HomeMy WebLinkAbout57483D - Rogers
SECTION .1100 - GENERAL PERIMIT FOR CONSTRUCTION OF BULKHEADS AND RIP RAP
REVETMENTS FOR SHORELINE PROTECTION IN ESTUARINE AND PUBLIC TRUST WATERS
AND OCEAN HAZARD AREAS
15A NCAC 07H .1101 PURPOSE
A permit under this Section shall allow the construction of bulkheads and riprap revetments for shoreline protection
in the public trust waters and estuarine waters AECs according to authority provided in Subchapter 07J .1100 and
according to the Rules in this Section. This permit shall not apply to shoreline protection along the oceanfront or to
waters and shorelines adjacent to the Ocean Hazard AEC with the exception of those shorelines that feature
characteristics of the Estuarine Shoreline AEC. Such features include the presence of wetland vegetation, lower
wave energy and lower erosion rates than the adjoining Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b) 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Ef. . July 1, 2009; April 1, 2003.
15A NCAC 07H .1102 APPROVAL PROCEDURES
(a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and
request approval for development. The applicant shall provide information on site location, dimensions of the
project area, and the applicant's name and address.
(b) The applicant shall provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property
owners indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work.. The notice. shall instruct adjacent property. owners to provide written comments
on the proposed development to the Division of Coastal Management within 10 days of receipt of
the notice, and, indicate that no response shall be interpreted as no objection. The Division of
Coastal Management shall review all comments and determine, based on their relevance to the
potential impacts of the proposed project, if the proposed project can be approved by a General
Permit. If the Division of Coastal Management determines that the project exceeds the guidelines
established by the General Permit Process, DCM shall notify the applicant that an application for a
major deyelopment permit shall be required.
(c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management
representative so that the proposed alignment may be marked. Written authorization to proceed with the proposed
development shall be issued if the Division representative finds that the application meets all the requirements of
this Subchapter. Construction of the bulkhead or riprap revetment shall be completed within 120 days of the
issuance of the general authorization or the authorization shall expire and it shall be necessary to re-examine the
alignment to determine if the general authorization may be reissued.
History Note: Authority G.S..113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Efjr March 1, 1984;
Amended Efj'.' July 1, 2009, October 1, 2007, September 1, 2006, January 1, 1990; December 1,
1987.
(i) No excavation, grading or fill shall be permitted except for that which may be- required for the construction of
the bulkhead or riprap revetment. This permit shall not authorize any excavation waterward of the approved
alignment.
0) Runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters.
Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that
eroded materials do no enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or
berms, sand fence, etc.).
(k) If one coritiguous acre or more of propertyAs to be excavated or filled, an erosion and sedimentation control plan
shall be filed with the Division of Land Resources, Land Quality Section, or appropriate local government having
jurisdiction. This plan shall be approved prior to commencing the land -disturbing activity.
(1) For the purposes of these Rules, the Atlantic Intracoastal Waterway (AIWW) is considered a natural shoreline.
(m) Construction authorized by this general permit shall be limited to a maximum shoreline length of 500 feet.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118. 1; 113A-124,
Eff. March 1, 1984;Amended Eff. July 1, 2009; April 1, 2005; December 1, 1991; January 1,
1989; December 1, 1987.
TO DENR;
i APPOINT Charles E. Overbeck jr. TO ACT AS MY AGENT ON,
CONSTRUCTION AT,,)4 ENCE: 2101 N. Lumina, Wright!
Carl W.-Rogers J
DATE
78' 2"
R. Reiter Property
LOLLY POP BASIN
0
0
0
P/L
0
N
Proposed Bulkhead 11" waterward of Existing Bulkhead
ei ", "" 18'2„
Existing Bulkhead
C. Rodgers Property
2101' N. Lumina Ave.
Wrightsville Beach
8 7' T
G. Ciener
PROPOSED BULKHEAD INSTALLATION Overbeck-Pippin Marine,LL
CARL ROGERS & Wrightsville Beach, NC
RRpi Arswpiuy AC CYTCTTIU/'_• nTGn ST1 TwI.- 910.256.3092
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATIONNVAIVER FORM
Name of Property Owner: LA
Address of Property: 0210
Applicant phone #:
(Lot or Street #, Street or Road, City & County)
Mailing Address:gM/ Al. 1--U OU 4-e-
(�r�ohyr�l2 Rea.c`'! /V e XNP
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
escription or drawina. with dimensions. must be provided with this letter
�-
R_ �
have no objections to is proposal. I have objections to this proposal.
IT /ons to what is being proposed, you must notify the Division of Coastal Management
(DCM) in writing within 10 days of receipt of this notice. Contact information for DCM offices is
available at www.nccoastalmangement.net/contact_dcm.htm or by calling 1-888-4RCOAST. No
response is considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, or lift must be set back a
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to
waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
Signature
C'a�C. rY1.�oGe�s
Print or Type Name
o2/6/ N. kulr/naa Ave -
Mailing Address / /I ),,,l 1/i/l'n lSD%i/�n All'/y
1 Pt/iill
(Ri"n f9perty Owner li
Ii
or Type Name
amrl N. kum inQ. Ave-,
Mailing Address
!-
Alt) 1P%/I
LOLLY POP BASIN
Proposed Bulkhead 11" waterward of Existing Bulkhead
78' 2" 18'2„
i 490, 0" ► . 87' 7"
R. Reiter Property
o
P/L
o i
i
i
I...............................
