includes the Scotts Hill and Hampstead areas, follows NC-210 to Montague Road, then follows
Montague Road until the Black River, which travels to the New Hanover County line. The RPO
boundary abuts the MPO boundary and spans across the rest of the County (See Map 4.6 for
more information).
MPOs are responsible for coordinating transportation efforts in urban areas and RPOs are
responsible for non-urban areas. The MPO and the RPO work with the NC Department of
Transportation (NCDOT) in making transportation related decisions for the region. With
citizen input, the MPO and RPO are responsible for developing a transportation priority list to
promote projects and programs with NCDOT and the Federal Highway Administration
(FHWA). In North Carolina, the State assumes the major responsibility for financing and
constructing highways and other primary roads that serve as major transportation corridors.
Furthermore, in County jurisdictions, roadway construction is only financed through private
development or funding through NCDOT.
The County’s location along the coast of North Carolina ensures that a significant amount of
traffic will result from residents and visitors traveling to area beaches. With anticipated
population growth, transportation systems will continue to be an important component in
improving the quality of life for current and future residents. This section summarizes the
existing transportation conditions, adopted plans, and future recommendations for the
County’s vehicular roadway network, pedestrian and bicycle transportation network, and
transit service.
EXISTING CONDITIONS
The roadway network within Pender County – especially along the US 17 corridor – highlights
how rapid economic development and population growth influence the geometry of the existing
roadway facilities. Without proper coordinated planning efforts, increased land use
development can hinder the network’s ability to provide connectivity throughout the area. As
the roadway network developed in the County, existing major roadways became the mode to
move both regional traffic and local traffic, rather than developing a grid network to better
distribute the traffic across the region. The current, non-grid development of the roadway
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-7
system relies on select primary routes and prevents the utilization of alternate routes when
accidents and other types of congestion occur. Thus, the area becomes difficult and frustrating
to navigate safely. Scotts Hill Loop Road, Country Club Road, and Sloop Point Loop Road are
the only roadways that provide connectivity to multiple housing units within the coastal area.
Figure 4.3 shows limited connectivity of the existing transportation network in Hampstead.
Figure 4.3: Existing Transportation Network Along US 17 and Lack of Connectivity
Source: Google Maps
Even though rapid economic development and population growth played a key role in the
development of the existing roadway network in the County, the region’s unique geography has
led to some of the limited connectivity in the transportation network – adjacent land uses are
divided by waterways and environmentally fragile lands. Accordingly, existing and future
roadway connections will face inevitable constraints.
Aside from the congestion and connectivity issues within the County’s jurisdiction, many
roadways built in the past were not constructed to minimum NCDOT roadway standards. As
these roadways degrade from vehicular wear and tear, maintenance and improvements will be
required. However, as they do not satisfy NCDOT roadway standards, NCDOT will not
accept responsibility for the upkeep of these roads and the onus for such falls upon residents
served by the roadway. To help eliminate future problems, County regulations should continue
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-8
to require roads to be built to NCDOT standards. An excerpt from the 1987 Pender County
Land Use Plan follows:
Based on a November 1985 windshield survey of the County, it was apparent that many
subdivisions have been developed over the years using dirt roads that will probably not meet
today’s Department of Transportation road standards. Although this may not be a major
problem now for the County, as these developments continue to have homes developed, many
of these roads may become maintenance problems from additional use. If they were not
originally constructed to State DOT standards or have not been accepted for DOT
maintenance, this could become a major long-range problem for the County. Adoption of
subdivision regulations requiring roads to be built to DOT standards will eliminate this problem
in the future.
In 2004, the County adopted subdivision regulations and as a part of those regulations minimum
roadway design standards were included.
TRAFFIC COUNTS
The annual traffic count used for transportation planning purposes is called the Annual Average
Daily Traffic Count (AADT). The AADT is the number of vehicles passing in both directions
over a single point on a roadway over the course of a year divided by the 365 days in a year.
For example, if 36,000 vehicles pass a single point on the road in a year, the AADT is 98.6
vehicles per day (36,000 / 365 = 98.6). It must be noted that these annual traffic counts are
averages, and certain peak season days may produce traffic counts well in excess of the AADT
count. Seasonal traffic counts are of particular concern in Pender County due to its proximity
to the coastline. In 2008, the NCDOT Traffic Survey Group suspended standalone seasonal
traffic counts. As a result, only AADT counts are available. Peak volumes are included in the
AADT, but are not available separately for comparison purposes.
To evaluate transportation and roadway deficiencies, the AADT counts are typically compared
to a road’s design capacity. Traffic on key segments of various roadways is counted and
calculated and compared to a standard road design capacity based on that roadway’s individual
type. For example, a two-lane roadway has a different design capacity than a roadway that has
two-lanes with a center turn lane.
Table 4.3: Pender County Annual Average Daily Traffic (2006 and 2015) Counts
Source: NCDOT
Roadway Name/Location
2006 Annual
Average
Daily Traffic
2015
Average
Annual
Daily Traffic
Percent Change
(2006-2015)
NC-50 – North of NC-53 1,300 1,600 23.08%
US 17 – South of NC-210 27,000 33,000 22.22%
Shaw Highway – North of NC-210 1,100 1,300 18.18%
US 17/NC-210 33,000 36,000 9.09%
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-9
Roadway Name/Location
2006 Annual
Average
Daily Traffic
2015
Average
Annual
Daily Traffic
Percent Change
(2006-2015)
NC-210 – West of I-40 12,000 13,000 8.33%
US 117 – North of NC-210 12,000 13,000 8.33%
I-40 at NC-210 25,000 26,000 4.00%
NC-53 – East of I-40 5,700 5,800 1.75%
NC-133 – West of US 117 10,000 10,000 0.00%
Penderlea Highway – West of Burgaw 1,900 1,900 0.00%
US 117 – North of Jacksonville Highway 4,100 4,000 -2.44
US 117 – South of NC-210 7,600 7,400 -2.63%
US 421 – North of NC-53 4,200 4,000 -4.76%
US 421 – South of NC-210 6,000 5,700 -5.00%
NC 11-53 – West of US 421 3,500 3,000 -14.29%
NC-210 – East of US 421 2,700 2,300 -14.82%
NC-210 – West of US 17 9,000 7,600 -15.56%
NC-210 – East of I-40 7,400 5,700 -22.97%
NC-11 – East of US 421 1,900 1,400 -26.32%
The highest AADT counts in Pender County are found on US 17/NC-210, US 17 (South of NC-
210) and I-40 at NC-210. Average daily traffic counts on these roadways range from 26,000 to
36,000 vehicles per day. Several of the roads included in Table 4.3 have experienced significant
AADT increases and decreases since 2006. NC-50 experienced the largest AADT percentage
increase (23.08%) followed by US 17 – South of NC-210 (22.22%). The largest AADT
percentage decrease occurred along NC-11 – East of US 421 (-26.32%). See Map 4.3: Traffic
Counts and Map 4.5: Coastal Traffic Counts and Automobile Accidents for more information.
LEVEL OF SERVICE
The relationship of travel demand compared to the roadway capacity determines the level of
service (LOS) of a roadway. Six levels of service identify the range of possible conditions.
Designations range from LOS A, which represents the best operating conditions, to LOS F,
which represents the worst operating conditions. Design requirements for roadways vary
according to the desired capacity and level of service. LOS D indicates “practical capacity” of a
roadway, or the capacity at which the public begins to express dissatisfaction. The six levels of
service are described below. While the description below only addresses the automobile, levels
of service can also be applied to non-motorized transportation as illustrated in Figure 4.4.
• LOS A: Describes primarily free flow conditions. The motorist experiences a high level
of physical and psychological comfort. The effects of minor incidents of breakdown are
easily absorbed. Even at the maximum density, the average spacing between vehicles is
about 528 feet, or 26 car lengths.
• LOS B: Represents reasonably free flow conditions. The ability to maneuver within the
traffic stream is only slightly restricted. The lowest average spacing between vehicles is
about 330 feet, or 18 car lengths.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-10
• LOS C: Provides for stable operations, but flows approach the range in which small
increases will cause substantial deterioration in service. Freedom to maneuver is
noticeably restricted. Minor incidents may still be absorbed, but the local decline in
service will be great. Queues may be expected to form behind any significant blockage.
Minimum average spacing is in the range of 220 feet, or 11 car lengths.
• LOS D: Borders on unstable flow. Density begins to deteriorate somewhat more quickly
with increasing flow. Small increases in flow can cause substantial deterioration in
service. Freedom to maneuver is severely limited, and the driver experiences drastically
reduced comfort levels. Minor incidents can be expected to create substantial queuing.
At the limit, vehicles are spaced at about 165 feet, or 9 car lengths.
• LOS E: Describes operation at capacity. Operations at this level are extremely unstable,
because there are virtually no usable gaps in the traffic stream. Any disruption to the
traffic stream, such as a vehicle entering from a ramp, or changing lanes, requires the
following vehicles to give way to admit the vehicle. This can establish a disruption wave
that propagates through the upstream traffic flow. At capacity, the traffic stream has no
ability to dissipate any disruption. Any incident can be expected to produce a serious
breakdown with extensive queuing. Vehicles are spaced at approximately 6 car lengths,
leaving little room to maneuver.
• LOS F: Describes forced or breakdown flow. Such conditions generally exist within
queues forming behind breakdown points.
Figure 4.4: Example Level of Service Image (non-motorized transportation included for reference)
Source: FDOT
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-11
Based upon available data, currently no roads within Pender County exceed traffic volume
capacity, but many in the southeastern portion of the County face congestion and lower levels
of service. According to a 2016 capacity analysis report prepared for NCDOT, in coordination
with the Hampstead Bypass project, along US 17 from Washington Acres Road to Sloop Point
Road, most signalized intersections operate an acceptable level of service. However, several
intersections experienced a LOS of F during the morning and evening commute times. Those
particular intersections include: NC 210/Dan Owen Drive, Hoover Road, Country Club
Drive/Jenkins Drive, and Vista Lane. According to the report, the most significant morning delay
(51.4 seconds) occurs at the intersection of Country Club Drive/Jenkins Drive, with the most
significant evening delay (30.5 seconds) at NC 210/Dan Owen Drive. The County desires
roadways to function at a LOS D or better. Consideration of the LOS of a particular roadway
will be important in future development approvals which may degrade a segment of roadway or
intersection beyond a LOS D.
During summer months, US 17 congestion is exacerbated due to increased seasonal visitors
traveling to area beaches. Furthermore, if accounting for seasonal increases in population and
traffic, NC-210 east of US 17 may approach or exceed capacity during the summer months. In
fact, seasonal traffic counts were collected by the Cape Fear RPO on NC-210 just west of the
NC-50 intersection. The results indicated a substantial increase in traffic when compared to the
AADT for the location. On Friday, May 26, 2017 (Memorial Day weekend), 17,592 vehicles
were counted, which indicates an increase of roughly 7,000 vehicles (64%) from the 11,000
AADT count. Based upon these increased seasonal counts along NC-210, it can be estimated
that a similar increase occurs along the US-17 corridor. It should be noted that NCDOT
designs roadways for AADT, not peak traffic counts. Figure 4.5 shows an image of a traffic
functioning at a LOS of F along US 17, south of Hampstead on Memorial Day weekend, 2017.
Figure 4.5: Memorial Day Weekend Traffic (2017)
Source: Cape Fear Council of Governments
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-12
AUTOMOBILE ACCIDENT LOCATIONS
From a safety perspective, there are multiple NCDOT High Frequency Crash locations and
Fatal Crash locations within the County. Traffic crashes are often used as indicators for locating
congestion and roadway problems. There have been numerous crashes along US 17 in the
Hampstead/Scotts Hill area, along the entirety of US 117, and along the central segment of US
421. The locations of fatal can be seen on Map 4.4: Automobile Accidents and Map 4.5:
Coastal Traffic Counts and Automobile Accidents.
COMMUTER TRIPS
At present, Pender County’s economy is predominantly comprised of farming, manufacturing
enterprises, and tourism-based services. With limited job availability in the County, a significant
percentage of residents commute outside the County to seek employment. For example, just
9% (973) of people both live and work within the WMPO portion of the County, while 91%
(10,230) of people work elsewhere. Whereas throughout the County as a whole, 37% (8,809)
of the total population works within the County, and 62% (14,443) work outside of the County.
This indicates the strain on the transportation networks within the southeastern part of the
County. A much higher percentage of commuters are located in this area than throughout the
remainder of the County.
With such a large commuting population and further development forecast in the area, it will be
critical to maintain major roadways at relatively uncongested levels. Figure 4.6 displays a
graphic of the number of commuters traveling to work inside and outside of Pender County.
The orange line represents the MPO boundary.
Figure 4.6: Commuter Traffic for Employment – Wilmington MPO Boundary
Source: Pender County Collector Street Plan (2016)
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-13
NON-MOTORIZED TRANSPORTATION
Non-motorized transportation is increasingly desirable nationwide. There are many economic
benefits of a pedestrian and bicycle friendly community (See Figure 4.7). In recent years,
Americans have begun to desire walkability over increased household square footage and now
place a large preference on the ability to walk or bike to destinations. According to a study
conducted by the National Association of Realtors, the presence of sidewalks/ greenways and
places to walk/bike are among the top community characteristics people consider important
when deciding where to live. While non-motorized transportation is often considered a leisure
travel mode, it can also be utilized to travel from point A to B for utilitarian purposes. In the
past, and as indicated by survey results and public input, residents have expressed interest in
expanding options for cycling and pedestrian travel in the County. While the more rural areas
of the County may not be suitable for bicycle and pedestrian facilities, the areas of the County
with a greater housing density and proximity to employment, recreation, or entertainment
opportunities may be ideal for investment of these facilities.
Figure 4.7: Statewide Economic Impact of Non-motorized Transportation
Source: WalkBikeNC
Unincorporated Pender County has
very limited pedestrian and bicycle
facilities, partly because funding for
such is not typically provided outside
of incorporated municipalities, as is the
case in Pender County. The few
existing facilities are mainly confined to
developer-built sidewalks. Several
bicycle and pedestrian facilities are
planned, but not yet constructed.
These include the Mountains-to Sea
Trail, the Coastal Pender Greenway,
the Coastal Pender Rail Trail, the
Central Pender Rail Trail, and the East
Coast Greenway. The exact
alignments for these trails have yet to
be determined. Safety remains an issue
for non-motorized transportation
users as there have been several
bicycle/pedestrian related accidents
over the years. From 2010 to 2014,
there were 60 bicycle and pedestrian
related crashes. Of these crashes, the majority were involving a vehicle and a pedestrian. Eight
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-14
pedestrian related crashes resulted in fatalities. The number of crashes and types of injuries
incurred from 2010 to 2014 are presented in Table 4.4.
Table 4.4: Pender County Bicycle and Pedestrian Crashes (2010-2014)
Source: NCDOT
Pedestrian
Injury
Crash Year
2010 2011 2012 201
3
201
4
Tota
l
Fatal 0 0 2 1 5 8
Disabling Injury 1 0 0 1 2 4
Evident Injury 3 5 3 3 2 16
Possible Injury 2 2 2 4 2 12
No Injury 0 0 3 2 1 6
Unknown Injury 0 0 2 0 0 2
Total 6 7 12 11 12 48
Bicyclist
Injury
Crash Year
2010 2011 2012 201
3
201
4
Tota
l
Disabling Injury 1 0 1 0 1 3
Evident Injury 0 4 2 1 0 7
Possible Injury 1 0 0 0 1 2
Total 2 4 3 1 2 12
TRANSIT SERVICE
Pender Adult Services, Inc. provides transit for seniors (age 65 and up), any person with a
disability, and general public (age 18 or older). Available pick up locations include the Heritage
Place Senior Center (901 S. Walker Street, Burgaw), Topsail Senior Center (20959 US 17,
Hampstead), Cape Fear Community College North Campus (4500 Blue Clay Road, Castle
Hayne), and Wallace Airport-Henderson Field (250 Henderson Field Road, Wallace). This
service provides a vital need for those without a personal vehicle or that may be unable to
drive. The primary use of the service is for traveling to medical care. Pender County has been
exploring opportunities for Park and Ride Facilities at key locations. There are currently no
fixed route transit services available throughout the County. A partnership with Wave Transit
would be necessary to provide these services.
LONG RANGE PLANNING INITIATIVES AND FUTURE IMPROVEMENTS
HAMPSTEAD BYPASS
The North Carolina Department of Transportation (NCDOT) proposes to construct the
proposed Bypass around Hampstead, NC in Pender County. This facility would extend from I-
140 (Wilmington Bypass) in New Hanover County to Sloop Point Loop Road in Pender
County. The project, which is identified as R-3300, is intended to improve traffic flow by
providing an alternative north-south route through the area. The Hampstead Bypass was first
identified in the 1997 Thoroughfare Plan for Pender County as a proposed principal arterial
road that runs parallel to US 17. The Bypass will provide higher speed controlled access within
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-15
the coastal region of the County. Once the principal arterial road is constructed, it is expected
to improve the traffic carrying capacity, as well as improve the safety of the roadway users in
the area. One of the two segments are currently funded, but the entirety of the project still
remains unfunded. After the completion of the Hampstead Bypass, daily traffic volumes are
expected to significantly decrease. A completion date is currently unknown. Figure 4.8 is an
image of the proposed Hampstead Bypass alignment. Figure 4.9 presents the 2010, 2020, and
2040 projected traffic volumes surrounding the area of the bypass.
In addition, as part of a 2016 capacity analysis report for US 17 from Washington Acres Road
to Sloop Point Road, it was indicated that if the Hampstead Bypass were not constructed, by
2040 significant delays would result and the majority of intersections would function at a LOS
of F. For example by 2040, during the average morning commute, the intersection of Country
Club Drive/Jenkins Drive would operate on a 115.7 second delay, with left turning vehicles
exiting Country Club Drive facing a nearly eight minute delay. During the evening commute,
traffic delays would be most significant at the intersection of Washington Acres Road, where
projected congestion would slow traffic by an average of 188.5 seconds. While traffic heading
northbound between Washington Acres Road and NC 210/Dan Owen Drive would be slowed
by five to seven minutes on average. Furthermore, the travel speeds from Washington Acres
Road to Sloop Point Road would vary between 11 and 23 miles per hour – significantly slower
than current peak commute speeds of 35 to 38 miles per hour. Accordingly, completion of the
Hampstead Bypass is among the top public input priorities identified as part of this land use
planning process.
Figure 4.8: Proposed Hampstead Bypass Alignment
Source: Cape Fear Council of Governments and Pender County
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-16
Figure 4.9: Hampstead Bypass Traffic Volume Projections
Source: WMPO
US 17 MEDIAN INSTALLATION (SUPERSTREET) & DAN OWEN DRIVE IMPROVEMENTS
In addition to the Hampstead Bypass, safety and traffic flow improvements are slated to be
constructed along US 17 from Washington Acres Road to north of Sloop Point Road (See
Figure 4.10). This will entail the construction of a median along the majority of this segment of
US 17 to a “superstreet” facility. A "superstreet" has intersections in which the minor cross-
street traffic is prohibited from going straight through or left at a divided highway intersection.
The minor cross street traffic must turn right but can then access a U-turn located in the
median to proceed in the desired direction. Doing this reduces the number of traffic signal
phases required to move traffic through the intersection thereby allowing for longer green
times on the major roadway and thus reducing congestion caused by the signals.
Also included in the US 17 Superstreet project is the extension of Dan Owen Drive and
subsequent connection to Factory Road. Together, both construction improvements will
greatly increase safety and traffic flow along the Hampstead area of US 17. Construction of the
projects are scheduled to begin in 2021.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-17
Figure 4.10: US 17 Median Installation (Superstreet)
Source: NCDOT
PENDER COUNTY COLLECTOR STREET PLAN (2016)
The Wilmington MPO, in partnership with the Pender County Planning and Community
Development Department, commissioned the Pender County Collector Street Plan (2016) to
determine future roadway connectivity demands in the southern portion of the County. The
Collector Street Plan includes three US routes and one NC route that are considered arterial
roads: US 17, US 117, US 421, and NC-210, respectively. Figure 4.11 presents the 2016
Collector Street Plan Area and displays the location of future collector streets.
Figure 4.11: Pender County Recommended Collector Streets
Source: Pender County Collector Street Plan (2016)
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-18
Collector streets are streets that connect neighborhoods and local roads to arterial roads.
Pender County currently has several collector streets, including Scotts Hill Loop Road, Country
Club Drive, Sloop Point Loop Road, NC-133, and Hoover Road. Collector streets are
commonly two lanes, no longer than two or three miles long, and have speed limits between 25
and 45 mph. They function to carry lower volumes of traffic while keeping the traffic congestion
on arterial roads at a minimum. Collector streets are suitable routes for shorter, local trips,
while long-distance trips remain on the arterial streets. Collector streets are also beneficial to
the residents and visitors through providing enhanced mobility opportunities for all users of the
roadway, including emergency service providers, pedestrians, bicyclists, school buses, and
municipal services. It is important to note that Pender County does not own or maintain the
roadways, therefore, the roads are either publicly owned and maintained by NCDOT, or
privately owned and maintained.
The Collector Street Plan also provides requirements for cross-section designs that
accommodate automobiles, cyclists, and pedestrians in the more densely populated areas of the
County. The Collector Street Plan separates the cross-section designs into four groups with
three different design options, all of which were designed based on the most current version of
NCDOT’s Complete Streets Policies. The different design options within each group suggest
improvements to increase bicycle and pedestrian safety and ensure that options are provided
for non-motorized transportation. The Collector Street Plan serves as an important step
toward ensuring that the newly constructed roads maintain appropriate connectivity across the
southern portion of Pender County. More information about the plan can be found on the
Pender County website.
COMPREHENSIVE TRANSPORTATION PLANS
PENDER COUNTY, TOPSAIL AREA, AND WILMINGTON MPO
Comprehensive Transportation Plans (CTP) are based on the projected growth for the planning
area for which it serves. The goal of the plan is to provide a detailed analysis of the County’s
transportation system, including roadway, rail, bicycle, pedestrian, and transit facilities. There is
a chance that actual growth patterns differ from the anticipated growth patterns included in the
CTP. Therefore, it may be necessary to accelerate or delay the implementation of some
recommendations presented in a CTP.
The implementation of the CTP is largely dependent upon the policy boards and citizens of the
County. As statewide transportation demands exceed available funding, it is imperative that the
local planning areas seek funding for projects of highest priority. Once projects are prioritized
at the local level, they are submitted to the MPO or RPO for regional prioritization. Local
governments should consistently use the CTP as a guide for development. To ensure proper
implementation of the recommended projects, local governments and NCDOT must
coordinate on relevant land development reviews. Significant projects included in the Pender
County 2016 CTP, the 2011 Topsail Area CTP, and the MPO CTP are presented in Table 4.5.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-19
The locations of these recommended projects can be seen on Map 4.6: CTP Roadway
Recommendations (2016).
Table 4.5: CTP Roadway Recommendations (2016)
Source: NCDOT Transportation Planning Branch, WMPO
Roadway Description Improvement
US 17 (Hampstead Bypass)
Construct a four-lane freeway from I-
140 to north of Topsail Middle/High
School.
Reduce congestion and improve
mobility in the area.
US 17 Upgrade existing facility to superstreet.
Improve capacity and mobility of the
existing facility with the Strategic
Highway Corridor vision. Improve
the Hurricane Evacuation Route
along the corridor.
US 117 (North of Rocky
Point)
Convert existing 2-3 lane facility from
NC 210 to US 117 Business/Walker
Street to a four-lane divided boulevard.
Reduce congestion and improve
mobility in the area.
US 117 Bypass
Convert the existing 3-lane facility to a
four-lane divided major thoroughfare.
Existing US 117 Bypass is projected to
be over capacity by 2040 from US 117
Business/Walker Street to NC-53.
Reduce congestion and improve
mobility in the area. Construction of
sidewalks on both sides of the
facility.
US 421 from North of NC-
210 to Sampson County Line
Widen to a four-lane divided
expressway to help during hurricane
evacuation.
US 421 is identified as a hurricane
evacuation route and is a vital artery
in moving people and goods through
the state.
NC-210 (East of US 17)
Widen existing facility to a four-lane
divided boulevard from US 17 to Little
Kinston Road. Widen existing facility
to a four-lane divided boulevard from
west bridge end, west of North Topsail
Beach to the Topsail Area CTP
Planning Boundary.
Relieve congestion on the existing
facility. Install curb and gutter and
sidewalks for the entire length of the
segment.
CAPE FEAR REGIONAL BICYCLE PLAN (2017)
The Cape Fear Regional Bicycle Plan aims to identify key bicycling routes and provide
recommendations for new facilities, programs, and policies to increase the options for
recreation-based tourism, affordable personal mobility, and carbon-free transportation.
According to the plan, there are several low-volume rural roadways throughout Pender County
that have potential to provide safe regional bicycle connections without significant investments.
The Cape Fear Regional Bicycle Plan highlights several types of new bicycle infrastructure
opportunities that are suitable for the area. Since the majority of the area is rural and typically
contain long distances between many destinations, the focus of the plan is to route bicyclists to
roadways with low traffic volumes. Ideally, these routes should be located along roadways with
paved shoulders so that limited changes to the existing roadways are required. However, when
this is not possible, bike lanes, shared use paths, shared-lane markings, separate bike lanes, and
signed bike routes are suitable to promote public health and safety. Figure 4.12 shows the
existing and proposed bicycle routes included in the Cape Fear Regional Bicycle Plan.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-20
Figure 4.12: Cape Fear Regional Bicycle Plan (2017)
Source: Cape Fear Regional Bicycle Plan
One of the short-term priority
projects included in the plan is
the Burgaw Osgood Canal
Greenway Link. This project
consists of widening the existing
pedestrian trail between Hayes
Street and South Walk Street,
as well as the section along the
east side of South Walker
Street. Shared-lane markings
will be installed following the
completion to the widening
project. This project will
complete the bicycle
connectivity between the
Osgood Canal Greenway at
Hayes Street and the Osgood
Canal Greenway at Fremont
Street and improve access to
Burgaw Middle School, Cape
Fear Community College,
Rotary Park, Johnson Park,
Wilmington Street Park A & B,
Ashe Street Park, and the
library. Figure 4.13 shows a
variety of bicycle facilities and
includes an image of the shared-lane markings that will be installed during the widening project.
