Loading...
HomeMy WebLinkAboutHooper-Y CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resourqjes rrynission in an area of environmental concern pursuant to 1"GrAC subchapter 7K .0203. cant Name �. D`� n G` , Phone Number 2s` ,Yd`2 r" ess State Zip act Locatio (County, tate Roa�f, Water Body, etc.) no ui )roposed project to be located and constructed as described This certification of exemption from requiring a CAMA pei e is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expit ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece A permit requirements does not alleviate the necessity of to continue this certification. obtaining any other State, Federal, or Local authorization. ETCH (SCALE: '/1/7-5 l /40 3rrAarpu31 4--' jo), sr� '�it��lbA�s ✓�, 2e�eo & s marine contractors, P.O. Box 868 iNome Beach, NC 28480 (910) 25b-3062 A- f'� oY pjC'm F-,EcEIVED DCM WILMINGTON, NC AUG 1 0 2010 Lgtr /O /