HomeMy WebLinkAboutBarnhillO
Aicant
cress_
FM
ject �-t
le and Dime
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K D88
r C 0103-
i��z .�
!�.i1�litj C. il� t,t,�11,i„� Phone Number �- . 3
, State Road, Water Body, etc.)
of Pro
proposed project to be located and constructed as described
ve is hereby certified as exempt from the CAMA permit re-
ement pursuant to 15 NCAC 7K This exemption to
AA permit requirements does not Mei e the necessity of
obtaining any other State, Federal, or Local authorization.
State
Zip
This certification of exemption from requiring a CAMA pE
valid for 90 days from the date of issuance. Following exp
a re-examination of the project and project site may be nec
to continue this certification.
:ETCH (SCALE: i I/L !.()
aksl i K
aLKH6Nb
CAMP
f t12"
rr�(
I
AZ4� jFA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
verly Eaves Perdue James H. Gregson Dee Fre(
)vernor Director Secr
April 19, 2011
ies E. Barnhill
Box1154
iamston, NC 27892
it Mr. Barnhill
Attached is your CAMA Certification of Exemption, issued for work to be done 6020 6th Street, in Olc
;lers Beach, Surf City, Onslow County.
In order to validate this Exemption, please sign both copies of the permit as indicated. Please retair
yellow copy for your files. Sign the white copy and return to us within 20 days of receipt, in the enclo:
-addressed envelope.
is not a valid document until it is signed and returned to our office.
nk you for your prompt attention to this matter.
Sincerely,
CK
Shaun K. Simpson
Permit Support Technician
�O
cant Name
sss V.L.
eject
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
State Road, Water Body, etc.)
pe and Dimensions of P
a proposed project to be located and constructed as described
)ve is hereby certified as exempt from the CAMA permit re-
rement pursuant to 15 NCAC 7K ..0203. This exemption to
MA permit requirements does nof666te the necessity of
jr obtaining any other State, Federal, or Local authorization.
Phone Number
State iAC
Zip
This certification of exemption from requiring a CAMA F
valid for 90 days from the date of issuance. Following exl
a re-examination of the project and project site may be ne
to continue this certification.
KETCH (SCALE: 1 s
ft� AM
aIS- n tzl &Ar
��`Mo j
AT,
Tn' A )-':TT TT. TT AH
QQt7C-7C,)-kTk : XP4
7TA 1-11T1-IKWAQ