HomeMy WebLinkAboutMason'sCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the Stale of North Carolina,
Department of Envlmnment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K ,0103.
Applicant Name S �s- I tr^1 z f Phone !Number
Address el e?,"
City %t/r tt1"fi:, M, I Slate 4Z9G Zip /
f l I� ./1 - - - -
Tvca and Dimensions of Project Kt_ n We U I-We'-sicuiK , .&1 /1/41 4 4_1�4 / -, s ! g ����
i
The proposed project to be located and constructed asdescribed This certification of exemption from requiring a LAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance, Following expiration,
quirement pursuant to 15 NCAC 7K .403. This exemption to a re-examinalion of the pmioctand project silo may benecessary
CAMA permit requirements does not alleviate the necessity of to continue this certification.
your obtaining any other State, Federal, or Local authorization.
SKETCH — (SCALE:
-, Wa,, K —< /too l/ 4 e e tie /.-7 e_-?
Any person who proceeds with a development without the con- M
sent of a CAMA official under the mistaken assumption that the Applican ignaturs
a�.,el�.,�,em c nvmm�tcri will he in vAnlatinn of tha CAMA If there 11Z44 ! .4, A I '
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
Acant Name S ntl r 'eld C ";1r Phone Number L /
Dress
✓ i State IOC Zip
R-ct Location ( nty, State load, Water Body, etc.) A. i w ev�.�- �� /;�
d�, G�� s , r^, .K .
proposed project to be located and constructed as described This certification of exemption from requiring a CAMA p
ve is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following exp
ement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nec
v1A permit requirements does not alleviate the necessity of to continue this certification.
r obtaining any other State, Federal, or Local authorization.
ETCH (SCALE: �TS
Ale
04V I
�.-� _ ��,y rh�✓�� fir„ f!> 7LG.s �ti�r /, " �/�,� ,.�'l�'/�
f
� if�r f �l /` ►«may T 5,e>le
r
r
irs, Robb L
m: Arlart [nc_marina@yahoo.com]
t: Wednesday, October 26, 2011 11:23 AM
Mairs, Robb L
EJ and B Arlart
ject: Mason's Marina Pilings
chments: Mason's Marina October 2011.jpg
ached photo of Marina Docks. #1 location is where existing piling broke off in mo
ent storm. Location #2 is where I want to place an additional piling as a safety ni
<eep the floating docks from swinging and braking off other pilings if we have ano
ng break in the future. So we want to place pilings at both locations. Please call i
310-470-9878 if you have any questions.
cerely,
Arlart, Owner
3on's Marina
19 Mount Pleasant Road
mington, NC 28411
)-470-9878
OCT 2 6 1011
CM WILMINGTON, NC
W
Mason's Marina on Page's Creek October 2011
Broken Piling location
#1
#2
1 U.S. Geological SurlapilkiMta @M11 GoDc ie - Terms of Use - Ede in Google Map Maker