HomeMy WebLinkAbout47558D - Sprunt❑CAMA / ❑ DREDGE & FILL
GENERAL PERMIT
ENew []Modification ❑Complete Reissue El Partial Reissue
As authorized by the State of North Carolina, Department of Environment and Natural Resources
and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
Applicant Name
Address -
I. L
City
State ZIP
Phone # O
'' i Fax # ( )
Authorized Agent
❑ CW
❑ EW ❑ PTA ❑ ES ❑ PTS
Affected
AEC(s): ❑ OEA
❑ HHF ❑ IH ❑ USA ❑ N/A
❑ PWS:
❑ FC:
ORW: yes / no
PNA yes / no Crit.Hab. yes / no
Previous permit #
Date previous permit issued
Rules attached.
Project Location: County ic-
Street Address/ State Road/ Lot #(s) , :+
Subdivision
CityZIP(
Phone # O River Basin
Adj. Wtr. Body l - (nat /man /unknl
Closest Maj. Wtr. Body --
Type of Project/ Activity
(Scale:
Pier (dock) length
Platf
Finge
Groi
Bulk
Basin
Boat
Boathouse/ Boatlift
Beac
Other
Shor
SAV:
Sandbags: not sure yes noLC-
Mo
Phot
Waiver Attached. yes no
A building permit may be required by: 4� ❑ See note on back regarding River Basin rules.
Notes/ Special Conditions
orm(s)
r piers)
head/ Riprap length
avg distance offshore
max distance offshore
channel
cubic yards
ramp
h Bulldozing
eline Length
not sure yes no
ratorium: nja yes no I
os: yes no
-- I — -. — —
n length
number
-
� I �
I
!! -
\ '��_ ✓ �+.��. 1 f _I
- � --�- --
I � I
i
I i
� I I
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit
'?4 �-4. 0 � 1 �7 €�
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date.
Local Planning Jurisdiction Rover File Name
Agent or Applicant Printed Name
Signature Please read compliance statement on back of permit
'?4 �-4. 0 � 1 �7 €�
Application Fee(s) Check #
Permit Officer's Signature
Issuing Date Expiration Date.
Local Planning Jurisdiction Rover File Name
Statement of Compliance and Consistency
This permit is subject to compliance with this application, site drawing and attached general and specific conditions. Any
violation of these terms may subject the permittee to a fine or criminal or civil action; and may cause the permit to become
null and void.
This permit must be on the project site and accessible to the permit officer when the project is inspected for compliance. The
applicant certifies by signing this permit that 1) prior to undertaking any activities authorized by this permit, the applicant will
confer with appropriate local authorities to confirm that this project is consistent with the local land use plan and all local
ordinances, and 2) a written statement or certified mail return receipt has been obtained from the adjacent riparian
landowner(s) .
The State of North Carolina and the Division of Coastal Management, in issuing this permit under the best available
information and belief, certify that this project is consistent with the North Carolina Coastal Management Program.
River Basin Rules Applicable To Your Project:
❑ Tar - Pamlico River Basin Buffer Rules ❑ Other:
❑ Neuse River Basin Buffer Rules
If indicated on front of permit, your project is subject to the Environmental Management Commission's Buffer Rules for the
River Basin checked above due to its location within that River Basin. These buffer rules are enforced by the NC Division of
Water Quality. Contact the Division of Water Quality at the Washington Regional Office (252-946-6481) or the Wilmington
Regional Office (910-796-7215) for more information on how to comply with these buffer rules.
Division of Coastal Management Offices
Raleigh Office
Mailing Address:
1638 Mail Service Center
Raleigh, NC 27699-1638
Location:
2728 Capital Blvd.
Raleigh, NC 27604
919-733-2293
Fax:919-733-1495
Morehead City Headquarters
400 Commerce Ave
Morehead City, NC 28557
252-808-2808/ 1-888-4RCOAST
Fax: 252-247-3330
(Serves: Carteret, Craven, Onslow -above
New River Inlet- and Pamlico Counties)
Elizabeth City District
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901
Fax:252-264-3723
(Serves: Camden, Chowan, Currituck,
Dare, Gates, Pasquotank and Perquimans
Counties)
Washington District
943 Washington Square Mall
Washington, NC 27889
252-946-6481
Fax: 252-948-0478
(Serves: Beaufort, Bertie, Hertford, Hyde,
Tyrrell and Washington Counties)
Wilmington District
127 Cardinal Drive Ext.
Wilmington, NC 28405-3845
910-796-7215
Fax:910-395-3964
(Serves: Brunswick, New Hanover,
Onslow -below New River Inlet- and
Pender Counties)
Revised 08/09/06
"AMA/ E DREDGE & FILL
4-5 `p
IENERAL PERMIT Previous permit#
New ❑Modification ❑Complete Reissue El Partial Reissue Date previous permit issued
ized by the State of North Carolina,Department of Environment and Natural Resources
oastal Resources Commission in an area of environmental concern pursuant to I SA NCAC Z 3Q ).0Rules attached.
Name OA V j O S1 t/NT Project Location: County _l NSW(C,4<._
9‘ 49 ( k-R;IJ vejo. SE Street Address/State Road/Lot#(s)L121-1;ps3 1A,_/1 i-Nr
1 N N State NC ZIP ZS 471
(910) II - (o k 5 I Fax#( ) Subdivision
:d Agent City VN IN NFrexJVQ ZIP 2 4
❑CW [EW &ilfTA l'IS ❑PTS Phone# ( ) River Basin owe
❑OEA ❑HHF ❑IH ❑UBA ❑N/A Adj.Wtr. Body C IZT1N 57 LL JA L (kt I /n
❑PWS: ❑FC: C,P1 F"E?r�
yes / no PNA yes /6 Crit.Hab. yes / no
Closest Maj.Wtr. Body �4•51, . j< 1 V 1
Project/Activity k=-L. PL A C- Bic -E, ( "
(Scale: N/,k
:k)length
I
i(s) j
ier(s) t- • _ —
ngth
mber i !
d/Riprap length ( 'I
distance offshore MINIM — -
ax distance offshore - ' �L , I *r NI • 4 f
flannel Il , �� y-h i1 , � r.
bic yards .. 2.�. {� ,.
Tip T ! —
1 ! j
use/Boatlift I - —
3ulldozingSIC
' , �1 : A ,y171.7 l 4�
62<< -t✓ :ifi-, _t. 'I ,iiS O/ ►' ' —
1 i t: K/S
,.,• ,. _: tA-..1',. (12+1`i '
ti I .
ne Length >1 1
' mi. 3 t} I kij 6C t,& e 2 LL—� 1 -•
not sure yes (, ■ �` r '• s-
gs: not sure yes (�) I �� F auiin - -' t i ® ^,� . . ,.. r
>rium: n/a yes tn9' ■�� : :� �.
yes ®i • n
•Attached: yes CI 1 '
ling permit may be required by: 6C.UNSA))C,(G. C a n See note on back regarding River Basin
Form DCM MP-5
BRIDGES and CULVERTS
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. BRIDGES ❑This section not applica
a. Is the proposed bridge: b. Water body to be crossed by bridge:
❑Commercial ❑Public/Government KPrivate/Community wton iltAWF :t:°" � � II Wa� C yze jl
c. Type of bridge(construction material): d. Water depth at the proposed crossing at NLW or NWL:
c slkb 6 -fee+
e. (i)Will proposed bridge replace an existing bridge? kYes DNo f. (i)Will proposed bridge replace an existing culvert? ❑Yes $Nc
If yes, If yes,
(ii)Length of existing bridge: &S/ (ii)Length of existing culvert:
(iii)Width of existing bridge: I67 . / (iii)Width of existing culvert:
(iv)Navigation clearance underneath existing bridge: I 0 (iv)Height of the top of the existing culvert above the NHW or
(v)Will all,or a part of,the existing bridge be removed? NWL:
(Explain) 1 t ST w:11l it .� (v)Will all,or a part of,the existing culvert be removed?
(Explain)
9- Length of proposed bridge: 100 h. Width of proposed bridge:
i. Will the proposed bridge affect existing water flow? ❑Yes No j. Will the proposed bridge affect navigation by reducing or
If yes,explain: increasing the existing navigable opening? ❑Yes it Ni
If yes,explain:
k. Navigation clearance underneath proposed bridge: I O I. Have you contacted the U.S.Coast Guard concerning their
approval? :Yes ❑No
If yes,explain:
m. Will the proposed bridge cross wetlands containing no navigable n. Height of proposed bridge above wetlands: h Q
waters? ❑Yes to
If yes,explain:
1 7 !^Ill 1/CDTC I. hie enrlinn nnl annlira
Form. DCN1 '.'• - _, n. i _-, I -a
c. Will the proposed project require any work channels? d. How will excavated or fill material be kept on site and erosion
Oyes ❑No controlled?