Existing Bulkhead !
C. Rodgers Property
2101 ' N. Lumina Ave.
Wrightsville Beach
i
i
a) ; P/L
G. Ciener
PROPOSED BULKHEAD INSTALLATION Overbeck-Pippin Marine,LL
CARL ROGERS & Wrightsville Beach, NC
nOnN 1MV9rCTT1k1/- e%Tre% r Vm Tug 91n.256.3nA2
USPS.com® - Track & Confirm
Page 1 of
•Customer Service USPS Mobile
Register I Sign In
aj sps.co ff
,Tools
Search USPS.com or Track Packages
Quick
Ship a Package
Send Mail
Manage Your Mail
Shop
Business Solutions
Track & Confirm
GET EMAIL UPDATES.
YOUR LABEL NUMBER
SERVICE
STATUS OF YOUR ITEM
DATE d TIME
LOCATION
FEATURES
i 70111150000014636185
First -Class Mail QD
Unclaimed
August 27, 2011, 12:30 pm
WRIGHTSVILLE
Expected Delivery By:
BEACH, NC
August 12, 2011
Certified Mail
Return Receipt
Notice Left
August 17, 2011, 8:44 am
WRIGHTSVILLE
BEACH, NC 28480
Notice Left
August 12, 2011. 3,10 pm
WRIGHTSVILLE
BEACH, NC 28480
Arrival at Unit
August 12, 2011. 8.55 am
WRIGHTSVILLE
BEACH, NC 28480
Acceptance
August 11, 2011, 1:59 pm
WRIGHTSVILLE
BEACH, NC 28480
Check on Another Item
What's your label (or receipt) number?
LEGAL
Drivacy Policy)
Terms of Use >
701A ,
Vo FEAR Act EEO Data .
OTHER LISPS SITES
Business Customer Gateway,
Postal Inspectors >
Inspector General >
Postal Explorer:
;opydght* 2011 USPS All Rights Reserved
ON USPS.COM
ON ABOUT.LISPS.COM
Government Services)
About USPS Home >
Buy Stamps & Shop,
Newsroom ,
Print a Label with Postage >
Mail Service Updates)
Customer Service ,
Forms & Publications ,
Site Index ,
Careers ,
Oivision of Coastal Mgt. Habitat Impact Computer Sheet
Acant: C�� / , V( . P S Permit #
e:
gl3p /r
S-7zY93
cribe below the HABITAT disturbances for the application. All values should match the name, and units of measurement
rid in your Habitat code sheet.
itat Name
DISTURB TYPE
Choose One
TOTAL Sq. Ft.
(Applied for.
Disturbance total
includes any
anticipated
restoration or
temp impacts)
FINAL Sq. Ft.
(Anticipated final
disturbance.
Excludes any
restoration
and/or temp
impact amount)
TOTAL Feet
(Applied for.
Disturbance
total includes
any anticipated
restoration or
temp impacts)
FINAL Feet
(Anticipated final
disturbance.
Excludes any
restoration and/or
temp impact
amount)
Dredge ❑ Fill Both ❑ Other ❑
Ov
Dredge ❑ Fill ❑ Both ❑ Other ;
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
Dredge ❑ Fill ❑ Both ❑ Other ❑
OVERBECK/PIPPIN MARINE CONTRACTORS, LLC
P.O. BOX 716
WRIGHTSVILLE BEACH, NC 28480
"AY
FOTHE �C ^
)RDER OF 1
414Z
is CRESG'E/VT .
3
Wilmington, NC P
66-1227-531
m
i;
$4a�•�o
DOLLARS z
8
en L
AUTHORIZ SIGNATURE
u
110004 L49111 1:053 11 2 2751: 000 2SO7 24 21"
Return Receipt Fee
idorsement Required)
estricted Delivery Fee
idorsement Required)
btal Postage & Fees
get, iipt. Nc
PO Box No.
y, State, LF
■ CBmplete items 1, 2, and 3. Also complete
item 4 if Restricted Delivery is desired.
■ Print your name and address on the reverse
so that we'can return the card to you.
■ Attach this card to the back of the mailpiece,
or on the front if space permits.
Article'A•ddressed to, rCiic-
2. Article Number
(Transfer from service label)
PS Form 381 1, February 2004
NGTC l NC
A. SS' UM7
/ J
❑ Agent
Addressee
B. Received by (Printed Name) Tc�ate of Delivery
D. Is delivery address different from item 1? XYes
If YES, enter delivery address below: ❑ No
3. Service Type
�" '�ail ❑ Express Mail
Registered sterred ❑ Return Receipt for Merchandise
❑ Insured Mail ❑ C.O.D.
1 4. Hestrirtnri nem,.._n ..-... _ .
7011 1150 0000 1463 6192 5
d
Domestic Return Receipt
102595-02-M-1540
U.S.
Postal
ServiceTF.,
CERTIFIED
MAIL,.,
RECEIPT
_. (C
. 'stic
Mail Only;
No Insurance
Coverage
Provided)
■
For
delivery
information
visit
U ; 1
Postage $
O Certified Fee �. i sRWL
O Return Receipt Fee
O (Endorsement Required) Here
Restricted Delivery Fee 9 2011
O (Endorsement Required)
Ln
rq Total Postage & Fees D� NTQ N
� Sent To / 4J f "
O Street, No ` �r---- - -------------
17,1- or PO BoxNo.
A