HomeMy WebLinkAboutPowellCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K 0M.
h 10 3-
At(b 4 bVI c I WA1 ! Phone Number `11�
proposed project to be located and constructed as described
)ve is hereby certified as exempt from the CAMA permit re-
rement pursuant to 15 NCAC 7K .0203. This exemption to
MA permit requirements does not alleviate the necessity of
it obtaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA p
valid for 90 days from the date of issuance. Following ex[
a re-examination of the project and project site may be nei
to continue this certification.
KETCH (SCALE:
WUV1 bo.
J�
N
r
6
0
Gr \Q- k C-)
p
2/2'd b96ES626:01 S009SZ90% 30Idd0 3n-E OWd:WOdJ dT0:2T TT02-
-2011 12:01P FROM:FMO BLUE OFFICE 9106756005
TO:93953964 P.1/2
FAX COVER SHEET
DATE: 515111
TO: Holly Snyder
Fax: 910-395-3964
FROM: Orlando Powell
Ph. #910-819-5096
RE: CAMA Permit Request
Number of Pages including cover sheet 2
As requested, see attached drawing of my Gazebo/Dock area. I'm
no artist, but hopefully this will give you a better understanding of
what I'm trying to accomplish.
Thanks for your help!
Orlando Powell