Loading...
HomeMy WebLinkAboutGiles CERTIFICATION OF EXEMPTION -Thr-) FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, 4 Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K.0203. licant Name L �'E '� G ` c Phone Number ress G3 1 CH,P.c>W LC 1c._ Skoa..GS kl - 50ec t T LN State Zip L'-' ject Location(County, State Road, Water Body, etc.) 1 e and Dimensions of Project -a 9L-N-,L-c L 6 c z�.L u , a� L_;,:,: , ;4-•0 1-L 1 Li ,.J ,-t.- LS proposed project to be located and constructed as described This certification of exemption from requiring a CAMA 1 ve is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following ex rement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be ne MA permit requirements does not alleviate the necessity of to continue this certification. r obtaining any other State, Federal,or Local authorization. KETCH (SCALE: f- 2 Lc `Pc`� �L� c ._ i i 1 z a aa,9-* <Int1, 3-wa 3 . i i