Loading...
HomeMy WebLinkAboutCape (4)CERTIFICATION OF EXEMPTION _ W FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. ,15-7 ri giant Name ✓ b� l- [6 Y Phone Number 'CIO 32,(GIo�. Iss bLvliamY State Zip 2SI40 ct Locatioh (County, State Road, Water Body, etc.) o and Dimensions of Project roposed project to be located and constructed as described is hereby certified as exempt from the CAMA permit re- -nent pursuant to 15 NCAC 7K .0203. This exemption to A permit requirements does not alleviate the necessity of Dbtaining any other State, Federal, or Local authorization. ;J.QL('- =TCH 0.ryl NC, Ut,-)(y JTr ,'MaV.. This certification of exemption from requiring a CAMA per valid for 90 d1gs from the date of issuance. Following expir a re-examination of the project and project site may be nece to continue this certification. (SCALL: j Vf'' � �jU�C{�l t tvr ► it, 1,i�6 � vim.. + 9 F MA __ with neH diameter m ' x,,g `R► Existing Tide Gate Pipe strap/anchor system from Manhole #1 to Junction Box #2 to be replaced dimiea andbarge SMOWWe for replacement Manhole #1 w Open water bypass channel that has formed around tide gate Junction Junction Box #1 (to be repaired or replaced) u► N 110 feet of ex sewer to be r, new buried 41 Manhole #2 (to be replaced with new 8-ft diameter manhole) ^*i rA - Burnt Mill Creek Sewer Improvements Subject: RE: CFPUA - Burnt Mill Creek Sewer Improvements From: "Boone, Kelly" <BooneKR@cdm.com> Date: Fri, 23 Jan 2009 16:02:29 -0500 To: "Holley Snider" <holley.snider@ncmail.net> CC: "Sloop, Michael" <SloopMK@CDM.com>, <chris.bowling@cfpua.org> Holley, The person from the Cape Fear Public Utility Authority who will pick up the CAMA exemption form for the Burnt Mill Creek Sewer Improvements project next week is Chris Bowling, and his contact information is below: Chris Bowling Cape Fear Public Utility Authority 235 Government Center Drive Wilmington, NC 28403 Telephone: (910) 799-6064 --�T Email address: Chris. Bowling@cfpua.org Chris needs to take the paperwork back to the Authority to get it signed by one of the managers with authority to sign permits, and then he'll get it back to you ASAP. I've also copied Chris on this email — he knows you will be calling next week. Kelly Kelly R. Boone, P.E. CDM 5400 Glenwood Ave., Suite 300 Raleigh, NC 27612 Telephone (919) 787-5620 Fax (919) 781-5730 Burnt Mill Creek Phase 1 Sewer Improvements s 60V Photo 1. Existing sewer with straps that need to be replaced. Tidegate is seen in distance. Burnt Mill Creek Phase 1 Sewer Improvements Photo 3. Existing stainless steel strap that needs to be replaced. Burnt Mill Creek Phase 1 Sewer Improvements Photo 5. Existing junction box that needs to be rehabilitated or replaced (looking south). o0 1�t O�v�Glno ✓ �P�`�a jun�rn fox 47 I Z �, � Elm. 1. E.— HE— ANOHORS SHALL BE REYOYEB MER T11E MISiAW1M)N a THE xEW AMC1gR5. 1. HELKK NICNON CONTRACTOR SHALL BE RESPd154LE POR U—TNO EXKT- UOlInKS WHH HORN CMOLWA qlE-C.1LL AND THE WC iF.N — UTRM ANHORitt. CONTMCTOR SMALL —` U—M w IX4nNC POTABLE WATER UK APPRO%xurzLT LOGTFD B[TWEEN HER, AHCHg4 /, AND /G. S. µELKN. AK IIOR CONTRA — SNNL CDptgNArz THE L-- M THE OtlSTND TIMBER PRE BENS BEEORE THE $f.-- 0< THE HEW HELKK `Kft .. SEE ONANINO S-] fOR NEIKAL ANCHOR OETMS AxD iNSTAWTNIN NOTES. 6)o Q HEW A«cHDR p HEW ANuaR /. NEW NKHOR IS 1 f\.✓ 6LA HEW /NCMOTt „ � raj° - I \ NEW ANCHOR /9 `\ /11 WATER).. eoasro. «r rti m c MA�� CAPE FEAR PUBLIC UTILITY AUTHORITY °"° -• HELICAL F BURNT MILL CREEK PHASE 1 INSTALLATION LOCA SEWER IMPROVEMENTS snrFExER C K.s1ym'-11• RETANER SSAAP J16L M (iYI 2) 2' r,.. neL ss 2' 2* ETA 31 $TRAP K.. J16L ss SS C 6v6vY T AD W/ ASTM fAM N(LIOLL ANCEpRED mDALYE N1115 SECTION 1 SECTION 2 2' - V-0' 2• - AXcnp1 r. 1. ARl— Sl— BE —EAN 2. PXrsr mro[mKs: pxlE XK Uy Ds mREE XEUX NICXOR, urea Xo. N-6203-00]0. TORQUE SINENCTN MAMG OF 6,000 R-LB UL»MTE CAPAG1x J. MAIERML "POPERTRS: OF 60 RIPS WIM A TOROM FAM061: R1 - 10 SIMFT —E— M tA• RDONO Ni CORNERED SOUM[ (RCJ) STEEL IS PER — A26 ANO ,ASTM A526 GR,10E E1.1 — — CEAfwGTE AT W - pmMUM — iRENGM HELL% WTERUL: R 3L• OR 15 LXIp(,— ROLLED LDN CARBON STEEI SHEET. STRIP OR —n PER N MINIM 1E. SAIENGM OF >e R9 CWPUNG I T. 1L'Dv]' LONG NIX NMD PER /STY A]Is AND x, NIX JAu NUTS PER ASTY —3. STANOMD FWSN: NL ANCHORS SMKL BE -1 DIPPED GALVANIZED PER ASN AIs] El— 6 RDN AN AVERAGE RE CNr OF ZINC COAANG OF 2.0 OZ/FP (] MRS) RRX A — TNICRNESs OF ALTER—Y. 1A OZ/'r (2.6 NO.). CRMTELY. ASTM A123 CAM eE APPLIED TO PROVIDE A —EA zINC CDATRID UP ro ZJ oz/R' (3.2 RRs). uPPER E1E65N: NL NIOIIORs S— BE NOT DIPPCO GA —ZED PER AS1Y Al. CUSS B R1111 AM AVERAGE WEIGHT OF ZINC COAANO OF 2.0 02/FP (J MILS) %— A MIEAMW TH—CSS OF 1A OZ/rt' (2.6 _). ALIERMRLY, A AI1J — /E APPUED TO PRprAIE A TXCRER .. NE STRUCTWIK STEFI wC S. Nl SWNIEJS — WEIZNNG ZINC COAING UP ID 2.] OZ/F1' (].R M.). 1 — IE PERFpiMEp BY AWS 01.1 CER 1 REU ER. SWAP BE PERFORMED IY AWs -1 EEA—ED RFIDER. ANc11rn R�s1 1, NCNOM SNNE BE INSTALLED TO AN U1—E EAP— OF 20 RPS, REJULANG N NE NU2RABLE DE— CAPACITY Di 10 OURS ERTN A FN:TOR DI S lY OF 2. ANCXOM — IE I—EDUED M M 9fARNO 6 — A LE1RLnw OF 6 FEET 1w1N A MNIRIIM AVERAGE Tp10UE Of 2000 FT-LM AND AS DEKCTED T' IIIE V—DER rO KNCK M REpuNED uPApx. 2. uPPDR PORTRlR DE ANCXOA A DRAPE• 611NE NAVE uPPER E11KN Al STAIEo ABp2. UPPER FR11511 SNNL E]E1ENO A MMMUM Of 12' MM ERRETRW GRADE. 6• O RETNMER STRAP 1ERA ]l6l M SECTION 3 DETAIL A CAPE FEAR PUBLIC UTILITY AUTHORITY BURNT MILL CREEK PHASE 1 SEWERIMPROVEMENTS HELICAL ANCHC DETAILS AND INST( Fear Public Utility Authority - Proposed Repairs to Burnt ... Subject: RE: Cape Fear Public Utility Authority - Proposed Repairs to Burnt Mill Creek Sewer From: "Boone, Kelly" <BooneKR@cdm.com> Date: Wed, 31 Dec 2008 16:30:45 -0500 To: <holley. snider@ncmail. net> Hi Holley, I just wanted to check in with you to see if you had a chance to review the email below regarding the Cape Fear Public Utility Authority's proposed repairs to the Burnt Mill Creek sewer. We just wanted to confirm that CDM considers these repairs maintenance and that no CAMA permit is required. Please let me know if you need additional information or have any questions. Thanks — and have a happy New Year — Kelly Kelly R. Boone, P.E. CDM 5400 Glenwood Ave., Suite 300 Raleigh, NC 27612 Telephone (919) 787-5620 Fax (919) 781-5730 Cell (919) 749-8267 Email boonekr(aD-cdm.com From: Boone, Kelly Sent: Monday, December 08, 2008 5:05 PM To: 'holley.snider@ncmail.net' Cc: Sloop, Michael Subject: Cape Fear Public Utility Authority - Proposed Repairs to Burnt Mill Creek Sewer Hi Holley, As we discussed on the phone earlier, we are helping the Cape Fear Public Utility Authority with rehabilitation of the Burnt Mill Creek Sewer (Phase 1). The rehabilitation project, which is under Fear Public Utility Authority - Proposed Repairs to Burnt ... wetland disturbance by using mats for heavy equipment. The Army Corps did require us to submit a Nationwide Permit (#3) to document impacts, which we did. During rehabilitation of the sewer, three problems were discovered. The Authority now proposes to repair these three deficiencies before placing the sewer back into service. We have discussed this with the Corps, and have again submitted an application for a Nationwide Permit #3. 1 received an email of the approval for that permit from the Corps this afternoon after you and I spoke. Attached is a description of the three repairs that need to be made. Also attached are several figures, drawings, and photos to help explain the proposed repairs. Time is critical for completion of these repairs, because the contractor who is performing the rehabilitation work is responsible for the bypass pumping. At this point, we are not allowing the contractor to shut down the bypass system for the rehabilitation, but that work is nearing completion, and we would like to make the repairs as soon as possible so that we can shut down this temporary system. We consider these repairs to be emergency repairs. Please review this information and let me know if we need a CAMA permit. Thanks for your consideration. Please let me know if you have any questions or need additional information. We would be happy to meet you on site this week to look at the facilities and describe the proposed work —just let me know if you would like to do that. Kelly « File: CFPUA Burnt Mill Creek Proposed Repairs.pdf >> « File: Figure 1 location map.pdf >> << File: Figure 2 JB#1 Cofferdam .pdf >> « File: S-1.pdf >> « File: S-2.pdf >> « File: Photos.pdf >> Kelly R. Boone, P.E. CDM 5400 Glenwood Ave., Suite 300 Raleigh, NC 27612 Telephone (919) 787-5620 Fax (919) 781-5730 (`all (C11 C11 7da-Ft9R7