HomeMy WebLinkAboutFreedland CERTIFICATION OF EXEMPTION
_Y FROM REQUIRING A CAMA PERMIT 44' Q --l'571/915 8 (1.2
as authorized by the State of North Carolina,
" ' Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
(� in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
icant Name P' s��✓ Phone Number l/6 2SG,
ess -$ 3 / /�.ifree,
/liter
v/%1/ fr State ei/t Zip 25
)ct Location(County;State Road, Water Body, etc.) 3Q I/ (-NC, ,c k RI vet
N WY 34 �, yr ev,� "wry �.- y �« 7/' ,
and Dimensions of Project CAL//.- t'P . '/ky /k A- 4 I —G►<<"s./
iroposed project to be located and constructed as described This certification of exemption from requiring a CAMA per
a is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expir
ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece
A permit requirements does not alleviate the necessity of to continue this certification.
Dbtaining any other State, Federal,or Local authorization.
ETCH (SCALE: / ".7.-.-Ze2 0
P44,1 K S (1-14/P z I
net ces) r 6
f ki,S'//', t ,e7 :Ai i+ t c,"
Z. - 14-eael • r
Fp - " 1 !C l' IINA ,5 CK i 5 rOr�r-, /"/rl�/
9 ,
Oki;f/,y i -he i li.w'" -,�je�'l� / Crr,,
J /4/ X f/V l-F-zp,
f i^.,4ti