HomeMy WebLinkAbout77295_Teresa Harvey_20201015 R- 5
0 L AMA/ LTDREDGE & FILL `�f Q(07 N9 77295 A B) C D
GENERAL PERMIT Previous permit#
��-= ❑New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued .,,y,/,f
As authorized by the State of North Carolina, Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I 5A NCAC //D U
1i ules attached.
Applicant Name /ere,. ! ,ye 7, Project Location: County
Address %:.(� /licic, 11 . 4,:,,.„ r`7 f Street Address/State Road/Lot#(s) l--' :, /_.4,
,kc .24t /3-City (���r State ���ZIP . �--, E ,./j t ��..., A.:(••'. 1 ��
Phone# ( ) - `- E-Mail 4 Subdivision 4/1-1
Authorized Agent City % / ZIP -,2 {-/U
Affected ❑CW FEW i L}PTA DES PTS Phone# ( =) yr - River Basin ? .~ // ,AEC(s): ❑OEA ❑HHF ❑IH ❑URA ❑N/A Adj.Wtr. Body j' ., , /,✓ (na /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / Closest Maj.Wtr. Body f
Type of Project/Activity ///,
(Scale:Aic I )
Pier(dock)length -
Fixed Platform(s) I
Floating Platform(s) ' _ ; j
Finger piers) / '
Groin length
number ......: — i F - _..._
•.Bulkhead/'Riprap length t T____,_
V
(, i l i� '
avg distance offshore i Jf
max distance offshore j 1 __._,,._—
Basin,channel i i I
j
cubic yards I 1-
Boat ramp i
Boathouse/Boatlift ...•.L... ... �.. ..
t .... ...... _. .. T __ 7 ; f ....
Beach Bulldozing —� — j
T i 4 L L l i i .
Other �
r
DuE ate w
Shoreline Length tff tip I b`i� !
SAV: not sure yes no —_- — I-. , -' 4—
Moratorium: n/a yes
i j
Photos: yes no r.t / TPrZ..1. .. t / ,1 . ...._._.... F • '_�-.,., ..
Waiver Attached: yes no / L_
ri A building permit may be required by: ' ' ! ' See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions / /// 7 ,7 // r,;- 6/4-i /'� , /, r .( /', 1-e i;. / /V- K, /l<.-,) . /
f C1,.A.4-i (C"o yJf /l e l,.,,J /.7 r ie e fy ,/,r lj of / ,'r /t,,.c., zip,.-i,r� b h tiv/ Sits.-f
i
- / e ,,,,b__,,-,, ,
•
_5 7 .../ /el.%
Agent or Appli t Printed Name /7 Permit Officer's Printed Name
Signature **Please read compliance statemeon back of permit** Signature
tix °= l U 9 / :k2,2 c) /., 4 ,
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(910-796-7215)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-6481
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort, Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick,New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
..0
L.
to❑LAMA/ 0 DREDGE & FILL �� �f'J00 No 77295 A BCD
GENERAL PERMIT �Y Previous permit#
>Z El New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
As authorized by the State of North Carolina,Department of Environmental Quality
and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC .
❑Rules attached.
Applicant Name Project Location: County
"
Address t, /. / . , i Street Address/State Road/Lot#(s) _. , , 44, ,
City State ZIP /�• ' ffi
Phone# ( ) E-Mail Subdivision
Authorized Agent City ZIP
Affected ❑CW ElEW ❑PTA ElES ❑PTS Phone# ( ) River Basin /`
AEC(s): ❑oEA ❑HHF E IH ❑UBA ❑N/A Adj.Wtr. Body (nat /man /unkn)
❑ PWS:
ORW: yes / no PNA yes / no Closest Maj.Wtr. Body
Type of Project/Activity
(Scale:y )
Pier(dock)length
I I
Fixed Platform(s) ■■■■•• ■■■■■ ■■■
Floating Platform(s) � ■■■■■■ µ ■■■■■■_ 1 1 1 ■M ._.
Finger pier(s)
ry
Groin length , i ! i I !
number 1
I
; Bulkhead/Riprap length ■ .l a ■ ■■
avg distance offshore ■■R M. — �C■ '�
max distance offshore a. ~ige.