The Cape Fear Regional Bicycle Plan can be found on the Cape Fear Council of Government’s
website.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-21
Figure 4.13: Types of Recommended Bicycle Facilities
Source: Cape Fear Regional Bicycle Plan (2017)
NCDOT STATE TRANSPORTATION IMPROVEMENT PROGRAM (2018-2027)
In 2013, the Strategic Transportation Investments (STI) law created a process to determine
how NCDOT, in partnership with local governments, will fund and prioritize transportation
projects in the state of North Carolina. The STI law allows NCDOT to use its funding more
efficiently and effectively to enhance the state’s infrastructure, while supporting economic
growth, job creation, and a higher quality of life. The STI law also establishes Strategic Mobility
Formula, which is a new way of allocating available revenues based on data-driven scoring and
local input. This formula was used for the first time to develop NCDOT’s current construction
schedule. Under STI, all modes compete for the same funding. This means that roadway
projects compete with ferry projects which will compete with public transportation,
bicycle/pedestrian, aviation, and rail projects.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-22
The Strategic Prioritization Office of Transportation (SPOT) develops quantitative scores for all
projects. Projects are evaluated based on their merit through an analysis of the existing and
future conditions, the benefits the project is expected to provide, the project’s multi-modal
characteristics, and how the project fits in with local priorities. Only the highest scoring
projects are selected to be included in the NCDOT Statewide Transportation Improvement
Program (STIP). The STIP, which identifies the transportation projects that will receive funding
during a 10-year period, is a state and federal requirement. Federal law requires it to be
updated at least every four years. NCDOT, however, updates it every two years. Pender
County has nine projects included in the current Draft STIP (2018-2027). Those projects are
described in Table 4.6 and can be seen on Map 4.7: Draft STIP (2018-2027).
Table 4.6: Pender County State Transportation Improvement Program Projects (2018-2027)
Source: NCDOT Draft STIP (2018-2027)
Roadway Description
US 17 (Hampstead Bypass) Construct freeway on new location from south of Hampstead to north of
Hampstead.
US 17 Convert road from Washington Acres Road (SR-1582) to Sloop Point Loop
Road (SR-1563) to superstreet.
I-40 Mill and resurface from Johnston-Sampson County line to US 117 in Pender
County.
I-40
Pavement rehabilitation from south of US 117 to north of Camp Kirkwood Road
(SR-1318) in Pender County and South of NC-210 in Pender County to the end
of I-40 in New Hanover County.
I-40 Pavement rehabilitation from west of Camp Kirkwood Road (SR-1318) to east of
NC-210.
NC-53 Widen US 117 Bypass to Stag Park Road to three lanes.
US 117 Business (Walker
Street/Wilmington Street) Construct roundabout.
NC-50/NC-210 Replace Bridge 700016 over the Intracoastal Waterway (Surf City Bridge).
Henderson Field (Wallace
Airport) Expand apron and extend runway to 5,500 feet.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-23
RECREATIONAL OPPORTUNITIES & PUBLIC ACCESS FACILITIES
According to the Coastal Area Management Act (CAMA), public facilities are considered a key
component of a community’s infrastructure. This section of the Land Use Plan inventories
public access facilities and available recreation facilities that residents and visitors can utilize.
Parks, recreation, and public access facilities are important to a community’s economic and
social well-being and also promote a healthy lifestyle. Parks provide an opportunity for stress
relief, exercise, social interaction, and offer a gathering place for families and friends.
Communities with adequate parks and recreation opportunities are generally highly sought after
by residents and attract future residents as a more desirable location for development of
homes, neighborhoods, businesses, and industry. Aside from the parks that the County
provides, there are several public access sites that allow for residents and visitors to embrace
the natural scenery and water-based recreational opportunities of the Northeast Cape Fear
River, Intracoastal Waterway, and the Atlantic Ocean.
According to analyses conducted by the NC Division of Parks and Recreation, Pender County
is significantly deficient in public recreational acreage and facilities. The 2015-2020 North
Carolina Statewide Comprehensive Outdoor Recreation Plan (SCORP) indicates that Pender
County ranks 78th out of the 100 North Carolina counties in residents per park acre, including
99th in playgrounds, 100th in athletic fields, 100th in athletic courts, 94th in picnic shelters, and
89th in residents per trail mile. These deficiencies are further reflected in the Regional Growth
Management Plan prepared by North Carolina’s Eastern Region Military Growth Task Force,
which indicates that an additional 8-10 acres of neighborhood parks, 13 acres of community
parks, and 25-127 acres of district parks are needed just to address the park acreage needed to
support the projected military-induced growth in Pender County. However, it should be noted
that recreational opportunities such as access to the Holly Shelter game lands and the
beach/sound are not included in the state or military analysis.
PARKS AND RECREATION
Pender County owns and operates three public parks – Pender Memorial Park, Hampstead
Kiwanis Park, and Millers Pond Park. Pender Memorial Park was first developed for fairground
use and then as the site of the athletic fields for the former Burgaw High School. In 2006, the
County was awarded a $280,000 PARTF grant that was utilized to develop two additional youth
baseball/softball fields, three batting cages, three multi-purpose soccer/football fields, a new
concession stand and bathroom, a playground, parking lot, and a picnic shelter. The County is
currently exploring options for the expansion of the existing facilities at the park. Figure 4.14
displays an image of playground equipment at Pender Memorial Park.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-24
Figure 4.14: Pender Memorial Park
Source: Cape Fear Council of Governments
The property that Hampstead Kiwanis Park was built on was originally donated to the
Hampstead Kiwanis Club by the Tommie Little and Bill Clark Families for the creation of a park
to serve the greater Hampstead community. Since then, Hampstead Kiwanis Club and Pender
County have worked together to develop and maintain the park. In 2002, the County received
a $250,000 PARTF grant, and used the $150,000 from private donations to construct a baseball
field, a multi-purpose field, a concession stand and bathroom, a playground, and a picnic shelter.
In 2004, the County was awarded an addition $395,000 as part of another PARTF grant to
construct two additional youth baseball/softball fields, one multi-purpose field, a paved walking
trail, and an additional parking lot. Figure 4.15 shows an image of the existing facilities at
Kiwanis Park.
Figure 4.15: Hampstead Kiwanis Park
Source: Cape Fear Council of Governments
Millers Pond Park is situated on a 31.38 acre site that was used by the NCDOT as a source of
fill dirt for a transportation improvement project. The mining of the fill resulted in the seven
acre freshwater pond. NCDOT eventually sold the property to Pender County. The park has a
parking area, 0.53 mile long nature trail, a pond overlook, bench seating, picnic shelters, a canoe
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-25
and small boat launch area, restrooms, a nature and education center, and informational kiosks.
Figure 4.16 displays an image of the seven acre freshwater pond.
Figure 4.16: Millers Pond Park
Source: Cape Fear Council of Governments
Beginning in 2013, Pender County and the N.C. Wildlife Resources Commission partnered
together to construct the Holly Shelter Shooting Range. Construction was completed in late
October of 2016 and the facility was open for operation in early November of 2016. The
shooting range includes a 200-yard rifle range with 12 shooting stations, a 50-yard pistol range
with 12 shooting stations, a target archery range, and a 3-D archery course with 20 stations. To
help cover the costs associated with operating the range, Pender County collects fees for a
daily pass. The County also provides staffing for the Holly Shelter Shooting Range. Figure 4.17
shows an image of the 50-yard pistol range. The location of three parks, as well as the other
private, municipal, state, and federally owned recreation facilities can be seen on Map 4.8:
Parks and Recreational Opportunities and Map 4.9: Coastal Parks and Recreational Facilities.
Figure 4.17: Holly Shelter Shooting Range
Source: Cape Fear Council of Governments
The County currently has five N.C. Wildlife Resources Commission (NCWRC) public boat
access sites, four of which are in unincorporated areas of the County. The fifth is located at
Soundside Park in Surf City. These sites provide boat launches and parking facilities. Two of the
sites are located off of Shaw Highway, along the Northeast Cape Fear River. The third is
located at the end of Whitestocking Road, which is also along the Northeast Cape Fear River.
The fourth public access is located in Hampstead, at the end of Lewis Road. This facility allows
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-26
the public to launch their boat into the Intracoastal Waterway. The locations of these public
water access sites can be seen on Map 4.10: Community Facilities and Map 4.11: Coastal
Community Facilities.
Other than these five NCWRC public boat access sites, there are 51 CAMA public access sites
along Topsail Island (22 miles long), which provide access to the sound and beach. This equates
to roughly one public access site every 0.43 miles. These locations are not shown on Map
4.10, but can be found on the NCWRC website. It is important to note that there are no
CAMA public access sites in unincorporated Pender County.
SCHOOLS
Parents typically consider the quality of schools in the area when deciding where to buy a
home. School systems can better plan for the need and location of new schools if they are kept
up to date on population growth, especially with regards to proposed residential developments.
If the school systems are involved in the new development review process, then they may be
able to identify needed sites for new schools within these areas. Sometimes school systems
negotiate with property owners to purchase land which exceeds their needs. If other local
governments are advised of the potential availability of land on or near a school site, they may
be able to satisfy some of their need for community facilities, such as parks and libraries.
Currently, the County does not require the reservation of school sites as part of the
development approval process.
Figure 4.18: South Topsail Elementary School
Source: Pender County
During the early 1980s, the Pender County School system
actually lost enrollment. However, just 5 years later, rapid
growth and an increasing birth rate pushed student enrollment
up by over 700 to nearly 5,000 students. Beginning in the
1990s, Pender County experienced rapid population growth
that has placed a severe strain on the County’s public school
system capacity, especially as the residential composition
shifted from a significant number of retirees to an increased number of families with school-age
children. In 1996, voters approved a $25 million school bond and in 2005 approved a $52
million bond to address crowded conditions of the existing schools. Capital budgets were set to
build new schools and complete much needed renovations to others:
• Two new elementary schools, North Topsail and South Topsail, were built in the
Hampstead community as the first two projects under the bond referendum and a
state grant.
• Two new elementary schools were built in Rocky Point. They were intended to
alleviate crowded conditions at Malpass Corner Elementary and Rocky Point
Elementary.
• A new middle school will house students for West Pender Middle and Burgaw
Middle Schools.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-27
• A new Topsail High School and Trask High School were built to relieve crowding of
the existing high schools in the County.
According to a report prepared by the Operations Research and Education Laboratory (ORED)
of NC State, over the past five years, the average annual growth rate in the Pender County
school system has been 2.58% or about 220 students per year. This increase of 3.83% is the
largest annual increase in the district’s student membership since 2006. The gain of 341 K-12
students from 2015-16 to 2016-17 was more than 50% greater than the average growth rate
over the past 5 years. As a result, the County school system continues to deal with capacity
issues.
Again, in 2014, Pender County Schools received a $75 million school bond to address the
population growth and increase academic opportunities. The school system is currently in the
process of completing renovations/additions to Cape Fear Elementary, Cape Fear Middle,
Burgaw Middle, West Pender Middle, and Pender High. The district is also constructing a new
elementary and middle school with a 1,568 student capacity in the Surf City area, as well as a
replacement school at Penderlea.
As of 2017, the County school system has 9,499 students enrolled and Table 4.7 indicates that
all of the schools in the eastern portion of the County are over capacity by at least 95%, from
2016-2027. As specified in the ORED report prepared for the school system, every school
located in the eastern area is projected to be over capacity at the start of the 2017-2018 school
year. It should be noted that the projections included in the Table 4.7 do not include the
added capacity for the new schools. The Surf City Elementary and Middle School is projected to
add capacity for 1,568 students – 750 for the elementary and 818 for the middle schools.
Accordingly, this will alleviate some overcapacity issues experienced in North Topsail
Elementary, Topsail Elementary, and Topsail Middle School.
Based on projections in the report, no schools located in the northern portion of the County
are anticipated to exceed capacity over the next ten years. Several schools in the southern area
of the County are projected to meet or exceed capacity beginning in the 2020-2021 school
year. Moving forward, partnership with the School System and the County Planning and
Community Development will be paramount to ensuring the proper allocation of resources and
capital.
The locations of the new schools can be seen on Map 4.10 Community Facilities and Map
4.11 Coastal Community Facilities.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-28
Table 4.7: Pender County Schools Capacity Projections (2016 – 2027)
Source: Pender County Schools (Red cells are greater than 105% capacity; orange 100-105%; yellow 95-100%; green less than 95%)
Area Capacity Pre-K Month-
1 Forecasted Month-1 (Average Daily Membership)
‘16-‘17 ‘16-‘17 ‘16-‘17 ‘17-‘18 ‘18-‘19 ‘19-‘20 ‘20-‘21 ‘21-‘22 ‘22-‘23 ‘23-‘24 ‘24-‘25 ‘25-‘26 ‘26-‘27
Northern Area
Burgaw
Elementary 683 36 577 591 588 602 594 592 586 595 609 615 627
Malpass Corner
Elementary 667 36 471 481 474 470 477 491 495 502 514 519 529
Penderlea
Elementary 532 499 474 459 440 419 400 386 379 372 372 379
Burgaw Middle 322 254 252 277 289 315 321 332 323 316 327 331
Pender High 795 36 635 635 609 599 590 610 638 653 658 647 638
Totals 2,999 108 2,436 2,443 2,407 2,400 2,395 2,414 2,437 2,453 2,469 2,480 2,504
Southern Area
Cape Fear
Elementary 516 479 516 529 536 560 572 603 580 630 668 710
Rocky Point
Elementary 484 80 187 483 472 483 506 549 603 644 685 719 756
Cape Fear Middle 483 484 492 524 530 484 482 446 529 535 601 576
West Pender
Middle 307 167 160 183 194 198 185 180 184 190 192 195
Heide Trask High 815 764 808 807 810 821 834 875 876 881 858 905
Totals 2,605 80 2,381 2,459 2,514 2,552 2,570 2,622 2,707 2,814 2,921 3,038 3,142
Eastern Area
North Topsail
Elementary 511 39 780 841 858 873 907 927 915 922 938 939 947
South Topsail
Elementary 512 676 721 759 787 799 841 829 847 871 880 897
Topsail
Elementary 506 581 609 614 633 662 701 705 715 731 739 754
Topsail Middle 745 1,038 1,051 1,095 1,151 1,206 1,261 1,349 1,394 1,460 1,461 1,485
Topsail High 1,400 1,395 1,472 1,492 1,513 1,486 1,492 1,588 1,663 1,729 1,870 1,921
Totals 3,674 39 4,470 4,694 4,818 4,957 5,060 5,223 5,386 5,541 5,729 5,889 6,004
Special/Alternative
Pender Early
College 212 225 225 225 225 225 225 225 225 225 225
System Total 9,278 227 9,499 9,821 9,963 10,134 10,249 10,484 10,754 11,033 11,344 11,632 11,875
SCHOOL TRAFFIC
Recently, the public has expressed concerns regarding traffic management and site planning at
the County’s schools. As high school students reach driving age, there will be a greater number
of students driving, while the number of elementary students being driven to school by parents
is also increasing. The majority of the school facilities were not designed to address the current
vehicular traffic volumes and turning movements found within the areas surrounding the
County’s schools. Traffic delay and motor vehicle safety are a constant concern of the residents
of the County.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-29
BROADBAND INTERNET
Access to broadband internet access is vital in Pender County because it allows for increased
opportunities for education, public safety, healthcare, government services, and economic
development. The benefits of increased broadband internet coverage include increased business
opportunities and entrepreneurialism. Expanding coverage allows for increased opportunity and
efficiency for businesses and citizens. Residents needing medical assistance are more easily
connected to their physicians. Broadband internet allows employees to work from home and
provides flexibility for businesses. And finally, residents have more opportunities to connect
with each other and be involved within the community. Broadband internet has become a
necessary utility in the same way people view water, electricity, and television access.
Broadband internet services in Pender County range in availability as they do throughout the
state of North Carolina. Similarly, the divide occurs between the rural and urban areas of the
County population. Many areas in the County receive acceptable broadband internet access.
Those areas include the more urban areas of Pender County along US17. Other areas such as
Rocky Point also have access to these services.
However, many areas in Pender County are underserved or do not have access to broadband
internet services at all. Those areas mostly include the northern and western portions of the
County. Areas such as Currie, Atkinson, Penderlea, and Maple Hill have provided feedback
regarding their desire for increased broadband internet services. Efforts to increase broadband
availability throughout the County should be pursued based on the current evaluation of
coverage and facilities.
Recent efforts to expand broadband coverage in Pender County include partnering with
COMSPECO to solicit responses from citizens throughout County to determine service
availability and potential areas of improvement. The responses were used to develop a potential
service map. The County also mapped existing wireless and water towers that could be utilized
to provide service in areas of need. These assets were identified and compared to the survey
responses. Meetings were held with internet service providers (ISPs) to coordinate service in
the identified areas of need. COMSPECO entered into a contract with the County to utilize
Maple Hill’s water tank to provide wireless internet service to the nearby area, including the
wastewater treatment plant, Maple Hill Recreation Center, and local Fire/EMS stations.
Additional efforts are underway to coordinate with Four County EMC to provide fiber
broadband service to Pender County Schools, which could provide opportunity for future
connections to nearby homes and businesses.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-30
SUMMARY
Listed below is a summary of the analysis and information included in this chapter:
• According to projections in the Local Water Supply Plan (2016), the County should
have sufficient capacity to serve residents and businesses through the year 2060.
• The County owns and operates three Wastewater systems: Rocky Point Sewer
Collection System (250,000 gallon per day permitted capacity), Maple Hill STEP
System (42,000 gallons per day permitted capacity), and soon to be operational
Pender Commerce Park Treatment Plant (500,000 gallons per day permitted
capacity). None of these systems are currently at or near capacity.
• Other than the existing Pender County facilities, County residents rely on private
wastewater providers for service or on-site septic systems.
• The existing transportation network within the County currently limits the amount
of connectivity and ease of access for local, short-length trips.
• The highest Annual Average Daily Traffic (AADT) counts are found on US 17/NC-
210 (36,000), US 17 – South of NC-210 (33,000), and I-40 at NC-210 (26,000).
• Based upon available data, currently no roadways exceed traffic volume capacity, but
US 17 and NC-210 likely exceed capacity during summer months.
• The County has been exploring opportunities for Park and Ride Facilities at key
locations. There are currently no fixed route transit services available in the County.
• Only 9% of residents both live and work within the WMPO boundary, while the
remaining 91% commute outside of the County for employment.
• Unincorporated Pender County has very limited pedestrian and bicycle facilities.
Safety remains an issue for non-motorized transportation users as there have been
60 bicycle/pedestrian crashed from 2010-2014. Eight of which resulted in fatalities.
• The Hampstead Bypass has been proposed and is expected to improve the traffic
carrying capacity and increase safety along US 17. One of the two proposed
segments is currently funded.
• According to the NC Division of Parks and Recreation, Pender County ranks 78th
out of the 100 North Carolina counties in residents per park area, including 99th in
playgrounds, 100th in athletic fields, 100th in athletic courts, 94th in picnic shelters, and
89th in residents per trail mile.
• Pender County owns and operates three public parks: Pender Memorial Park,
Hampstead Kiwanis Park, and Millers Pond Park. The County partners with the
NCWRC to operate the Holly Shelter Shooting Range, which opened in early
November of 2016.
• Unincorporated areas of the County have four NCWRC public boat access facilities.
Only one is an Intracoastal Waterway public boat access facility.
• Many areas in Pender County are underserved or do not have access to broadband
internet services at all. Those areas mostly include the northern and western
portions of the County.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-31
GOALS, OBJECTIVES, AND POLICIES
INTRODUCTION
The County has established a set of land use and development related policies to act as
guidelines during any official decision making process. These policies and goals reflect the
comments and concerns received during the public involvement process and provide citizens,
property owners, and developers with a predictability of official actions. Goals, policies, and
recommended actions in this chapter relate to infrastructure (water & wastewater),
transportation, public access, parks and recreation, schools, and broadband service. Two
CAMA management topics are covered in the policy section herein: Infrastructure Carrying
Capacity and Public Access. It should be noted that these topic areas are developed as part of
the Division of Coastal Management’s 7B Land Use Planning Guidelines.
Refer to Appendix A for Definitions of actions words contained within the policy section.
INFRASTRUCTURE CARRYING CAPACITY – WATER & WASTEWATER FACILITIES
Goal 4.1: Ensure that public infrastructure systems are sized, located, and managed to provide
service to residents and businesses and so the quality and productivity of Areas of
Environmental Concern (AECs) and other fragile areas are protected or restored.
Objective 4.1: Ensure that the location and capacity of public infrastructure systems are
consistent with the County’s growth and development goals.
Policy 4.1.A: Capital Improvement Planning: The County shall coordinate capital
improvement planning with the Comprehensive Land Use Plan and in accordance with
Technical Review Committee process.
Recommended Action 4.1.A.1: Consider establishing a Cost of Land Use
Fiscal Impact Analysis study that will include current information about the cost
of government services, such as schools, water, and sewer.
Policy 4.1.B: Coordinate Water and Wastewater Facilities with Long-Range
Plans: The County shall coordinate the timing, location and intensity of growth –
where possible – by locating/approving water and sewer improvements in accordance
with the Comprehensive Land Use Plan and Water/Wastewater Master Plans.
Recommended Action 4.1.B.1: Update the 2006 Water and Wastewater
Master Plans to address current conditions of private wastewater providers,
Interbasin transfer requirements, emergency raw water infrastructure, and
provisions for alternative drinking water sources, if desired.
Recommended Action 4.1.B.2: Establish estimated demand for water and
wastewater service in each respective Water & Sewer Service District.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-32
Recommended Action 4.1.B.3: Consider identifying and establishing
generalized service area boundaries for the location of public and private water
and sewer providers.
Policy 4.1.C: Operation of Water and Wastewater Facilities: The County shall
ensure efficient uninterrupted operation of water and wastewater facilities for residents
served by County facilities.
Policy 4.1.D: Water and Wastewater Expansion & Acquisition: The County
shall continue to pursue grants to expand public water and wastewater systems to serve
priority economic development areas and areas that have inadequate or degraded
service levels or environmental concerns with onsite systems.
Recommended Action 4.1.D.1: Encourage water and sewer systems to be
designed and located such that expansion to serve future development is feasible.
Recommended Action 4.1.D.2: Identify policies and procedures for the
consolidation and acquisition of private water/wastewater systems should the
issue arise in the future.
Recommended Action 4.1.D.3: Consider establishing a separate capital
improvement fund for the potential future acquisition of failing private
water/wastewater systems.
Policy 4.1.E: Regional Coordination: The County shall continue to seek regional
cooperation and coordination to maximize service delivery while minimizing duplication
of infrastructure and services.
Policy 4.1.F: Future Land Use Map Review: The County shall consult the future
land use map when considering the locations of new public or community
water/wastewater facilities.
WATER FACILITIES
Policy 4.1.G: Water Supply Expansion: The County will consider modifying its
water purchase agreement with the Lower Cape Fear Water and Sewer Authority in
the next five to ten years to meet estimated growing demand.
Recommended Action 4.1.G.1: Consider establishing a study to explore
additional sources for drinking water whether through alternative surface
water/groundwater sources or treatment methods.
Recommended Action 4.1.G.2: Consider establishing more stringent
drinking water quality testing procedures than those mandated by state and
federal guidelines to inform users of potential water quality issues.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-33
Recommended Action 4.1.G.3: Consider establishing a voluntary program
for testing of private drinking water wells for those in need. If determined water
quality issues exist as a result of testing, consider prioritizing expansion of
centralized service to areas impacted by degraded water quality.
Policy 4.1.H: Interbasin Transfer Certificate: The County will continue to support
efforts to obtain an Interbasin Transfer Certificate to allow for expansion of the potable
water supply to additional areas of the County.
Policy 4.1.I: Maintaining Adequate Fire Protection: The County will continue to
ensure that adequate water pressure is available to meet fire suppression as needed to
keep pace with the demands of the growing seasonal population.
WASTEWATER FACILITIES
Policy 4.1.J: Commerce Park Wastewater Treatment Plant (WWTP): The
County will continue to recruit customers and users to increase demand at the
Commerce Park.
Policy 4.1.K: Rocky Point Wastewater Collection System: The County shall
continue to support wastewater service area of the Rocky Point collection system.
Recommended Action 4.1.K.1: Consider providing service to residential
users in the service area of the Rocky Point collection system.
Recommended Action 4.1.K.2: Establish an allocation of capacity to be
dedicated to future residential versus non-residential use.
Policy 4.1.L: Private Wastewater Expansion: The County will continue to require
a consistency review with the Comprehensive Land Use Plan and Wastewater Master
Plan for construction or expansion of private wastewater systems.
Recommended Action 4.1.L.1: Revise the table of permitted uses in the
UDO to include additional wastewater facility types to enable greater discretion
in the approval procedure. Such uses should be distinguished through clear
definitions which distinguish their treatment capacity and service intent.
Policy 4.1.M: Package Treatment Plants: The County will discourage the use of
package treatment plants and only allow such where expansion of centralized public
and/or private sewer service is not feasible.
Recommended Action 4.1.M.1: In cases where package treatment plants are
approved, consider requiring a specific contingency plan specifying how ongoing
private operation and maintenance of the plant will be provided, and detailing
provisions for assumption of the plant into a public system should the private
operation fail.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-34
Recommended Action 4.1.M.2: Consider establishing a program to manage
decentralized wastewater treatment systems and/or required periodic inspection
by County staff as a condition of approval.
Recommended Action 4.1.M.3: Consider identifying locations where
package treatment plants shall not be permitted.
Policy 4.1.N: Soils and Septic Tank Suitability: The County shall continue to
prohibit on-site septic systems on lots smaller than 15,000 square feet (12,000 square
feet in the Planned Development and Residential Mixed zoning districts) and where
public or community wastewater service is available. All septic tanks must be in
compliance with State Health Regulations as administered by the Pender County Health
Department.
TRANSPORTATION - VEHICULAR
Goal 4.2: Manage the timing, location and intensity of growth by coordinating transportation
improvements in accordance with development and ensuring safe and efficient modes of
transportation are available to all residents and visitors.
Objective 4.2: Provide support for the efficient flow of vehicular traffic through NCDOT
roadway projects, connectivity requirements, and implementation of adopted transportation
plans.
Policy 4.2.A: Safety: The County supports safety as a primary concern for all
transportation-related projects.
Policy 4.2.B: Hampstead Bypass: The County shall enthusiastically support the
construction of the Hampstead Bypass.
Recommended Action 4.2.B.1: Encourage NCDOT to proceed with
advanced acquisition of right-of-way to expedite the process.
Recommended Action 4.2.B.2: Ensure all proposed development is designed
to coordinate with existing or planned streets and highways as provided in the
UDO and NCGS 153A-331.
Policy 4.2.C: Comprehensive Transportation Plan: Ensure that the Pender
County Comprehensive Transportation Plan (CTP) is updated and that it is coordinated
with the Comprehensive Land Use Plan.
Recommended Action 4.2.C.1: Require future update to the Comprehensive
Transportation Plan(s) be coordinated. Work with NCDOT to establish a CTP
encompassing the entirety of Pender County rather than separated by the
Wilmington MPO and Cape Fear RPO boundaries.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-35
Policy 4.2.D: Roadway Hierarchy and LOS: The County should continue to utilize
a hierarchical, functional transportation system that prioritizes needed improvements,
and promotes the proper arrangement of land use patterns to ensure and determine the
proper levels of service (LOS) to reduce any associated negative impacts to the overall
transportation network.
Policy 4.2.E: Regional Coordination: Ensure that Pender County’s transportation
needs are adequately addressed through the Wilmington MPO and Cape Fear RPO
Transportation Improvement Program requests.
Recommended Action 4.2.E.1: Work with the MPO, RPO, NCDOT or
outside consultant to create safety audits in locations with high crash rates as
identified on Maps 4.4 and 4.5.
