HomeMy WebLinkAboutTopsail (6) •
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K.0203.
licant Name Ott ti O r Phone Number :.j/• • S Z3
esscc- ) S• A &-v1
'T P5Pai•- &E.11% State Zip Z.
act Location(County,Sate Road, Water Body, etc.)
i_U�c tL tJ r/ � �� 1aT�-A�i TL ���+�� aaK• 10„�� Lz►�E i
and Dimensions of Project
R-t PVgc.f ;' o xv1 tL.E r,l
)roposed project to be located and constructed as described This certification of exemption from requiring a CAMA pei
e is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expir
ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece
A permit requirements does not alleviate the necessity of to continue this certification.
obtaining any other State, Federal, or Local authorization.
ETCH (SCALE:
_SEE a t T iNe._#E T M AP
•
4M Construction (
� 554 Southampton P1. S:
p. Leland,N.C. 28451
Phone 910-371-2195
Fax 910-371-2214
Quoted to:
Town of Topsail Beach
820 S. Anderson Blvd.
Topsail Beach, NC 28445
Customer ID Good Thru Payment T
TWN150 11/29/07 Net 30 D<
Quantity Item Description
ATTENTION: Tom Hogg
4M Construction Company, Inc. ,
submitting the following quota
for one (1) mile of sidewalk.
Included in this price is the
removal of mile of 4 ' X 2" a
and disposal at an approved du:
site, and the installation of
\ 6" 4 00 0 psi
concrete sidewalk a. mile in le
Permits shall be furnished by
r Town Topsail Beach.
S 'e by:
/ c
eon Milner
Approved by: