HomeMy WebLinkAboutSpruntCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT Trek? e
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of
environmental concern pursuant to 16-N"C Subchapter 7K .0203.
)licant Name C Phone Number
Iress
v '1State Zip �
ject Locati n �(=nty, Stake Road, Water Body, etc.)
e and Dimensions 9f,Project Tl�of h fglc X�i ' �'/l>�t 4 1-12tece-
fi' / It1i,.iI7
proposed project to be located and constructed as described This certification of exemption from requiring a CAMA pE
ie is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following exp
�ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nec
1A permit requirements does not alleviate the necessity of to continue this certification.
obtaining any other State, Federal, or Local authorization.
/V/6 5, l.f 44 la'- .5 S "
ETCH (SCALE: 4%--L
.,YAP /"S b Ly4r / ,SLR //
Pelf 1+1'r A' rtrr- NetjLzt. , �6- Fy23 .
I
JI411NIIM V400
�o 9nv
A13 3b
a
ON `NOIeNIVY1iM W---�r
uoz t c gnd
14. ff(y,W �rxlryy+d�/