Recommended Action 4.2.E.2: Explore all opportunities for safety
improvements to intersections identified as high crash locations.
Policy 4.2.F: Collector Street Plan: The County shall continue to support and
implement the Pender County Collector Street Plan when reviewing and approving new
development proposals within the WMPO Boundary area of the County.
Recommended Action 4.2.F.1: Provide an annual update to the Planning
Board and Board of Commissioners regarding the implementation status of the
Collector Street Plan. Such a report should identify issues and opportunities for
improving the existing requirements contained in the UDO, if any.
Recommended Action 4.2.F.2: Update the Collector Street Plan in concert
with the Future Land Use map contained in this plan and when such is revised or
amended.
Policy 4.2.G: Flexible Road Standards: The County shall continue to allow and
encourage flexible road design standards, where consistent with minimum NCDOT
safety standards, which incorporate low impact development and smart growth
principles.
Policy 4.2.H: Entryway Corridors: The County encourages the aesthetic
enhancement of entryway corridors and recognizes the important economic, tourism,
and community image benefits of attractive roadways that enter the County’s planning
area. Such entryway corridors should receive priority attention for improved
appearance and development standards, including landscaping, signage, and tree
preservation.
Policy 4.2.I: Connectivity: The County shall continue to enforce connectivity
requirements that require new developments and individual sites to provide vehicular
and pedestrian interconnectivity to existing or planned adjacent sites and adjoining
developments.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-36
Recommended Action 4.2.I.1: Consider updating the UDO to provide
additional provisions to clarify the intent of connectivity requirements and safety
to ensure that future development, adjacent to existing connection points/stub
streets, follows through with construction of connecting stub streets and
encourages safety.
Recommended Action 4.2.I.2: Consider establishing a case study of existing
connectivity ordinances within county jurisdictions across North Carolina, and
their various effectiveness, in an effort to improve connectivity regulations in
Pender County.
Recommended Action 4.2.I.3: Consider updating the UDO to include
language specifically requiring stub streets to be constructed to the adjacent
property line and that no obstructions shall be permitted.
Recommended Action 4.2.I.4: Consider requiring a stub out connection
where development is adjacent to single family lots fronting upon
thoroughfares/arterial roadways to allow for future connections.
Recommended Action 4.2.I.5: Update and continually maintain the database
of future right-of-way dedications, “paper streets,” and stub-outs. Research
recorded documents to expand the database to include existing paper streets to
ensure maximum coordination and connectivity.
Policy 4.2.J: Private Roads/Streets: The County shall continue to require that all
private streets be constructed in accordance with the most current NCDOT
Subdivision Minimum Construction Standards manual and the NCDOT Guidelines for
Drainage Studies and Hydraulic Design.
Recommended Action 4.2.J.1: Update required certifications and disclosures
contained in the UDO, regarding private roads, to include language stating such
has been constructed to the minimum standards of the of the NCDOT
Subdivision Minimum Construction Standards manual and NCDOT Guidelines
for Drainage Studies and Hydraulic Design. Specifically require all
certifications/disclosures regarding private roads/streets be included with each
approval.
Recommended Action 4.2.J.2: Establish a study to identify public input
regarding private road/streets and specific policy changes, if desired, for the
permitting thereof.
Recommended Action 4.2.J.3: Clarify applicability requirements within the
UDO for “subdivisions with private streets subject to requirements to construct
public streets.” Such applicability should be clearly stated at the onset of
discussion regarding private streets.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-37
Recommended Action 4.2.J.4: Consider requiring all private roads/streets to
include an easement to allow for travel of the roadway by the general public. In
particular, if future development includes access to public facilities or public trust
areas, such an easement should be required.
TRANSPORTATION – ALTERNATIVE MODES
Goal 4.3: Provide safe opportunities for walking and cycling, while supporting the need for
paratransit service and other alternatives to provide transportation choices for residents and
visitors.
Objective 4.3: Encourage alternative means of transportation to reduce traffic, enhance
economic development, offer services to those without use of a vehicle, and provide
recreational opportunities for residents and visitors.
Policy 4.3.A: Alternative Means of Transportation: The County shall work with
the NCDOT, MPO, and the RPO to encourage alternative forms of transportation
including regional rail, paratransit, public transit, Transportation Demand Measures such
as van-pooling and ride sharing, and an inter-modal transportation system.
Recommended Action 4.3.A.1: Explore opportunities to increase the
number of transportation services and options in Maple Hill in order to link the
residents to jobs, health care, and other local services.
Recommended Action 4.3.A.2: Explore the possibility of extending a bus
route from NC 53 to the Onslow County line, and providing a park and ride lot
at this location.
Recommended Action 4.3.A.3: Explore the possibility of partnering with
Pender County Adult Services to coordinate transportation stops and services
between PAS and WAVE Transit and connect in Castle Hayne.
Policy 4.3.B: Cape Fear Regional Bicycle Plan: The County shall support efforts
to implement the recommendations contained in the Cape Fear Regional Bicycle Plan.
Policy 4.3.C: Share the Road: Ensure that rural highways include shoulders that
provide sufficient space for bicyclists and have “share the road” signs to alert drivers.
Policy 4.3.D: Bicycle and Pedestrian Transportation: The County shall encourage
all projects to consider pedestrian and bicycle for inclusion in all road construction,
reconstruction, or maintenance projects.
Recommended Action 4.3.D.1: Establish a funding strategy and continuing
maintenance policy for construction of County sidewalks and greenway/multi-use
path facilities. Ideally, such funding and maintenance responsibility shall be the
under the purview of the Parks and Recreation department.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-38
Recommended Action 4.3.D.2: Pursue grant funds to complete an official
NCDOT Comprehensive Bicycle and/or Pedestrian Transportation Plan for the
Hampstead area. Such a plan should identify alternative funding methods,
maintenance responsibilities, and prioritized facilities. Grant applications are
typically due November/December of each year. County jurisdictions are now
eligible to apply (Eligibility for Pender County should be pursued).
Recommended Action 4.3.D.3: Consider options to establish a Countywide
Greenway Plan. Such a plan will outline priority locations for greenway facilities,
funding mechanisms tied to future development, and procedures for maintenance
and continued upkeep thereof.
Recommended Action 4.3.D.4: Identify and prioritize all recommended
bicycle and pedestrian facilities as part of any future non-motorized
transportation planning effort.
Recommended Action 4.3.D.5: Establish a bicycle and pedestrian committee
to prioritize future bicycle and pedestrian capital improvements and identify
programs and needs related to non-motorized transportation.
Recommended Action 4.3.D.6: Establish a bicycle and pedestrian
transportation infrastructure service area map to allocate funding collected as
part of a fee-in-lieu program to install bicycle and pedestrian facilities in
accordance with recommended improvements.
Policy 4.3.E: Pender Adult Services Transit: The County shall continue to support
paratransit service as a vital resource for the elderly, disabled, and/or those without
access to a personal vehicle.
Policy 4.3.F: Public Transit: The County shall support efforts to establish public
transit opportunities such as park and ride facilities and/or fixed route services in
accordance with the Future Land Use Map.
Recommended Action 4.3.F.1: Coordinate provisions for public transit and
Transportation Demand Management services with the Regional Mixed Use
future land use category as depicted on the County’s Future Land Use Map.
Recommended Action 4.3.F.2: Monitor changes to Urban/Rural Census
designations following the 2020 Census to identify locations suitable for potential
fixed route transit services.
PUBLIC ACCESS
Goal 4.4: Maximize public access to the public trust waters of the coastal region for residents
and visitors.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-39
Objective 4.4: Implement policies and recommendations that assure satisfactory access to
public trust waters for all Pender County residents, businesses, and visitors.
Policy 4.4.A: Public Water Access: The County supports efforts to work with local
groups and state and federal agencies to secure and maintain water access points
throughout the County. The County will consider any state or federal financial
assistance that may be available to increase the inventory of public water access points.
The County also supports the preservation and maintenance of areas that have
traditionally and historically been used for public access.
Recommended Action 4.4.A.1: Pursue funding under the North Carolina
CAMA Shoreline Access funding program for other eligible projects that provide
access for its citizens.
Policy 4.4.B: Public Water Access Amenities: The County supports state and
federal funding of piers for crabbing, fishing, or public estuarine access.
Recommended Action 4.4.B.1: Consider updating the 1993 Waterfront
Access Plan with funding from the Division of Coastal Management.
Recommended Action 4.4.B.2: Consider revising the UDO to require that
public water access is provided in accordance with subdivision/development as
outlined in an approved Waterfront Access Plan and/or at appropriate intervals
along estuarine and riverine bodies of water. Such a provision may require the
dedication of public access easements through extension of right-of-way to high
water marks as a means of recreation.
Recommended Action 4.4.B.3: Consider establishing a separate capital
improvement fund for the construction of waterfront amenities and/or
acquisition of suitable waterfront access locations.
Policy 4.4.C: Waterfront Land Acquisition: The County will encourage not only
the State of North Carolina, but also area local governments to diligently pursue the
acquisition and development of waterfront properties for public use, particularly
regarding boating access.
Policy 4.4.D: Boating Access: The County will continue to work with the NC
Wildlife Resources Commission (WRC) Boating Infrastructure Program to identify and
acquire land for public boat ramps and ancillary parking facilities to public trust waters.
Recommended Action 4.4.D.1: Identify potential locations suitable for
applying for funds for public boat ramps, particularly along coastal waters in
support of the tourism-based economy. Such locations may include Long Creek,
Moores Creek, Rockfish Creek, and Scotts Hill Intracoastal Waterway access.
Recommended Action 4.4.D.2: Consider applying for public access funding
for additional boat ramps.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-40
Recommended Action 4.4.D.3: Consider co-location of other appropriate
recreational amenities and multiple grant funding sources at future boat ramps.
Policy 4.4.E: Public Trust Waters Navigation: The County opposes any use which
significantly interferes with the public right to navigate or utilize existing access to any
public trust waters.
Policy 4.4.F: ADA Accessibility: The County believes that, where possible, public
water access sites should be accessible to persons with disabilities.
Policy 4.4.G: Dredging: The County will continue to work with the Army Corps of
Engineers and any other State and Federal agencies to ensure continued dredging and
maintenance of channels and rivers as needed to keep these facilities open to navigation.
Policy 4.4.H: Water-Based Tourism and Development: The County supports
development that promotes Pender County as a tourist and recreational destination.
The County intends for such development to protect and preserve the natural
environment and support public water access through private funds and grant monies.
PARKS AND RECREATION
Goal 4.5: Increase the amount of land available and the funding for parks, recreation and open
spaces to serve current Pender County residents and visitors. NOTE: Additional policies
concerning open space are included in Chapter 3.
Objective 4.5: Ensure adequate, appropriately located parks, recreation and open spaces are
available to serve the needs of Pender County residents and visitors.
Policy 4.5.A: Comprehensive Parks and Recreation Master Plan: The County
shall coordinate development and provisions for recreational amenities with the
Comprehensive Parks and Recreation Plan.
Recommended Action 4.5.A.1: Prepare a new, updated Comprehensive
Parks and Recreation Master Plan.
Recommended Action 4.5.A.2: Ensure that the updated plan adequately
reflects current and future recreation needs. Adopt implementation measures to
acquire and develop parks, recreation areas, and open spaces.
Recommended Action 4.5.A.3: Ensure future capital improvement projects
include a balance between revenue generation facilities and nonrevenue
generating facilities.
Recommended Action 4.5.A.4: Establish parks and recreation service
districts for the allocation and distribution of recreational opportunities.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-41
Recommended Action: 4.5.A.5: As part of the plan update, identify needed
activities and programs for neighborhood youth that are potentially viable in the
Maple Hill neighborhood.
Policy 4.5.B: Regional Parks: The County shall support the expansion and
development of large regional parks such as Pender Memorial Park and Hampstead
Kiwanis Park as the primary recreational opportunities for residents and visitors.
Recommended Action 4.5.B.1: Establish expansion plans for athletic fields
and programming at Pender Memorial Park and Hampstead Kiwanis Park.
Policy 4.5.C: Coordinated Development: The County shall encourage
development plans to arrange open space/amenities adjacent to other open space areas,
County parks and recreation facilities, or state, federal, or other protected lands.
Policy 4.5.D: Recreation Facilities Required: The County shall continue to enforce
regulations requiring construction of appropriate recreational amenities for applicable
develop and/or a “fee in lieu of” option to enable the enhancement of amenities of
nearby park facilities.
Recommended Action 4.5.D.1: Establish a monetary value for recreational
amenities/units to more appropriately allocate fees captured as part of the
development approval process.
Policy 4.5.E: Board of Education Coordination: The County shall coordinate with
Pender County Board of Education and partner with civic groups to co-locate parks and
recreation sites on or adjacent to school property as appropriate.
Policy 4.5.F: Upland Recreation Facilities: The County shall ensure that park and
recreation set asides include usable upland open space.
Policy 4.5.G: Recreation Standards: The County shall continue to ensure UDO
regulations include clearly defined recreation standards, which include reasonable and
quantifiable areas of facilities/fees to be provided.
Policy 4.5.H: Maintenance: The County shall consider establishing a maintenance
department within the Parks and Recreation Department.
Recommended Action 4.5.H.1: Establish a formal Maintenance Operations
Plan and policy.
Policy 4.5.I: Funding and Resources: The County shall consider allocating increased
funding and resources for enhancement and maintenance of existing and future parks
and recreation facilities.
Recommended Action 4.5.I.1: Consider increasing spending to bring per
capita figures closer to those of the counties in the region and communities of
similar populations.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-42
Recommended Action 4.5.I.2: Increase revenue generation within the
department to bring the cost recovery closer to the state average.
SCHOOLS
Goal: 4.6: Provide exceptional schooling and award-winning service to Pender County’s
growing school-age population.
Objective 4.6: Ensure adequate student space in Pender County Public Schools and encourage
co-location of community facilities.
Policy 4.6.A: Regional Cooperation: The County supports regional cooperation and
a process for all local governments, including the Technical Review Committee, to
advise public school officials of pending large developments and population growth in
general so that they may adequately plan to increase capacity.
Policy 4.6.B: Long-Range Plan: The County supports long-range planning for the
school system to establish future enrollment figures, capital improvement needs, and
funding constraints.
Recommended Action 4.6.B.1: Establish and continually update a twenty-
year plan for the Pender County School System which provides enrollment
figures, capital improvement needs, and funding constraints.
Recommended Action 4.6.B.2: Ensure that capital improvements to schools
adequately address the needs of different areas of the County, including
improvements to existing schools update the facilities to modern standards of
newer schools.
Recommended Action 4.6.B.3: Establish an estimated number of students
per each development type (single-family, multi-family, etc.) to identify short-
term impacts of development approval.
Recommended Action 4.6.B.4: Address traffic access, safety, and circulation
issues through physical improvements and operating procedures.
Recommended Action 4.6.B.5: Consider establishing school capacity
thresholds (80/90%) whereby active capital improvement measures will be
initiated to alleviate future overcrowding.
Policy 4.6.C: Land Acquisition: The County encourages local government
participation in land acquisition for new schools, in order to co-locate other public
facilities, such as parks and libraries, on or near school sites.
Policy 4.6.D: School Site Reservation: The County supports legislation to allow for
reservation of school sites in the development approval process in accordance with, the
requirements of NCGS 153A-331.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-43
Recommended Action 4.6.D.1: In accordance with the Board of Education,
establish and adopt an appendix to this land use plan which clearly identifies the
specific location and size of each school site to be reserved for future use.
When siting new school locations, especially in the eastern portion of the
County, it will be important to assure Smoke Awareness Areas are evaluated to
optimize the use of controlled burning for wildfire reduction and habitat
management.
Policy 4.6.E: Shared-use Facilities: The County shall continue to support the
shared-use of school facilities for recreational opportunities and community activities.
BROADBAND SERVICE
Goal 4.7: Enhance broadband internet services to underserved communities throughout the
County to increase the economical and lifestyle opportunities provided by broadband internet
service.
Objective 4.7: The County shall take actions to coordinate with internet service providers
(ISPs) and other similar entities in an effort to enhance broadband internet coverage in areas
that area currently underserved.
Policy 4.7.A: Broadband Expansion: The County supports the installation and
expansion of broadband internet services to areas of the County that are currently
underserved by working with developers and ISPs on the expansion of services.
Policy 4.7.B: Underserved Areas: The County shall support the expansion of
current broadband internet coverage to areas that are both serviced and underserved
by utilizing existing facilities and supporting the expansion of existing and new networks.
Recommended Action 4.7.B.1: Perform annual GIS updates to the wireless
network maps by coordinating with ISPs and reviewing permit applications.
Recommended Action 4.7.B.2: Establish a telecommunications committee to
assess the potential for broadband internet access in underserved areas, and to
act as a point of contact for developers, residents, businesses, and providers.
Recommended Action 4.7.B.3: Consider establishing a provision or incentive
whereby the availability of broadband service is included in the review of zoning
map amendments or conditional zoning requests.
COORDINATED DEVELOPMENT
Goal 4.8: The County maximizes opportunities to benefit public safety, health, and wellbeing
by coordinating public facilities, services and utilities development with natural resources
conservation.
Chapter 4: Community Facilities and Services Pender 2.0: Comprehensive Land Use Plan
4-44
Policy 4.8.A: Green Infrastructure Plan: Consider developing and integrating a
green infrastructure plan with future capital improvement and public services plans
(Refer to Policy 3.1.K.)
Recommended Action 4.8.A.1: Review the Biodiversity/Wildlife Habitat
Assessment and associated environmental features GIS data in community
facilities and services projects and planning, with the purpose of reducing
unnecessary impacts to natural resources and wildlife habitat.
4
4
4
4
4
)_
Topsail Beach
Surf City
Scott's Hill Water & Sewer District
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210 AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear RiverCape F
e
a
r
R
i
v
e
r
AB11
AB11
Columbia/UnionWater & Sewer District
Moore's CreekWater & Sewer District
Central Pender Water & Sewer District
Maple HillWater & Sewer District
Rocky Point/TopsailWater & Sewer District
Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County
Atlantic OceanM a p 4 . 1 : W a t e r F a c i l i t i e s
0 1.5 3 4.50.75 MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Water Utilities
Water & Sewer District Boundaries
Water Lines
4 Water Towers
)_Pender County Water Treatment Plant
Onslow County
Pender 2.0:Comprehensive Plan
Topsail Beach
Surf City
Scott's Hill Water & Sewer District
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210 AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear RiverCape Fear River
AB11
AB11
Columbia/UnionWater & Sewer District
Moore's CreekWater & Sewer District
Central Pender Water & Sewer District
Maple HillWater & Sewer District
Rocky Point/TopsailWater & Sewer District
Pender Commerce Park WWTP
)_
AB210
£¤117
AB50Maple Hill WWTP
^*
Non-Residential Service Only
Onslow County
Sampson County
New Hanover County
Bladen County
Duplin County
Brunswick County
Columbus County
Atlantic OceanMap 4.2: Wastewater Service Facilities & Availability0 1.5 3 4.50.75 MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Water Service
Water & Sewer District Boundaries
Wastewater Availability*
Public Wastewater Provider
Private Wastewater Provider
Onslow County
Pender 2.0:Comprehensive Plan
*Generalized location of available wastewater service in unincorporated Pender County.
Topsail Beach
Surf City
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear River26,00022,0005,700
4,4
0
0
7,60021,
00019,0002,400
3,3002,8
0
0
4,1005,000
2,800
1,
6
0
0610
5
,
7
0
0
7,
0
0
0
4,900
15,00010,
0
0
0
3,000
2,7003,5003201,30021094
0
2,
4
0
01,400480
1,500
13,0004,6002,300710
AB11
AB11
AtlanticOceanBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
M a p 4 . 3 : T r a f f i c C o u n t s
0 1.5 3 4.50.75 MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
2015 AADT Counts (NCDOT)
60 - 1,999
2,000 - 4,999
5,000 - 9,999
10,000 - 19,999
20,000 - 39,000
AADT Increase/Decrease
AADT Increase (2006-2015)
AADT Decrease (2006-2015)
Onslow County
Pender 2.0:Comprehensive Plan
New Hanover County
See Map 4.5 for more detail of the traffic counts and automobile accidents.
^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_^_
^_
^_
^_^_
^_
^_^_
^_
^_^_^_^_^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_^_
^_
^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_^_^_^_
^_
^_
^_
^_^_
^_
^_
^_^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_^_^_^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_
^_^_^_
^_
^_^_^_^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_^_
^_
^_^_^_
^_
^_
^_
^_^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_^_^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_^_
^_^_
^_^_^_^_^_^_^_^_^_^_
^_
^_
^_^_
^_
^_^_
^_
^_^_^_^_^_
^_
^_
^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_
^_^_^_
^_
^_
^_^_
^_^_
^_^_^_
^_
^_
^_
^_^_^_
^_
^_
^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_
^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_^_
^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_
^_
^_
^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_^_^_
^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_^_^_^_^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_
^_^_
^_
^_^_
^_
^_^_^_^_^_
^_
^_
^_^_
^_^_^_
^_
^_
^_^_
^_
^_^_^_
^_
^_
^_^_^_^_
^_
^_^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_^_^_
^_
^_
^_
^_^_^_^_
^_
^_
^_^_^_^_
^_
^_
^_^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_
^_^_^_
^_
^_
^_^_
^_
^_
^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_
^_
^_
^_^_^_^_
^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
Topsail Beach
Surf City
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear River15,000AB11
AB11
AtlanticOceanBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
M a p 4 . 4 : A u t o m o b i l e A c c i d e n t s
0 1.5 3 4.50.75 MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Automobile Accidents (2009 - 2013)
^_Fatal Crashes
High Frequency Crash Locations (2010-2014)
5 to 29
!(30 to 49
!(50 and above
Onslow County
Pender 2.0:Comprehensive Plan
New Hanover County
See Map 4.5 for more detail of the traffic counts and automobile accidents.
^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_
^_
^_
^_
^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_^_^_^_
^_
^_
^_
^_^_
^_
^_
^_^_
^_
^_
^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_
^_
^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_^_
^_
^_^_^_^_^_
^_
^_
^_
^_^_^_^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_^_
^_
^_
^_
^_^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_
^_
^_
^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_
^_
^_
^_
^_
^_
^_^_
^_
^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_
^_
^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_^_
Lea-Hutaff Island
Topsail Beach
Surf City
Island Creek RoadHoover Road
Country Club Drive
Scot
t
s
H
i
l
l
Loop
R
o
a
d
Nixons Creek
Topsail Sound &Middle Sound ORW AreaOld Topsail CreekFutch Cree
k
Batts Mill Creek (Barlow Creek)
County Line Branch
Old Mill
C
r
e
e
k
Beckys Creek (Bishops Creek)Virginia Creek
Mullet Run
Intracoastal WaterwayIntracoastal WaterwaySloop Point Loop RoadHolly Shelter Game Land
AB210
AB210
AB50
£¤17
£¤17 Atlantic OceanW
a
s
h
i
n
g
t
o
n
A
c
r
e
s
R
o
a
d
Factory R
o
a
d
Sl
o
o
p
P
o
i
n
t
L
o
o
p
R
o
a
d
U
n
i
o
n
B
e
t
h
e
l
R
o
a
d Wa
t
t
s
L
a
n
d
i
n
g
R
o
a
d
Shepa
r
d
s
R
o
a
d
2,50
0 25,00036,00022,00034,0004,5006,0
0
0
2,100
1,2
0
0
39
0
2,
8
0
0
1,6
0
0
11,000
9,8
0
016,000850
1
1
,
0
0
0 4,3005,4001,9002,0001,40060
0
7,600
AB210
300Harri
s
o
n
C
r
e
e
k
R
o
a
d2,6004,4004,5001,
6
0
0 26,0006,500
5,
1
0
0
2,5
0
0
Sidb
u
r
y
R
o
a
d
Onslow County
New Hanover County
Atlantic OceanMap 4.5: Coastal Traffic Counts and Automobile AccidentsPender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
2015 AADT Counts (NCDOT)
60 - 1,999
2,000 - 4,999
5,000 - 9,999
10,000 - 19,999
20,000 - 39,000
AADT Increase/Decrease
AADT Increase (2006-2015)
AADT Decrease (2006-2015)
Automobile Accidents (2009-2013)
^_Fatal Crashes
High Frequency Crash Locations (2010-2014)
5 to 29
30
50 and above
0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
!.
!.
!.
Topsail Beach
Surf City
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic Ocean
Englishtown
R
d
Pe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear River15,000Cape F
e
a
r
R
i
v
e
r
AB210 WMPO Boundary
CFRPO Boundary
AB11
AB11
AtlanticOcean
New HanoverCountyBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
Map 4.6: CTP Roadway Recommendations (2016)0 1.5 3 4.50.75 MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Roadway Recommendations
Boulevards
Needs Improvement
Freeways
Needs Improvement
Expressways
Needs Improvement
Major Thoroughfares
Needs Improvement
Minor Thoroughfares
Needs Improvement
Proposed Freeway
Hampstead Bypass
Proposed Highway Interchanges
!.Interchanges
Onslow County
Pender 2.0:Comprehensive Plan
Topsail Beach
Æ`Æ`Æ`
¥"f¢
!.
!.
!.
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear River15,000Surf City
Cape F
e
a
r
R
i
v
e
r
AB11
AtlanticOcean
New HanoverCountyBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
M a p 4 . 7 : D r a f t S T I P ( 2 0 1 8 - 2 0 2 7 )
0 1.5 3 4.50.75 MilesN
Onslow County
Pender 2.0:Comprehensive Plan
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Proposed Roadway
Hampstead Bypass
!.Hampstead Bypass Interchanges
Roadway Maintenance
Planned Roadway Maintenance
¥"f¢Bridge Replacements
Airport Modifications
Æ`Runway Extension/Apron Expansion
¥f¢
Burgaw
W Wilmington
St
E Wilmington
StJacksonville HwyN W
r
i
gh
t
S
t
£¤117
S Walk
e
r
S
t
S
Sm
i
t
h
S
t
S
D
i
c
k
e
r
so
n
S
t
AB53
Penderl
e
a
H
w
y
Surf City
Topsail Beach
[k
[k
[k
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown Rd
Canetuck RoadPe
n
d
e
r
l
e
a
H
w
y
Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear RiverCape F
e
a
r
R
i
v
e
r
Burgaw
AB11
AB11
[k
Holly Shelter Shooting Range
Sandy Run Savannah State Natural Area
HampsteadKiwanis Park
AtlanticOcean
New HanoverCountyBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
MapleHill CivicCenter
WilliardOutreachOrganization
Moores CreekNationalBattlefield
Hoggard Park
CanetuckCommunityCenter
Rocky PointCommunityDevelopment Center
MillersPond Park
Map 4.8: Parks and Recreational Opportunities0 2 41MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Community Facilities
[k County Operated Recreational Facilities
Other Recreational Opportunities
Onslow County
Pender 2.0:Comprehensive Plan
[k BurgawPenderMemorialPark
HarrellMemorialParkHankins Park
Johnson Park
New Hanover CountyN W
r
i
g
h
t
S
t
AB53
£¤117
Pender
l
e
a
H
w
y
£¤117 E Wilmington StW Bridges St
S Dickerson StS Smith StAB53
W Wilmingto
n StSee Map 4.9 for more detail of the parks and recreationalopportunities.
