HomeMy WebLinkAboutCarolina (7)-Y
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission /G
in an area of environmental concern pursuant to 15 NCAC�ubchapter-7K .0203:-- CAS/�i�
li n Name
cat Phone Number
ress
kfz State 144 df • Zip
ject Location (Count�j State Road, Water Body, ptc.)
�l/
ww��Aw.�►��sr�r�rww�i�wvr3�r�ca��a
proposed project to be located and constructed as described
to is hereby certified as exempt from the CAMA permit re-
;ment pursuant to 15 NCAC 7K .0203. This exemption to
1A permit requirements does not alleviate the necessity of
obtaining any otheyState, Federal, or Local authorization.
This certification of exemption from requiring a CAMA pe
valid for 90 days from the date of issuance. Following expi
a re-examination of the project and project site may be neci
to continue this certification.
ETCH ` ' (SCALE: A/75
--*' 1*el�` 4-" 0�0-" /�
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission �-
in an area of environmental concern pursuant to• 03:— CAS' f 3� AV " �.
ame /GfN� mbteerrApplicant N
Address , 4,
City---�-��� State ,
Project Location (Count State Road, Water Bosly, to. " - D�f
nie" 0 s�/e ('lrn"*' S%��.�y ���i� iGi� �.1� U1ri ,
Type and Dimensions_of
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiration,
quirement pursuant to. A4-7f__2'6_ This exemption to a re-examination of the project and project site may be necessary
CAMA permit requiremen oes not alleviate the necessity of to continue this certification.
your obtaining any othe late, Federal, or Local authorization.
NCGS 113 A 1123 tSl lob 5
SKETCH (SCALE: AIT<
W14' dva b, dA' 'L
�4 - lAe lid, 4,v
RECEIVED
AUG 16 2011
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
cant�signafe
irs, Robb L
m: Brian Stanberry [brian.stanberry@carolinabeach.org]
t: Thursday, August 11, 2011 4:22 PM
Mairs, Robb L
Jeremy Hardison
ject: RE: 909 Canal Drive Outfall
nks for the quick response. Sorry it took a bit to get back with you. Our goal is to find a date when the tide will
cide with our work schedule. We intend to start the process as soon as the water line recedes below the worki
i. This would allow for the maximum amount of drying time possible before the next high tide. The form woulc
made, off site, and placed around the pipe. Doing it that way should let us begin pouring the concrete
iediately. Our intent is to use Fast -Setting, concrete mix, made by Quikrete. This concrete is formulated to set
)-40 minutes. The forms would be left on for several days, then removed. What are your thoughts? Does this
id like an acceptable approach? Thanks for the assistance.
an Stanberry
actor of Public Works
✓n of Carolina Beach
# 443-1837
n.stanberry )carolinabeach.org
n: Mairs, Robb L [mailto:robb.mairs@ncdenr.gov]
t: Wednesday, August 10, 2011 8:57 AM
Jeremy Hardison
Brian Stanberry
jest: RE: 909 Canal Drive Outfall
my and Brian,
iks for email on this project. The one thing we need to make sure is that there will not be live concrete placed
in the water. Could you go into more detail on this matter and indicate any type of drying agents and timing th
Id be accomplished (i.e. low tide)?
iks,
t
n: Jeremy Hardison[mailto:jeremy.hardison@carolinabeach.org]
t: Tuesday, August 09, 2011 12:42 PM
emy'Hardison
ling Administrator
vn of Carolina Beach
11 N. Lake Park Blvd.
-olina Beach, NC 28428
(910) 458 2991
(910) 458 2997
emy.Hard ison D-carolinabeach.orq
w.carolinabeach.orq
m: Brian Stanberry
t: Tuesday, August 09, 2011 12:33 PM
Jeremy Hardison
ject: 909 Canal Drive Outfall
my,
intention is to remove this old, deteriorated concrete stabilizing block. We then would form up a new stabiliz
k and fill with concrete. The block will be 1' thick, 3' long and about 2.5' tall. The concrete would be pre mixed
ied to the form by hand. No heavy machinery would be used. This outfall location is located between the 907
Canal Drive addresses. Just let me know if there are any concerns. Thanks for the assistance.
'an Stanberry
actor of Public Works
m of Carolina Beach
# 443-1837
n.stanberry(&,carolinabeach.org
la