Loading...
HomeMy WebLinkAboutOverbeckCERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuango 1 IVL65 cant Name ess act Locatiorr(County, State Road, Water Body, etc.) Al"-tl and Dimen ions of Project t"" ; roposed project to be located and constructed as described is hereby certified as exempt from the CAMA permit re- pent pursuant to fr714--9�8�3, This exemption to % permit requirements does not' alleviate the necessity of )btaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA per valid for 90 days from the date of issuance. Following expin a re-examination of the project and project site may be nece! to continue this certification. :TCH (SCALE: �iie Ave u-- f71I( i -51 ��14 k'�'Wr . j i � a F -- --� r 00 F x J a. -17 Aff Zh l6a RECEIVE® MAY 12 2010 &5 t4arine contrad ors, ie P.O. BOX fib`.? W#tsAe Beach, N-r' WO (910) ��� P16id F&S Marine Con 2010 09:59A FROM:F&S MARINE 9102563062 TO:3953964 P.1 CERTIFICATION OF EXEMPTION FROM REQUIRING A LAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant)o 15 NCAC Subchapter 714.02 and Dimensions of i proposed projecttobe located and constructed asdescribed This certification of exemption from requiring a CAMA permit ova is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiratk ,ement pursuant to 15 NCAC 71K. is exemption to a re-examination of the project and project site may be necesse MA permit requirements does no{al eviate necessity of to continue this certification. it obtaining any other State, Federal, or Local authorization. SKETCH (SCALE: �//