Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
77412_Neal Williams_20201027
�5 ;, P ,I1CAMA/ ❑DREDGE & FILL IP 4 in 57 No 77412 A B C D GENERAL PERMIT Previous permit# ,. >< ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued /A As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC ': ���/ Rules attached. Applicant Name ,. .e sl-'.c Project Location: County . , Address '. it,c s/7- ..)X Fv-e./ Street Address/State Road/Lot#(s) -.7 L.. _, 4 r City /-e A •,,,, State -UC ZIP ,72 7k/C1 / Phone#( ) E-Mail i✓.//9 f�`c r^< 7 ��' Subdivision C,' sly [ / J / i` /G Authorized Agent ✓e�a/ J c l r!� City X e/�e�c•. ZIP .� c� ❑CW W ❑PTA Ida El Phone# River Basin /‘r ..- Affected ( J / AEC(s): ❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body / ,-i: er<r at roan /unkn) ❑ PWS: _/- `J ORW: yes / __ PNA yes / no Closest Maj.Wtr. Body OOOO ,, o Type of Project/Activity i! ;-j> y f,. - '- w-,.el ., 7 113 /k it d (Scale: / - ' ) Pier(dock)length Fixed Platform(s) I 1 Floating Platform(s) ` i Finger pier(s) Groin length y�, IC i number f 4j G Bulkheai/'Riprap_length G I `--__ -..._ ( I___._ avg distance offshore /(/ ` i j max distance offshore /(/ I Basin,channel " - II . cubic yards , f I I i 1 Boat ramp 1 , 1 Y Boathouse/Boatlift ( _-- —.r 1 i ! o7 I. 1 IIv} lu/zs 14 e1 Beach Bulldozing -- j I./4, Other 1 f L I I Shoreline Length A 0 /L I t AI/ e"/) I 14 P„ li SAV: not sure yes 63 liz,v / —I- 1 { /( I, Moratorium: n/a yes no , , at f , , Photos: yes _ ._ _...._ ��_,_ __ _ —_ Waiver Attached: yes no I ' I A building permit may be required by: /J Csty s/ / C Q . rKee note on back regarding River Basin rules. (Note Local Planning Jurisdiction) Notes/Special Conditions 're e D 7//. /wU , /o 7 . t Y`c. I,. , -1 4 w� , ,ilrirot S Ii. 1/41-/- 7.-1X14,,--,G r ..51 /,• Ag nr Applicant Print,. Name Permit Officer' ri Name v Signatu _ �"�`P ease rea.`,mpl' ce statement on back of permit '* Signature §(740 ___S r / t i-/ .2 - .--20 l r- I a2 7 .,2J.� Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648I) or the Wilmington Regional Office(9 I 0-796-72 1 5)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 910-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 _- 0❑CAMA/ ❑DREDGE & FILL �} („FJ N . 77412 A BCD T� `v /l GENERAL PERMIT :7 Previous permit# iNew ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued As authorized by the State of North Carolina,Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC . ❑Rules attached. Applicant Name /(/.. / Project Location: County Address / Street Address/State Road/Lot#(s) City . • State c ZIP • - 74--' Phone# ( ) E-Mail i, tv° // 5 1 /. Subdivision / Authorized Agent �r'r 4 7 City ZIP Affected ❑CW E'EW ❑PTA ❑ES EI PTS Phone# ( ) River Basin . AEC(s): OEA El HHF Cl IH CI UBA ❑N/A Adj.Wtr. Body gnat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / no Closest Maj.Wtr. Body Type of Project/Activity i r / (Scale: / ,,.ti., ) Pier(dock)length Fixed Platform(s) ( 1 I ! 1 j Floating Platform(s) l ' j I __ Finger pier(s) '1 i _!__...... , .............._._ ._-._.__ J i Groin length / ' I + f t /- i I' i number r._........ -�-+t -- — —__�__.......... _ .... / Bulkheaci/Riprap length11( — _ — avg distance offshore . .� I I 1 max distance offshore Basin,channel I ' cubic yards 1 I 1 Boat ramp I l Boathouse/Boatlift —_—.� l.... I ..... I ._._ ..._'4 L'_ i _.i...._._ _ - ... Ir. ♦f - - 1 r Beach Bulldozing - --- --- — t` -- i r Other I / 1 ' . 1 I j t . c. -c.. C,G. 6c 1 - ,C t._• Shoreline Length !: t-' `i t.l i ' !`. / { •,• 1.