HomeMy WebLinkAboutSanfordflicant Name
Iress
;CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
on
ject Location (County, -State Road, SWater Body, etc.)
/A 1) 1. ice! ': i-6i I J / f : ^ .A/
e and Dimensions of Project
proposed project to be located and constructed as described
✓e is hereby certified as exempt from the CAMA permit re-
ament pursuant to 15 NCAC 7K .0203. This exemption to
1A permit requirements does not alleviate the necessity of
obtaining aiy other State, Federal, or Local authorization.
Phone Number &64-73q
State _� Zip
i
This certification of exemption from requiring a CAMA pe
valid for 90 days from the date of issuance. Following expi
a re-examination of the project and project site may be nec(
to continue this certification.
;ETCH (SCALE:
ftTL.-NTIC- DC,0PfN `-
F'KoroS&-) y' X l S'
VU► e c� o �
I o' Y I
sad
1 /
%4 ide
LfD4--
6`n`-V
v� U
Legend:
Ac - Acres
Br. - Below Ground
Cori. - Concrete
CO - Cie r.6ut
C.H. - Deed Hook
❑ EB - Electric Box
OISF - lrm Stake Foul,
0155 - Iron 5t ke' Set.
MBL - Minimum Building Line
M.B. - Flap Book
QMNF - Mog Nail Found I
Pg - POP
ruw - Right-of-way 1" -
-]
( ) - Field Data
�'
Atlantic Ocean
am
Retard Dots
Lines not 5urveyed (+r
567'29'56'W - 69.99'
1-7
I`k— High Water Ltne
I
Toe ,f ti
Dun'
<1
eLv re a6s
Vicinity Sketch
�- Cori. Under Builpir'Q _
Flood
Zone VE
Elev. 15 ~ III zn
r
Subject property is subject to CAMA
Firbt L g Jurisdiction and Permitting as
- R lisp Vege an I I'- determined by the NTH, CAMA 1PO,
R. McAlister on 10/13/2010 and is
Tbvs�
cV2� O� III3 within the CAIJA Ocean Erodible (AEC)
% •�'f �---- and a Hi h Hamrd Flnori Zone in a
Ftood n
Lire (TyP )
— I g°ISF
1`
P
•i , 1 I $ COBRA area d not eligible for Federal
lot 8P ��a^ ! I I m Flood Insurance Per Firm CPN 37D466
M.B. 25, 99 �j 4277 J. Effective Nov. 3. 2005.
.31 p�H�' (z Fiou Di Shoup
Flood S
5.34
Zane VE
E7sv. I4
I �21 i
\ 20 / to
J
m
in
n
�
a
1
W I -i 69.98'
Tod at
I.And
se menstione ore
fl5F meosured in Field
1'Hrw
Impervious Surface Aran
r — House it Covered Decks 1754.90 s.f.
(to rrool' overhong)
8.% 132 OF Lot Area
L' J,� 7 ; Height of Building 6 Highest
\ , Point is 45.99'
Fm I L m
n711
N66
Enclosed Area
�� £ - /
.o'
20'
Underneath t.icuse
e'
a' I'
t3,5 Is-5
tJots, Arch lMrisr 3
Bedroom Hb r
Covered
b.20
lewp
a
_
Comte with
I Parch
L'�
t F,-k v izoar for
6pacee_
- PraP0sv
Existirgrrx
5p
G
�� `Grc,ic I
`moo �`-
n
G
rass n Hui W Ar
Neu:
6'BG c
.30'00'E - 69,98'
30' °E
GL
Limited
Common Area
Per M.B. 25, PC. 199
�it&_i�onchmcrk
MNF as shown on this mop at
C Hampton Clary Circle
Eldy 6.88 NAV D' 88
—scleas of
Exist. Grwel°0 --0;.15F
555 �A (o4e. a n_�
e, rr�,vrxn, iey E
Lawent l,id f Hampton Col-ony i
o
rrmbr Is 17.4 Fl. VE _ ( 20' Asphalt J ` 12
Zone: R-15 fir' 13 '� 20 1 Rood t0 ,CirrcleA7
Setbacks: Front rev Tax Parcel Identification Number 768A-118 �- ZYI R/ Y Y f1
er 10' Parcel Number 048034 31 /
� I u r YV rp i
Rear 10• Reference M.B. 25, Pg. 199 - o
CAQA 60D.B. 1920. Pg. 611 Of �'W n � -3 1 r�
NO RECORD SEARCH DONE BY tt L S L) r
1 OR FURNISHED TO SURVEYOR IN � � � 1
REGARD TO ZONING, SETBACKS, MN
EASEMENTS OR RESTRICTIONS. CRgg'
Survey? n
THIS MAP NOT FOR v n z z a oG
PHYSICAL SURVEY BY RECORDING PURPOSSESEE i a r
!
