HomeMy WebLinkAboutJohnson (10) CERTIFICATION OF EXEMPTION
Ce)
FROM REQUIRING A CAMA PERMIT PS 0.-1 o2 . 1 SC-
as authorized by the State of North Carolina,
0 Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
licant Name • &
'hi' eV/ 70/HS :re. Phone Number GAG, �G
'ress /4,4 4 ' 1 /1ewa►/ s.)k ,L--i t. 7T)
iy %rh, ,,'iq State /Z/' Zip j
ject Location(Co Puby, State Road, Water Body, tc.)
--fr P rs. (i-i <. ,P4-7 r'► js •, Gig fQle!s174 4 //<mli/? �les�4
e and Diplensions of Project y/oti 7'?' rj�drJ e/** 1 y,#rs�_ y jril ////-
°/ /PL9f/ / i" / 4 .4r/ 'GY-iA' 5edf?. /''1�7/Y000,6 5 4//L'dh7`rl/
/proposed project to be located and constructed as described This certification of exemption fromrequiring a CAMA
)ve is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following ex
'ement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be ne
MA permit requirements does not alleviate the necessity of to continue this certification.
it obtaining any other State, Federal, or Local authorization.
KETCH /1/-&-."7 ,Cs .. ''t.� k01/ he//zi/l r-& . (SCALE:
j,.
n.
�' ark � / G,///7 /"r /W", '�f,«7lS
r
pi/ rx,/i f .74 . D/D 3 •
( 4 a
a
r i
Cap c
41 >2 p R '
U.S. ARMY 0 PS OF ENGINEERS
r !f g y•-
WIL 1,k; -
_ -
Lotion Id. : 6O5 obO93 Jf NOV 0'8 2004' -
County
pNESIONjor,-:- •-•
GENERAL PERMIT (REGIGNANLA0NuA4v,imiyipE) VERIFICATION_
nCperty owner bk.
r. Sart
ddr Totv/V 143-e•
ess 66 ex-J, _
C /11
_!,lephone No. - 6 6.
. .
ze and Location of project(water body,road name/number,town,etc.) IEa or
7/6 6_
,rito 44'161' AkL
Lt
A ki
ascription of Activity earl. puV, 61C.0Z-1 ti(
_
_ •
?plicable Law: X, SectiOn,.40,41 (Clean Water Act,33 IJ.S4:C.91344).
aeck all that apply) _Seaton. 10(River and Harbor Act of 1899).
nhorization: - 9'81)600 Regional General Permit Number.
Nationwide Permit Number
or work is authorized by this Regional General(RGP)or Nationwide Permit(NWP)provided it is aceOniplishe
strict accordance with the attached conditions and your submitted plans. If your activity is iubjeet to Sec&
4 (if Section 404 block above is.checked), before beginning work you must also receive:a Section 401.,Ngati
ality certification from the N:C.-INN/Sion of Environmental Management,i'teleph9,--ne (9 i9) 733-1786. For an
ivity within the twenty coastal counties,before beginning work you must contact the.N.C. Pivilion,of Coast
magernent,telePlic;ne(919)-1337.293. . . - • .7;01
:ase read and carefully comply with the attachedconditions of the RGP or NWP. Any violation of 'condition
the RGP or the NWP referefiCed aboire may Subject the permittee to a stop Wolk ofder,n restoration&der, and/
?ropriate legal action. - - - •
is Department of the Army RGP or NWP verification does not relieve the perntittee of the responsibility to obtai
?',9ther.required Federal,State,pI.localappnuyaItslpennits. The permittee may need.t9,F9tItact 41P: 1cPPriatq.Stat
I local agencies before beginning work. -