Loading...
HomeMy WebLinkAbout02117D - WestbrookCERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0103 licant Name icat�n (Co nty, State Rod, Water Body, v.� . t t 1(a (.t ✓� �" �. and Dimensions of Project proposed project to be located and constructed as described e is hereby certified as exempt from the CAMA permit Arement pursuant to 15 NCAC 7K . C?I G� . This exemption :AMA permit requirements does not alleviate the necessity of r obtaining other State, Federal or Local authorization. 02 Phone Number Uri This certification of exemption from requiring a CAMA valid for 90 days from the date of issuance. Following e) a re-examination of the project and project site may be i to continue this certification. KETCH (SCALE: ' _ a i SXN-, �vZi.�l,l G�-t , IV_ 0 t�� ✓ 59 Al w W &A. North Carojina , 4 Department of EnVITO 'ev" C-aw's Perdue Division Of Cow.ta, nment and Natjjral GOvernor 'WMNement H ""kegm) DiMM'for &� �AqRqAa 0 Date: game of prOOOM Owner Applying for Permit: � �,Iea Atoss, NMe Number.. LtLt)j yj may that I have aUthCir1ZOd (agent) ""ff. for the purpose of aPPlYing for and obtjWj terart on my ng aR CAMA pen -nits necessary to irmtaij or Onstruct t f Z•-T kmy Property located at) - --2--J lkA -T� lis certification is valid thru (date) 2- OPertY Owner Signalure Dee Fr"m an Secrelaty Deft tj,4�I K�7 7Z CERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT N° 0; as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission In an area of environmental concern pursuant to 15 NCAC Subchapter 7KK -0103 , Applicant Name (J- Phwe NUmbe q1b)2.2v1- AddrQss__ City DAY1 State V Zip C Pr jet Lvcat' n (Co nty, State Ro d, Water Bo y,11 ,� Type and Dimensions of Project The proposed project to be located and constructed as described This cerdflcation of exemption from requiring a CAMA above is hereby cerdfled as exempt from the CAMA permit valid for 90 days from the date of Issuance. Following e requirement pursuant to 15 NCAC 7K , 0 073. This exemption a re-examination of the project and project site may be to CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining other State, Federal or Local authorization. SKETCH (SCALE: I 1 gX Op - 1 I I