[k
Surf City
Topsail BeachShaw HwyIsland Creek RoadHoover
RoadCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Banks ChannelNixons Creek
Topsail Sound &Middle Sound ORW AreaOld Topsail Creek Mill Creek(Betts Creek)Futch Cree
k
Batts Mill Creek (Barlow Creek)
County Line Branch
Beckys Creek (Bishops Creek)Virginia Creek
Mullet Run
Topsail SoundIntracoastal WaterwayIntracoastal WaterwayNortheast Cape Fear RiverSloop Point Loop RoadHolly Shelter Game Land
AB210
AB210
AB50
£¤17
£¤17
Lea-Hutaff Island
Le
w
i
s
R
o
a
d
AB210
W
a
s
h
i
n
g
t
o
n
A
c
r
e
s
R
o
a
d
Factory R
o
a
d
Albury Recreation Area
Poplar Grove Plantation
Soundside Park
Hampstead Kiwanis Park
New Hanover County
Onslow County
Keith Batts Family Park
Topsail Town Center Park
Edgecombe Community Center
Surf City Community Center
Atlantic OceanMap 4.9: Coastal Parks and Recreational Opportunities0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Community Facilities
[k County Operated Recreational Facilities
Other Recreational Opportunities
rq
rq
rq !y
!y
!y
!y
!y
"Y&
"Y&
"Y&"Y&
"Y&
"Y&
"Y&
"Y&
"Y&"Y&
"Y&
"Y&
"Y&
Surf City
Topsail Beach
5
5
5
55
5
5
5
5
5
5
55
5
5
5
5
5
55
"Y&"Y&
"Y&
"Y&
"Y&
St. Helena
Watha
Atkinson
Henderson Field/ Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Atlantic OceanEnglishtown Rd
Canetuck RoadPe
n
d
e
r
l
e
a
H
w
y
Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Sloop Point RoadAB53
AB11
AB11
AB210
£¤421
£¤421
£¤421
AB133
AB210
AB210
AB210
AB50
AB50
AB50
AB53
AB53
£¤17
£¤17
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
Black River
Northeast Cape Fear RiverCape F
e
a
r
R
i
v
e
r
Burgaw
AB11
AB11
5
Penderlea School
AtlanticOcean
New HanoverCountyBrunswickCounty
ColumbusCounty
Bladen County
Onslow County
SampsonCounty
Duplin County
PenderHighSchool
Heide TraskHigh School Rocky PointElementary
West PenderMiddleSchool MalpassCornerElementary
CapeFearElementary
Pender EMS &Fire Station7 - HQ
Pender EMS& FireStation 8
RockyPoint FireDepartment
Cape FearMiddleSchool
Shiloh-ColumbiaVolunteer FireDepartment
Pender EMSStation 9
Long CreekGrady VolunteerFire Department
PenderleaVolunteer FireDepartment
Pender EMS& FireStation 5
PenderleaElementarySchool
M a p 4 . 1 0 : C o m m u n i t y F a c i l i t i e s
0 2 41MilesN
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Community Facilities
5 Schools
5 Schools Under Construction"Y&EMS & Fire
!y Boat Ramp Access
rq Senior Centers
Onslow County
Pender 2.0:Comprehensive Plan
rq"Y&5
5
5 "Y&
Burgaw
5 Pender County Head Start/Pre-K
PenderEarlyCollege
BurgawElementary Pender EMS& FireStation 1
HeritagePlace
BurgawMiddleSchool
NC ForestServiceDistrict 8
New Hanover CountyN W
r
i
g
h
t
S
t
AB53
£¤117
Pender
l
e
a
H
w
y
£¤117 E Wilmington StW Bridges St
S Dickerson StS Smith StAB53
W Wilmingto
n StSee Map 4.11 for more detail of the community facilities.
rq
!y
!y
"Y&
"Y&"Y&
"Y&
"Y&
"Y&
"Y&
"Y&
55
5
5
5
5
Lea-Hutaff Island
Topsail Beach
Surf CityShaw HwyIsland Creek RoadHoover
RoadCountry Club DriveScot
t
s
H
i
l
l
Loop
R
o
a
d Banks ChannelNixons Creek
Topsail Sound &Middle Sound ORW AreaOld Topsail Creek Mill Creek(Betts Creek)Futch Cree
k
Batts Mill Creek (Barlow Creek)
County Line Branch
Beckys Creek (Bishops Creek)Virginia Creek
Mullet Run
Topsail SoundIntracoastal WaterwayIntracoastal WaterwayNortheast Cape Fear RiverSloop Point Loop RoadHolly Shelter Game Land
AB210
AB210
AB50
£¤17
£¤17 Atlantic OceanLe
w
i
s
R
o
a
d
AB210
W
a
s
h
i
n
g
t
o
n
A
c
r
e
s
R
o
a
d
Factory R
o
a
d
Surf City Elementary/Middle School
Surf City Fire Department
Sloop Point Fire Department
Surf City Volunteer Fire Department
South Topsail Elementary
Pender EMS & Fire Station 6
Pender EMS & Fire Station 4
Topsail High SchoolTopsail Middle School
North Topsail Elementary
Topsail Elementary School
Pender EMS & Fire Station 2
Topsail Beach Fire Department
Hampstead Volunteer Fire Department
Topsail Senior Center
New Hanover County
Onslow County
Atlantic OceanM a p 4 . 1 1 : C o a s t a l C o m m u n i t y F a c i l i t i e s
0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
Pender County Boundary
Game Lands
Municipal Boundaries
Corporate Limits
Extraterritorial Jurisdiction
Community Facilities
5 Schools
5 Schools Under Construction"Y&EMS & Fire
rq Senior Center
!y Boat Ramp Access
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-1
CHAPTER 5: LAND USE AND GROWTH MANAGEMENT
INTRODUCTION
This chapter outlines existing development patterns throughout unincorporated Pender County
and further categorizes the types of structures and land uses. Put simply, the existing land use
analysis is a description of the development that exists today. For example, if a parcel is
developed with a single-family home, then the corresponding existing land use classification is
single-family residential. An analysis of vacant land and future development potential based upon
zoning classification is provided in this section. The chapter also contains the future land use
map and a narrative that provides a framework for desired growth patterns and guidance for
land use decisions over the next ten to twenty years. Goals, policies, and recommended actions
are provided relating to land use and development at the end of the chapter.
EXISTING LAND USE ANALYSIS
This section allows the local elected officials, appointed boards, citizens, and local planning staff
to gather an overall ‘picture’ of the existing land use patterns throughout Pender County. An
assessment of these patterns, and the identification of available areas for development, can help
forecasting where, what type, and how much development may occur in the future. This section
will also assist in identifying vacant land where new development is expected and areas where
in-fill or redevelopment is feasible and/or desirable. The information in this section provides a
foundation for establishing the County’s Future Land Use Map (Map 5.8: Pender County
Future Land Use Map).
SOURCE OF EXISTING LAND USE ANALYSIS AND MAP
The Existing Land Use Map (Maps 5.1-5.7) and tables were created by the Cape Fear Council
of Governments using Pender County Tax Records updated in December 2016, full-color
orthophotos (map quality aerial photos) taken in 2016, and Land-Based Classification Standards
(LBCS) developed by the American Planning Association.
LAND USES IDENTIFIED IN UNINCORPORATED PENDER COUNTY
Land is classified as it is currently developed or undeveloped as provided in Table 5.1: Existing
Land Use Classifications.
Table 5.1: Existing Land Use Classifications
Source: Cape Fear Council of Governments GIS, Pender County GIS
Existing Land
Use Class Land Uses/Development Type within each Existing Land Use Classification
Commercial Retail shops/stores (including grocery stores, pharmacies, etc.), Entertainment, Convenience
stores, Restaurants (all food service), Hotel/motel, Repair Services, etc.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-2
Existing Land
Use Class Land Uses/Development Type within each Existing Land Use Classification
Office &
Institutional
Schools, Churches/Cemeteries, Health Services, Emergency Services, Government/Community
Centers, Fraternal Lodges, etc.
Industrial Water/Sewer Treatment Plants, Processed Food Production/Distribution, Manufacturing,
Warehouse Distribution, Rock/Soil/Sand Quarries
Multi-Family
Residential 2 or more dwelling units attached
Single-Family
Residential Single-family detached dwelling unit (includes modular homes)
Manufactured
Home Prefabricated dwelling units/Mobile homes
Recreational Parks, Common Areas, Golf Courses, Clubhouses, etc.
Conservation Game Lands, Conservation Easements, Land Trusts, National Parks, etc.
Rural
Agriculture
Single-family dwellings on lots greater than 2 acres, Livestock/Poultry Production, Crop
Cultivation, Silviculture, Horticulture, etc.
Vacant/Infill Undeveloped Land Less Than 2 Acres
Figures 5.1 – 5.9 provide an example of each particular land use type.
Figure 5.1: Commercial Land Use (2017)
Source: Cape Fear Council of Governments
Figure 5.2: Office & Institutional Land Use– Heide Trask High School (2017)
Source: Cape Fear Council of Governments
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-3
Figure 5.3: Industrial Land Use – Acme Smoked Fish of North Carolina (2017)
Source: Cape Fear Council of Governments
Figure 5.4: Multi-Family Residential Land Use (2017)
Source: Cape Fear Council of Governments
Figure 5.5: Single-Family Residential Land Use (2017)
Source: Cape Fear Council of Governments
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-4
Figure 5.6: Manufactured Home Land Use (2017)
Source: Cape Fear Council of Governments
Figure 5.7: Recreation Land Use – Millers Pond Park (2017)
Source: Cape Fear Council of Governments
Figure 5.8: Rural Agriculture Land Use (2017)
Source: Cape Fear Council of Governments
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-5
Figure 5.9: Vacant/Infill Land Use (2017)
Source: Cape Fear Council of Governments
EXISTING LAND USE
The following section outlines the existing land use patterns throughout unincorporated Pender
County and within each respective planning area.
PENDER COUNTY
Table 5.2: Existing Land Use in the Planning Jurisdiction provides a breakdown of the County
by each particular existing land use category. The land use classifications are summarized by the
number of parcels, acreage, and percent of acreage in each respective use classification
throughout the County. Because Pender County spans such a large area, existing land use data
is also categorized by each of the six planning areas.
Table 5.2: Existing Land Use in the Planning Jurisdiction
Source: Cape Fear Council of Governments GIS, Pender County GIS
Existing Land Use (ELU) by
Type
Pender County
Parcel Count Acres Percent Acreage
Commercial 441 1,181.59 0.21%
Office & Institutional 341 2,441.19 0.43%
Industrial 96 1,696.23 0.30%
Multi-Family Residential 314 69.28 0.01%
Single-Family Residential 17,655 33,303.65 5.90%
Manufactured Home 2,655 5,902.55 1.05%
Recreational 30 621.27 0.11%
Conservation 231 118,988.15 21.08%
Rural Agriculture 6,806 344,111.97 60.96%
Vacant/Infill 8,342 6,107.94 1.08%
Incorporated Municipalities,
Rights-of-way, and Waterbodies -- 50,069.17 8.87%
Total 36,911 564,493.00 100.00%
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-6
Rural agriculture land uses occupy the greatest percentage of land throughout unincorporated
Pender County. This land use classification accounts for more than 60% (344,111.97 acres) of
land throughout the unincorporated County. Conservation lands account for second largest
percentage of land – over 21% of the total acreage in the County (118,988.15 acres) – and can
be attributed primarily to the large tracts of land within the Holly Shelter and Angola Bay Game
Lands. Together, rural agriculture and conservation lands account for more than 80% of the
land in the County. Single-family dwellings account for the most significant category of
developed land in the unincorporated County, followed by manufactured dwellings. In total,
there is nearly 40,000 acres of land used for single-family residential purposes. Commercial,
office, and industrial uses are scattered throughout the County, with the majority concentrated
south of NC 210 and along the US 17 corridor (See Map 5.1: Pender County Existing Land
Use, as well as Maps 5.2 – 5.7 for each planning area’s existing land use maps for additional
information.
Vacant/Infill land accounts for a little over 1% of the land in the Pender County. These lands are
currently undeveloped and are less than 2 acres in area. As such, these parcels represent prime
development opportunities as many will not be further subdivided and only require a structure
to be built upon them. It should be noted, however, that just over 50% of the vacant/infill land
potentially contains wetlands and therefore may be subject to development constraints if
identified as 404 wetlands through a jurisdictional determination.
This characterization of the County as a whole is largely comparable to the analysis surmised
some thirty years ago. Dating back to the 1987 Land Use Plan, it can be said that land use
patterns thirty years ago are largely similar to those today, except for perhaps an increase in
the relative density of development. See excerpt below:
Pender County has a very low density of development with extensive forested areas and
agricultural areas throughout the County. Most residential and commercial development is
located in municipalities or along highway thoroughfares leading to municipalities or
communities. The fastest growing portion of the County is Topsail Township, including Topsail
Beach, Surf City, and the area between U.S. 17 and the Intracoastal Waterway. The major land
use change affecting the County and completed since the 1981 Land Use Plan was prepared
has been the completion and opening of Interstate 1-40.
UNION PLANNING AREA – EXISTING LAND USE
The Union Planning Area, located in the northwestern portion of Pender County, is primarily
characterized by rural agriculture land use. The Town of Watha and the unincorporated
communities of Willard and Penderlea are located in the Union Planning Area. Over 90% of the
land in the planning area is classified within this category – which indicates very low density
residential development, wooded areas, or active/inactive agriculture lands. Apart from rural
agricultural lands, approximately 7.23% of the land is currently used for single-family residential
and manufactured home land uses. Commercial, office & institutional, and industrial are limited
to locations along US 421 and US 117. It is important to note that the existing land uses within
the incorporated Town of Watha are not included in this analysis. More details regarding the
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-7
existing land uses can be found in Table 5.3: Union Planning Area Existing Land Use (2017)
and Map 5.2: Union Planning Area Existing Land Use.
Table 5.3: Union Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Union Planning Area Parcel Count Acreage Percent Acreage
Commercial 41 94.39 0.08%
Office & Institutional 70 398.86 0.36%
Industrial 7 16.86 0.02%
Multi-Family Residential 1 1.18 0.001%
Single-Family Residential 2,023 6,720.78 5.98%
Manufactured Home 450 1,399.57 1.25%
Conservation 6 633.43 0.56%
Rural Agriculture 2,006 102,190.12 90.97%
Vacant/Infill 1,078 880.92 0.78%
Total 5,682 112,336.09 100.00%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
HOLLY SHELTER PLANNING AREA – EXISTING LAND USE
The Holly Shelter Planning Area is located in the northeastern portion of Pender County, which
contains two state owned and managed game and the unincorporated community of Maple Hill.
Since these game lands are located in the planning area, the majority of existing land use is
dedicated to conservation (57.23%). The second most common land use in the Holly Shelter
Planning Area is rural agriculture, which makes up nearly 40% of the land mass. Other than
conservation and rural agriculture, there is very limited development in this planning area. The
most substantial concentration of development is found along NC 50 and NC 53. There is also
scattered single-family development and vacant lots located adjacent to the Northeast Cape
Fear River. The existing land use information for the Holly Shelter Planning Area can be found
in Table 5.4: Holly Shelter Planning Area Existing Land Use (2017) and Map 5.3: Holly Shelter
Planning Area Existing Land Use.
Table 5.4: Holly Shelter Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Holly Shelter Planning
Area Parcel Count Acreage Percent Acreage
Commercial 24 53.91 0.04%
Office & Institutional 36 332.76 0.25%
Industrial 13 754.51 0.58%
Multi-Family Residential 1 0.94 0.001%
Single-Family Residential 905 2,988.50 2.28%
Manufactured Home 237 675.12 0.51%
Recreation 2 5.33 0.004%
Conservation 70 75,094.97 57.23%
Rural Agriculture 1,153 50,621.94 38.58%
Vacant/Infill 853 684.22 0.52%
Total 3,294 131,212.18 100.0%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-8
BURGAW PLANNING AREA – EXISTING LAND USE
Within the Burgaw Planning Area, approximately 83% of land is composed of rural agriculture
uses. This analysis does not included any information within the Town of Burgaw or the Village
of St. Helena. Over 10% of the land in the Burgaw Planning Area is currently used for single-
family residences. Of the other land uses in this planning area, nearly 3% is conservation land,
and approximately 1.39% is vacant/infill land. More detailed information can be found in Table
5.5: Burgaw Planning Area Existing Land Use (2017) and Map 5.4: Burgaw Planning Area
Existing Land Use.
Table 5.5: Burgaw Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Burgaw Planning Area Parcel Count Acreage Percent Acreage
Commercial 11 92.53 0.27%
Office & Institutional 30 272.10 0.79%
Industrial 4 59.92 0.17%
Multi-Family Residential 4 5.16 0.01%
Single-Family Residential 1,262 3,491.31 10.10%
Manufactured Home 169 431.86 1.25%
Recreation 1 4.41 0.01%
Conservation 4 1,016.68 2.94%
Rural Agriculture 715 28,721.95 83.07%
Vacant/Infill 617 480.42 1.39%
Total 2,817 34,576.34 100.0%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
CASWELL PLANNING AREA – EXISTING LAND USE
The Caswell Planning Area is located in the southwestern portion of Pender County. US 421
and NC-210 traverse the planning area and the unincorporated community of Currie and
incorporated Town of Atkinson are located here. Similar to the previous planning areas,
Caswell’s land use pattern is primarily rural residential and agriculture. Over 85% of the land is
classified as a rural agriculture. The second most prevalent land use in the Caswell Planning
Area is conservation, closely followed by single-family residential development (6.13% and
5.42%, respectively). The Pender Commerce Park is located within this planning area on US 421
near the southern border of the County. Limited development exists around this site and
minimal housing despite the availability of suitable land for development. More information can
be found in Table 5.6: Caswell Planning Area Existing Land Use (2017) and Map 5.5: Caswell
Planning Area Existing Land Use.
Table 5.6: Caswell Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Caswell Planning Area Parcel Count Acreage Percent Acreage
Commercial 22 60.30 0.07%
Office & Institutional 53 201.37 0.22%
Industrial 13 509.81 0.56%
Multi-Family Residential 1 17.54 0.02%
Single-Family Residential 1,379 4,903.10 5.42%
Manufactured Home 378 1,348.87 1.49%
Conservation 38 5,549.32 6.13%
Rural Agriculture 1,267 77,183.74 85.28%
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-9
Vacant/Infill 873 732.38 0.81%
Total 4,024 90,506.43 100.0%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
LONG CREEK PLANNING AREA – EXISTING LAND USE
The existing land use within the Long Creek Planning Area is primarily rural agriculture, with
approximately 77% of land being classified as such. Single-family residences account for more
than 6,400 acres of land in this planning area. Rocky Point is located within this planning area.
There is a greater mix of land uses and general development within this planning area that can
be found throughout much of the rest of the inland portions of the County. Along the US 117
corridor there is a mix of commercial, office, industrial, and residential development.
Wastewater service is available along this corridor, but is only available for non-residential use.
Small subdivisions and residential development are located along the primary roadway corridors
and in close proximity to the Northeast Cape Fear River. With close proximity to New
Hanover County and easy access to I-40, it is anticipated that this area will have more
substantial growth and development than the other planning areas, save for Topsail. Close to
8% of land is dedicated to conservation efforts and is primarily attributed to the Bellhammon
Tract, located along the Northeast Cape Fear River. Approximately 1.5% of this planning area’s
land is currently being used for manufactured homes, which is the highest percentage across all
the other planning areas. This information is provided in Table 5.7: Long Creek Planning Area
Existing Land Use (2017) and Map 5.6: Long Creek Planning Area Existing Land Use.
Table 5.7: Long Creek Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Long Creek Planning
Area Parcel Count Acreage Percent Acreage
Commercial 86 280.05 0.48%
Office & Institutional 58 495.41 0.85%
Industrial 27 202.64 0.35%
Multi-Family Residential 12 9.32 0.02%
Single-Family Residential 3,134 6,419.36 11.05%
Manufactured Home 512 882.18 1.52%
Recreation 5 33.75 0.06%
Conservation 7 4,295.78 7.39%
Rural Agriculture 1,140 44,576.87 76.73%
Vacant/Infill 1,194 903.03 1.55%
Total 6,175 58,098.38 100.0%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
TOPSAIL PLANNING AREA – EXISTING LAND USE
The Topsail Planning Area is located along the coast in the southeastern portion of the County
and is bisected by US 17 and contains the unincorporated community of Hampstead. Despite
exhibiting characteristics of an incorporated municipality, Hampstead remains unincorporated.
According to population estimates outlined in Chapter 2 of this plan, the Topsail Planning Area
has experienced the greatest population growth rate increase from 2000 to 2015. Despite this,
as of 2017, nearly 50% of land is still classified as rural agriculture, much of which is located
west of US 17. Single-family residential development accounts for 10% of the land use within
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-10
this planning area or nearly 9,000 acres. Large housing developments are located east of US 17
and include the Scotts Hill community, Washington Acres, Olde Point, Belvedere Plantation,
and others. This area of the County is also beginning to experience redevelopment of
manufactured home communities. For example, the Topsail Greens golf course community is
undergoing the conversion of golf course fairways and manufactured housing to more expensive
stick-built single-family housing. As development pressures mount in this planning area, it is
anticipated that this trend will continue. As stated in Chapter 2, the share of manufactured
housing in the County appears to be declining in favor of stick-built or modular single-family
homes. However, there is still more than 1,100 acres of development allocated to
manufactured housing in the Topsail planning area – the majority of which is located north of
Hampstead and closer to the Town of Surf City.
Commercial development is scattered along the US 17 corridor, with the greatest
concentration found in the center of Hampstead and extending northeast to Sloop Point Road.
Conservation land accounts for the second largest use of land within the Topsail Planning Area.
This is due to a portion of the Holly Shelter Game Land in the planning area, as well as Lea-
Hutaff Island. These tracts of land are classified as conservation and will continue to be classified
as such in the future. There are more than 3,500 parcels classified as vacant/infill that are
available for development without further subdivision. The majority of these parcels are zoned
for single-family residential uses at a minimum lot size of 15,000 square feet.
This area has experienced substantial growth over the last thirty years. According to the
County’s 1987 Land Use Plan, residential development was slowly beginning to increase in this
area. An excerpt from the 1987 Land Use Plan provides insight into the land use pattern in this
area thirty years ago.
1987 Land Use Plan - Topsail Township Existing Land Use
Based on the survey, we found that commercial development continues to concentrate along
U.S. 17 near Poplar Grove Plantation, Hampstead, near Vista, and at the intersection of N.C.
210 and U.S. 17. In addition to commercial uses along the U.S. 17 corridor, two public schools
and a public library are located between Hampstead and the Belvedere Plantation
development.
Single-family residences are located along Scotts Hill Loop Road at Scotts Hill, with water access
for boats at Scotts Hill Marina. A large area between Scotts Hill and Washington Acres is
wooded and undeveloped. Washington Acres has approximately 75 lots developed, with most
of these developed lots being concentrated on or near the water. Washington Acres also has a
boat landing available. Deerfield, at the time of the survey in late 1985, had 21developed lots,
with most of those being located on the water. Development along Lea Drive/Factory Road
between Hampstead and the Intracoastal Waterway is a combination of conventional homes
and mobile homes.
Both Olde Point and Belvedere Plantation are very attractive planned communities surrounding
golf course facilities. The development along Kings Landing/Olde Point Loop at the waterfront is
a relatively high-density single-family development with rather small lots. Also, at the waterfront,
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-11
a marina is being developed as part of the Belvedere community. Continuing north on U.S. 17,
the next major new development is Topsail Green, which is an attractive mobile home
development around an 18-hole golf course. State Roads Sloop Point, Lewis Road, and Moores
Landing have a combination of conventional and mobile home development on single lots, with
Bay Harbour in the early development stages with only two developed lots in late 1985.
Virginia Creek Forest and Deer Run and Cedar Landing, near N.C. 50, are large, primarily
mobile home developments. Gabes Point is a larger residential development with entrance from
N.C. 50 at the entrance to the Surf City and Topsail Beach Bridge. Lots on or near the water
are developed, with many of the interior lots undeveloped.
Further information can be found in Table 5.8: Topsail Planning Area Existing Land Use (2017)
and Map 5.7: Topsail Planning Area Existing Land Use.
Table 5.8: Topsail Planning Area Existing Land Use (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Topsail Planning Area Parcel Count Acreage Percent Acreage
Commercial 261 597.50 0.69%
Office & Institutional 99 741.71 0.85%
Industrial 36 152.78 0.18%
Multi-Family Residential 336 35.14 0.04%
Single-Family Residential 9,027 8,758.72 10.06%
Manufactured Home 923 1,149.53 1.32%
Recreation 29 577.79 0.66%
Conservation 119 32,333.31 37.13%
Rural Agriculture 1,024 40,358.88 46.35%
Vacant/Infill 3,756 2,366.70 2.72%
Total 15,610 87,072.06 100.0%
*Waterbodies, incorporated municipalities, and rights-of-way are not included.
VACANT LAND ANALYSIS & DEVELOPMENT POTENTIAL
In order to better understand the impacts of potential development in the unincorporated
County, vacant and rural agricultural lands were analyzed based upon the zoning district in
which they are located. To further refine the potential for future development, land potentially
subject to wetlands was also removed from the calculation (see Map 3.6: Coastal and Non-
Coastal Wetlands). To establish the estimate, all acreage occupied by wetlands was removed
from the calculation. It should be noted that these mapped wetlands only represent an
indication of potential environmental constraints. Only those wetlands identified as “404” by
jurisdictional determination will pose true regulatory constraints. Housing unit estimates are
calculated based upon the current density allocation after removing 30% of the acreage to
account for roads, open space, utilities, and/or stormwater. These calculations are merely
estimates to convey the potential for development throughout the County. Table 5.9: Pender
County – Vacant/Rural Land not Impacted by Wetlands by Zoning Districts (2017) provides the
total acreage and percent acreage of land within each of the designated zoning districts.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-12
Table 5.9: Pender County – Vacant/Rural Land not Impacted by Wetlands by Zoning Districts
(2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Zoning District Total Acreage Percent Acreage
General Industrial 2,418.60 1.38%
Industrial Transition 29.48 0.02%
General Business 1,468.65 0.84%
Office & Institutional 53.12 0.03%
Planned Development 4,155.48 2.38%
Residential Performance 19,977.12 11.44%
Manufactured Housing Community 37.63 0.02%
Rural Agricultural 146,295.01 83.75%
Environmental Conservation 235.39 0.13%
Total 174,670.47 100.00%
Throughout the unincorporated County, Rural Agricultural zoning accounts for the greatest
percentage of potentially developable land. Though, most of this land will continue to be used
only for agricultural or very low density purposes. If all of this land were converted to single-
family development at the minimum lot size it would equate to nearly 100,000 additional single-
family homes. The Residential Performance and Planned Development zoning district account
for nearly 25,000 acres of land that could be developed for housing. Accordingly, there is ample
land available to accommodate future development throughout the entire county. More specific
analysis of vacant land and development potential by zoning district follows.
