Loading...
HomeMy WebLinkAboutFlohr (3) CERTIFICATION OF EXEMPTION v // FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, 4% Department of Environment, Health,and Natural Resources and the Coastal Resources Commission r� in an area of environmental concern pursuant to 15 NCAC Subchapter 7K.0203. licant Name \)c(N ru 4 Phone Number 71 D"O066 ress S- f'' fjkyZ (1�j LAIN l) N State Ni(., Zip 7 KZ ect ocation( ou ty,State Road, Water Body, etc.) ' (I pPc -- t and D;tnens��io�ns of P F n1 � D , ___ L_ti )roposed project to be located and constructed as described This certification of exemption from requiring a CAMA pei 'e is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expir ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece IA permit requirements does not alleviate the necessity of to continue this certification. obtaining any other State, Federal,or Local authorization. ETCH (SCALE: i S A y .A '- rr /C( i 4/4 / s ,r 767-4-\ 2-(:y b''''',^ v" '-/o-C v./eLit d: ,fi_. PG °'r �'�' ......„—s 1./ c -o/ 23 1 /--/A 4J1 5/2004 12: 12 7900060 FLOHR PAGE 01 • Daniel Flohr 8 Cedar Island Wilmington, NC 28409 January 15, 2004 NC Division of Coastal Management 127 Cardinal Drive Wilmington, NC 20409 Sirs: Please accept this letter as a request to repair my bulkhead at 8 Cedar Island in Wilmington. Existing Bulkhead: N 900 feet Pressure treated wood with pilings, walers, vertical sheathing, and tie-backs. Problem to be repaired Rotting of vertical sheathing at mud line on ICWW side of bulkhead. Repair: Re-sheath approximately 195 feet of bulkhead from waler down to below mud line Materials to be used: —2000' linear of 2.5 lb. pressure treated T&G 2'5(8"wood planks N1000 Stainless steel screws N 800 square feet of bulkhead fabric Please let me know if this letter is acceptable and when we might schedule an inspection. Than 1),-/I,