�''. ' SAV: not sure yes ! { �' Moratorium: n/ayes n f - I f• Photos: yes i _ _ �_ _ �_ Waiver Attached: yes no '' T — ' A building permit may be required by: /, r "r ( o . LJ See note on back regarding River Basin rules. (Note Local Planning Jurisdiction) , Notes/Special Conditions d 7/ /7G CI . /_ ,-i, /_.. < _( /, ,�,;. Ag—or Applicant Print Nan* Permit Officer's Printed Name LG - -- Sinature **P ease read=" m li nce statement on back of permit** Signature g So P P . (/.; / , , ,2 Application Fee(s) Check# Issuing Date Expiration Date Statement of Compliance and Consistency This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become null and void. This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian landowner(s). The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available information and belief,certify that this project is consistent with the North Carolina Coastal Management Program. River Basin Rules Applicable To Your Project: Tar-Pamlico River Basin Buffer Rules Other: Neuse River Basin Buffer Rules If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the Wilmington Regional Office(9 I 0-796-72 15)for more information on how to comply with these buffer rules. Division of Coastal Management Offices Morehead City Headquarters Washington District 400 Commerce Ave 943 Washington Square Mall Morehead City, NC 28557 Washington, NC 27889 252-808-2808/ I-888-4RCOAST 252-946-648 I Fax: 252-247-3330 Fax: 252-948-0478 (Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde, North of New River Inlet-and Pamlico Tyrrell and Washington Counties) Counties) Elizabeth City District Wilmington District 401 S. Griffin St. 127 Cardinal Drive Ext. Ste. 300 Wilmington, NC 28405-3845 Elizabeth City, NC 27909 910-796-7215 252-264-3901 Fax: 9 I 0-395-3964 Fax: 252-264-3723 (Serves: Brunswick, New Hanover, (Serves:Camden, Chowan,Currituck, Onslow-South of New River Inlet- Dare,Gates, Pasquotank and Perquimans and Pender Counties) Counties) http://portal.ncdenr.org/web/cm/dcm-home Revised 7/06/17 ROY COOPER {:a Governor MICHAEL S. REGAN Secretary Coastal Management BRAXTON DAVIS ENVIRONMENTAL QUALITY Director BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION A riparian buffer authorization is required for shoreline stabilization activities within the Neuse and Tar-Pamlico River basins per Division of Water Resources(DWR) regulations 15A NCAC 02B.0233 and 0259. The Division of Coastal Management(DCM)through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned 1 regulations. Those activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party(contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to$25,000 per day per violation. i. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1(begins at the most landward of either normal water line(NWL)or normal high water line(NHWL)and extends 30 feet landward)shall be minimized to what must be impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and • filling in the buffer is a violation of the riparian buffer rules. 2. Clearing& Grading:Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised,which includes maintaining diffused (non-channelized)flow of storm water runoff through the buffer. 3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be satisfactorily restored as described in condition 5 below. 4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only;sites where wave overwash is expected to be severe,the first ten(10)feet landward(unless specifically authorized otherwise by DCM)from the structure may be maintained as a stable lawn in order to provide for structural stability. j 5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until site restoration can be accomplished. 