Table 5.10.: Pender County Planning Areas – Vacant/Rural Land not Impacted by Wetlands by
Zoning Districts (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Zoning District
Union Planning Area Holly Shelter Planning
Area Burgaw Planning Area
Total
Acreage
Percent
Acreage
Total
Acreage
Percent
Acreage
Total
Acreage
Percent
Acreage
General Industrial -- -- -- -- -- --
Industrial Transition -- -- -- -- -- --
General Business 690.35 1.12% 16.25 0.07% 249.29 1.53%
Office & Institutional 14.63 0.02% 6.37 0.03% 4.06 0.02%
Planned
Development -- -- -- -- -- --
Residential
Performance 2,631.35 4.28% 1,385.68 6.37% 2,897.53 17.78%
Manufactured
Housing Community -- -- -- -- -- --
Rural Agricultural 58,039.55 94.51% 20,210.61 92.91% 13,125.15 80.55%
Environmental
Conservation 35.13 0.06% 134.55 0.62% 18.14 0.11%
Total 61,411.00 100.00% 21,753.75 100.00% 16,294.18 100.00%
Within the Union, Holly Shelter, and Burgaw Planning Areas, the most significant percentage of
land available for development falls within the Rural Agricultural zoning district. Accordingly, it
is anticipated that these planning areas will continue to be predominantly rural in nature. Some
land is available for development in the Residential Performance zoning district, which allows
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-13
for housing development on lots of approximately 15,000 square feet. See Table 5.10 and
Table 5.11: Pender County Planning Areas – Vacant/Rural Land not Impacted by Wetlands by
Zoning Districts (2017)
UNION PLANNING AREA – VACANT LAND BY ZONING DISTRICT
Within this planning area, it is anticipated that minimal growth in housing and associated
services will occur over the next thirty years. Where growth does occur, it will likely be in
proximity to the Northeast Cape Fear River near the I-40/US 117 intersection and along the
US 421 corridor.
HOLLY SHELTER PLANNING AREA – VACANT LAND BY ZONING DISTRICT
The vast majority of land located within the Holly Shelter Planning Area is zoned Rural
Agriculture or Environmental Conservation. Accordingly, very low density residential
development and conservation lands will continue to be the predominant land use pattern in
the Holly Shelter Planning Area. Future development within this area will likely entail very low
density single-family residential uses and supporting services.
BURGAW PLANNING AREA – VACANT LAND BY ZONING DISTRICT
Within this planning area, there is nearly 3,000 acres of land available for development zoned
Residential Performance, which would allow for the development of nearly 6,000 single-family
homes in the planning area. There is also more than 13,000 acres of zoned Rural Agriculture.
As a result, a substantial deviation from the low density, agricultural land use pattern on the
periphery of the Town of Burgaw is not anticipated.
Table 5.11: Pender County Planning Areas – Vacant/Rural Land not Impacted by Wetlands by
Zoning Districts (2017)
Source: Cape Fear Council of Governments GIS, Pender County GIS
Zoning District
Caswell Planning Area Long Creek Planning
Area Topsail Planning Area
Total
Acreage
Percent
Acreage
Total
Acreage
Percent
Acreage
Total
Acreage
Percent
Acreage
General Industrial 516.97 1.43% 1,901.62 9.01% -- --
Industrial Transition -- -- 29.48 0.14% -- --
General Business 53.66 0.15% 197.39 0.94% 261.53 1.72%
Office & Institutional 6.59 0.02% 16.27 0.08% 4.91 0.03%
Planned
Development 352.43 0.98% 899.40 4.26% 2,899.47 19.03%
Residential
Performance 1,153.02 3.19% 6,791.47 32.17% 5,114.96 33.57%
Manufactured
Housing Community -- -- -- -- 37.63 0.25%
Rural Agricultural 34,494.47 95.54% 13,204.74 62.55% 6,914.44 45.38%
Environmental
Conservation 44.59 0.12% -- -- 2.98 0.02%
Total 36,104.76 100.00% 21,109.28 100.00% 15,235.93 100.00%
The Caswell, Long Creek, and Topsail Planning Areas are anticipated to experience much more
development and growth than the planning areas located in the northern portion of the
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-14
County. In total, throughout these three planning areas, there is more than 17,000 acres of
vacant land zoned as Residential Performance or Planned Development (See Table 5.10).
Accordingly, there is ample suitable land available to accommodate projected population
growth.
CASWELL PLANNING AREA – VACANT LAND BY ZONING DISTRICT
In the Caswell Planning Area, the vast majority of land available for development – nearly
35,000 acres – is zoned Rural Agricultural. This would allow for very low density residential
development. Much of the southern portion of the US 421 corridor is zoned Rural Agricultural,
despite its close proximity to New Hanover County and the 140 Bypass. The potential for
more dense residential development in this planning area is feasible, as approximately 1,500
acres of land is zoned for Residential Performance and Planned Development. In addition, there
is more than 500 acres of underutilized land zoned for General Industrial along the US 421
corridor.
LONG CREEK PLANNING AREA – VACANT LAND BY ZONING DISTRICT
Rocky Point is located in the Long Creek Planning Area whose close proximity to I-40, Castle
Hayne, and several employment centers make the area poised for increased growth and
development. Within the planning area, there is nearly 7,000 acres of suitable land zoned
Residential Performance that would allow for the construction of approximately 15,000 housing
units. However, the vast majority of land (63%) is zoned as Rural Agriculture. There is roughly
200 acres of vacant land zoned General Business – the majority of which is located near the
intersection of US 117 and NC-210 just west of I-40 – to support future development of
commercial, office, retail, healthcare, and accommodation type uses. Lastly, there is nearly
2,000 acres of vacant land zoned for General Industrial uses. Much of this land is located along
I-40 and south of NC 210, some of which may be better suited for residential rather than
industrial uses.
TOPSAIL PLANNING AREA – VACANT LAND BY ZONING DISTRICT
As discussed previously, the Topsail Planning Area has experienced the most growth and
development impacts of all the planning areas. Even with the significant amount of development
that has occurred over the last thirty years, there still remains an abundant amount of land
suitable for residential and commercial development in the planning area. There is more than
8,000 acres of vacant land zoned for Residential Performance and Planned Development in the
planning area. If built out, this would equate to approximately 17,000 new housing units. Within
this 8,000 acres, there are several master planned communities such as Blake Farm, Hawksbill
Cove, and Wyndwater that will be developed over the next five to ten years and will contribute
to the housing boom in the area. Additionally, there are a substantial number of platted
residential lots that are currently vacant, where infill residential development will occur. Many
of these vacant lots are located in the existing communities of Olde Point, Belvedere Plantation,
Snug Harbor, Virginia Creek, Washington Acres, and others. There is also land available for
commercial development – more than 250 acres zoned General Business –along the US 17
corridor. Development within this General Business district will provide retail and office
opportunities for the residential communities in the planning area.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-15
FUTURE LAND USE
The Pender County Future Land Use Map (Map 5.8) is created to provide guidance for zoning
and land use decisions. The map visually depicts the County’s long range land use and
development goals. The map is intended to show the community’s planned future growth
patterns within the County’s planning jurisdiction and is also provided for each respective
planning area (Maps 5.9 – 5.14).
The future land use categories provide the desired land uses and development characteristics
for each respective category. While the future land use map and guidelines establish goals and
policy direction for various areas in the County’s planning jurisdiction, it is the County’s Official
Zoning Map and Unified Development Ordinance that codifies the actual development
regulations within the planning jurisdiction.
FUTURE LAND USE CATEGORIES
This section defines the future land use guidelines for Pender County. The future land use
classification includes twelve land use categories. North Carolina General Statutes require that
all rezoning decisions and ordinance amendments be reviewed for consistency with the
County’s Land Use Plan, including a statement by the Planning Board and Board of
Commissioners as to whether the amendment is or is not consistent with the Land Use Plan.
Each future land use category includes a description and desired uses. Desired density is
provided for residential categories, which is classified based on Dwelling Units per Acre (du/a).
Dwelling units per acre are the number of residential units constructed per acre of lot size. The
following narrative outlines the key desired development guidelines for each individual future
land use category depicted on the future land use maps.
HOW TO USE THE FUTURE LAND USE MAP AND GUIDELINES
Upon adoption of this plan, the Planning Board, Board of Commissioners, and citizens should
reference this chapter in reviewing land use and development related decisions and policy
implementation. The future land use map should be amended if significant changes occur or are
proposed to occur. This will aid in consistency with changes to the County’s Official Zoning
Map.
Each future land use classification (note: category is used interchangeably throughout this
chapter) contained in this chapter is described with a short narrative and supporting
development guidelines. The color that identifies that future land use category on the Future
Land Use Map is also provided on the page containing the narrative and development guidelines.
It should be noted that the boundary of each particular future land use category is not bound
explicitly by parcel lines.
Key terms used in the future land use category narrative:
• Mixed use: The horizontal or vertical mixture of non-residential and/or residential uses
within a common development plan. The term mixed use is intended to imply flexibility
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-16
in market driven development of compatible land uses to reduce traffic congestion,
provide entertainment and services to residents, and enhance quality of life for Pender
County residents.
• Neighborhood scale: Development that conforms to the neighborhood fabric. The
footprint of neighborhood scale structures are typically limited to 15,000 square feet or
less with surface parking lots not exceeding 20,000 square feet.
• Human scale: Development that caters to the pedestrian rather than the automobile.
Structures are built with architectural features, fenestration, 25% transparency or
greater, and are served by bicycle and pedestrian facilities.
• Supporting services: Infrastructure or land uses that are complementary to more dense
residential development. This includes water/sewer infrastructure, health care facilities,
grocery stores, and broadband availability.
• Employment centers: Development of significant commerce centers that support
employment. These commerce centers may consist of multi-story office buildings with
footprints in excess of 20,000 square feet. These centers must be located on primary
roadway corridors such as US 17, US 117, US 421, and I-40.
REGIONAL MIXED USE
The regional mixed use category will allow for the strategic allocation of future development
and population growth, while limiting land use conflicts within existing neighborhoods. Growth
is focused in locations that are served by water/sewer infrastructure and are located along
planned major collector roadways and existing primary roadway corridors in the southern
portion of the County (I-40, US 17, US 117, US 421, and NC-210). This future land use
category provides access to retail, office, and multi-family residential uses. These land uses are
primarily accessed by the automobile, but facilities should be included to increase the viability of
access via walking or cycling.
The preferred land use mix is primarily commercial/retail and office with multi-family residential
uses. Large employment centers and retail spaces are encouraged. Higher density single-family
uses should account for less than 25% of a development proposal and should complement a
more substantial mix of commercial/office and multi-family development. Development within
this category should provide ample landscaping and street trees to present an inviting
environment to travelers passing through the County. More intense commercial and offices
uses requiring larger lots sizes, parking area, and stormwater infrastructure are permitted in
this land use category. Artisan manufacturing is encouraged in this category.
Big box buildings, such as department stores, variety stores, warehouse retail centers, grocery
stores, furniture outlets, and similar buildings shall be designed such that the exterior façade has
the appearance of several smaller, human scale, buildings through the use of vertical treatments
and elements that break up the horizontal wall.
Internal circulation patterns should create street-like spaces lined with on-street angled or
parallel parking and parking areas. Internal pedestrian connections should also be provided
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-17
whereby structures within a development are connected with each other. Sidewalks should
connect all buildings within the site and to adjoining sites. Sidewalks should have street trees
and pedestrian lighting. Surface parking lots should be heavily shaded, landscaped, and located in
the rear of new development where practicable. Shared parking should be encouraged where
multiple uses are located within walking distance (1/4 mile). Stormwater infrastructure should
be located behind buildings or incorporated into the design of the development as an amenity.
Development density within this category allows for up to 15 units per acre for multi-family
residential development and up to 10 units per acre for single family development.
Desired Uses:
• Most commercial, retail, office, & institutional uses
• Employment centers
• Artisan manufacturing
• Multi-family residential
• High density single-family residential uses
• Upper story residential
Inappropriate Uses:
• Medium and low density single-family residential uses
• Storage facilities
• Industrial uses
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 – 10 foot sidewalks, crosswalks, pedestrian signals
• Cyclist: bicycle lanes, multi-use paths, and bicycle parking
• Transit: Park and ride facilities and limited fixed-route service (including bus shelters)
NEIGHBORHOOD MIXED USE
Neighborhood mixed use allows for a transition between more intense commercial, office, and
residential development to lower density residential neighborhoods. The neighborhood mixed
use category is primarily dedicated to non-residential uses that provide services, entertainment,
and amenities to residents within a three mile radius. Land use and development within this
category is closely coordinated with existing and planned roadway transportation networks,
while encouraging bicycle and pedestrian access. This future land use category should be
composed of a mixture of integrated commercial, office, institutional, and single-family
residential uses. This future land use classification is not intended to be solely reserved for
mixed use developments. Single use developments that contribute toward an integrated land
use pattern of appropriate commercial, office, civic, and medium density residential uses are
encouraged.
Regional Mixed Use
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-18
Appropriate uses include neighborhood-scale retail, restaurant, and office establishments;
religious and educational institutions; and higher-density single-family residences – attached and
detached. Large-scale or intense commercial establishments, multi-family development, and
industrial operations are not appropriate. Building footprints are generally limited to 15,000
square feet in size or smaller. These areas should be served by water and sewer infrastructure.
Development density within this category allows for up to 10 units per acre for residential
development.
Desired Uses:
• Commercial/retail and office uses that serve existing communities. Examples include
restaurants, cafes, drug stores, healthcare facilities, professional offices, and retail -
oriented uses.
• Single-family dwellings – detached, duplex, and townhouse (up to ten units in a single
structure)
Inappropriate Uses:
• Establishments requiring large surface parking in excess of 20,000 square feet
• Low density residential uses
• Industrial uses
• Storage facilities
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks, crosswalks, and pedestrian signals
• Cyclist: bicycle lanes, multi-use paths, and bicycle parking
COMMERCIAL WATERFRONT
Pender County’s Intracoastal Waterway and river segments are prime locations for strategically
placed development to support and enhance coastal activities, water-based recreation, and the
tourism industry. This future land use category should be developed with commercial and
recreational amenities that support the County’s interest as a tourism destination, while
providing access to these resources for residents and the general public. Principles for
development include allocation of space for public access, coordination with floodplain and
CAMA development regulations, sensitivity to natural habitat, tree preservation, and buffering
of any adjacent residential uses. The use of low-impact development for stormwater
management is highly encouraged. Pervious parking lots are highly desired and appropriate
gravel (clean-washed #57 stone) may be used in place of permanent surfaces. Ease of vehicular
and bike/pedestrian access is vital to the commercial waterfront land uses.
Neighborhood
Mixed Use
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-19
Direct access to public trust waters should be provided. Development within this future land
use category should be compatibly designed and connected to the adjacent waterbody – river
or Intracoastal Waterway – through designated public access locations such as a boardwalk,
dock, pier, and/or canoe/kayak or small boat launch.
Desired Uses:
• Water-based restaurants and retail establishments open to the public
• Water-based recreational uses available for public use
Inappropriate Uses:
• Uses not associated with coastal or riverine waters
• Industrial uses
• Residential uses
Transportation Infrastructure:
• Automobile: collector (local, minor) and local roads
• Pedestrian: 5 foot sidewalks
• Cyclist: bicycle lanes, multi-use paths, and bicycle parking
CIVIC
The civic future land use category accounts for the development of governmental buildings and
supporting community services such as police and fire rescue. Public institutional uses such as
schools and governmental buildings are also included in this future land use category.
Desired Uses:
• Public uses
Inappropriate Uses:
• Commercial development
• Residential development
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks
• Cyclist: bicycle lanes, multi-use paths, and bicycle parking
Commercial
Waterfront
Civic
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-20
INDUSTRIAL
To increase employment in the County, industrial uses are highly encouraged in appropriate
locations such as the Pender Commerce Park or US 117 in Rocky Point. Industrial land uses
that are adjacent to residential land uses should be heavily buffered to reduce any adverse
impacts between these two incompatible uses. The width of the buffer should be based on the
type of industry and its potential to create noise, odors, heavy truck traffic, or other negative
effects.
Appropriate uses include manufacturing, warehousing and wholesaling, transportation and
distribution centers, water and wastewater treatment facilities, landfills, bulk storage of
hazardous materials, large equipment storage and operation, and other uses that may be
unpopular neighbors. Residential development and general retail uses are not appropriate.
These areas should be served by water and sewer infrastructure.
Desired Uses:
• Industrial
• Manufacturing
• Mining
Inappropriate Uses:
• Residential
• Commercial
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks on site
• Cyclist: bicycle lanes and bicycle parking on site
LIGHT INDUSTRIAL
The purpose of this land use category is for the use of light industrial operations and heavy
commercial uses such as building material suppliers, auto repair, auto sales, storage facilities,
and other establishments with extensive outdoor storage or those that will have an impact on
neighboring properties. Light industries typically require less space, raw power, and water
consumption than those in the Industrial future land use category. These uses may entail the
manufacturing of partially processed materials to produce items of relatively high value per unit
weight.
These areas should have excellent transportation access (or potential access) to primary
roadways. These areas may be individual sites or integrated into the Pender Commerce Park.
Light industrial uses create minimal emission of smoke, dust, fumes, glare, noise, and vibrations.
These areas should be served by water and sewer infrastructure.
Industrial
Light Industrial
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-21
Desired Uses:
• Light industrial
• Light manufacturing
• Office
• Heavy commercial
• Storage facilities
Inappropriate Uses:
• Heavy industrial
• Heavy manufacturing
• Residential uses
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks
• Cyclist: bicycle lanes and bicycle parking on site
MEDIUM DENSITY RESIDENTIAL
Medium density residential uses are vital to supporting Pender County’s growing population by
strategically locating more dense residential development in areas that will not create conflicts
with existing neighborhoods. These uses are located in close proximity to supporting services
and a mixture of development types, and are generally found in the southern portion of the
County. Appropriate uses include single-family residences, duplexes, townhomes, community
recreation and open space uses, and neighborhood-scale institutional uses such as religious and
civic organizations. Townhomes may be suitable when proposed as part of a master planned
community whereby the dimensional requirements and uses forming the outer boundary of the
community are compatible with the adjacent properties or permissible uses. Clustering of new
residential communities is encouraged.
Planned communities may also include well-integrated neighborhood-scale commercial and
office uses. Industrial and manufacturing uses, and commercial and office uses not located within
a planned community, are inappropriate. Development density within this category is three to
six dwelling units an acre or less.
Desired Uses:
• Single-family dwellings – detached and duplex (up to two units per structure)
• Townhomes may be suitable when included as part of a master planned community
• Age appropriate retirement housing
• Recreation, parks, and open space
Medium Density
Residential
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-22
Inappropriate Uses:
• Multi-family residential uses
• Commercial, office, and institutional development not integrated into a planned
community
• Industrial development
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks and crosswalks at primary intersections
• Cyclist: bicycle lanes and multi-use paths
LOW DENSITY RESIDENTIAL
The Low Density Residential future land category is located on the fringe of medium density
residential uses and within existing single-family neighborhoods. These areas are typically
established single-family neighborhoods with a low density residential development pattern.
Appropriate uses include single-family dwellings and neighborhood-scale institutional facilities.
Commercial and industrial uses are inappropriate in these areas, as are large institutions and
other significant traffic generators. Duplexes and townhomes may be suitable when proposed
as part of a master planned community whereby the dimensional requirements and uses
forming the outer boundary of the community are compatible with the adjacent properties or
permissible uses. Clustering of new communities is encouraged.
Development density within this category is two dwelling units an acre or less. Water and
sewer service may not be available in these areas.
Desired Uses:
• Single-family residential uses – detached
• Duplexes and townhomes may be suitable when included as part of a master planned
community
• Recreation, parks, and open space
Inappropriate Uses:
• Non-residential development
• Single-family dwellings – attached
• Multi-family residential uses
Transportation Infrastructure:
• Automobile: Collector (local, minor), and local roads
• Pedestrian: 5 foot sidewalks on one side
• Cyclist: bicycle lanes and multi-use paths
Low Density
Residential
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-23
COASTAL RESIDENTIAL
Supporting the County’s coastal character and natural habitat is a top priority for Pender
County residents. To more appropriately preserve the County’s coastal character, the Coastal
Residential future land use category is established. Coastal residential land uses are located east
of the US 17 corridor and generally within a half-mile of estuarine waters such as coastal creeks
and the Intracoastal Waterway. Appropriate uses include single-family residences, community
recreation and open space uses, and water-based recreation uses (public and private).
Unencumbered access to public trust coastal waters and maximum development setback from
the shoreline is highly encouraged. Clustering of new communities is encouraged.
To support adjacent coastal surface water quality, low impact development (LID) is encouraged.
In general, lots should maximize pervious surfaces. Tree preservation and mitigation is required
for stormwater purposes and as a means of preserving the coastal habitat. Development density
within this category is three dwelling units an acre or less. Water and sewer service are
typically available in these areas.
Desired Uses:
• Single-family dwellings – detached
• Recreation, parks, and open space
Inappropriate Uses:
• Single-family dwellings – attached
• Multi-family residential uses
• Commercial, office, and institutional development
• Industrial development
Transportation Infrastructure:
• Automobile: Collector (local, minor) and local roads
• Pedestrian: 5 foot sidewalks
• Cyclist: bicycle lanes and multi-use paths
RURAL AGRICULTURE
The Rural Agricultural future land use category supports and protects Pender County’s
agricultural areas. These areas are an essential part of the County’s economy and agricultural
heritage. Within the Rural Agriculture future land use category, agriculture uses are highly
encouraged. Preservation of prime farmland soils for continued prosperity of farming and
forestry operations should be considered. Manufactured homes and very low density single-
family detached dwellings are appropriate uses in this category. Commercial, civic, office, and
institutional uses are permitted where compatible with existing neighborhoods and as a
resource or employment opportunity for area residents. Development density within this
Coastal
Residential
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-24
category is one dwelling unit an acre or less. Expansion of centralized water and sewer systems
within this future land use category are discouraged, unless necessary to protect public health
when existing systems fail.
Desired Uses:
• Single-family dwellings – detached
• Manufactured homes
• Recreation, parks, and open space
Inappropriate Uses:
• Single-family dwellings – attached
• Multi-family residential uses
• Most commercial, office, and institutional development
• Industrial development
Transportation Infrastructure:
• Automobile: Collector (local, minor) and local roads
• Cyclist: paved shoulders and multi-use paths
RECREATION
The Recreation future land use category is intended to preserve future public and private
recreation/open space lands. Recreation uses such as parks, golf courses, boat launches, and
passive open space should be preserved for use by future generations. In order to protect
property values and enhance quality of life, these lands should be protected from future
development.
Desired Uses:
• Preserved open space
• Active and passive recreation uses
• Recreational amenities and clubhouses
• Public buildings
Inappropriate Uses:
• Non-residential development
• Residential development
Transportation Infrastructure:
• Automobile: arterial, collector (major, local, minor), and local roads
• Pedestrian: 5 foot sidewalks
• Cyclist: bicycle lanes, multi-use paths, and bicycle parking
Recreation
Rural
Agriculture
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-25
CONSERVATION
This land use category includes state-owned game lands, conservation trust lands, and Lea-
Hutaff Island. These lands serve as resources for the public at large through environmental
education opportunities, natural aesthetic qualities, wildlife habitat, and stormwater drainage.
Development is strongly discouraged within this future land use category. Appropriate uses
include parks, passive/active open space, and nature centers. Residential, commercial, and
industrial development are not appropriate.
Desired Uses:
• Nature trails
• Preserved open space
• Nature-based educational uses that have limited environmental impact
• Forestry and agricultural uses
• Passive recreation areas
Inappropriate Uses:
• Non-residential development unless exempted above
• Residential development
Transportation Infrastructure:
• Automobile: collector (local, minor) and local roads
• Pedestrian: nature trails
• Cyclist: paved shoulders and multi-use paths
Conservation
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-26
SUMMARY
Listed below is a summary of the analysis and information included in this chapter:
• Rural agriculture land uses occupy the greatest percentage of land throughout
unincorporated Pender County. This land use classification accounts for 61%
(344,111.97 acres) of land throughout the unincorporated County.
• Single-family dwellings account for the most significant category of developed land in the
unincorporated County, followed by manufactured dwellings. In total, approximately 7%
(40,000 acres) of land is used for single-family residential purposes.
• Vacant/Infill land accounts for a little over 1% of the land in the Pender County. These
lands are currently undeveloped and are less than 2 acres in area. As such, these parcels
represent prime development opportunities as many will not be further subdivided and
only require a structure to be built upon them.
• Dating back to the 1987 Land Use Plan, it can be said that land use patterns thirty years
ago are largely similar to those today, except for perhaps an increase in the relative
density of development.
• Throughout the unincorporated County, Rural Agricultural zoning accounts for the
greatest percentage of land. Though, most of this land will continue to be used only for
agricultural or very low density purposes. If all of this land were converted to single-
family development at the minimum lot size it would equate to nearly 100,000 additional
single-family homes.
• The Residential Performance and Planned Development zoning district account for
nearly 25,000 acres of land that could be developed for housing. Accordingly, there is
ample land available to accommodate future development throughout the entire county.
• Within the Union, Holly Shelter, and Burgaw Planning Areas, the most significant
percentage of land available for development falls within the Rural Agricultural zoning
district. Accordingly, it is anticipated that these planning areas will continue to be
predominantly rural in nature.
• The Caswell, Long Creek, and Topsail Planning Areas are anticipated to experience
much more development and growth than the planning areas located in the northern
portion of the County. In total, throughout these three planning areas, there is more
than 17,000 acres of vacant land zoned as Residential Performance or Planned
Development.
• The Pender County Future Land Use Map is created to provide guidance for zoning and
land use decisions. The map visually depicts the County’s long range land use and
development goals. The map is intended to show the community’s planned future
growth patterns within the County’s planning jurisdiction.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-27
GOALS, OBJECTIVES, AND POLICIES
INTRODUCTION
The County has established a set of land use and development related policies to act as
guidelines during any official decision making process. These policies and goals reflect the
comments and concerns received during the public involvement process and provide citizens,
property owners, and developers with a predictability of official actions. Policies in this chapter
relate to land use and growth management. One CAMA management topic is covered in the
policy section herein: Land Use Compatibility.
Please note the following concerning the usage and definition of a Goal, Objective, Policy, and
Recommended Action. Each of these terms are intended for a specific component of the
implementation and utility of this land use plan. See below for more information:
• Goal: A general statement indicating a desired end or the direction the County will
follow to achieve that end.
• Objective: Direction toward the attainment of a particular goal.
• Policy: A statement identifying the County’s position regarding the pursuit of a goal or
objective.
• Recommended Action: A statement outlining a specific course of action the County
may pursue to implement goals and policies. Recommended actions are not used in
review of development proposals, text amendments, and/or rezoning requests.
Refer to Appendix A for Definitions of action words contained within the policy section.
LAND USE COMPATIBILITY
Goal 5.1: Land Use and Growth Management: Manage the physical growth and
development of Pender County by encouraging more intensive land uses in key locations
identified for such growth while preserving and protecting the unique physical character and
social assets of the rural heritage and coastal habitat that makes the County a unique place to
live.
Objective 5.1: Land Use and Growth Management: Ensure that development and use of
resources balances protection of natural resources and agricultural lands with economic
development, avoids risks to public health and welfare, and is consistent with the capability of
the land.
Policy 5.1.A: New Development: The County shall require all development to
adhere to the land use regulations set forth in the County’s Unified Development
Ordinance. Accordingly, the County shall utilize any and all zoning and subdivision
procedures, allowed per NC General Statutes, to preserve the unique characteristics of
Pender County. This may include – but shall not be limited to – overlay districts, cluster
development requirements, density incentives, open space allocation, tree preservation,
school site reservation, conditional zoning, and other tools as may be necessary.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-28
Policy 5.1.B: Land Use Plan Consistency: The County generally requires that any
official land use and development related actions (e.g. re-zonings, text amendments, and
special use permits) remain consistent with the policies adopted in this plan and any
other applicable plan. Any actions that are inconsistent with such plans shall require a
statement from the Planning Board and Board of Commissioners approving such
decisions, as to the in conditions taken into account in amending the Unified
Development Ordinance to meet the development needs of the community, and why
the action was reasonable and in the public interest.
Policy 5.1.C: Coordination with Infrastructure/Services: The County shall
encourage development in areas where the necessary infrastructure – roads, water,
sewer, broadband, and schools – is available, planned or can be most cost effectively
provided and extended to serve existing and future development. Natural resource
conservation should be considered.
Recommended Action 5.1.C.1: Annually review the future land use map in
concert with new or proposed infrastructure to ensure the desired growth
pattern reflects the expansion of new roads, water, sewer, broadband, or
schools. Identify geographic areas that may be suitable for an increase or
decrease in the relative density associated with infrastructure plans. This review
should include an inventory and analysis of completed or planned collector
streets.
Recommended Action 5.1.C.2: To avoid unnecessary impacts to wildlife
habitat, the Biodiversity/Wildlife Habitat Assessment and other conservation GIS
map layers and information will be considered in future growth plans.
Policy 5.1.D: Focused Growth and Development: The County supports a growth
pattern that includes low density single-family residential communities, but also allows
for the strategic placement of higher density residential, mixed uses, and commercial
development to accommodate and support future population growth, where necessary
infrastructure exists or is planned.
Policy 5.1.E: Compatible Development: The County supports new commercial
and multi-family developments that blend with surrounding neighborhoods and limit
traffic, noise, and light impacts on existing residential uses.
Policy 5.1.F: Conditional Zoning: The County shall continue to use conditional
zoning process as a tool for encouraging desirable development outcomes.
Policy 5.1.G: Development Review: The County supports an efficient, transparent,
and predictable development review and approval procedure.
Recommended Action 5.1.G.1: Consider rezoning all vacant Planned
Development tracts to a base zoning district that is consistent with the future
land use map. Establish an inventory of vacant land zoned Planned Development.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-29
Recommended Action 5.1.G.2: Consider revising the County’s Master
Development Plan review procedure to only apply to phased development plans.
Where unphased development is proposed, the Master Development Plan
procedure should be modified to reflect a staff/technical review committee
review of a conceptual or schematic plan. Consider revising or removing the
Master Development Plan procedure for vacant land within the Planned
Development zoning district. An option for by right development without
Planning Board approval should be provided to development applicants and
property owners within the Planned Development district.
MIXED USE DEVELOPMENT: COMMERCIAL, OFFICE, AND MULTI-FAMILY
Policy 5.1.H: Mixed Use Development: The County supports a wide range of
commercial and residential development at varying intensities, when appropriately
located, and provided that impacts to adjacent property owners and traffic congestion is
mitigated.
Recommend Action 5.1.H.1: Consider establishing Mixed Use zoning
districts consistent with the County’s future land use map – Regional and
Neighborhood – which allow for development of multi-family, commercial, office,
and vertical mixed use development.
Recommend Action 5.1.H.2: Consider establishing urban design guidelines
and/or Form Based Code requirements for development within the Regional and
Neighborhood Mixed Use future land use category. This effort should be
undertaken by a consultant as part of public driven master planning process.
Recommended Action 5.1.H.3: To encourage the installation of shade trees,
the following should be removed from the County’s “Canopy Tree” plant
material list: Crepe Myrtle, Gingko Biloba, and Washington Hawthorn. Such
trees are selected for removal due to their limited canopy spread and ability to
provide shade.
Recommended Action 5.1.H.4: Require the installation of bicycle and
pedestrian infrastructure as outlined in a future Comprehensive Bicycle and
Pedestrian Transportation Plan, which specifically serves the development.
Policy 5.1.I: Multi-family Residential Development: The County shall allow multi-
family development in designated and appropriate areas as identified within the Regional
Mixed Use future land use category.
Recommended Action 5.1.I.1: Consider allowing multi-family developments
as a by right use in certain zoning districts in accordance with the future land use
map.
Recommended Action 5.1.I.2: Consider establishing residential density
standards that are comparable to neighboring jurisdictions. As part of the
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-30
procedure, the County should analyze and research any and all incentives and/or
supplemental regulations whereby an increase in density is granted. Neighboring
jurisdictions: Onslow County – 10 dwelling units per acre, Brunswick County –
14 dwelling units per acre, New Hanover County – 17 dwelling units per acre.
Recommended Action 5.1.I.3: Consider establishing options whereby multi-
family residential developments contribute funds for the County to acquire
water-based recreational areas serving residents in the immediate area rather
than for construction/allocation of open space within their particular
development. Adherence to the provisions outlined in NCGS 153A-331 is
required.
Policy 5.1.J: Multi-family Residential Development and Infrastructure: The
County shall coordinate the expansion of multi-family residential development with the
availability of water and sewer infrastructure.
Policy 5.1.K: Commercial Development: The County supports a wide range of
commercial development, particularly those businesses that provide needed services to
residents and visitors, provided that the impacts on traffic are minimized.
Recommended Action 5.1.K.1: Discourage the construction of storage
facilities along the road frontage. Such facilities should be located behind other
development and generally not visible from primary roadways. Based on public
input, storage facilities are not desired along the US 17 corridor.
Policy 5.1.L: Office and Employment Centers: The County vigorously supports
the development of large-scale office and employment centers to increase the number
of jobs located within the County.
Policy 5.1.M: Commercial Waterfront: The County supports carefully developed
commercial waterfront locations for use by the public, as a means to increase access to
public trust areas, and to support the tourism industry.
Recommended Action 5.1.M.1: Consider establishing a Commercial
Waterfront zoning district consistent with the County’s future land use map.
Uses should only be permitted through the special use permit process or specific
development standards. Water-based restaurants, retail establishments, and
recreational uses available for public use are desired.
INDUSTRIAL USES, BUSINESS DEVELOPMENT, AND TOURISM
Policy 5.1.N Industrial Uses and Business Development: The County supports
the recruitment and siting of compatible industrial, heavy commercial, and large-scale
employment establishments in areas that are consistent with County’s future land use
map. Compatible heavy commercial and employment center uses are also appropriate
within the Regional Mixed Use future land use category.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-31
Recommended Action 5.1.N.1: Consider committing additional County
resources to improve and expand efforts to retain and recruit industries. Place
emphasis on re-use of vacant buildings, recruitment of clean industries,
expansion of the Pender Commerce Park, and creation of jobs.
Policy 5.1.O Pender Commerce Park/US 421: The County encourages and
supports economic development projects of industrial, commercial, and other
employment-related development in Pender Commerce Park and other properties in
the vicinity.
Policy 5.1.P: Industrial Development Infrastructure: The County supports the
expansion of water and sewer infrastructure for industrial and business development as
depicted on the County’s future land use map.
Policy 5.1.Q: Industrial Development in Hazard Areas: The County discourages
industrial development within special flood hazard areas. This policy applies to both new
industrial development and to expansion of existing industrial facilities.
Policy 5.1.R: Storage Facilities: The County supports the development of storage
facility uses in the Industrial and Light Industrial future land use categories.
Policy 5.1.S: Wallace Airport Service: The County supports on-going efforts to
retain and enhance air service at Wallace Airport/Henderson Field.
Recommended Action 5.1.S.1: Continue to work with the Town of Wallace
to identify opportunities for commercial and industrial expansion in the
proximity of the airport.
Policy 5.1.T: Maritime Industry: The County supports maritime-related industries
such as marine biotechnology, commercial fishing, aquaculture, and coastal tourism.
Recommended Action 5.1.T.1: Consider options to partner with the
UNCW Center for Marine Science and MARBIONIC to identify opportunities
for marine biotech, aquaculture, or uses that would be compatible with coastal
tourism.
Policy 5.1.U: Tourism Development and Uses: The County shall strive to protect
and enhance coastal habitats, agricultural heritage, and surface water quality as an
effective method for continued expansion of tourism-related industries and jobs.
RESIDENTIAL DEVELOPMENT AND HOUSING
Policy 5.1.V: Residential Development: The County supports a range of housing
types and development at appropriate densities and locations that are compatible with
their surroundings and are in accordance with the future land use map.
Recommended Action 5.1.V.1: Consider establishing tiered residential
zoning districts based upon the future land use map and/or existing lot sizes.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-32
Policy 5.1.W: Single-family Residential Development: The County shall maintain
areas exclusively for conventional single-family development. Conversion of single-family
homes to two-family and/or multi-family residential uses within established single-family
neighborhoods shall be discouraged.
Policy 5.1.X: Coastal Residential Development: The County supports the
protection of existing coastal single-family residential neighborhoods and property
values by encouraging low-impact development principles, impervious coverage
thresholds, public trust access, and preservation of tree canopy.
Recommended Action 5.1.X.1: Consider the establishment of a new Coastal
Residential zoning district or overlay district for single-family residential
development within ½ mile of estuarine or coastal waters. Such a district should
encourage low impact development (LID), limit impervious surface coverage,
require tree preservation and mitigation, and incentivize the allocation of public
access to coastal waters.
Policy 5.1.Y: Manufactured Homes: The County shall continue to provide areas
exclusively for manufactured housing development in the planning jurisdiction.
Goal 5.1.Z: Cluster Development Incentive: The County supports the clustering
of residential development within the residential future land use categories for the
preservation of coastal natural resources, prime agricultural lands, or wildlife habitat
areas.
Recommended Action 5.1.Z.1: Consider incentives such as a density bonus
where it can be demonstrated that a development will perpetually preserve
coastal natural resources, prime agricultural lands, and/or wildlife habitat areas in
accordance with the NC WRC “Conservation Recommendations for Priority
Terrestrial Wildlife Species and Habitats in North Carolina.”
Policy 5.1.AA: Public Access Incentive: The County supports increased access to
public trust waters through public access easements.
Recommended Action 5.1.AA.1: Consider incentives such as a density
bonus where a development provides public trust water access to County
residents through a permanent access easement. Such a provision may require
the dedication of public access easements through extension of right-of-way to
high water marks as a means of recreation and/or a fee-in-lieu for waterfront
acquisition. NOTE: See Recommended Action 4.4.B.2.
Policy 5.1.BB: Workforce Housing: The County supports the development of a
variety of workforce housing options for teachers, fire fighters, police officers, seniors,
and low to moderate income persons.
Recommended Action 5.1.BB.1: Consider establishing zoning district
regulations which support a variety of housing options in close proximity to
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-33
primary employment centers such as the Pender Commerce Park, US 421, and
US 117/210.
Recommended Action 5.1.BB.2: Consider incentives such as a density bonus
where a development provides housing for low to moderate income persons.
RURAL RESIDENTIAL AND AGRICULTURE
Policy 5.1.CC: Agricultural Business: The County support efforts to preserve
existing farming operations and to expand agri-business opportunities.
Policy 5.1.DD: Mitigating Impacts: The County supports efforts to mitigate adverse
effects of large-scale livestock farms, such as odor and potential ground/surface water
pollution from waste lagoons.
Policy 5.1.EE: Rural Land Use Patterns: The County supports the rural residential
and agricultural land use patterns as they currently exist throughout much of the
County and as depicted on the future land use map.
Recommended Action 5.1.EE.1: Consider establishing a zoning district
specific to the Penderlea community which will preserve the existing land use
pattern and lifestyle of the area.
Policy 5.1.FF: Rural Non-Residential Uses: The County shall continue to
accommodate limited non-residential uses in rural areas.
Recommended Action 5.1.FF.1: Consider increasing development intensity
and uses at primary rural roadway intersection in accordance with the future
land use map.
Policy 5.1.GG: Rural Infrastructure Expansion: The County generally discourages
the expansion of water and sewer infrastructure in the Rural Agricultural future land use
category, unless necessary to protect public health when existing systems fail.
RECREATION AND CONSERVATION
Policy 5.1.HH: Recreational Development: The County encourages and supports
expansion and preservation of public and private recreational lands.
Policy 5.1.II: Conservation Lands: The County supports the preservation of existing
conservation lands as depicted on the future land use map for education opportunities,
natural aesthetic qualities, wildlife habitat, and stormwater drainage. Development is not
supported in these areas. Expansion of conservation lands by private property owners is
supported by the County.
Recommended Action 5.1.II.1: Consider designating Lea-Hutaff Island as
Environmental Conservation on the County’s official zoning map.
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-34
HISTORIC AND CULTURAL RESOURCES
Goal 5.2: Historic and Cultural Resources: Protect, enhance, and maintain vital historic
and cultural resources for future generations as a means to support tourism and the County’s
identity.
Objective 5.2: Historic and Cultural Resources: Ensure that historic and cultural
resources are maintained or enhanced as development occurs.
Policy 5.2.A: The County supports the preservation of significant historic and cultural
resources.
Recommended Action 5.2.A.1: Designate historic, cultural or architecturally
significant properties through National Register or local historic programs.
Recommended Action 5.2.A.2: Consider prioritizing historic, cultural or
architecturally significant properties for public acquisition/protection.
PLANNING AREAS
Goal 5.3: Union Planning Area: Maintain the continued viability of agricultural operations
and the predominant low density rural lifestyles of residents in the Union Planning Area.
Objective 5.3: Union Planning Area: Ensure that rural land use patterns are maintained and
encourage preservation of prime farmlands for current and future use.
Goal 5.4: Holly Shelter Planning Area: Support Maple Hill residents by incentivizing
commercial and industrial uses in targeted areas with an emphasis on increasing the number of
economic development opportunities and services in the planning area.
Objective 5.4 Holly Shelter Planning Area: Focus on long-term economic sustainability,
job creation, and business opportunities through economic development efforts and land use
policies that encourage appropriate non-residential investment in environmentally viable sites.
Goal 5.5: Burgaw Planning Area: Protect the low density residential land use patterns and
rural heritage on the periphery of the Town of Burgaw, while discouraging growth within
vulnerable flood hazard areas.
Objective 5.5: Burgaw Planning Area: Ensure that rural land use patterns are maintained
and limit expansion of dense residential development within the flood hazard areas adjacent to
the Northeast Cape Fear River.
Goal 5.6: Caswell Planning Area: Solidify the Pender Commerce Park and adjacent
properties as highly suitable for major economic development projects – including mixed use
and residential developments – that support the creation of new jobs and enable significant
non-residential tax base growth.
Objective 5.6: Caswell Planning Area: Support the development of commercial, office, and
residential land uses along the US 421 corridor and in close proximity to the Pender
Chapter 5: Land Use and Growth Management Pender 2.0: Comprehensive Land Use Plan
5-35
Commerce Park to serve as an employment base, economic development opportunity, and as a
means for providing suitable workforce housing.
Goal 5.7: Long Creek Planning Area: Expand development which supports employment
through the expansion of mixed uses that include multi-family and commercial land uses.
Objective 5.7: Long Creek Planning Area: Accommodate higher density mixed use
growth in and around the I-40/US 117 and NC 210 intersections.
Goal 5.8: Topsail Planning Area: Protect existing single-family neighborhoods and coastal
habitats from the expansion of incompatible land uses, while focusing more intensive growth
and development in key locations along the US 17 corridor and in accordance with the US 17
Bypass and Collector Street Plan.
Objective 5.8: Topsail Planning Area: Manage traffic congestion, preserve coastal lifestyles,
and enhance job opportunities through focused growth and development that will attract
employers and support the continued expansion of residential development at varying densities.
PUBLIC INPUT
Goal 5.9: Public Input: Increase opportunities for public input in all facets of the land use
planning process.
Objective 5.9: Public Input: Ensure that all residents of Pender County have a full and
adequate opportunity to participate in the planning decision making process.
Policy 5.9.A: The County shall continue to utilize standing committees and boards to
involve the public in planning decisions whenever practicable.
Policy 5.9.B: The County shall continue to utilize the County’s website, social media,
and other methods to keep residents informed of planning and land use decisions
whenever practicable.
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail Beach
Atlantic OceanEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadAB50
AB50
£¤17
£¤17
AB210
AB210
AB210
AB210
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
AB11
AB11
£¤421
£¤421
AB210
AB11
AB11
AB53
AB53
AB53
Onslow County
Sampson County
New Hanover County
Bladen County
Brunswick County
Columbus County
Duplin County
Atlantic OceanMap 5.1: Pender County Existing Land Use 0 1.5 3 4.50.75 MilesN
Pender County Boundary
Incorporated Municipalities
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Manufactured Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
Onslow County
Pender 2.0 Comprehensive Plan
Cape Fear River
Black River
Northeast Cape Fear River
Henderson Field/Wallace Airport
Watha
Atkinson
Burgaw
St. Helena
AB11
AB11
£¤421
£¤421
AB11
AB53
AB53
£¤117
§¨¦40
£¤117
Angola BayGame Land
Englishtown RdPe
n
d
e
r
l
e
a
H
w
y
Shiloh RoadMalpass Corner Rd
SampsonCounty
Duplin County
Map 5.2: Union Planning Area Existing Land UsePender County BoundaryUnion Planning AreaIncorporated MunicipalitiesGame LandsExisting Land UseCommercialOffice & InstitutionalIndustrialMulti-Family ResidentialSingle-Family ResidentialMobile HomeRecreationConservationRural AgricultureVacant/Infill
N
Pender 2.0:Comprehensive Plan
0 1 20.5 Miles
Henderson Field/Wallace Airport
Watha
Surf City
Northeast Cape Fear RiverBurgaw
St. Helena
Shaw HwySloop Point RoadHoover
Road
£¤117
£¤117
£¤117
§¨¦40
AB53
AB53
AB53
AB50
AB210AB210
AB210
AB210
£¤17
£¤17
AB133
AB53
AB11
Old Maple Hill RoadCypress Creek RoadS
h
a
w
H
w
y
Cro
o
m
s
b
r
i
d
g
e
R
o
a
d
AtlanticOcean
Duplin County
Map 5.3: Holly Shelter Planning Area Existing Land UsePender County Boundary
Holly Shelter Planning Area
Incorporated Municipalities
Game Lands
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Mobile Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
Holly Shelter Game Land
Angola BayGame Land
Onslow County
N
Pender 2.0:Comprehensive Plan
0 1.5 30.75 Miles
Burgaw
St. Helena
AB53
AB53
£¤117
§¨¦40
Pe
n
d
e
r
l
e
a
H
w
y
Penderl
e
a
R
o
a
d
W Wilmington
Str
e
et
Malpass Corner RdHighsmith RoadShaw HwyS Walk
e
r
S
t
r
e
e
tE Wilmington StreetS Smith StreetS
D
i
cke
r
son
S
t
ree
tN W
r
i
gh
t
S
t
ree
t
Old Savannah
R
oa
d
£¤117
§¨¦40
St
a
g
P
a
r
k
R
o
a
d
Whitestocking Road
Horsebranch RoadPiney Woods Road
New Road
S
t
a
g
P
a
r
k
Ro
ad Whitestocking RoadAB53
Map 5.4: Burgaw Planning Area Existing Land UseBurgaw Planning Area
Incorporated Municipalities
Game Lands
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Mobile Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
N
Pender 2.0:Comprehensive Plan
0 1 20.5 Miles
Atkinson
Northeast Cape Fear RiverCape Fea
r River
Burgaw
St. HelenaShiloh RoadMalpass Corner RdHighsmith RoadCan
e
t
u
c
k
R
o
a
d
AB210
AB210
AB133
AB11
AB11
AB53
£¤421
£¤421
Heading Bluff Road
Black River
Canetuck RoadBeattys Bridge Road
Blue
b
e
r
r
y
R
o
a
d
£¤117
£¤117
§¨¦40
Sloc
u
m
T
r
a
i
l
Sloc
u
m
T
r
a
i
l
AB210
New HanoverCountyBrunswickCounty
ColumbusCounty
Bladen County
SampsonCounty
Map 5.5: Caswell Planning Area Existing Land UsePender County Boundary
Caswell Planning Area
Incorporated Municipalities
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Mobile Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
N
Pender 2.0:Comprehensive Plan
0 1.5 30.75 Miles
Northeast Cape Fear RiverSt. Helena
Shaw HwyAB210
AB210
AB210
AB133
£¤117
£¤117
§¨¦40
§¨¦40
£¤421
£¤421
Clarks Landing RoadHer
r
ing
s
Chape
l
RoadHighsmith RoadStone House Road
Li
t
t
le
Ke
l
l
y
Ro
ad
Rebecca Kennedy
R
o
a
d
Northeast Cape Fear RiverAshton Road
Moore
Town
Road
New HanoverCounty
Map 5.6: Long Creek Planning Area Existing Land UsePender County Boundary
Long Creek Planning Area
Incorporated Municipalities
Game Lands
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Mobile Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
Surf CityNortheast Cape Fear RiverOnslow County
Island Cr
e
e
k
R
o
a
d
Country Club DriveScotts Hi
l
l
Loop RoadHoover RoadHolly Shelter Game Land
Sloop Point Loop RoadTopsail Beach Watts Landing RoadShepards Road
F
a
c
t
o
r
y
R
o
a
d
Washington Acres Road£¤17
Ha
r
r
i
s
o
n
C
r
e
e
k
R
o
a
d
Sloop Point Loop RoadTown of Holly Ridge
Onslow County
AB210
AB210
AB210
AB50AB210New HanoverCounty
Map 5.7: Topsail Planning Area Existing Land UsePender County Boundary
Topsail Planning Area
Incorporated Municipalities
Game Lands
Existing Land Use
Commercial
Office & Institutional
Industrial
Multi-Family Residential
Single-Family Residential
Mobile Home
Recreation
Conservation
Rural Agriculture
Vacant/Infill
N0 10.5 Miles
Pender 2.0:Comprehensive Plan
!.
!.
!.
Burgaw
St. Helena
Watha
Atkinson
Henderson Field/Wallace Airport
Angola BayGame Land
Holly Shelter Game Land
Surf City
Topsail BeachEnglishtown RdPe
n
d
e
r
l
e
a
H
w
y
Can
e
t
u
c
k
R
o
a
d Highsmith RoadShiloh RoadShaw HwyIsland Creek RoadHoover
RoadMalpass Corner RdCountry Club DriveScot
t
s
H
i
l
l
L
o
o
p
R
o
a
d Sloop Point RoadAB50
AB50
£¤17
£¤17
AB210
AB210
AB210
AB210
AB133
£¤117
£¤117
£¤117
£¤117
§¨¦40
§¨¦40
AB11
AB11
£¤421
£¤421
AB210
AB11
AB11
AB53
AB53
AB53
Town ofHolly Ridge
AB50
Sampson County
Bladen County
New Hanover County
Duplin County
Columbus County
Brunswick County Atlantic OceanM ap 5 . 8 : Pe n d e r C o u n t y F u t ure L a nd U s e
0 1.5 3 4.50.75 MilesN
Pender County Boundary
Incorporated Municipalities
Proposed Freeway
Hampstead Bypass
Proposed Highway Interchanges
!.Interchanges
Proposed Collector Streets
Major Collector
Minor Collector
Local Collector
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
Onslow County
Pender 2.0 Comprehensive Plan
Cape Fear River
Black River
Northeast Cape Fear River
St. Helena
Burgaw
Atkinson
Henderson Field/Wallace Airport
Watha
AB11
AB11
£¤421
£¤421
AB11
AB53
AB53
£¤117
§¨¦40
£¤117
Angola BayGame Land
Englishtown RdPe
n
d
e
r
l
e
a
H
w
y
Shiloh Road
Malpass Corner Rd
Shiloh Road
Tuckahoe RoadPiney Woods Road
La
m
b
R
o
a
d
Pelham Road
Half
w
a
y
B
r
a
n
c
h
Sch
o
o
l
R
o
a
d
W
a
t
h
a
R
o
a
d
North Chubb
RoadBay RoadCroomsbridge Road
Murp
h
y
R
o
a
d
Van
Eden
Ro
ad
Willard Road
Page Roa
dPoint CaswellRoadSampsonCounty
Duplin County
Map 5.9: Union Planning Area Future Land UsePender County BoundaryUnion Planning AreaIncorporated MunicipalitiesFuture Land UseRegional Mixed Use
Neighborhood Mixed UseCommercial WaterfrontCivicIndustrialLight IndustrialMedium Density ResidentialLow Density ResidentialCoastal ResidentialRural Agriculture
ConservationRecreation
N
Pender 2.0:Comprehensive Plan
0 1 20.5 Miles
North
e
a
s
t
C
a
p
e
Fear
R
i
v
e
r
!.
St. Helena
Burgaw
Northeast Cape Fear RiverSurf City
Watha
Henderson Field/Wallace Airport
Shaw HwySloop Point RoadHoover
Road
£¤117
£¤117
£¤117
§¨¦40
AB53
AB53
AB53
AB50
AB210AB210
AB210
AB210
£¤17
£¤17
AB133
AB53
AB11
Old Maple Hill RoadCypress Creek RoadS
h
a
w
H
w
y
Cro
o
m
s
b
r
i
d
g
e
R
o
a
d
Town of Holly Ridge
AB50
AtlanticOcean
Duplin County
Map 5.10: Holly Shelter Planning Area Future Land UsePender County Boundary
Holly Shelter Planning Area
Incorporated Municipalities
Proposed Collector Streets
Major Collector
Minor Collector
Local Collector
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
Holly Shelter Game Land
Angola BayGame Land
Onslow County
N
Pender 2.0:Comprehensive Plan
0 1.5 30.75 Miles
Burgaw
St. Helena
AB53
AB53
£¤117
§¨¦40
Pe
n
d
e
r
l
e
a
H
w
y
Penderl
e
a
R
o
a
d
W Wilmington
Str
e
et
Malpass Corner RdHighsmith RoadShaw HwyS Walk
e
r
S
t
r
e
e
tE Wilmington StreetS Smith StreetS D
i
cke
r
son
S
t
ree
tN W
r
i
gh
t
S
t
ree
t
Old Savannah
R
oa
d
£¤117
§¨¦40
St
a
g
P
a
r
k
R
o
a
d
Whitestocking Road
Horsebranch RoadPiney Woods Road
New Road
S
t
a
g
P
a
r
k
Ro
ad Whitestocking RoadAB53
Map 5.11: Burgaw Planning Area Future Land UseBurgaw Planning Area
Incorporated Municipalities
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
N
Pender 2.0:Comprehensive Plan
0 1 20.5 MilesNortheast Cape Fear River
St. Helena
Burgaw
Cape Fea
r River
Northeast Cape Fear RiverAtkinson Shiloh RoadMalpass Corner RdHighsmith RoadCan
e
t
u
c
k
R
o
a
d
AB210
AB210
AB133
AB11
AB11
AB53
£¤421
£¤421
Heading Bluff Road
Black River
Canetuck RoadBeattys Bridge Road
Blue
b
e
r
r
y
R
o
a
d
£¤117
£¤117
§¨¦40
Sloc
u
m
T
r
a
i
l
Sloc
u
m
T
r
a
i
l
AB210
Map 5.12: Caswell Planning Area Future Land UsePender County Boundary
Caswell Planning Area
Incorporated Municipalities
Proposed Collector Streets
Major Collector
Minor Collector
Local Collector
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
N
Pender 2.0:Comprehensive Plan
0 1.5 30.75 Miles
Northeast Cape Fear RiverSt. Helena
Northeast Cape Fear RiverShaw HwyAB210
AB210
AB210
AB133
£¤117
£¤117
§¨¦40
§¨¦40
£¤421
£¤421
Clarks Landing RoadHer
r
ing
s
Chape
l
RoadHighsmith RoadStone House Road
Li
t
t
le
Ke
l
l
y
Ro
ad
Rebecca Kennedy
R
o
a
d
Ashton Road
Moore
Town
RoadLi
t
t
le
Ke
l
l
y
Ro
ad
Clarks Landing Loop RoadF
e
n
n
e
l
l
T
o
w
n
R
o
a
dMalpass Corner RoadPa
g
e
R
o
a
d
Blueberry R
oa
d
Ridgecre
s
t
L
a
n
e Old Swann Point AvenueArvida Spur
Road Por
te
r
s
Lane
RoadBalcombe RoadMcC
r
a
r
y
Ro
a
d
New Road
Old River Road
Map 5.13: Long Creek Planning Area Future Land UsePender County Boundary
Long Creek Planning Area
Incorporated Municipalities
Proposed Freeway
Hampstead Bypass
Proposed Collector Streets
Major Collector
Minor Collector
Local Collector
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
0 1 20.5 MilesN
Pender 2.0:Comprehensive Plan
!.!.!.Northeast Cape Fear RiverOnslow County
Town of Holly Ridge
Surf City
Onslow County
Island Cr
e
e
k
R
o
a
d
Country Club DriveScotts Hi
l
l
Loop RoadHoover RoadHolly Shelter Game Land
Sloop Point Loop RoadTopsail Beach Watts Landing RoadShepards Road
F
a
c
t
o
r
y
R
o
a
d
Washington Acres RoadAB210
AB210
AB210
£¤17
Ha
r
r
i
s
o
n
C
r
e
e
k
R
o
a
d
Sloop Point Loop RoadAB50
Lea Hutaff Island
ICWW
ICWW Virginia CreekAB210New HanoverCounty
Map 5.14: Topsail Planning Area Future Land Use MapPender County Boundary
Topsail Planning Area
Incorporated Municipalities
Proposed Freeway
Hampstead Bypass
Proposed Highway Interchanges
!.Interchanges
Proposed Collector Streets
Major Collector
Minor Collector
Local Collector
Future Land Use
Regional Mixed Use
Neighborhood Mixed Use
Commercial Waterfront
Civic
Industrial
Light Industrial
Medium Density Residential
Low Density Residential
Coastal Residential
Rural Agriculture
Conservation
Recreation
N0 10.5 Miles
Pender 2.0:Comprehensive Plan
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-1
CHAPTER 6: TOOLS FOR MANAGING DEVELOPMENT
This section of the land use plan describes Pender County’s procedures for administering land
development regulations and also provides a schedule for implementation of recommended
actions. This section has three major parts that describe the:
▪ Role of the land use plan in local decisions: the role of the plan and the status of its goals,
objectives, policies, and recommended actions in Pender County’s land use and
development decisions;
▪ Existing development management program: Pender County’s existing policies, ordinances,
codes, and regulations and how they will be coordinated and employed to implement
the plan’s policies and recommended actions;
▪ Action plan and implementation schedule: the priority policies and recommended actions
that will be taken to implement the plan with a general schedule to accomplish these
actions.
Collectively, these sections describe how the Pender 2.0: Comprehensive Land Use Plan will
manage future land use and development.
ROLE OF THE LAND USE PLAN IN LOCAL DECISIONS
Pender 2.0: Comprehensive Land Use Plan serves a variety of functions and the plan for the
future contains a broad range of:
• Goals: A general statement indicating a desired end or the direction the County will
follow to achieve that end.
• Objectives: Direction toward the attainment of a particular goal.
• Policies: A statement identifying the County’s position regarding the pursuit of a goal
or objective.
• Recommended Actions: A statement outlining a specific course of action the County
may pursue to implement goals and policies. Recommended actions are not used in
review of development proposals, text amendments, and/or rezoning requests.
The goals, objectives, policies, and recommended actions provide a long range planning function
but they also help guide day to day operations. The daily functions relate primarily to the
decisions of actions of elected and appointed officials and the County’s administrative staff.
For the Board of Commissioners, the Pender 2.0: Comprehensive Land Use Plan contains
County policies and provides a guide when making decisions regarding future land use and
development, public access, protecting the environment, mitigating natural and manmade
hazards, or ensuring that the County’s infrastructure and services are adequate to serve
population. While Pender 2.0: Comprehensive Land Use Plan’s policies do not have the same
status as zoning regulations, except in matters related to development or land uses within
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-2
Areas of Environmental Concern (AECs), the policies and recommended actions and the future
land use map contained in the plan help guide decisions on future ordinances and zoning
decisions. Moreover, general statutes require statements of consistency with comprehensive
plans or any other locally adopted plan(s) before adopting or rejecting any local code,
ordinance, or zoning changes or amendments. Amendments to this plan will be initiated and
approved by the Board of Commissioners and will occur in accordance with the guidelines for
land use plan amendments under Subchapter 7B of the North Carolina Administrative Code.
The land use plan can be amended as whole by a single resolution or in parts by successive
resolutions and is subject to special state notice and advertising requirements for land use plan
amendments.
In addition to guiding development decisions, the Board of Commissioners use the Pender 2.0:
Comprehensive Land Use Plan’s policies and recommended actions when making decisions on
the County’s capital improvement program (CIP) and its annual operating budgets. The Board
of Commissioners will also review the implementation strategy and make periodic adjustments
based on budgetary considerations, emerging issues, problems or community needs, or to
coordinate with future planning efforts and ongoing projects. All changes to the Pender 2.0:
Comprehensive Land Use Plan’s policies and recommended actions and this implementation
strategy will be forwarded to the DEQ’s Division of Coastal Management (DCM) for its
subsequent approval.
The County’s Planning Board will use the plan and its policies to determine the consistency of
project plans and development proposals with community goals and objectives. Policies and the
future land use map will also guide decisions on whether to grant or deny requests for such
things as special use permits or the approval of statutory vested rights.
The County’s administrative staff use the plan’s policies and recommendations in a variety of
ways. Staff in the Planning and Community Development Department will use the plan when
reviewing site plans and development proposals. Various County departments will use the
policies and recommended actions to guide proposals for development projects and plans for
public services and facilities. Many of the plan’s policies and recommended actions also guide
ongoing operations and programs within other County departments as well. Accordingly,
County staff will use the implementation strategy to guide budget preparation, the development
of the CIP, and make reference to the plan when applying for various sources of federal, state,
and county grant funds.
In reviewing conditional zoning requests, the County’s administrative staff, Planning Board, and
Board of Commissioners will use the plan for consistency review. Conditional zoning allows for
the consideration of certain development types that are permitted uses in the underlying zoning
district, but due to their nature may not be appropriate for a particular location. A conditional
zoning district is intended for a development that has a high level of certainty of being
constructed and the most commonly expected application will contain a specified use. This
process allows for mutually agreeable conditions that are established through negotiation
between the applicant and the County.
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-3
The County’s Pender 2.0: Comprehensive Land Use Plan will be used by other federal and state
officials, in particular DEQ’s DCM. An important use of Pender 2.0: Comprehensive Land Use
Plan is for consistency determinations by the DCM for major permits issued pursuant to CAMA
regulations.
The Pender 2.0: Comprehensive Land Use Plan will be of use to a variety of community
members. The plan is a useful tool for developers and property owners because it provides
guidance on the types of land use and development that are desired within the community. The
plan’s policies and recommendations will also help developers to craft proposals that are
consistent with the County’s goals and objectives, thereby increasing the likelihood that these
projects will be approved. The plan also provides information that will help owners and
developers to better understand the capabilities and limitations of their property. The plan also
provides community members with information to reference when supporting or opposing
projects within the community.
EXISTING DEVELOPMENT MANAGEMENT PROGRAM
All land development in Pender County is subject to a wide range of state and local permits
pursuant to a comprehensive set of state regulations and local ordinances. The following
sections summarize Pender County’s major ordinances and the regulatory provisions of the
County’s development management program.
PENDER COUNTY’S LAND DEVELOPMENT REGULATIONS
Pender County, like other counties in the state, has been granted general statutory authority by
the North Carolina General Statutes to enact necessary ordinances designed to protect and
promote the health, safety and the general welfare of its citizens. Local plans and policies are
enforced through ordinances adopted by the Board of Commissioners. Following is a listing of
County Ordinances and enforcement provisions related to land use and development. These
provisions are applicable to the unincorporated areas of Pender County.
Pender County Unified Development Ordinance: The Unified Development Ordinance is the most
prominent land development regulatory tool used by the Pender County to ensure that land is
developed in conformance with the designations contained in the Future Land Use Classification
Map contained in Chapter 5 (Map 5.8: Pender County Future Land Use). The ordinance was
originally adopted in 2010. The ordinance regulates location and height of buildings, establishes
minimum building lot sizes, and establishes districts in which uses related to residential,
commercial, and institutional uses are either allowed or prohibited.
Subdivision Regulations: Since 2004, Pender County has enforced subdivision regulations which
guide the general design of newly developing areas within the County’s jurisdiction. These
regulations are contained within the Unified Development Ordinance. A subdivision is the
division of any parcel or tract of land into two or more lots for the purpose of development.
The purpose of the subdivision regulations is to establish procedures and standards for the
development and subdivision of land within the County’s jurisdiction.
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-4
Flood Damage Prevention Ordinance: Pender County administers a Flood Damage Prevention
Ordinance and participates in the Federal Flood Insurance Program. First floor building
elevation requirements vary in the County if located in the Special Flood Hazard Area.
Building Code: Pender County has an active building inspections program and enforces the NC
State Building Code, including the codes concerning general construction, plumbing, heating,
electrical, fire, and gas, as well as the NC Uniform Residential Building Code. The County’s
Building Inspectors issue building permits and inspect construction to ensure strict compliance
with all code enforcement.
Airport Minimum Standards Ordinance: This ordinance was adopted to protect the airport
interests and to aid public safety by restricting height of objects and buildings near the
Henderson Field Airport. The ordinance provides continuity for maintaining the orderly
development of commercial businesses at the airport.
Sign Ordinance: Sign restrictions are included in the Unified Development Ordinance.
ACTION PLAN AND IMPLEMENTATION SCHEDULE
The following table outlines a schedule to assist the County in implementing the
recommended actions of this land use plan. The implementation schedule is to be used as a
resource for County staff and officials. The schedule is not a mandate for the allocation of
funding nor does it require such.
Table 6.1: Schedule for Implementing Recommended Actions
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Water Quality and Natural Environment
Recommended Action 3.1.A.1: Monitor NC DEQ
Surface Water Classifications for any changes that
identify a degradation of water bodies. When a change
results in a lower surface water quality designation, the
County in partnership with applicable agencies or
municipalities, will take steps to study and identify the
reason for such change.
Ongoing Planning & Community
Development
Recommended Action 3.1.B.1: Consider establishing an
overlay district for the CAMA 575 foot Outstanding
Resource Waters AEC buffer to encourage enhanced
mitigation of stormwater runoff and preservation of
tree canopy.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.C.1: Consider identifying
incentives for new subdivisions whereby riparian buffers
are increased in size from the standard 30 foot buffer
and identify strategies to limit land disturbance and tree
removal within these areas.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.D.1: Explore opportunities to
increase the requirements for stormwater management
for all types of development. In doing so, the County
should adopt stormwater regulations to account for fill
FY 18 /19
Planning & Community
Development, Public
Works
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-5
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
(including standalone lots), impervious coverage limits,
and the designation of a design storm year. Such
requirements should identify regulations for the
construction phase (i.e. erosion and sedimentation
control) and post-construction phase (i.e. stormwater
control).
Recommended Action 3.1.D.2: Consider modifying
applicability requirements for stormwater management
that are more stringent than those outlined by 15A
NCAC 02H .1019, whereby 10,000 square feet of
impervious surface or greater than an acre of
disturbance triggers stormwater mitigation.
FY 18 /19
Planning & Community
Development, Public
Works
Recommended Action 3.1.D.3: Consider establishing a
stormwater/ditch maintenance program coordinated
through the County Public Works Department and with
the NC Department of Transportation.
FY 19 /20 Public Works
Recommended Action 3.1.D.4: Consider establishing a
percent reduction goal in overall stormwater runoff
volume. For example, the County will reduce
stormwater runoff volumes by 10% by 2025.
FY 19 /20 Planning & Community
Development
Recommended Action 3.1.D.5: Develop a Stormwater
Management Master Plan with a principle focus on
reduction of stormwater runoff volumes. Partnership
with regional local governments or agencies may be
required.
FY 20 /21 Planning & Community
Development
Recommended Action 3.1.E.1: Expand efforts to identify
and eliminate stormwater discharges resulting from
County building, facilities, and activities. For example,
downspout disconnection to impervious surfaces and
the installation of rain gardens can substantially reduce
stormwater runoff discharges.
FY 18 /19 Public Works
Recommended Action 3.1.F.1: Establish partnerships
with Pender County municipalities (if necessary) to
develop a Watershed Restoration Plan(s). Partnership
with regional local governments or agencies may be
required.
FY 20 /21 Planning & Community
Development
Recommended Action 3.1.F.2: Pursue grant funds to
assist in developing a Watershed Restoration Plan.
Pursuant to Section 205(j)/604(b) of the Clean Water
Act, the Division of Water Resources will award grant
funds to Regional Commissions and Councils of
Government for to carry out water quality management
and planning projects, including, but not limited to:
• Identifying most cost effective and locally
acceptable facility and non-point source
measures to meet and maintain water quality
standards;
• Developing an implementation plan to obtain
state and local financial and regulatory
commitments to implement measures
developed to meet water quality standards; and
FY 20 /21 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-6
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
• Determining the nature, extent, and cause of
water quality problems in various areas of the
state.
Recommended Action 3.1.F.3: Ensure that the
Watershed Restoration Plan contains the nine minimum
elements required to receive EPA Section 319 funds for
implementation of capital improvements projects.
FY 20 /21 Planning & Community
Development
Recommended Action 3.1.H.1: Explore options for
implementing incentives for developers that utilize low-
impact development (LID) techniques to manage the
potential impacts of stormwater runoff.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.H.2: Consider requiring LID
techniques for development located within the CAMA
575 foot Outstanding Resource Waters AEC.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.I.1: The County shall
consider requiring all rezoning/conditional zoning
petitions to be reviewed in relation to the
Biodiversity/Wildlife Habitat Assessment and the NC
Wildlife Resources Commission Habitat Conservation
Recommendations.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.J.1: Consider expanding the
definition of “environmental features” to include Areas
of Environmental Concern (AECs), Significant Natural
Heritage Areas (SNHAs), Natural Heritage Element
Occurrences (NHEOs), Smoke Awareness Areas, and
Prime Farmland soils.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.J.2: Consider providing the
information referenced in Recommended Action 3.1.K.1
on the County’s GIS website.
FY 18 /19 Planning & Community
Development,
Information Technology
Recommended Action 3.1.J.3: Consider developing a
green infrastructure plan that identifies a network of
natural lands and open spaces and provides ecosystem
conservation as well as alternative transportation
modes through trails and greenways. Such a plan should
guide the preservation of open space for new
development where identified.
FY 21 /22
Planning & Community
Development, Parks and
Recreation
Recommended Action 3.1.J.4: Consider establishing a
green infrastructure committee composed of local
government staff and natural resource professionals
whose main purpose is to implement the green
infrastructure plan and coordinate natural resources
conservation among all local plans, ordinances, and
departments.
FY 21 /22
Planning & Community
Development, Parks and
Recreation
Recommended Action 3.1.K.1: Consider revising the
density calculations to remove preserved open space
from the calculation.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.K.2: Consider including a
minimum passive open space requirement where
environmental features are present and remove the 50%
maximum designation.
FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-7
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Recommended Action 3.1.K.3: Consider providing
specific standards for the provision of open space to
include such things as habitat connectivity and tree
preservation. Habitat connectivity should encourage the
dedication of large contiguous tracts of land, typically 10
acres at a minimum, with a minimum average width of
500 feet and separation from building activity of at least
350 feet and conservation of natural open space that is
at least 300 feet wide between environmental features
will be encouraged to better ensure that wildlife can
travel between core wildlife habitats. Where such
cannot be reasonably provided, a payment in-lieu fee
should be provided to the County for the future
dedication of park land that will protect wildlife habitat,
while also providing an amenity for the general public
and residents of the subject development.
FY 18 /19
Planning & Community
Development, Parks and
Recreation
Recommended Action 3.1.K.4: Consider establishing a
‘Resource Conservation Incentive District’ located to
the south of US 17, in and adjacent to floodplain forests
along streams and rivers and adjacent to and between
Game Lands. South of US 17, maritime forest blocks of
five to ten acres should be set-aside from development
and connected to wetlands and forest in the floodplain
where practicable.
FY 18 /19 Planning & Community
Development, Parks and
Recreation
Recommended Action 3.1.K.5: In concert with NC
Wildlife Resources Commission, consider evaluating a
program to rezone rural areas to a base density of no
greater than one unit per three or more acres. A
density of one unit per three acres has been shown to
raise property values in rural areas. Within these areas
consider allowing for a density bonus to conserve at
least 50 percent of the site.
FY 19 /20 Planning & Community
Development
Recommended Action 3.1.K.6: Compile a GIS database
of all designated open space and consider providing such
on the County’s GIS website or available through the
Planning and Community Development Department.
FY 19 /20
Planning & Community
Development,
Information Technology
Recommended Action 3.1.L.1: Consider expanding the
applicable development types – rather than zoning
districts – that require tree preservation.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.L.2: Consider removing the
exemption for tree surveys/preservation in Special
Flood Hazard Area (SFHAs), Areas of Environmental
Concern (AECs), wetland buffers, and stream buffers.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.L.3: Consider a provision that
allows for an applicant to display a tree protection area
without the individual designation of each tree species
and size.
FY 18 /19 Planning & Community
Development
Recommended Action 3.1.L.4: Consider enhancing
mitigation for the removal of significant trees, as defined
in the UDO, such that the caliper of trees removed is
equivalent to that replaced.
FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-8
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Recommended Action 3.1.M.1: Encourage the use of the
NC Division of Forestry, Forestry Best Management
Practices Manual to Protect Water Quality.
Ongoing Planning & Community
Development
Recommended Action 3.1.Q.1: Consider providing
outreach and education to homeowners regarding the
impacts of failing bulkheads to surface waters and
property damage.
Ongoing Planning & Community
Development
Natural Hazard Areas
Recommended Action 3.2.D.1: Consider participating in
the Community Rating System Status (CRS) as a means
to reduce flood insurance rates. As part of this
participation, County staff should be continuously
trained on the steps that can be taken to improve the
CRS rating.
FY 18 /19 Planning & Community
Development
Recommended Action 3.2.E.1: Consider establishing a
formalized procedure for evaluating potential land
acquisition projects, which also considers wildlife habitat
conservation, prior to such.
FY 19 /20
Planning & Community
Development, Parks and
Recreation, County
Manager’s Office
Recommended Action 3.2.H.1: Consider establishing an
overlay district within Smoke Awareness Areas and/or
the Wildland/Urban Interface zone to require Firewise
Landscaping practices.
FY 19 /20 Planning & Community
Development
Recommended Action 3.2.I.1: Consider establishing a
public education program designed to help inform the
public about their exposure to natural hazards and
actions they can take to mitigate potential damage to
public health, safety, and property from natural
disasters. This includes, but is not limited to:
• Ensure the local library maintains documents
about flood insurance, flood protection,
floodplain management, and natural and
beneficial functions of floodplains. Many
documents are available free of charge from
the Federal Emergency Management Agency
(FEMA);
• Encourage builders, developers, and architects
to become familiar with the NFIP’s land use
and building standards;
• Provide local real estate agents with handouts
advising potential buyers to investigate
potential flood hazards for the property they
are considering purchasing;
• Advertise the availability of flood insurance on
an annual basis; and,
• Post hazard related information on the
County’s website and distribute appropriate
educational materials and other social media
outlets.
FY 19 /20 Planning & Community
Development
Agricultural Lands
Recommended Action 3.3.B.1: Consider partnering with
NC State or an appropriate agency or consultant to FY 20 /21 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-9
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
prepare a Return on Investment (ROI) analysis for the
various land use types that exist in the County, including
agricultural lands.
Recommended Action 3.3.C.1: Pursue grant funds
available through the NC Department of Agriculture
Development and Farmland Preservation Trust to
complete a farmland preservation plan.
FY 20 /21
Planning & Community
Development,
Cooperative Extension
Recommended Action 3.3.C.2: Explore options for the
creation of a Prime Agricultural Land Overlay district to
help preserve and protect agricultural lands for future
use.
FY 19 /20
Planning & Community
Development,
Cooperative Extension
Recommended Action 3.3.C.3: Consider establishing a
guidance manual for the siting and/or installation of
solar panels/farms that will address such things as
incentives, prime farmland soils, land clearing,
stormwater management and decommissioning.
FY 20 /21
Planning & Community
Development,
Cooperative Extension
Recommended Action 3.3.C.4: Consider investing in a
consumer education campaign that highlights the
benefits of buying local produce, beef, poultry, pork, and
fish. The County should also inform consumers of the
locations where they can purchase these products.
FY 20 /21
Planning & Community
Development,
Cooperative Extension
Recommended Action 3.3.D.1: Consider providing
resources to help develop, promote, and support
alternative farming methods in identified prime
agricultural areas.
Ongoing Cooperative Extension
Recommended Action 3.3.E.1: Consider developing a
public outreach program to educate residents about the
potential benefits of the Beaver Management Assistance
Program.
FY 19 /20 Planning & Community
Development,
Cooperative Extension
Recommended Action 3.3.E.2: Consider developing a
map to identify known beaver issue areas to assist with
targeted outreach for the program.
FY 19 /20
Planning & Community
Development,
Information Technology
Infrastructure Carrying Capacity – Water & Wastewater
Recommended Action 4.1.A.1: Consider establishing a
Cost of Land Use Fiscal Impact Analysis study that will
include current information about the cost of
government services, such as schools, water, and sewer.
FY 19 /20 Planning & Community
Development, Utilities
Recommended Action 4.1.B.1: Update the 2006 Water
and Wastewater Master Plans to address current
conditions of private wastewater providers, Interbasin
transfer requirements, emergency raw water
infrastructure, and provisions for alternative drinking
water sources, if desired.
FY 20 /21 Utilities
Recommended Action 4.1.B.2: Establish estimated
demand for water and wastewater service in each
respective Water & Sewer Service District.
FY 20 /21 Utilities
Recommended Action 4.1.B.3: Consider identifying and
establishing generalized service area boundaries for the FY 20 /21 Planning & Community
Development, Utilities
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-10
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
location of public and private water and sewer
providers.
Recommended Action 4.1.D.1: Encourage water and
sewer systems to be designed and located such that
expansion to serve future development is feasible.
Ongoing Planning & Community
Development, Utilities
Recommended Action 4.1.D.2: Identify policies and
procedures for the consolidation and acquisition of
private water/wastewater systems should the issue arise
in the future.
FY 21 /22 Utilities
Recommended Action 4.1.D.3: Consider establishing a
separate capital improvement fund for the potential
future acquisition of failing private water/wastewater
systems.
FY 21 /22 Utilities
Water Facilities
Recommended Action 4.1.G.1: Consider establishing a
study to explore additional sources for drinking water
whether through alternative surface water/groundwater
sources or treatment methods.
FY 20 /21 Utilities
Recommended Action 4.1.G.2: Consider establishing
more stringent drinking water quality testing
procedures than those mandated by state and federal
guidelines to inform users of potential water quality
issues.
FY 20 /21 Utilities
Recommended Action 4.1.G.3: Consider establishing a
voluntary program for testing of private drinking water
wells for those in need. If determined water quality
issues exist as a result of testing, consider prioritizing
expansion of centralized service to areas impacted by
degraded water quality.
FY 21 /22 Utilities
Wastewater Facilities
Recommended Action 4.1.K.1: Establish an allocation of
capacity to be dedicated to future residential versus
non-residential use.
FY 20 /21 Planning & Community
Development, Utilities
Recommended Action 4.1.L.1: Revise the table of
permitted uses in the UDO to include additional
wastewater facility types to enable greater discretion in
the approval procedure. Such uses should be
distinguished through clear definitions which distinguish
their treatment capacity and service intent.
FY 18 /19 Planning & Community
Development, Utilities
Recommended Action 4.1.M.1: In cases where package
treatment plants are approved, the County should
require a specific contingency plan specifying how
ongoing private operation and maintenance of the plant
will be provided, and detailing provisions for assumption
of the plant into a public system should the private
operation fail.
FY 18 /19 Planning & Community
Development, Utilities
Recommended Action 4.1.M.2: Consider establishing a
program to manage decentralized wastewater treatment
systems and/or required periodic inspection by County
staff as a condition of approval.
FY 20 /21 Utilities
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-11
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Recommended Action 4.1.M.3: Consider identifying
locations where package treatment plants shall not be
permitted.
FY 20 /21 Planning & Community
Development, Utilities
Transportation - Vehicular
Recommended Action 4.2.B.1: Encourage NCDOT to
proceed with advanced acquisition of right-of-way to
expedite the Hampstead Bypass process.
Ongoing Planning & Community
Development
Recommended Action 4.2.B.2: Ensure all proposed
development is designed to coordinate with existing or
planned streets and highways as provided in the UDO
and NCGS 153A-331.
Ongoing Planning & Community
Development
Recommended Action 4.2.C.1: Require future update to
the Comprehensive Transportation Plan(s) be
coordinated. Work with NCDOT to establish a CTP
encompassing the entirety of Pender County rather
than separated by the Wilmington MPO and Cape Fear
RPO boundaries.
