HomeMy WebLinkAboutOak (5);ant Name Iss CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. N� ifN �-►� ISLE' /p iti N#�/It 4V^hone Number 1.330 ` State Zip fe ct Location (County, State Road, Water Body, etc.) 100 0 �� ``� { !ll� "jam and Dimensions of Project L I!-!] it 4 li i L.U/ roposed project to be located and constructed as described This certification of exemption from requiring a CAMA pen is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following expiry vent pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece! a permit requirements does not alleviate the necessity of to continue this certification. )btaining any other State, Federal, or Local authorization. =TCH (SCALt: POP h n q J C)( M SD fti I I I UVTT (c L,11L-'" V , rrV l eW t x' � Z- t 7%--3H2q [t )T r< G C <,W V 1/, 1 s k, r jT HL 1 n ►'1't I Pt." " (& L i'11 �c�NQ i 01 7ONEice, f ►n_r . -0-_ .jam , AWhiT ►L BID FORM 0 A OAK ISLAND BEACH VILLAS ��Jy 100, 200, 1300 & 1400 BUILDINGS - ENVELOPE REPAIRS 1000 CASWELL BEACH ROAD, V601 CASWELL BEACH, NC 28465 5 pages TO: Oak Island Bach Villas Homeowners Association 1000 Caswell Beach Road, V601 Caswell Beach, NC 28465 Fax form to 910-202-5558 Contact E.B. Pannkuk @ Andrew Consulting Engineers w/ questions @ 910-202-5555 FROM: VE1&,tjYc(/C�5 fil` �Ir4 Name of Bidder Amp- I�) rA*be wac- k,6 Address of Bidder CAS cE �Al4k(E, "•e• 2�i5429 FOR: Oak Island Beach Villas 100, 200, 1300 & 1400 Building Envelope Repairs, Caswell Beach, NC The undersigned, having visited the Site as described in the Invitation to Bid and having familiarized himself with local conditions affecting the Cost of the Work and with all requirements of the Contract Documents as prepared by the Engineer and all Addenda to said documents hereby proposes to furnish all things as required by said documents of the Project for the following amounts: GENERAL CONTRACT: Base Bid 1. Buildings 100 and 200 only. 2. All repair work identified on Construction Documents. Construction Documents include: CO, Site Plan, A100, A200, AD1, AD2, AD3, AD4, ADS, AD6, AS1, AS2, AS3, AS4, ASS, S001, S101, S201, SD1, SD2, and SD3 dated 10-24-2011. 3. The base bid includes anticipated framing repairs as quantified in the unit pricing below. S)f Add/Deduct Cost per each Exterior Wood Stud Replacement performed see A/SD-1. (Contract is based on 600 individual wood stud replacements. �-4/47ri -7i:-)D Dollars Add/Deduct Cost per each Exterior Corner Replacement Detail performed see B/SD-1. (Contract is based on 40 exterior corner replacements). ,r Dollars M Add/Deduct Cost per each 16" section of Exterior Top & Bottom Plate Replacement performed see C/SD-1. The number of sections will be determined based on the number of exterior studs affected (1 stud = 16"). (Contract is based on 1,000 16" sections of top or bottom plate replaced). -i::—( 1` t Doll ars 35- Add/Deduct Cost per each Exterior Window Opening and Framing Repair Detail performed see D/SD-1. (Contract is based on 20 exterior window opening repairs). c� ��9—e l-�c�N�� �/J �q�� �1 7�i� Dollars ($) 17 /X, Add/Deduct Cost per each Exterior Door Opening Header and Framing Repair performed see E/SD-1. (Contract is based on 12 exterior door openingrepairs). I V1'� l4d6 We4 141AC- '1/ �F/qa _ Dollars Add/Deduct Cost per each 10' Door Opening Header and Framing Repair performed see F/SD-1. (Contract is based on 15, 10' door opening repair _ (tit 9L)dyje&)J �l%q!r-7 Y Dol A J J / Y1 - J .. - L ^ - - 1 - - -- - - - L - - i - _ . . - r - .. . .... Add/Deduct Cost per each Roof Truss Member Replacement performed see J/SD-1. (Contract is based on 12 roof truss member replacements). S) 9Eq 91 Gc( 7" Dollars Add/Deduct Cost per each Deck Slope performed see A/SD-1. (Contract is based on 8 deck slope repairs). a Add/Deduct Cost per each Square or Round Pile Repair performed see SD-3. (Contract Hiisr based on 1 pile repair). y)2Ey uL�WIm--6 -F=Q Dollars (�) 3 Base - Alternate #A: Replace unit exterior front doors and exterior storage doors. Dollars Base - Alternate #B: Replace unit exterior entry screen doors. Dollars Base - Alternate #C: Unit Price: Hourly rate to repair interior drywall and apply 1 coat of prime paint to damaged interior drywall. This unit rate includes all taxes, insurance, overhead and profit. elf `Y �1 q4r Dollars per man hour. Alternate Bid #1 uildings 100, 200, 1300, and 1400. 