HomeMy WebLinkAboutArnolt ,
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
k` Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursua t to 15 NCAC Subchapter 7K .0203.
,�/� 1.74. f ,,�/ / y - / Rio) 3
Ilicant Name ' 'rr� C r /if 1"�U( � C a L /✓Hy' Phone Number z
Tress ,-it -' `'/ 1'✓ Sr .
'; r,L,'I p'./t, 13t41 G State A/C Zip ca
ject Location (County,State Road, Water Body, etc.) /UM.," HK4A,10 ve - / jetz t.4v"4 ri-,- S
/01 k5 ' Jew'il e
e and Dimensions of Project Rle e / ( x/7/1 ;e �,A1„/a,
'Ovrr a 5'✓c7i O. f Si►vi , "AO •
proposed project to be located and constructed as described This certification of exemption from requiring a CAMA pf
ie is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following exp
ament pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nec
IA permit requirements does not alleviate the necessity of to continue this certification.
obtaining any other State, Federal,or Local authorization.
:ETCH (SCALE: N`15
(1-1//re Aanyyt i
11 7 Z(..„ S 7/h ,i,,r' 1-
. l
;� /wide i,
S9C f//� �'Pee pi p/h
A,
- _ - -�--N::‘,
,,r>a/f ?7ir.571
1 I Ci l/►, let
RO.Basc868 f& �'/y (,�art,aoto�+r, /aa -
Mi Beoct�NC Q PO,Box868
��O AA
\Nightsv le:-• h,NC 28480
1 !'"
(9ds, /.2
eo a
1 / L-_--)Ottliar6d.Winehofr)
di) goviit I -rp ft,08/--4 c- friitf PLC
kiktitst;- 3 f
to-i1u' tiiC ! 01 0 h 'n',Josh
/i /ofyi,a
- vyz.).?
isio,A o ilosikiongetArd-on. A r"- T '
*Aorta &et ast feR141 6.
rsr P, .drit.. 1' fig , ,
. IA , 1 i
14 ��1s r1 NG r/YOD Vir
litk
/
0 tili
1)L4 4 PO ei<re
VRECE?VE
..6.. CM vv,, ,R,.,,^T(
SEP 1 2 ?0
A
mit Class Permit Numb
:W 35-05
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
. 11
ctrmtt
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
aed to Michael Arnolt,3833 N. Meridian St.,Suite 37,Indianapolis,IN 46208
thorizing development in New Hanover County at Banks Channel,#2 Water St., Wrightsville
ich , as requested in the permittee's application dated 09/15/04. including the
idled workplan drawings (2), 1 dated revised 11/24/04 and 1 dated 09/15/04
s permit, issued on April 13. 2005 , is subject to compliance with the application (where consist'
h the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms it
subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
This permit authorizes only the docks, piers, and other structures and uses located in or over the wate
that are expressly and specifically set forth in the permit application. No other structure, whethe
floating or stationary, shall become a permanent part of this docking facility without permi
modification. No non-water dependent uses of structures may be conducted on, in or over public trus
waters without permit modification.
No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
(See attached sheets for Additional Conditions)
his permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and
.r qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
An appeal requires resolution prior to work initiation or
inuance as the case may be.
his permit must be accessible on-site to Department
onnel when the project is inspected for compliance.
chael Arnolt Page 2 of 3
Permit#35-05
ADDITIONAL CONDITIONS
The authorized structure and associated activity shall not cause an unacceptable interference w
navigation.
The permittee shall maintain the authorized work in good condition and in conformance with the ten
and conditions of this permit. The permittee is not relieved of this requirement if he abandons t
permitted activity without having it transferred to a third party.
This permit does not authorize the interference with any existing or proposed Federal project, and t
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injt
which may be caused from existing or future operations undertaken by the United States in the pub
interest.
The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permant
reflectors should be attached to the structure in order to make it more visible during hours of darkness
inclement weather.
The pier and associated structures shall have a minimum setback distance of 15 feet between any pa
of the structure and the adjacent property owner's riparian access corridor, which is determined
drawing a line parallel to the channel, then drawing a line perpendicular to the channel line tl
intersects with the shore at the point where the upland property line meets the water's edge.
In order to ensure compliance with Condition No. 7 of this permit, and to ensure that the authoriz
docking facility does not extend past the Wrightsville Beach Pier Head line, an as-built survey shall
performed on the docking facility, and copies of the survey shall be provided to the U.S. Army Corp.
Engineers and the Division of Coastal Management, within 60 days of completion of construction.
General
No vegetated wetlands or open water areas shall be excavated or filled.
The permittee understands and agrees that, if future operations by the United States requires t
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in t
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cat;
unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, up
due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructic
caused thereby, without expense to the United States or the state of North Carolina. No claim shall
made against the United States or the state of North Carolina on account of any such removal
:hael Arnolt Page 3 of 3
Permit#35-05
ITE: Future development of the permittee's property may require a modification of this perm
Contact a representative of the Division at (910) 395-3900 prior to the commencement of ai
such activity for this determination. The permittee is further advised that many non-wat
dependent activities are not authorized within 30 feet of the normal high water level.
1TE: The permittee and/or his contractor is urged to meet with a representative of the Division prior
project initiation.
ITE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No. 0
• 0156.
►TE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit N
19780056 (COE Action Id. No. 200500355) which was issued on 03/25/05.