HomeMy WebLinkAboutCape (4)CERTIFICATION OF EXEMPTION
_ W FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
,15-7
ri
giant Name ✓ b� l- [6 Y
Phone Number 'CIO 32,(GIo�.
Iss bLvliamY
State Zip 2SI40
ct Locatioh (County, State Road, Water Body, etc.) o
and Dimensions of Project
roposed project to be located and constructed as described
is hereby certified as exempt from the CAMA permit re-
-nent pursuant to 15 NCAC 7K .0203. This exemption to
A permit requirements does not alleviate the necessity of
Dbtaining any other State, Federal, or Local authorization.
;J.QL('-
=TCH
0.ryl NC, Ut,-)(y JTr ,'MaV..
This certification of exemption from requiring a CAMA per
valid for 90 d1gs from the date of issuance. Following expir
a re-examination of the project and project site may be nece
to continue this certification.
(SCALL:
j Vf''
� �jU�C{�l t tvr ► it, 1,i�6 � vim.. + 9
F
MA
__
with neH
diameter m
' x,,g `R► Existing Tide Gate
Pipe strap/anchor system from Manhole #1
to Junction Box #2 to be replaced
dimiea andbarge
SMOWWe for replacement
Manhole #1
w Open water bypass channel that
has formed around tide gate
Junction
Junction Box #1
(to be repaired
or replaced)
u►
N
110 feet of ex
sewer to be r,
new buried 41
Manhole #2
(to be replaced
with new 8-ft
diameter manhole)
^*i
rA - Burnt Mill Creek Sewer Improvements
Subject: RE: CFPUA - Burnt Mill Creek Sewer Improvements
From: "Boone, Kelly" <BooneKR@cdm.com>
Date: Fri, 23 Jan 2009 16:02:29 -0500
To: "Holley Snider" <holley.snider@ncmail.net>
CC: "Sloop, Michael" <SloopMK@CDM.com>, <chris.bowling@cfpua.org>
Holley,
The person from the Cape Fear Public Utility Authority who will pick up the CAMA exemption form
for the Burnt Mill Creek Sewer Improvements project next week is Chris Bowling, and his contact
information is below:
Chris Bowling
Cape Fear Public Utility Authority
235 Government Center Drive
Wilmington, NC 28403
Telephone: (910) 799-6064 --�T
Email address: Chris. Bowling@cfpua.org
Chris needs to take the paperwork back to the Authority to get it signed by one of the managers
with authority to sign permits, and then he'll get it back to you ASAP.
I've also copied Chris on this email — he knows you will be calling next week.
Kelly
Kelly R. Boone, P.E.
CDM
5400 Glenwood Ave., Suite 300
Raleigh, NC 27612
Telephone (919) 787-5620
Fax (919) 781-5730
Burnt Mill Creek Phase 1 Sewer Improvements
s 60V
Photo 1. Existing sewer with straps that need to be replaced. Tidegate is seen in distance.
Burnt Mill Creek Phase 1 Sewer Improvements
Photo 3. Existing stainless steel strap that needs to be replaced.
Burnt Mill Creek Phase 1 Sewer Improvements
Photo 5. Existing junction box that needs to be rehabilitated or replaced (looking south).
o0 1�t O�v�Glno ✓ �P�`�a
jun�rn fox 47 I
Z �, �
Elm.
1. E.— HE— ANOHORS SHALL BE REYOYEB MER T11E MISiAW1M)N a THE xEW AMC1gR5.
1. HELKK NICNON CONTRACTOR SHALL BE RESPd154LE POR U—TNO EXKT- UOlInKS WHH HORN CMOLWA qlE-C.1LL
AND THE WC iF.N — UTRM ANHORitt. CONTMCTOR SMALL —` U—M w IX4nNC POTABLE WATER UK
APPRO%xurzLT LOGTFD B[TWEEN HER, AHCHg4 /, AND /G.
S. µELKN. AK IIOR CONTRA — SNNL CDptgNArz THE L-- M THE OtlSTND TIMBER PRE BENS BEEORE THE
$f.-- 0< THE HEW HELKK `Kft
.. SEE ONANINO S-] fOR NEIKAL ANCHOR OETMS AxD iNSTAWTNIN NOTES.
6)o Q
HEW A«cHDR p
HEW ANuaR /.
NEW NKHOR IS 1 f\.✓
6LA
HEW /NCMOTt „ � raj° - I
\ NEW ANCHOR /9 `\
/11
WATER)..
eoasro. «r rti m c
MA�� CAPE FEAR PUBLIC UTILITY AUTHORITY
°"° -• HELICAL F
BURNT MILL CREEK PHASE 1 INSTALLATION LOCA
SEWER IMPROVEMENTS
snrFExER C K.s1ym'-11•
RETANER SSAAP J16L M (iYI 2) 2'
r,.. neL ss 2' 2*
ETA 31 $TRAP
K.. J16L ss
SS C 6v6vY T
AD W/ ASTM fAM N(LIOLL ANCEpRED mDALYE N1115
SECTION 1 SECTION 2
2' - V-0' 2• -
AXcnp1 r.
1. ARl— Sl— BE —EAN
2. PXrsr mro[mKs:
pxlE XK Uy Ds mREE XEUX NICXOR, urea Xo. N-6203-00]0.
TORQUE SINENCTN
MAMG OF 6,000 R-LB
UL»MTE CAPAG1x
J. MAIERML "POPERTRS:
OF 60 RIPS WIM A TOROM FAM061: R1 - 10
SIMFT —E—
M tA• RDONO Ni CORNERED SOUM[ (RCJ) STEEL IS PER — A26 ANO
,ASTM A526 GR,10E E1.1 — — CEAfwGTE AT W - pmMUM — iRENGM
HELL% WTERUL:
R 3L• OR 15 LXIp(,— ROLLED LDN CARBON STEEI SHEET. STRIP OR —n PER
N MINIM 1E. SAIENGM OF >e R9
CWPUNG I T.
1L'Dv]' LONG NIX NMD PER /STY A]Is AND x, NIX JAu NUTS PER ASTY —3.
STANOMD FWSN:
NL ANCHORS SMKL BE -1 DIPPED GALVANIZED PER ASN AIs] El— 6 RDN AN
AVERAGE RE CNr OF ZINC COAANG OF 2.0 OZ/FP (] MRS) RRX A — TNICRNESs OF
ALTER—Y.
1A OZ/'r (2.6 NO.). CRMTELY. ASTM A123 CAM eE APPLIED TO PROVIDE A —EA
zINC CDATRID UP ro ZJ oz/R' (3.2 RRs).
uPPER E1E65N:
NL NIOIIORs S— BE NOT DIPPCO GA —ZED PER AS1Y Al. CUSS B R1111 AM
AVERAGE WEIGHT OF ZINC COAANO OF 2.0 02/FP (J MILS) %— A MIEAMW TH—CSS OF
1A OZ/rt' (2.6 _). ALIERMRLY, A AI1J — /E APPUED TO PRprAIE A TXCRER
.. NE STRUCTWIK STEFI wC
S. Nl SWNIEJS — WEIZNNG
ZINC COAING UP ID 2.] OZ/F1' (].R M.).
1 — IE PERFpiMEp BY AWS 01.1 CER 1 REU ER.
SWAP BE PERFORMED IY AWs -1 EEA—ED RFIDER.
ANc11rn R�s1
1, NCNOM SNNE BE INSTALLED TO AN U1—E EAP— OF 20 RPS, REJULANG N NE NU2RABLE DE— CAPACITY Di
10 OURS ERTN A FN:TOR DI S lY OF 2. ANCXOM — IE I—EDUED M M 9fARNO 6 — A LE1RLnw OF 6
FEET 1w1N A MNIRIIM AVERAGE Tp10UE Of 2000 FT-LM AND AS DEKCTED T' IIIE V—DER rO KNCK M REpuNED
uPApx.
