HomeMy WebLinkAboutMcGeeCERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMITJ^P��
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources CommS'ssio
in an area of environmental concern pursuan to 15 NC ubchapter 7K .0203 '&e"45 10� 91A
umnle' C C y/'! Phone Number 2 3
, State Road, Water Body, etc.)
State
Zip
�O
cant Name
eject Location
Ju ai iu
proposed project to be located and constructed as described This ccrtification of exemption from requiring a CAMA F
we is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following exl
rement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be ne
MA permit requirements does not alleviate the necessity of to continue this certification.
it obtaining a other State, Federal, or Local authorization.
�/1��'/
<ETCH (SCALE:
[/Vw A-w eAp I-e' / (17
,</ /i
a�llllrll-
-7( Y -11,
..Y. CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMITy►P,by�
-- as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Comm
In an area of environmental concern pursuan to 15 NC . ,Ves j �l
Applicant Nance r " i- Phone Number
Address '
City _ State Zip
Project Location (Count , State Road`, Water Body, etc.)
Type and Dimgn;ions of
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of Isuance. Following expiration,
quirement pursuant 'IK �203. ills -exemptiona re -exam ina#lon of ft ro ed and project site may be necessary_ _
CAMA permit requ ants does not alleviate the necessity of to continue this cenific�tion.
your obtaining a other State, Federal, or Local authorization.
SKETCH (SCALE: j
_A4
I I i
-
01
I. _
rii--
-
-�! �L _ _.._ � I�Ir. ��✓ _.. iI'/l � - %'!/i � // I7F ; :���74�
if
k i 4
SEA 101
D -M Wll11Rl�xn��r 1..
,ny person who proceeds with a development without the con- r' / '//! 7"'W-41 1-'A
uoz o c gnv
QM13o3d
Remove and replace
decking as
needed to
access
and replace 6 pilings
supporting
uncovered
deck
CB basin
Covered
Boat-
house
Uncovered deck
15'x24'
-;v�Canal
Dennis Mc(
Boat ramp
CEF
AUG 2 9