HomeMy WebLinkAboutMabry (2) v
CERTIFICATION OF EXEMPTION
7__) FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC -3 Subchapter 7K .028 ,0/03
giant Name 01 A$12y C/D D AC/xi,/ p Phone Number //e5—Z
)ss # / Sou krps PT 2D
/ TvAl /dam'? // State ,t/C Zip _24
ct Location(County, State Road,Water Body, etc.) - / j4/A)m.s pr
and Dimensions of Project ,Q E= 6,x75 -/A/6- ,B/iA D or /d!,
-oposed project to be located and constructed as described This certification of exemption from requiring a CAMA pe
is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expi
nent pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be neci
permit requirements does not alleviate the necessity of to continue this certification.
btaining any other State, Federal,or Local authorization.
TCH (SCALE: / // 20
R-E- FA-c E
EXIST 1..)Gu�k -Ta..�
P
1
•
f dr g Avis chwa as 40,,
44. PO.Box868
, wrtsv11eBeach.NC26480
` (910)256,3062
` P :fir . ,1' <
, efr I fiAil
• \ ti-- I'T friA
SEP " •fh'
Allikko, 1 r I. 1,14111111"r
i l
e
•
R •
w " r frig
Ima• =0,24Q&N_wHanov-- c*z i/GR`
G-) u Te"e Atlas ��'"
5'04 91"N u 7"' elev .0 m Eye aIt m;
J Ne
I, /2L, f1Y-0L-; 1fAh` 23n'1i
‘u . C14, ,/mA
I•. .iI,•nj.. A/ — ,9,.0
r
70# • r.ar.w
fiAtin► •trlwr� o�►n e sn�
919,(7-3062
• , < i
\LY A X )( Y iN->C\N)K
r�1,.,ra
ki-).
__bui),J Ibuo..., ----..., ...Now
eora
#u»"rw L20-.-— --- So'xzJpw6'
sods how .(' mild 2 8 V-e.rw Sd ►a 6
razor
Z X
4.161:6.` olor
' � W
.��' <036.01 t c
\10. 7 c . <
pry f {
I