6. Site Restoration:At minimum,pre-project site conditions must be re-established.A site that was wooded prior to this shoreline stabilization project must be restored with woody vegetation at a stem density of 260 stems per acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first subsequent planting season (November 1 through /March 30) after completion of the bulkhead. • Pre-project site conditions: 0���.L-/‹.K�c� k,,,,, 7. Project Drawing:The drawing on the CAMA General Permit is considered the project drawing of your property indicating the location of the shoreline stabilization structure and any associated clearing,grading,and construction corridors.This drawing will be used to aid in compliance and monitoring efforts. By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all information is complete and accurate. ��, s.<<6 .T7 Ag it or'plic- t .r' to 4ame ermit Officer's Signat re ..� .4e._ .,A Ai /2 f 27 ,�� t or . pplicantirgn- ure Issue Date CAMA GENERAL PERMIT#: 7 7 / /2 . State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mali Washington.NC 278891 252-946-6481 Wilmington Office 1127 cardinal Drive E t Wilmington.NC 28405-3845 I t10-796.7215 Morehead City Office 1400 Commerce Avenue Morehead City.NC 28557 1252-808-2808 10/27/2020 Yahoo Mail-Re:Permission for rip-rap Re: Permission for rip-rap From: Neal Williams(nwil1959@gmail.com) To: jerolselby@yahoo.com Date: Monday, September 21, 2020, 04:41 PM EDT I, Neal Williams, give Jerol Selby permission to install rip-rap along my waterfront bulkhead @ 372 Shady Shores Belhaven, N.C. On Fri, Sep 18, 2020, 10:19 AM Jerol Selby<jerolselby_@yahoo.com>wrote: Good morning Neal, I need you to send me an email giving me permission to sign the cama permit. Thanks, Jerol Selby Jr. On Thursday, September 3, 2020, 05:55:06 PM EDT, Neal Williams<nwil1959@gmail.com>wrote: 1/1 --- 1/2020 Yahoo Mail-Re:CAMA Permit Re: CAMA Permit From: Reagan Rippy(rrippy@rcsnc.org) To: jerolselby@yahoo.com • Date: Friday, September 18, 2020, 10:23 AM EDT Jerol Selbyhas permission to sign the CAMApermit for installation of ripraponpropertyat 380 Shady Shores, Belhaven, NC. Reagan Rippy On Fri, Sep 18, 2020 at 10:20 AM Jerol Selby<jerolselby@yahoo.com>wrote: Good Morning Reagan, I need you to send me an email giving me permission to sign cama permit. Thanks, Jerol Selby Jr. On Thursday, September 3, 2020, 12:43:17 PM EDT, Reagan Rippy<rrippy-@resnc.org>wrote: ------- Forwarded message------ From: Neal Williams <nwi11959@gmail.com> Date:Thu, Sep 3, 2020 at 12:26 PM Subject: Re: CAMA Permit To: Reagan Rippy<rrippy-@resnc.org> I, Neal Williams, have no objection to Reagan Rippy putting rip-rap at his bulkhead. On Wed, Sep 2, 2020,4:02 PM Reagan Rippy<rrippy_@resnc.org>wrote: I, Reagan Rippy, have no objection to Neal Williams putting rip-rap in front of his bulkhead. 1/3 RRUUTHERFORD Renee Rippy<reneer@rcsnc.org> COUNTY SCHOOLS Fwd: Request for permission for riprap installed . 2 messages Reagan Rippy<rrippy@resnc.org> Wed,Aug 26,2020 at 8:37 AM To:Renee Rippy<reneer@rcsnc.org> -Forwarded message From:Neal Williams<nwi11959@gmail.com> Date:Tue,Aug 25,2020 at 8:37 PM Subject:Request for permission for riprap installed. To:<rrippy@resnc.org> Mrs.Reagan, My name is Tammie Williams,my husband and I have purchased the lot beside you.We have contracted with Jerol Selby to have riprap installed at our bulkhead.He requested that we get your permission to have this work done because we need it for the cama permit. Thank you, Neal and Tammie Williams Mr.Reagan Rippy Assistant Principal R-S Central High School Rutherford County Schools,NC (828)287-3304 rrippy@resnc.org "All e-mail correspondence to and from this address is subject to the North Carolina Public Records Law,which may result in monitoring and disclosure to third parties,including law enforcement." Reagan Rippy<rrippy@resnc.org> Wed,Aug 26,2020 at 10:28 AM To:Renee Rippy<reneer@rcsnc.org> —Forwarded message From:Reagan Rippy<rnppyvresnc.org> Date:Tue,Aug 25,2020 at 9:33 PM Subject:Re:Request for permission for riprap installed. To:Neal Williams<nwi11959@gmail.com> Thank you,you too! On Tue,Aug 25,2020 at 9:32 PM Neal Williams<nwi11959@gmail.com>wrote: We look forward to meeting you both as well.We went down to the property Saturday and they have started tearing down the trailer on your property. Hope y'all have a wonderful night. On Tue,Aug 25,2020,9:25 PM Reagan Rippy<rrippy@rcsnc.org>wrote: Absolutely,you have our permission as well.Thank you for letting us know!Nice to hear from you.Maybe Renee and I could take y'all to dinner when we get everything settled.We'd love to meet our new neighbors! On Tue,Aug 25,2020 at 9:20 PM Neal Williams<nwil1959@gmail.com>wrote: When My husband first contacted him 2 weeks ago, Jerol said that he was hoping to do both jobs at the same time.This afternoon he contacted us and said that he is hoping to start next month but he didn't give us a specific date in September. I give you my permission to have rip-rap install on your bulkhead.If you will please state the same for me in an email. Thank you.Tammie On Tue,Aug 25,2020,9:02 PM Reagan Rippy<rrippy@resnc.org>wrote: Mr.and Mrs.Williams, I am so glad to hear from you.We have also talked with Selby about doing rip rap on our side!We have been delayed a few times with closing due to seller issues with paperwork,but our plan is to contract him as soon after September 8th as possible.We,too,will need your permission.Please,let Mr.Selby know that we still plan to go forward with it as well.I wonder if he wouldn't prefer to do them both at the same time.When is he planning to do work for you'? [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] [Quoted text hidden] Renee Rippy<reneer@resnc.org> RUTHERFORD COUNTY SCHOOLS Fwd: CAMA Permit 2 messages Reagan Rippy<rrippy@resnc.org> Wed,Sep 2,2020 at 4:01 PM To:Renee Rippy<reneer@resnc.org> Forwarded message-- From:Jerol Selby<jerolselby@yahoo.corn> Date:Wed,Sep 2,2020 at 3:59 PM Subject:CAMA Permit To:rrippy@resnc.org<rrippy@resnc.org>,Neal Williams<nwi11959@gmail.com> Good Afternoon,Hope ya"ll are well. The permission emails/letters will need to say something more like this. I(name of neighbor)have no objection to(name of lot owner)putting rip-rap in front of His/Her bulkhead. Please forward to me whenever possible. Thanks, Jerol Mr.Reagan Rippy Assistant Principal R-S Central High School Rutherford County Schools,NC (828)287-3304 rrippy©rcsnc.org "All e-mail correspondence to and from this address is subject to the North Carolina Public Records Law,which may result in monitoring and disclosure to third parties,including law enforcement." Reagan Rippy<rrippy@resnc.org> Wed,Sep 2,2020 at 4:02 PM To:Jerol Selby<jerolselby@yahoo.com>,Renee Rippy<reneer@rcsnc.org> Cc:Neal Williams<nwil1959@gmail.com> I,Reagan Rippy,have no objection to Neal Williams putting rip-rap in front of his bulkhead. [Quoted text hidden] boa (-r I //7 AC/ have no objection Neal and Tammie Williams putting rip-rap in front of their bulkhead at 372 Shady Shores, Belhaven, N.C. e.12.