HomeMy WebLinkAboutOcean (15) CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment,Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
licant Name 7Wv p Cc e4nd 2 - l eA—c (—t Phone Number 9f0, S7
ress 3 W '0 5 t •
A, ZC State NC° Zip1
ect Location (County, State Road, Water Body, etc.) ji e/6, z ? J =-.vij J 4 /, ALP., i-
and Dimensions of Project 5 ' w. ,4 L uivcj , (r+PO .w (3r=A-i N 4-erc 5 S
proposed project to be located and constructed as described This certification of exemption from requiring a CAMA pei
,e is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expir
ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be necE
IA permit requirements does not alleviate the necessity of to continue this certification.
obtaining any other State, Federal, or Local authorization.
ETCH (SCALE:
west / s grir'✓-� 7
P PioPocarK wAY
Oy
j !le LAa12
—AC
.ram -
•
cean Isle Beach Proposed Groundlevel Boardw,
A i__i_
4A
W. FIRST ST
Proposed 5'Groundlevel
Boardwalk
IIIIIIII
o .
4 I
+'d tR'
1 ' -* �
.•f 4
y.
r
t
, J , -w .g
,A 4
;"
i Existing Beach ` '
n 4