Basin,channel
I
cubic yards ■■■■•■■■ I I■•■■■ UMW .- 1 ■■
Boat ramp j
I
Boathouse/Boatlift t
I- , _ } •
j -
l
Beach Bulldozing �� 1 ■■
Other t
I I, tv 1 1
1111111111111111MIIMEIMINEWMIIIIIIIIIIIIIIIIIIIIIMIMI1111111111111111111Ill
Shoreline Length IIiI ' 1UlHH
IN 1
• ; „ : „
SAV: not sure yes no
} —L
• ;r f
:1 ', :—,- i le
Moratorium: n/a yes no -r�
Photos: yes no ..... i — I ; a�
Waiver Attached: yes no • I iI i 1 1 1 i ' ,� „ •
A building permit may be required by: / // See note on back regarding River Basin rules.
(Note Local Planning Jurisdiction)
Notes/Special Conditions ;-'/ / ' - /
Agent or Applicant Printed Name /�� Permit Officer's Printed Name
/ f� /
"fig 1-A
Signature **Please read compliance statement on back of permit** Signature
•
Application Fee(s) Check# Issuing Date Expiration Date
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that I)prior to undertaking any activities authorized by this permit,the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s).
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief,certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
Tar-Pamlico River Basin Buffer Rules Other:
Neuse River Basin Buffer Rules
If indicated on front of permit,your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Resources. Contact the Division of Water Resources at the Washington Regional Office (252-946-648 I) or the
Wilmington Regional Office(9 I 0-796-72 1 5)for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Morehead City Headquarters Washington District
400 Commerce Ave 943 Washington Square Mall
Morehead City, NC 28557 Washington, NC 27889
252-808-2808/ I-888-4RCOAST 252-946-648 I
Fax: 252-247-3330 Fax: 252-948-0478
(Serves:Carteret,Craven,Onslow- (Serves: Beaufort,Bertie, Hertford, Hyde,
North of New River Inlet-and Pamlico Tyrrell and Washington Counties)
Counties)
Elizabeth City District Wilmington District
401 S. Griffin St. 127 Cardinal Drive Ext.
Ste. 300 Wilmington, NC 28405-3845
Elizabeth City, NC 27909 910-796-7215
252-264-3901 Fax: 910-395-3964
Fax: 252-264-3723 (Serves: Brunswick, New Hanover,
(Serves:Camden,Chowan,Currituck, Onslow-South of New River Inlet-
Dare,Gates, Pasquotank and Perquimans and Pender Counties)
Counties)
http://portal.ncdenr.org/web/cm/dcm-home
Revised 7/06/17
Staples, Shane
From: teresaharveys <teresaharveys@hughes.net>
Sent: Saturday, October 10, 2020 4:38 PM
To: Staples, Shane
Subject: [External] FW: Permission to build
External email.Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
rep_ort.spam_@nc.gov
Sent from my U.S.CellularC Smartphone
Original message
From: boyd proctor<boydproctor1959@gmail.com>
Date: 10/10/20 9:58 AM(GMT-05:00)
To: teresaharveys@hughes.net
Subject: Permission to build
To whom it concerns.
Marcus Boyd Proctor Jr. of
361 Debbi Lynn Lane
Belhaven NC 27810.
I give permission to Bonzal and Teresa Harveys, to perform shoreline stabilization, build house
structure and bulkhead on their property next to property I own on Debbi Lynn Lane in Belhaven
North Carolina.
Boyd
t
*4% 1.,\
- _ ,
. .... - .._-_ .....f 41r
NCDENR
North Carnhina fleoartment of Environment and Natural Resources
hi-sic, '-f Coas'ai 1.1ar ;,procr
Donald R. wan der Vaart
Secretary
BUFFER AUTHORIZATION CERTIFICATE FOR SHORELINE STABILIZATION
A riparian buffer authorization is required for shoreline stabilization activities within the Tar-Pamlico& Neuse River basins
per Division of Water Resources (DWR) regulations 15A NCAC 02B.0259 &0233. The Division of Coastal Management
(DCM) through a Memorandum of Understanding with the Division of Water Resources(DWR) has reviewed your project
proposal and has determined that the project as proposed complies with the aforementioned regulations.
