Loading...
HomeMy WebLinkAboutMabry:ter • CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCCAAiC Subchapter 7K .0703. licant Name Cry ' / , Phone Number ress I'n 12, 7, State C ZIP ect Location (Coun , State Road, Water Body, etc.) and Dimensions of Projects proposed project to be located and constructed as described ,e is hereby certified as exempt from the CAMA permit re- �ment pursuant to 15 NCAC 7K .0203. This exemption to 1A permit requirements does not alleviate the necessity of obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA pe valid for 90 days from the date of issuance. Following expi a re-examination of the project and project site may be nec to continue this certification. ETCH (SCALE: 1117S wo- � S P7 -0' ( u,t/ i( t-vl)✓ 4 Ip 14 7-4� 7 A QM9 d^, PTe jlvx�5 �tt2 t - -�r14 AUG 3 1 2011 26�'- OfF