FY 21 /22 Planning & Community
Development
Recommended Action 4.2.E.1: Work with the MPO,
RPO, NCDOT or outside consultant to create safety
audits in locations with high crash rates as identified on
Maps 4.4 and 4.5.
FY 20 /21 Planning & Community
Development
Recommended Action 4.2.E.2: Explore all opportunities
for safety improvements to intersections identified as
high crash locations.
FY 20 /21 Planning & Community
Development
Recommended Action 4.2.E.1: Provide an annual update
to the Planning Board and Board of Commissioners
regarding the implementation status of the Collector
Street Plan. Such a report should identify issues and
opportunities for improving the existing requirements
contained in the UDO, if any.
Ongoing Planning & Community
Development
Recommended Action 4.2.E.2: Update the Collector
Street Plan in concert with the Future Land Use map
contained in this plan and when such is revised or
amended.
Ongoing Planning & Community
Development
Recommended Action 4.2.I.1: Consider updating the
UDO to provide additional provisions to clarify the
intent of connectivity requirements and safety to ensure
that future development, adjacent to existing
connection points/stub streets, follows through with
construction of connecting stub streets.
FY 19 /20 Planning & Community
Development
Recommended Action 4.2.I.2: Consider establishing a
case study of existing connectivity ordinances within
county jurisdictions across North Carolina, and their
various effectiveness, in an effort to improve
connectivity regulations in Pender County.
FY 19 /20 Planning & Community
Development
Recommended Action 4.2.I.3: Consider updating the
UDO to include language specifically requiring stub
streets to be constructed to the adjacent property line
and that no obstructions shall be permitted.
FY 18 /19 Planning & Community
Development
Recommended Action 4.2.I.4: Consider requiring a stub
out connection where development is adjacent to single FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-12
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
family lots fronting upon thoroughfares/arterial
roadways to allow for future connections.
Recommended Action 4.2.I.5: Update and continually
maintain the database of future right-of-way dedications,
“paper streets,” and stub-outs. Research recorded
documents to expand the database to include existing
paper streets to ensure maximum coordination and
connectivity.
Ongoing Planning & Community
Development
Recommended Action 4.2.J.1: Update required
certifications and disclosures contained in the UDO,
regarding private roads, to include language stating such
has been constructed to the minimum standards of the
of the NCDOT Subdivision Minimum Construction
Standards manual and NCDOT Guidelines for Drainage
Studies and Hydraulic Design. Specifically require all
certifications/disclosures regarding private roads/streets
be included with each approval.
FY 18 /19 Planning & Community
Development
Recommended Action 4.2.J.2: Establish a study to
identify public input regarding private road/streets and
specific policy changes, if desired, for the permitting
thereof.
FY 19 /20 Planning & Community
Development
Recommended Action 4.2.J.3: Clarify applicability
requirements within the UDO for “subdivisions with
private streets subject to requirements to construct
public streets.” Such applicability should be clearly
stated at the onset of discussion regarding private
streets.
FY 18 /19 Planning & Community
Development
Recommended Action 4.2.J.4: Consider requiring all
private roads/streets to include an easement to allow
for travel of the roadway by the general public. In
particular, if future development includes access to
public facilities or public trust areas, such an easement
should be required.
FY 18 /19 Planning & Community
Development
Transportation – Alternative Modes
Recommended Action 4.3.A.1: Explore opportunities to
increase the number of transportation services and
options in Maple Hill in order to link the residents to
jobs, health care, and other local services.
Ongoing Planning & Community
Development
Recommended Action 4.3.A.2: Explore the possibility of
extending a bus route from NC 53 to the Onslow
County line, and providing a park and ride lot at this
location.
FY 19 /20 Planning & Community
Development
Recommended Action 4.3.A.3: Explore the possibility of
partnering with Pender County Adult Services to
coordinate transportation stops and services between
PAS and WAVE Transit and connect in Castle Hayne.
FY 19 /20 Planning & Community
Development
Recommended Action 4.3.D.1: Establish a funding
strategy and continuing maintenance policy for
construction of County sidewalks and greenway/multi-
use path facilities. Ideally, such funding and maintenance
FY 20 /21
Planning & Community
Development, Parks and
Recreation, Public
Works
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-13
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
responsibility shall be the under the purview of the
Parks and Recreation department.
Recommended Action 4.3.D.2: Pursue grant funds to
complete an official NCDOT Comprehensive Bicycle
and/or Pedestrian Transportation Plan for the
Hampstead area. Such a plan should identify alternative
funding methods, maintenance responsibilities, and
prioritized facilities. Grant applications are typically due
November/December of each year. County jurisdictions
are now eligible to apply (Eligibility for Pender County
should be pursued).
FY 18 /19
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.3.D.3: Consider options to
establish a Countywide Greenway Plan. Such a plan will
outline priority locations for greenway facilities, funding
mechanisms tied to future development, and
procedures for maintenance and continued upkeep
thereof.
FY 20 /21
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.3.D.4: Identify and prioritize all
recommended bicycle and pedestrian facilities as part of
any future non-motorized transportation planning
effort.
FY 20 /21 Planning & Community
Development, Parks and
Recreation
Recommended Action 4.3.D.5: Establish a bicycle and
pedestrian committee to prioritize future bicycle and
pedestrian capital improvements and identify programs
and needs related to non-motorized transportation.
FY 20 /21 Planning & Community
Development
Recommended Action 4.3.D.6: Establish a bicycle and
pedestrian transportation infrastructure service area
map to allocate funding collected as part of a fee-in-lieu
program to install bicycle and pedestrian facilities in
accordance with recommended improvements.
FY 20 /21 Planning & Community
Development
Recommended Action 4.3.F.1: Coordinate provisions
for public transit and Transportation Demand
Management services with the Regional Mixed Use
future land use category as depicted on the County’s
Future Land Use Map.
FY 20 /21 Planning & Community
Development
Recommended Action 4.3.F.2: Monitor changes to
Urban/Rural Census designations following the 2020
Census to identify locations suitable for potential fixed
route transit services.
FY 20 /21 Planning & Community
Development
Public Access
Recommended Action 4.4.A.1: Pursue funding under the
North Carolina CAMA Shoreline Access funding
program for other eligible projects that provide access
for its citizens.
Ongoing
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.4.B.1: Consider updating the
1993 Waterfront Access Plan with funding from the
Division of Coastal Management.
FY 19 /20
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.4.B.2: Consider revising the
UDO to require that public water access is provided in
accordance with subdivision/development as outlined in
an approved Waterfront Access Plan and/or at
FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-14
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
appropriate intervals along estuarine and riverine bodies
of water. Such a provision may require the dedication of
public access easements through extension of right-of-
way to high water marks as a means of recreation.
Recommended Action 4.4.B.3: Consider establishing a
separate capital improvement fund for the construction
of waterfront amenities and/or acquisition of suitable
waterfront access locations.
FY 18 /19 Planning & Community
Development
Recommended Action 4.4.D.1: Identify potential
locations suitable for applying for funds for public boat
ramps, particularly along coastal waters in support of
the tourism-based economy. Such locations may include
Long Creek, Moores Creek, Rockfish Creek, and Scotts
Hill Intracoastal Waterway access.
FY 19 /20
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.4.D.2: Consider applying for
public access funding for additional boat ramps. Ongoing
Planning & Community
Development, Parks and
Recreation
Recommended Action 4.4.D.3: Consider co-location of
other appropriate recreational amenities and multiple
grant funding sources at future boat ramps.
Ongoing
Planning & Community
Development, Parks and
Recreation
Parks and Recreation
Recommended Action 4.5.A.1: Prepare a new, updated
Comprehensive Parks and Recreation Master Plan. FY 21 /22 Parks and Recreation
Recommended Action 4.5.A.2: Ensure that the updated
plan adequately reflects current and future recreation
needs. Adopt implementation measures to acquire and
develop parks, recreation areas, and open spaces.
FY 21 /22 Parks and Recreation
Recommended Action 4.5.A.3: Ensure future capital
improvement projects include a balance between
revenue generation facilities and nonrevenue generating
facilities.
Ongoing Parks and Recreation
Recommended Action 4.5.A.4: Establish parks and
recreation service districts for the allocation and
distribution of recreational opportunities.
FY 21 /22
Planning & Community
Development, Parks and
Recreation
Recommended Action: 4.5.A.5: As part of the plan
update, identify needed activities and programs for
neighborhood youth that are potentially viable in the
Maple Hill neighborhood.
FY 21 /22 Parks and Recreation
Recommended Action 4.5.B.1: Establish expansion plans
for athletic fields and programming at Pender Memorial
Park and Hampstead Kiwanis Park.
FY 19 /20 Parks and Recreation
Recommended Action 4.5.D.1: Establish a monetary
value for recreational amenities/units to more
appropriately allocate fees captured as part of the
development approval process.
FY 21 /22 Planning & Community
Development, Parks and
Recreation
Recommended Action 4.5.H.1: Establish a formal
Maintenance Operations Plan and policy. FY 18 /19 Parks and Recreation,
Public Works
Recommended Action 4.5.I.1: Consider increasing
spending to bring per capita figures closer to those of
the counties in the region and communities of similar
populations.
Ongoing Parks and Recreation
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-15
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Recommended Action 4.5.I.2: Increase revenue
generation within the department to bring the cost
recovery closer to the state average.
Ongoing Parks and Recreation
Schools
Recommended Action 4.6.B.1: Establish and continually
update a twenty-year plan for the Pender County
School System which provides enrollment figures,
capital improvement needs, and funding constraints.
FY 19 /20 School System
Recommended Action 4.6.B.2: Ensure that capital
improvements to schools adequately address the needs
of different areas of the County, including
improvements to existing schools update the facilities to
modern standards of newer schools.
Ongoing School System
Recommended Action 4.6.B.3: Establish an estimated
number of students per each development type (single-
family, multi-family, etc.) to identify short-term impacts
of development approval.
FY 19 /20
Planning & Community
Development, School
System
Recommended Action 4.6.B.4: Address traffic access,
safety, and circulation issues through physical
improvements and operating procedures.
Ongoing School System
Recommended Action 4.6.B.5: Consider establishing
school capacity thresholds (80/90%) whereby active
capital improvement measures will be initiated to
alleviate future overcrowding.
FY 19 /20 School System
Recommended Action 4.6.D.1: In accordance with the
Board of Education, establish and adopt an appendix to
this land use plan which clearly identifies the specific
location and size of each school site to be reserved for
future use.
FY 18 /19
Planning & Community
Development, School
System
Broadband Service
Recommended Action 4.7.B.1: Perform annual GIS
updates to the wireless network maps by coordinating
with ISPs and reviewing permit applications.
Ongoing Information Technology
Recommended Action 4.7.B.2: Establish a
telecommunications committee to assess the potential
for broadband internet access in underserved areas, and
to act as a point of contact for developers and
providers.
FY 19 /20 Planning & Community
Development
Recommended Action 4.7.B.3: Consider establishing a
provision or incentive whereby the availability of
broadband service is included in the review of zoning
map amendments or conditional zoning requests.
FY 19 /20 Planning & Community
Development
Coordinated Development
Recommended Action 4.8.A.1: Review the
Biodiversity/Wildlife Habitat Assessment and associated
environmental features GIS data in community facilities
and services projects and planning, with the purpose of
reducing unnecessary impacts to natural resources and
wildlife habitat.
FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-16
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Land Use Compatibility
Recommended Action 5.1.C.1: Annually review the
future land use map in concert with new or proposed
infrastructure to ensure the desired growth pattern
reflects the expansion of new roads, water, sewer,
broadband, or schools. Identify geographic areas that
may be suitable for an increase or decrease in the
relative density associated with infrastructure plans.
This review should include an inventory and analysis of
completed or planned collector streets.
Ongoing Planning & Community
Development
Recommended Action 5.1.C.2: To avoid unnecessary
impacts to wildlife habitat, the Biodiversity/Wildlife
Habitat Assessment and other conservation GIS map
layers and information will be considered in future
growth plans.
FY 18 / 19 Planning & Community
Development
Recommended Action 5.1.G.1: Consider rezoning all
vacant Planned Development tracts to a base zoning
district that is consistent with the future land use map.
Establish an inventory of vacant land zoned Planned
Development.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.G.2: Consider revising the
County’s Master Development Plan review procedure
to only apply to phased development plans. Where
unphased development is proposed, the Master
Development Plan procedure should be modified to
reflect a staff/technical review committee review of a
conceptual or schematic plan. Consider revising or
removing the Master Development Plan procedure for
vacant land within the Planned Development zoning
district. An option for by right development without
Planning Board approval should be provided to
development applicants and property owners within the
Planned Development district.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.G.3: Consider rezoning all
vacant Planned Development tracts to a base zoning
district that is consistent with the future land use map.
Establish an inventory of vacant land zoned Planned
Development.
FY 18 /19 Planning & Community
Development
Recommend Action 5.1.H.1: Consider establishing
Mixed Use zoning districts consistent with the County’s
future land use map – Regional and Neighborhood –
which allow for development of multi-family,
commercial, office, and vertical mixed use development.
FY 18 /19 Planning & Community
Development
Recommend Action 5.1.H.2: Consider establishing
urban design guidelines and/or Form Based Code
requirements for development within the Regional and
Neighborhood Mixed Use future land use category. This
effort should be undertaken by a consultant as part of
public driven master planning process.
FY 20 /21 Planning & Community
Development
Recommended Action 5.1.H.3: To encourage the
installation of shade trees, the following should be FY 18 /19 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-17
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
removed from the County’s “Canopy Tree” plant
material list: Crepe Myrtle, Gingko Biloba, and
Washington Hawthorn. Such trees are selected for
removal due to their limited canopy spread and ability
to provide shade.
Recommended Action 5.1.H.4: Require the installation
of bicycle and pedestrian infrastructure as outlined in a
future Comprehensive Bicycle and Pedestrian
Transportation Plan, which specifically serves the
development.
FY 20 /21 Planning & Community
Development
Recommended Action 5.1.I.1: Consider allowing multi-
family developments as a by right use in certain zoning
districts in accordance with the future land use map.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.I.2: Consider establishing
residential density standards that are comparable to
neighboring jurisdictions. As part of the procedure, the
County should analyze and research any and all
incentives and/or supplemental regulations whereby an
increase in density is granted. Neighboring jurisdictions:
Onslow County – 10 dwelling units per acre, Brunswick
County – 14 dwelling units per acre, New Hanover
County – 17 dwelling units per acre.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.I.3: Consider establishing
options whereby multi-family residential developments
contribute funds for the County to acquire water-based
recreational areas serving residents in the immediate
area rather than for construction/allocation of open
space within their particular development. Adherence
to the provisions outlined in NCGS 153A 331 is
required.
FY 19 /20
Planning & Community
Development, Parks and
Recreation
Recommended Action 5.1.K.1: Discourage the
construction of storage facilities along the road
frontage. Such facilities should be located behind other
development and generally not visible from primary
roadways. Based on public input, storage facilities are
not desired along the US 17 corridor.
Ongoing Planning & Community
Development
Recommended Action 5.1.M.1: Consider establishing a
Commercial Waterfront zoning district consistent with
the County’s future land use map. Uses should only be
permitted through the special use permit process or
specific development standards. Water-based
restaurants, retail establishments, and recreational uses
available for public use are desired.
FY 18 /19 Planning & Community
Development
Industrial Uses, Business Development, and Tourism
Recommended Action 5.1.N.1: Consider committing
additional County resources to improve and expand
efforts to retain and recruit industries. Place emphasis
on re-use of vacant buildings, recruitment of clean
industries, expansion of the Pender Commerce Park,
and creation of jobs.
Ongoing County Manager’s
Office
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-18
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
Recommended Action 5.1.S.1: Continue to work with
the Town of Wallace to identify opportunities for
commercial and industrial expansion in the proximity of
the airport.
Ongoing Planning & Community
Development
Recommended Action 5.1.T.1: Consider options to
partner with the UNCW Center for Marine Science and
MARBIONIC to identify opportunities for marine
biotech, aquaculture, or uses that would be compatible
with coastal tourism.
FY 19 /20 Planning & Community
Development, Tourism
Residential Development and Housing
Recommended Action 5.1.V.1: Consider establishing
tiered residential zoning districts based upon the future
land use map and/or existing lot sizes.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.X.1: Consider the
establishment of a new Coastal Residential zoning
district or overlay district for single-family residential
development within ½ mile of estuarine or coastal
waters. Such a district should encourage low impact
development (LID), limit impervious surface coverage to
35% or less, require tree preservation and mitigation,
and incentivize the allocation of public access to coastal
waters.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.Z.1: Consider incentives such
as a density bonus where it can be demonstrated that a
development will perpetually preserve coastal natural
resources, prime agricultural lands, and/or wildlife
habitat areas in accordance with the NC WRC
“Conservation Recommendations for Priority
Terrestrial Wildlife Species and Habitats in North
Carolina.”
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.AA.1: Consider incentives
such as a density bonus where a development provides
public trust water access to County residents through a
permanent access easement. Such a provision may
require the dedication of public access easements
through extension of right-of-way to high water marks
as a means of recreation and/or a fee-in-lieu for
waterfront acquisition. NOTE: See Recommended
Action 4.4.B.2.
FY 18 /19 Planning & Community
Development
Recommended Action 5.1.BB.1: Consider establishing
zoning district regulations which support a variety of
housing options in close proximity to primary
employment centers such as the Pender Commerce
Park, US 421, and US 117/210.
FY 19 /20
Planning & Community
Development, Housing
Authority
Recommended Action 5.1.BB.2: Consider incentives
such as a density bonus where a development provides
housing for low to moderate income persons.
FY 19 /20
Planning & Community
Development, Housing
Authority
Residential and Agriculture
Recommended Action 5.1.EE.1: Consider establishing a
zoning district specific to the Penderlea community FY 19 /20 Planning & Community
Development
Chapter 6: Tools for Managing Development Pender 2.0: Comprehensive Land Use Plan
6-19
Action Item
To be done in
Fiscal Year (July-
June)
Department
Responsibility
which will preserve the existing land use pattern and
lifestyle of the area.
Recommended Action 5.1.FF.1: Consider increasing
development intensity and uses at primary rural
roadway intersection in accordance with the future land
use map.
FY 18 /19 Planning & Community
Development
Recreation and Conservation
Recommended Action 5.1.II.1: Consider designating
Lea-Hutaff Island as Environmental Conservation on the
County’s official zoning map.
FY 18 /19 Planning & Community
Development
Historic and Cultural Resources
Recommended Action 5.2.A.1: Designate historic,
cultural or architecturally significant properties through
National Register or local historic programs.
FY 19 /20 Planning & Community
Development
Recommended Action 5.2.A.2: Consider prioritizing
historic, cultural or architecturally significant properties
for public acquisition/protection.
Ongoing Planning & Community
Development
Appendix A: Definitions and Acronyms Pender 2.0: Comprehensive Land Use Plan
A-1
APPENDIX A: DEFINITIONS AND ACRONYMS
DEFINITIONS OF ACTION AND DESCRIPTIVE WORDS USED IN POLICIES
The following is a list of definitions for the ‘action-words’ used in the County’s policy
statements. This list is used to help in clarifying a policy’s meaning and intent.
Consider: Implies permission to pursue a course of action. Pursuit of such action is not
required.
Continue: Follow past and present procedures to maintain desired goal, usually with
County staff involved at all levels from planning to implementation.
Create: Bring about the desired goal, usually with County staff and Planning Board
involved at all levels from planning to implementation. This could include financial
support by the County.
Discourage: Inhibit an undesired course or action through County regulation, staff
recommendation and decisions.
Encourage: Foster the desired goal through County regulation, staff recommendation
and decisions.
Enhance: Improve current regulations and decisions towards a desired state through the
use of policies and County staff at all levels of planning. This could include financial
support by the County.
Ensure: To make certain or sure an action is implemented, usually with County staff
involvement. Financial support by the County should be provided if needed.
Establish: To introduce through the creation thereof. Financial support by the County
may be provided if needed.
Goal: A general statement indicating a desired end or the direction the County will
follow to achieve that end.
Identify: Catalog and confirm resource or desired item(s) through the use of County
staff and actions.
Implement: Actions to guide the accomplishment of the Plan recommendations.
Maintain: Keep in good condition the desired state of affairs through the use of County
regulations and practices by staff. Financial support by the County should be provided if
needed.
May: Implies permission to pursue a course of action or implies that a course of action
is probable and likely. While “may” leaves room for flexibility for a range of choices, it
does not imply a “may” or “may not” status as used in policy statements.
Appendix A: Definitions and Acronyms Pender 2.0: Comprehensive Land Use Plan
A-2
Objective: Direction toward the attainment of a particular goal.
Policy: A statement identifying the County’s position regarding the pursuit of a goal or
objective.
Prevent: Stop described event through the use of appropriate County regulations, staff
actions, Planning Board actions, and County finances, if needed.
Promote: Advance the desired state through the use of County policies and codes and
Planning Board and staff activity at all levels of planning. This could include financial
support by the County.
Protect: Guard against a deterioration of the desired state through the use of County
policies and regulations, staff, and, if needed, financial support by the County.
Provide: Take the lead role in supplying the needed financial and staff support to achieve
the desired goal. The County is typically involved in all aspects from planning to
implementation to maintenance.
Recommended Action: A statement outlining a specific course of action the County may
pursue to implement goals and policies. Recommended actions are not used in review of
development proposals, text amendments, and/or rezoning requests.
Shall: An obligation to carry out a course of action.
Should: An officially adopted course or method of action intended to be followed to
implement the community Goals. Though not as mandatory as "shall", it is still an
obligatory course of action unless clear reasons can be identified that an exception is
warranted.
Support: Supply the needed staff support, policies, and financial assistance at all levels to
achieve the desired goal.
Sustain: Uphold the current state through County policies, decisions, financial resources,
and staff action.
Work: Cooperate and act in a manner through the use of County staff actions, and
policies to create the desired goal.
Acronyms Used In the Plan
AEC Areas of Environmental Concern
CAMA Coastal Area Management Act
COE Corps of Engineers, United States
CRAC Coastal Resource Advisory Committee
Appendix A: Definitions and Acronyms Pender 2.0: Comprehensive Land Use Plan
A-3
CRC Coastal Resource Commission
CRS Community Rating System
CZMA Coastal Zone Management Act
DCM Division of Coastal Management
NC DEQ Department of Environmental Quality
DWR Division of Water Resources
EMS Emergency Medical Service
EMT Emergency Medical Technician
ETJ Extra-territorial Jurisdiction
FAR Floor Area Ratio
FEMA Federal Emergency Management Agency
GIS Geographic Information System
HQW High Quality Waters
ICWW Intracoastal Waterway
LPO Local Permit Officer
LUP Land Use Plan
MG Million Gallons
MGD Millions of Gallons per Day
MHWL Mean High Water Line
MLWL Mean Low Water Line
MS4 Municipal Separate Storm Sewer System
N.A. Not Applicable
NC North Carolina
NCAC North Carolina Administrative Code
NCDOT North Carolina Department of Transportation
NFIP National Flood Insurance Program
NPDES National Pollutant Discharge Elimination System
NPS Non-point Source
Appendix A: Definitions and Acronyms Pender 2.0: Comprehensive Land Use Plan
A-4
NSW Nutrient Sensitive Waters
ORW Outstanding Resource Water
OSDS Onsite Sewage Disposal System
SW Swamp Waters
U.S. United States
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-1
APPENDIX B: MAP DATA SOURCES
DATA SOURCES USED TO CREATE MAPS
The following is a list of data sources used to compile the County’s maps that supplement their
respective chapters in this plan.
Map 1.1: Location
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 2.1: Planning Areas
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.1: Areas of Environmental Concern (AECs)
Environmental Systems Research Institute (ESRI)
NC OneMap
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
North Carolina Division of Coastal Management (NCDCM)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-2
Map 3.2: Special Flood Hazard Areas (SFHAs)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
North Carolina Division of Coastal Management (NCDCM)
North Carolina Floodplain Mapping Program (NCFMP)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.3: Storm Surge from Hurricanes (Fast Moving Storm)
Environmental Systems Research Institute (ESRI)
National Oceanic and Atmospheric Administration (NOAA)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.4: Surface Water Classifications
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Environmental Quality (NCDEQ)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-3
Map 3.5: Coastal Surface Water Classifications & Fish Nursery Areas
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Environmental Quality (NCDEQ)
North Carolina Department of Transportation (NCDOT)
North Carolina Division of Coastal Management (NCDCM)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.6: Coastal and Non-Coastal Wetlands
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
North Carolina Division of Coastal Management (NCDCM)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.7: Natural Heritage Natural Area Locations (SNHAs)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.8: Smoke Awareness Areas & Managed Areas
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-4
North Carolina Wildlife Resources Commission (NCWRC)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.9: Biodiversity and Wildlife Habitat Assessment
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
North Carolina Natural Heritage Program (NCNHP)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.10: Septic System Suitability
Environmental Systems Research Institute (ESRI)
Natural Resources Conservation Service (NRCS)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 3.11: Agricultural Lands Assessment & Voluntary Agricultural Districts
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
North Carolina Natural Heritage Program (NCNHP)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-5
Map 3.12: Prime Farmland Classifications
Environmental Systems Research Institute (ESRI)
Natural Resources Conservation Service (NRCS)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.1: Water Facilities
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.2: Wastewater Service Facilities & Availability
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.3: Traffic Counts
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-6
Map 4.4: Automobile Accidents
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.5: Coastal Traffic Counts and Automobile Accidents
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.6: CTP Roadway Recommendations (2016)
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Wilmington Urban Area Metropolitan Planning Organization (WMPO)
Map 4.7: Draft STIP (2018-2027)
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-7
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.8: Parks and Recreational Opportunities
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.9: Coastal Parks and Recreational Opportunities
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
U.S. Geological Survey (USGS)
Map 4.10: Community Facilities
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
Pender County Geographic Information Systems (GIS)
Pender County Schools
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-8
U.S. Geological Survey (USGS)
Map 4.11: Coastal Community Facilities
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Schools
U.S. Geological Survey (USGS)
Map 5.1 Pender County Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.2 Union Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-9
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.3 Holly Shelter Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.4 Burgaw Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.5 Caswell Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-10
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.6 Long Creek Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.7 Topsail Planning Area Existing Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-11
Map 5.8 Pender County Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.9 Union Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.10 Holly Shelter Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-12
U.S. Geological Survey (USGS)
Map 5.11 Burgaw Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.12 Caswell Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.13 Long Creek Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Appendix B: Map Data Sources Pender 2.0: Comprehensive Land Use Plan
B-13
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
Map 5.14 Topsail Planning Area Future Land Use
Cape Fear Council of Governments (CFCOG)
Environmental Systems Research Institute (ESRI)
North Carolina Center for Geographic Information and Analysis (NC CGIA)
North Carolina Department of Transportation (NCDOT)
NC OneMap
Pender County Geographic Information Systems (GIS)
Pender County Tax Records
U.S. Geological Survey (USGS)
%%%%% %% %% %
%
%!% "%
#%%$% %