Loading...
HomeMy WebLinkAboutBald (7)CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT r:Z=)r as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. licant Name ALA-) tt f�"�i t �� ►t, L_T� LLC . % C 0(e- Phone Number ` ress ,Ln—��; C ��l L `t �- % State Ny - Zip ject Location (County, State Road, Water Body, etc.) / ' L r Jkle e and Dimensions of Project ., J�t'il 11 S ii ��1,� I N(, �C� .7�Y�r' K',! r Ti 'Rif (— proposed project to be located and constructed as described ve is hereby certified as exempt from the CAMA permit re- ement pursuant to 15 NCAC 7K .0f03. This exemption to AA permit requirements does not alleviate the necessity of r obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA valid for 90 days from the date of issuance. Following e) a re-examination of the project and project site may be of to continue this certification. IKETCH (SCALE: c) c 7Zir -C, )c Pi47 (2 S OF Sc()�f r7f; Ty C Ytt l PV-T-k;J1U (E C' Iry Z ; I SJj90 Y1271/1. ff t c— 7j% r�I f+' �.�J lT7 i Bruce Marek, P.E. P. O. Box 3069 Bald Head Island, NC 28461 910-228-2484 Cell April 25, 20111 Ms. Heather Coats NCDENR Division of Coastal Management 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Repair Exemption Request: Bald Head Island Marina South Jetty Pier End/Jetty Walk: CAMA 172-87 Dear Ms. Coats: Included are 5 color copies of an 241106" color drawing Cl seal dated 4-21-11 in support of this Repair Exemption Request for the Bald Head 'island Limited, LLC CAMA Permit 172-87, Marina Development. 4 Late last Wednesday evening, April 20, an incoming sailboat got one of her lines caught on one of the channel entrance guide piles, and its bow was swung into the end of the wood jetty pier with sufficient momentum to damage the pier end. For safety, we have had to cordon about 40' pier end off. See the pictureson the drawing. My initial structural evaluation, without the benefit of removing planks, is that there is damage to the girders, stringers and rails to 36' back from the pier end. I have asked for 40' of repair to allow a proper tie in to undamaged structure. A cross section of the jetty detail is included on the drawing, with the notation for the contractor to match the actual as -built conditions. The transverse girders are appx 4' on center, for a total of S 1+/- girders along the full length (200'+/- of the on pier "jetty walk'. A few of these girder attachments to the concrete pier cap are in need of below deck repairs outside of the 40' end area. Please include this miscellaneous repair work in our repair exemption. 1 believe the contractor estimate is for an additional 7 girders. Note that we would like to get the pier end, often used for fishing, repaired in plenty of time for the Memorial Day Weekend. In addition to the pier end repair, we would like to take this opportunity to repair/replace. approximately 40 of the over 500 on grade or on jetty deck planks, which are either 2x4 or 2x6 Pressure Treated Southern Pine. The on grade Jetty Walk walkway (appx 220 If) was. approved in 2004, and BHI Construction Records indicate it was built in 2005. There is severe checking/cracking on some planks, as well as some popped board ends. If you have any questions, please call me at 910-228-2484. When the permit is completed, please have copies faxed to 910-457-7463 & 457-7220 or emailed to me and to Jim Henry. Thanks for your attention to this matter. c�a0LIAr''• q l