If yes,complete Form DCM-MP-2.
e. What type of construction equipment will be used(for example, f. Will wetlands be crossed in transporting equipment to project site?
dragline,backhoe,or hydraulic dredge)? Dyes ❑No
If yes,explain steps that will be taken to avoid or minimize
environmental impacts.
g. Will the placement of the proposed bridge or culvert require any
shoreline stabilization? Dyes ❑No
If yes,complete form MP-2, Section 3 for Shoreline
Stabilization only.
ill tol
Date
ilw.1 °fee k
1/-
Project Name
044)el 0)A 14 iaila 1" ." Vu--t Eft %/1‘.+-
Applicant me
Applicant Signature
Form D'CM sM?-s '. zu Culy*,ts. pa,:o. 2
< Form continues on back>
c. Type of culvert(construction material):
d. (i)Will proposed culvert replace an existing bridge? e. (i)Will proposed culvert replace an existing culvert?
Oyes ❑No Oyes ❑N1
If yes, If yes,
(ii)Length of existing bridge: (ii)Length of existing culvert(s):
(iii)Width of existing bridge: (iii)Width of existing culvert(s):
(iv)Navigation clearance underneath existing bridge: (iv)Height of the top of the existing culvert above the NHW or
(v)Will all,or a part of,the existing bridge be removed? • NWL:
(Explain) (v)Will all,or a part of,the existing culvert be removed?
(Explain)
f. Length of proposed culvert: g. Width of proposed culvert:
h. Height of the top of the proposed culvert above the NHW or NWL. i. Depth of culvert to be buried below existing bottom contour.
j. Will the proposed culvert affect navigation by reducing or k. Will the proposed culvert affect existing water flow?
increasing the existing navigable opening? Oyes ❑No - ❑Yes ON(
If yes,explain. If yes,explain:
3. EXCAVATION and FILL ❑This section not applicat
a. (i)Will the placement of the proposed bridge or culvert requir a y b. (i)Will the placement of the proposed bridge or culvert require any
excavation below the NHW or NWL? Oyes No excavation within coastal wetlands/marsh(CW),submerged
If yes, aquatic vegetation(SAV),shell bottom(SB),or other wetlands
(WL)? If any boxes are checked,provide the number of square
(ii)Avg.length of area to be excavated: feet affected.
(iii)Avg.width of area to be excavated: ❑CW ❑SAV ❑SB
(iv)Avg.depth of area to be excavated: OWL :None
(v)Amount of material to be excavated in cubic yards:
(ii)Describe the purpose of the excavation in these areas:
c. (i)Will the placement of the proposed bridge or culvert quire any
high-ground excavation? Yes ❑No
tOrIr3 Df"s'"? a?i"t'-� (Br3Car,! ._i and (.:u1vo:1a. Pas c. Ci 4
d. If the placement of the bridge or culvert involves any excavation,please complete the following:
(i) Location of the spoil disposal area: 3 0 0 e4A-- "to 1 t4.
(ii)Dimensions of the spoil disposal area: N✓�O?�200
(iii)Do you claim title to the disposal area? jrYes ONo (If no,attach a letter granting permission from the owner.)
(iv)Will the disposal area be available for future maintenance? 'Yes ❑No
(v)Does the disposal area include any coastal wetlands/marsh(CW),submerged aquatic vegetation(SAVs),other wetlands(WL),or shell
bottom(SB)?
❑CW ❑SAV OWL ❑SB ONone
If any boxes are checked,give dimensions if different from(ii)above.
(vi)Does the disposal area include any area below the NHW or NWL? ? DYes It No
If yes,give dimensions if different from(ii)above.
e. (i)Will the placement of the proposed bridge or culvert result in any f. (i)Will the placement of the proposed bridge or culvert result in any
fill(other than excavated material described in Item d above)jo fill(other than excavated material described in Item d above)to
be placed below NHW or NWL? ❑Yes Ir No be placed within coastal wetlands/marsh(CW),submerged
If yes, • aquatic vegetation(SAV),shell bottom(SB),or other wetlands
(WL)? If any boxes are checked,provide the number of square
(ii)Avg.length of area to be filled: feet affected.
(iii)Avg.width of area to be filled: ❑CW ❑SAV ❑SB
(iv)Purpose of fill: OWL ONone
(ii)Describe the purpose of the excavation in these areas:
g. (i)Will the placement of the proposed bridge or culvert result in any
fill(other than excavated material described in Item d above)to
be placed on high-ground? ❑Yes 'No
If yes,
(ii)Avg.length of area to be filled:
(iii)Avg.width of area to be filled:
(iv)Purpose of fill:
4. GENERAL
a. Will the proposed project require the relocation of any existing b. Will the proposed project require the construction of any tempos ry
utility lines? Oyes No detour structures? Oyes o
If yes,explain: If yes,explain: