Loading...
HomeMy WebLinkAboutCarolina (11)CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environment al concern pursuant to 15 NCAC Subchapter 7K.A2e3. ,vV- _ plicant Name 62!fA /7 Phone Number dress >ject Location (County, State Road, Water Body, etc.) State Zip )e a d Dime siojspf Project proposed project to be located and constructed as described ive is hereby certified as exempt from the CAMA permit re- 'ement pursuant to 15 NCAC 7K .0203. This exemption to MA permit requirements does not alleviate the necessity of r obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA p valid for 90 days from the date of issuance. Following exF a re-examination of the project and project site may be nec to continue this certification. <ETCH (SCALE: /I� D/) S - rq //11.� S 'Z,)q / ✓/� S- 61q/i�9 9 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue James H. Gregson Governor Director June 1, 2009 Jeremy Hardison Town of Carolina Beach 1121. N. Lake Park Blvd. Carolina Beach, NC 28428 Exemption Number—#07 Dee Freen Secret RE. EXEMPTED PROJECT (MINOR) EXEMPTION -STRUCTURAL ACCESSWAY (15A NCAC 7K .0207) Oceanside Street End of Sea Oats Drive OCEAN HAZARD AREA OF ENVIRONMENTAL CONCERN Dear Mr. Hardison: I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an application for minor development permit under the Coastal Area Management Act. After making a site inspection on March 4, 2009, 1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with previously approved exemption and.site.drawing issued on September 11, 2008, and meet the conditions specified below. If you pl should change and your project will no longer meet these conditions, please contact me before proceeding. STRUCTURAL ACCESSWAY EXEMPTED 1. The accessway must not exceed six feet in width and shall provide only pedestrian access to the ocean beach. 2. The accessway must be constructed so as to make negligible alterations to the frontal dunes. This means that the .accessway must be constructed on raised posts or pilings of five feet or less in depth, so that wherever possible only posts or pilings touch the frontal dunes without any alteration to the dunes. In no case shall the frontal dune be altere as to significantly diminish its capacity as a protective barrier against flooding and erosion. 3. Construction of the accessway be shall consistent with all other applicable local ordinances and N. C. Building Code standards. 4. Construction of the accessway shall be consistent with all other applicable federal requirements and shall be construe in accordance with the Army Corps of Engineers requirements for construction spanning the width of the rock revetm( 5. The accessway shall be constructed in a manner that would minimize any impedance of the public use of the beach, This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal c Local authorization. This exemption expires 90 days from the date of the letter. rely, ..'...._..--- CERTIFICATION OF EXEMPTION_ FROM REQUIRING A LAMA PE�MI'T .' as authorized by the.State of North Carolina, Department of Environment, Health, and Natural Resources anc `^mmission in an area of environmental concern pursuant to.15 4CAC Subs Applicant Narne L''rl'.,r�� 7s ` r1 Address t `I . •L.+ -izv- �-f�- Ci C,c2,/t� Gf ' �r .� -iArii Project Location (Coutlf'y, State Road Water Body, etc.. Type and Dimensions of Project 42 yet-. Qjlk: iL r The proposed'project to be'bcated'andconstructedas described -This ceriffication of exemption from requiring a CAMA permit i; above, is hereby certified as exempt #turn the CAMA pertnit•-re- .... • valid 1p4 90 days from tha date of issuance. Following expiration quireRient pursuant to:,15-NCAC-* .oio this exemption to ; CAMA : ;. a re=examination of the project and project site maybe necessar permit requirements does nat=alleviare.the' necessity of- .tocontingethis ceitification. your olitpining aWother Sfafe,.Fed'era[, or.Lacal-authorization. aVAN ol it �� .�� �'��%►" �,