I certify thoI th(F by ..49'*a%,p under my supervision O ►"1
from on octu4'' !rryegr. ff[pde4.l�le:=, my supervision with
J reference Mist ff�d; thou ;xheYb�indories not surveyed Lot No a Block - G YZ
ore -indi-cater: as Fftsta��{It�rri� r>fferdnce source; that this c� Ian HAMPTON COLONY
w
m
w
z
0
a
z
z
Q
BREAK -AWAY JOINT of
REQUIRED
Lu
� w
U
U
d
co
U) Q
p
f 4'-0" MAX WIDTH
wO
w
o
o
+
CROSS WALKWAY
oas
W
Q
-OVER
+
I
w z
Q
BREAK -AWAY JOINTS
p
PERMITTED AT STAIR AND
cn U
t WALKWAY SEGMENTS
Q
CROSS -OVER MAY BE CONSTRUCTED PER
APPENDIX M - WOOD DECKS'
PILINGS REQUIRED PER SECTION 4503
w
z_
J
w
O
co
z
a
w
U
O
Beach Walkways
(Also see Oceanfront Construction)
Beach walkways make it easier to get to the beach without damaging dunes, which play a vital role
in maintaining the structure and safety of North Carolina's barrier islands and beaches.
To ensure that the dune system is not damaged when a walkway is built, you must follow the
following rules in addition to the general use standards for the ocean hazard AEC {15A NCAC 7H
.0308}:
Figure 4.2
■ Walkways must be for
pedestrian use only.
■ Walkways must be no
wider than 4 feet.
■ Walkways wider than
feet or not for pedestrian
use may be permitted if
5 MMWVR0rV= M
they meet a public need A'a Mliufit 4
that cannot be met in oEiiii _
other ways. (Note: This
standard does not apply to public fishing piers if they meet all other applicable standards.)
• Elevated walkways allow dunes to adjust naturally to wind and wave forces, maintaining
the stability of the protective dune system. Walkways must be on posts or pilings
embedded to a depth of 5 feet or less, so that when possible, only the posts — not the
walkway itself — touch the frontal dune. Walkways may touch the dune only to the extent
necessary.
• Walkways won't be allowed if they weaken the dune's protection against flooding and
erosion (see Figure 4.2).
• Any vegetation disturbed in the construction and use of a walkway or vehicle accessway
must be replanted as quickly as possible.
■ Walkways or vehicle accessways may not be considered threatened structures and are not
eligible for sandbag protection.
11, Jason
m: ksanford.ifs@verizon.net
t: Wednesday, October 05, 2011 4:37 PM
Dail, Jason
yect: Re: RE: 604 Hampton Colony Circle North Topsail Beach NC
,n:
se go ahead with the FLNSV visit and let me know the results. Also, can you include sand fence on the exemption letter you
I need to replace it from Irene damage.
)ady have the CAMA minor permit in hand for the driveway and staircase. I just added the dune crossover on the same plan
J see a view of the entire property.
1k you,
0/05/11, Dail, Jason<jason.dail@ncdenr.gov> wrote:
n,
, I need to go out and confirm the first line of natural stable vegetation (FLNSV) that Ryan located back in September 2010. T
is only valid for 60 days. Secondly, the beach access walkway can be covered under an exemption so I'll move forward with t
I confirm the FLNSV. With respect to the proposed gravel drive, that constitutes development and therefore would require a
1A minor permit. If you like, I can drop a package in the mail to you. I'll be in the area on Tuesday Oct. 11, 2011, so if you woL
ie to make a site visit just let me know.
ait to hear back from you before I proceed.
iks,
in
h Carolina Department of Environment and Natural Resources
,ion of Coastal Management
in Dail
I Representative
Cardinal Drive Ext.
