HomeMy WebLinkAboutTopsail (2)CERTIFICATION OF EXEMPTION
tY FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
cant Name bWn) a *-4+
Phone Number !
,SS � vd
State L _ ?!P
ct Location (County, State Road, Water Body, etc.)
and Dimensions of Project
,roposed project to be located and constructed as described
is hereby certified as exempt from the CAMA permit re-
ment pursuant to 15 NCAC 7K .0203. This exemption to
A permit requirements does not alleviate the necessity of
obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA per
valid for 90 days from the date of issuance. Following expir
a re-examination of the project and project site may be nece
to continue this certification.
=TCH �GI�StA� ��/t1 Rl�'(�C.FritiN! Is
/�/T$
r— 44
C�J
�L
rn � .i
�
-k
h
c� c`
VA_ __ .
^9 r'aVvA ur
Ocean
Eo )�
to
T-o-1-a 3 co s-�- '#
Y
3��
7
L zx(,>k/�o
z � 161Zo
'gaze I2 S
FOB I COsj-
2.2SC) 0-0
D(-e-Qn
4p'
I
oa �
� `�KlcX It
2-AJDAIO
z- ZXlOXjy
3- ZxSx��
lox 12-
�' 2xgxra
f 6
QubS 1vn d_+oJ 6V
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
In an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203,
Applicant Name I MUM tyr I &L AJ ..,
Address'
City State
Project Location (County, State Road, Water Body, etc.) Zw r;P !✓'iS'l
1 /
Type and Dimensions of Project � h
1,1�is
The proposed project to be located and constructed as described
above is hereby certified as exempt from the CAMA permit re-
quirement pursuant to 15 NCAC 7K .0203. This exemption to
CAMA permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local authorization.
Phone Number
W
This certification of exemption from requiring a CAMA permit is
valid for 90 days from the date of issuance. Following expiration,
a re-examination of the project and project site may be necessary
to continue this certification.
SKETCH c {�[ LCsnt.tl,°PV — (SCALE: �Vr< )
X�
-1J
d �p
Any person who proceeds with a development without the con-