Those r activities covered by your Coastal Area Management Act(CAMA) permit have received Buffer Authorization as
long as the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply
with this Buffer Authorization may subject the property owner&the party (contractor) performing the construction &/or
land clearingto a civil penalty of p a ty by DWR up to$25,000 per day per violation.
1. Impacts: Impacts to woody vegetation from clearing and filling in Zone 1 (begins at the most landward of either
the waters edge or the coastal wetland line and extends 30 feet landward)shall be minimized to what must be
impacted for the sound installation of the shoreline stabilization project. Unnecessary clearing and filling in the
buffer is a violation of the riparian buffer rules.
2. Clearing &Grading: Clearing and grading of Zone 2 (begins at the landward edge of Zone 1 and extends 20 feet
landward) is allowed provided that it is re-vegetated immediately and Zone 1 is not compromised, which includes
maintaining diffused (non-channelized)flow of storm water runoff through the buffer.
3. Construction Corridors: Construction corridors are allowed for shoreline stabilization projects, but they must be
satisfactorily restored as described in condition 5 below.
4. Potential Overwash: For vertical shoreline stabilization projects(bulkheads)only; sites where wave overwash is
expected to be severe, the first ten (10)feet landward (unless specifically authorized otherwise by DCM) from the
structure may be maintained as a stable lawn in order to provide for structural stability.
5. Temporary Stabilization: Immediately post-construction, bare soils must be stabilized as quickly as possible by
providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting.
This ground cover is a temporary measure used to address erosion until site restoration can be accomplished.
6. Site Restoration: At minimum, pre-project site conditions must be re-established.A site that was wooded prior to
this shoreline stabilization project must be restored with woody vegetation at a stem density of 320 stems per
acre. Non wooded sites may be re-vegetated with woody vegetation. Restoration must be completed by the first
subsequent planting season (November 1 through March 30)after/ completion of the bulkhead.
• Pre-project site conditions:/it prryc-- 'a /L( Je J , Lv,�„ r/ .7,-,c//�,-
f/i 1<'-t 6.747,,r C I/,O...1C J
7. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property
indicating the location of the shoreline stabilization structure and any associated clearing, grading, and
construction corridors. This drawing will be used to aid in compliance and monitoring efforts.
By your signature below you agree to be held responsible for meeting all of the above listed conditions and verify that all
information is complete and accurate.
/�&tc /��✓Cy .
A or Applicant Prin d Name or Officer's Signa ure
,01.S-7.-2
Agent or Applicant Sign ur 7 Issue Dat
CAMA GENERAL PERMIT#: / 7 �S /J'
Washington Office Morehead City Office Wilmington Office
943 Washington Square Mall 400 Commerce Avenue 127 Cardinal Drive Ext.
Washington,NC 27889 Morehead City,NC 28557 Wilmington,NC 28405-3845
Phone 252-946-6481 Phone 252-808-2808 910-796-7215
An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper
NC Division of Coastal Mgt Habitat Impact Comgiter Sheet
Applicant ,f tl Mevzy,
Date: /0 - /.5"-v2a
General Permit#: 77.2 cJj
Describe below the HABITAT disturbances for the application. All values should match he name,and units of measurement
found in your Habitat code sheet
I TOTAL Sq.Ft FINAL Sq. Ft. ; TOTAL Feet FINAL Feet
(Applied for. (Anticipatedfiaal (Applied for. (Anticipated final
DISTURB TYPE Disturbance total disturbance Disturbance disturbance.
•
Habitat Name Choose One includes any Excludes an total includes Excludes any
anticipated restoration any anticipated restoration and/or
restoration or and/or lemp restoration or temp impact
temp impacts) impact am cut) temp impacts) amount)
•
k /n L Dredge❑ Fill Both ❑ Other ❑
a/0`«•J Dredge❑ Fill❑ Both ❑ Other IE ) 0
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑ `
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ FiII❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑
Dredge❑ Fill❑ Both ❑ Other ❑ t
Dredge❑ Fill❑ Both ❑ Other ❑