iington, NC 28405
ie: (910) 796-7221, Fax: (910)395-3964
r. nccoastalmanagement. net
ase note that e-mail correspondence to and from this address may be subject to the North Carolina Public records Law and n
losed to third parties.*
)riginal Message-----
): Kevin Sanfordfmailto:ksanford.ifsaverizon.netl
l: Wednesday, October 05, 2011 12:50 PM
)ail, Jason
!ect: RE: 604 Hampton Colony Circle North Topsail Beach NC
is Dail, Jason[mailto:mason. dailancdenr.govl
: Monday, September 12, 2011 11:46 AM
Levin Sanford
) J Hill AICP
ect: RE: 604 Hampton Colony Circle North Topsail Beach NC
>r issues 1) and 3) referenced below, feel free to proceed with the work that was approved under the CAMA minor permit. Ho
2) (the dune
-over) will need to be addressed separately. Although exempt from permitting requirements, we'll need to see what you have
osed with respect to the dune cross -over. If you could, please provide me with a detailed drawing showing the dimensions ar
ion of the proposed cross -over in relation to the vegetation line, frontal dune, and corresponding setback (60'). Once we have
oration, we'll proceed with a decision.
iks,
i Carolina Department of Environment and Natural Resources Division of Coastal Management Jason Dail Field Representa
cardinal Drive Ext.
iington, NC 28405
ie: (910) 796-7221, Fax: (910)395-3964 www.nccoastalmanagement.net
ise note that e-mail correspondence to and from this address may be subject to the North Carolina Public records Law and n
used to third parties."
)riginal Message-----
i: Kevin Sanford fmailto:ksanford.ifs(cDverizon.netl
: Monday, September 12, 2011 10:47 AM
)ail, Jason
ect: FW: 604 Hampton Colony Circle North Topsail Beach NC
n,
is a copy of the minor cama permit you requested.
ik you,
)riginal Message-----
): Kevin Sanford[maiIto: ksanford.ifs(cDverizon.net
l
: Friday, September 02, 2011 1:43 PM
3son.dail(@ncdenr.gov
ect: 604 Hampton Colony Circle North Topsail Beach NC
n,
ipleted construction of a home in June at North Topsail Beach and received final CO. I am ready to begin the following items
h off'
louse as follows:
n J. Sanford, President
rance and Financial Services, Inc
i Harbour Park Drive
)thian, VA 23112
)739-9121
Information from ESET NOD32 Antivirus, version of virus signature database 6457 (20110912)
message was checked by ESET NOD32 Antivirus.
(/www.eset.com
Information from ESET NOD32 Antivirus, version of virus signature database 6457 (20110912)
message was checked by ESET NOD32 Antivirus.
(/www.eset.com
Information from ESET NOD32 Antivirus, version of virus signature database 6519 (20111005)
message was checked by ESET NOD32 Antivirus.
f/www.eset.com
CERTIFICATION OF EXEMP :'ION
FROM REQUIRING A CAMA FcRMIT
i as authorized by the State of North, Garin,
Department of Fnvironmew, Heath, and Natural Resources and the Coastal Resources Comrniss,o.i
in an area of envir"mental concern pursuant to 15 NCAC Subchapter ?K .0203.
Appic2nt Name r ' fiiG' fz�� �— Phone Number �-'
Address � a _�LC��L� __-;06=
City _1�'�1�7 " ------ - --- State �^
Pro ec: Location {Courny, Slate Br ad, w,ate; Sony, etc:) r _ i _
Type and Dimensions
Pr_ .e,4
The prcposed project to be iocated and constmr ted as desrn
alloys is hereby cani`ied as exempt from the CAMA pormir ra-
qu rement pursuant to , 5 NCAC 7K .0203, This exemption to
CAMApermit requirements does not alleviate the necessity of
yc,,r cotalning any other State, Fade. at. or Locoi authorization.
This cerifts!ian of exemption from torluiring a CAN1A perm!', is
valid for 90 days from the date of issuance. Fcilowirg expiration,
a re-oamina!ion of the project and project site may tm necessary
to continue this certification.
SKETCH-! (SCALE:
.r
Any person who proceeds with a development without the car,-
sant of a CAMA official under the mistaken assumption that the nt's s
de; alopment is exempted, will be in violation of the CAMA if There
;c a cr3h4arrfant rictarrninatLr%that a narmit woe-orn;iroH fro tho