2. uPPDR PORTRlR DE ANCXOA A DRAPE• 611NE NAVE uPPER E11KN Al STAIEo ABp2. UPPER FR11511 SNNL E]E1ENO
A MMMUM Of 12' MM ERRETRW GRADE.
6•
O RETNMER STRAP
1ERA ]l6l M
SECTION 3
DETAIL A
CAPE FEAR PUBLIC UTILITY AUTHORITY
BURNT MILL CREEK PHASE 1
SEWERIMPROVEMENTS
HELICAL ANCHC
DETAILS AND INST(
Fear Public Utility Authority - Proposed Repairs to Burnt ...
Subject: RE: Cape Fear Public Utility Authority - Proposed Repairs to Burnt Mill Creek Sewer
From: "Boone, Kelly" <BooneKR@cdm.com>
Date: Wed, 31 Dec 2008 16:30:45 -0500
To: <holley. snider@ncmail. net>
Hi Holley,
I just wanted to check in with you to see if you had a chance to review the email below regarding
the Cape Fear Public Utility Authority's proposed repairs to the Burnt Mill Creek sewer. We just
wanted to confirm that CDM considers these repairs maintenance and that no CAMA permit is
required. Please let me know if you need additional information or have any questions.
Thanks — and have a happy New Year —
Kelly
Kelly R. Boone, P.E.
CDM
5400 Glenwood Ave., Suite 300
Raleigh, NC 27612
Telephone (919) 787-5620
Fax (919) 781-5730
Cell (919) 749-8267
Email boonekr(aD-cdm.com
From: Boone, Kelly
Sent: Monday, December 08, 2008 5:05 PM
To: 'holley.snider@ncmail.net'
Cc: Sloop, Michael
Subject: Cape Fear Public Utility Authority - Proposed Repairs to Burnt Mill Creek Sewer
Hi Holley,
As we discussed on the phone earlier, we are helping the Cape Fear Public Utility Authority with
rehabilitation of the Burnt Mill Creek Sewer (Phase 1). The rehabilitation project, which is under
Fear Public Utility Authority - Proposed Repairs to Burnt ...
wetland disturbance by using mats for heavy equipment. The Army Corps did require us to submit a
Nationwide Permit (#3) to document impacts, which we did.
During rehabilitation of the sewer, three problems were discovered. The Authority now proposes to
repair these three deficiencies before placing the sewer back into service. We have discussed this
with the Corps, and have again submitted an application for a Nationwide Permit #3. 1 received an
email of the approval for that permit from the Corps this afternoon after you and I spoke.
Attached is a description of the three repairs that need to be made. Also attached are several
figures, drawings, and photos to help explain the proposed repairs.
Time is critical for completion of these repairs, because the contractor who is performing the
rehabilitation work is responsible for the bypass pumping. At this point, we are not allowing the
contractor to shut down the bypass system for the rehabilitation, but that work is nearing
completion, and we would like to make the repairs as soon as possible so that we can shut down
this temporary system. We consider these repairs to be emergency repairs.
Please review this information and let me know if we need a CAMA permit. Thanks for your
consideration. Please let me know if you have any questions or need additional information. We
would be happy to meet you on site this week to look at the facilities and describe the proposed
work —just let me know if you would like to do that.
Kelly
« File: CFPUA Burnt Mill Creek Proposed Repairs.pdf >> « File: Figure 1 location map.pdf >> <<
File: Figure 2 JB#1 Cofferdam .pdf >> « File: S-1.pdf >> « File: S-2.pdf >> « File: Photos.pdf >>
Kelly R. Boone, P.E.
CDM
5400 Glenwood Ave., Suite 300
Raleigh, NC 27612
Telephone (919) 787-5620
Fax (919) 781-5730
(`all (C11 C11 7da-Ft9R7