6. A air work identified on Construction Doc ents. Constr ion Documents include: CO, Se Ian, A100, A200, Al3 A1400, AD1, AD2, AD ,4, AD5, AD6, AS 1, AS2, AS S4, AS5, S001 101, S201, S1301, S1401, SD1, SD2, a SD3 ed 10-24-2011. \ 2. The base bid includes a ated framing repairs as quantified in the unit cmg be 3. All cantilevered b ony repairs (see -2) are included in Dollars Add/D uct Cost per each Exterior Wood Stud Replacement perform see A/SD-1. (Contract is based on 1,400 individual wood stud re pla ments). Dollai Add/Deduct Cost er each Exterior Corner Replacement Detail performed see B/1. (Contract is based on 100 exterior c ner replacements). S - Dollars Add/Deduct Cost per eac 16" section of Exterior To)6 & Bottom Plate Replacement performed se C/SD-1. The number f sections will be determined based on the nu ber of exterior studX affected (1 stud = 16"). (Contract is based on 2, 0 16" sectitop or bottom plate replaced). ons f Dollars Add/Deduct Cost per each Exterior W Repair Detail performed see D/SD-1 exterior window opening repairs). M Add/Deduct Cost per each b Framing Repair performed/see exterior door opening re irs). Opening and Framing 'act is based on 50 Dollars rior Door Openihq Header and E/SD-1. (Contra4 is based on 40 Dollars Add/Deduct Cost er each 10' Door Opening Header a d Framing Repair perform see F/SD-1. (Contract is based on 40, 10' door opening repair Dollars ($) A/Deduct Cost per each Roof Truss Member Replacement perNrmed see J/SD-1. (Contract is based on 20 roof truss member repla ements). Add/Deduc Cost per each Deck Slope performed see A/SD- . (Contract is based on 26 deck slope repairs). Doll, Add/Deduct Cost p r each Square or Round Pile epair performed see SD-3. (Contract 's based on 1 pile repair). Unit Price: Price to replacetp square of shingles. Alternate 1 - Alternat and exterior storage doors. Alternate 1 - doors. rs Dollars Dollars eplace unit exterior front doors Dollars #B: Replace4nit exterior entry screen Alt pate 1 - Alternate #C: Unit Price: Hourly r to to repair interior all and apply 1 coat of prime paint to damag interior drywa .This unit rate includes all taxes, insurance, overhe d and prof' . Dollars per n hour. GENERAL CONDITIONS 1. All framing repair must be approved by the engineer prior to any repairs commencing. 4. Provide and maintain safety fencing around work areas. 5. Note: GC to repair paved or gravel surfaces to preconstruction condition. GC to document condition prior to construction — to be approved by engineer. TO FURNISH PERFORMANCE AND PAYMENT BOND: Dollars MAJOR SUBCONTRACTORS/VENDORS: (List the Subcontractors and vendors you agree to use if awarded the Contract) Subcontractors: Waterproofing Moisture Barrier, Flashings, and Sealants: Waterproof Deck: Cladding and Siding: Window and Sliding Door: Framing: Roofing: Vendors: Siding: Windows / Sliding Doors: TIME OF COMPLETION: If awarded this Contract, the undersigned will: - start work within calendar days from the date of Notice To Proceed - provide a construction schedule within 14 calendar days from the date of Notice to Proceed. - complete the work within calendar days of Notice To Proceed. ADDENDUM RECEIPT: Receipt of the following Addenda to the Contract are acknowledged: (Yes/No) Addendum No. 1 Dated 41_ /f 11_1_ J If written notice of acceptance of this Bid is mailed, telefaxed, or delivered to the Undersigned within 5 days after the Bid opening date, the undersigned will, within five (5) days thereafter execute and deliver AIA Document No. A101 in accordance with the Specifications and Bid as accepted. The Undersigned hereby designates as his office to which such notice of acceptance may be mailed or delivered: Name of Bidder: W E(c')0-4 I �1W/CFS V 0'6 06k' Bidder: Individual ( ), Partnership 01 Corporation ( ) X appropriate box Bidders Address: 4CXP' fe�ELl c I'C d Partners Names if Partnership: Organized under the laws of the State of: ery S Name & Home address of the President or Principal Partner: Signed: By: —1 Title: State License N Date: Fax: Corporate Seal: End of Bid Form 5 Pages wdsweo7' J�� �uM,r�u� �o r�l. �•C 2� t> umber: V-wAIA Document A101'' - 2007 Standard Form of agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AGREEMENT made as of the 14th day of December in the year 2011 (In words, indicate day, month and year.) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added information needed for its (Name, legal status, address and other information) completion. The author may also have revised the text of the original Oak Island Beach Villas Owners Association, hic. AIA standard form An Addkbns and 1000 Caswell Beach Drive, Unit 601 Deletions Report that notes added Oak Island, NC 28465 information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this and the Contractor_ document indicator where the author (Name, legal status, address and other information) has added necessary information and where the author has added to or Velocity Services Group, Inc. deleted from the original AIA text. 406-B Madeline Trask Road Castle Hayne, NC 28429 This document has important leW..' consequences_ Consultation with L attomey is encouraged with respect for the following Project: to its completion or modification. (Name, location and detailed description) AIA Document A201 TM'-2007, General Conditions of the Contract Oak Island Beach Villas - Building 100 and 200 Renovations for Construction, is adopted in this 1000 Caswell Beach Drive document by reference. Do not use Oak Island, NC 28465 with other general conditions unless this document is modified. The Architect: (Name, legal status, address and other information) Architect — Use Engineer or Andrew Consulting Engineers 3811 Peachtree Avenue, Suite 300 Wilmington, NC 28403 Consulting Architect Johnston Architecture LLP AIA Ian A. Johnston AIA 3967 Market Street Wilmington, NC 28403 The Owner and Contractor agree as follows. TABLE OF ARTICLES 1 THE CONTRACT DOCUMENTS 2 THE WORK OF THIS CONTRACT 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION d CONTRACT SUM 5 PAYMENTS 6 DISPUTE RESOLUTION 7 TERMINATION OR SUSPENSION 8 MISCELLANEOUS PROVISIONS 9 ENUMERATION OF CONTRACT DOCUMENTS 10 INSURANCE AND BONDS ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral- An enumeration of the Contract Documents, other than a Modification, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § 3A The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date ofcommencement ifit differsfrom the date of this Agreement or, ifapplicable, state that the date will be fixed in a notice to proceed) 15 December 2011 If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner's time requirement shall be as follows: § 3.2 The Contract Time shall be measured from the date of commencement. § 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than 150 ( One Hundred Filly days from the date of commencement, or as follows: ,___ �_._ .,._ r , .. r.. ,. ,te., tn.,- to —"v hp Lw.d when coordinated with the date of Portion of Work Substantial Completion Date . subject to adjustments of this Contract Time as provided in the Contract I3ociunents. (Insertprowsioav, ifany, for liquidated damages -toting to failure to achieve Substantial Completion on time ar for bonus payments far early completion of the Work) ARTICLE 4 CONTRACT SUM § 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract. The Contract Sum shall be Six Hundred Fifty Nine Thousand, One Hundred Ninety Six Dollars ($ 659,196 ), subject to additions and deductions as provided in the Contract Documents. § 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of acceptedalternates. If the bidding orproposal documentspermit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.) § 4.3 Unit prices, if any: (Identify and state the unit price; state quantity limitations, ifany, to which the unit price will be applicable.) l 7H Units and Limitations Price Per Unit ($0.00) § 4.4 Allowances included in the Contract Sum, if any: (Identify allowance and state exclusions, ifany, from the allowance price.) Rem Price Conceal electrical & HVAC lines in the $1,800.00 underpinning ceiling at both Buildings 100 & 200. ARTICLE 5 PAYMENTS § 5.1 PROGRESS PAYMENTS § 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. § 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: § 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 20th day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the l 5th day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than twenty five (25 ) days after the Architect receives the Application for Payment. various portions of the Work The schedule of values shall be prepared in satdt form and supported by such data to s�nc�t»nriAtr its accuracy as the Architect may require. This sr••hcdulc, tmlcss objected to by the Arelriteet shall be used as a basis for reviewing the Contractor's Applications for PayruenL the § 5.1.5 Applirdtions for Payment shall Show the percentage of completion of each portion of the Work as of the end of Period covered by the Application for Payment_ c mpu Subject rift t0 other provisions of the Contract Documents, the amount of each program payment shall be computed as follows: -1 Take that portion of the Contract Sum Proper multiplying the ly allocable to completed Work as determined by Percentage completion of each portion of the Work b the um allocated to that portion of the Work in share of the Pending final determination of cost to tthe schedule of values, less retainage of ten percent (l OS° he Owner of changes in h be included as provided in Section 7.3.9 of ALA Dthe Work, amounts not in dispute sall ocument A201 rm -2pp7, General Conditions of the Contract for Construction; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved m advance by the Owner, suitably stored off the site at a location agreed upon in writing) less retainage of five percent (S %)� 3 Subtract the aggregate of previous payments made by the Owner; and .4 Subtract amounts, if any, for which the Architect has withheld nr nullified a Certificate for Payment as provided in Section 9.5 ofAIA Document A201-2007. § 5.1.7 The progress payment amount det following circumstances; ermined in accordance with Section 5.1.6 shall be further modified under the 1 Add, upon Substantial Completion of the Work, a sum full amount of the Contract sufficient to increase the total payments to the Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims; and (Section 9.8.5 ofAM Document A201-2007requires release ofappficable retainage upon Substantial Completion of Work mth consent of surety, if any} .2 Add, if final completion of the Work is thereafter materially delayed thro any additional amounts payable in accordance with Suction 9.103 of AIA ugh no fault of the Contractor, 3. Substantial Completion of the work is defined as acceptable for full rental��t A201-2007. § 5.1.8 Reduction or limitation of retainage, if any, shall be as follows: e it n intended, prior to Substantial Completion of the errh're Work, to reduce or limit the retcrinage resulhngfrom the percentages inserted in Sections 5.1.6.1 and 5.1.62 above and tins is not explained elsewhere in the Contract Documents, insert here provisionsjor such reductiovr or limitation.) § 5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. § 5.2 FINAL PAYMENT § 5.21 Final payment, constituting the entire aid Contractor when dance of the Contract Sum, shall be made by the Owner to the 1 the Contractor has fully performed the Contr Work as provided in Section 12.2.2 ofAIA Dact except for the Contractor's responsibility to correct ocument A201-2007, and to satisfy other requirements, if any, which extend beyond final payment; and .2 a final Certificate for Payment h.. ►.m : m._ ARTICLES DISPUTE RESOLUTION § 6.1 INITIAL DE03ION MAKER The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201-2007, unless the parties appoim[ below another individual, not a party to this Agreement, to serve as Initial Decision Maker. of the parties mutually agree. tnwn the name, address and adw-r contact information of the Initial Decision Maker, if other Akan the Architect) Prime Profes ioual / Project Fmgbeer E.B. Parmkuk w/ Andrew Consulting Engincers, 3811 Peachtree Avenue, State 300 Wilmington, NC 28403 § 62 BINDING DISPUTE RESOLUTION For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201 2007, the method of binding dispute resolution shall be as follows: (Check the appropriate bar. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.) [X ] Arbitration pursuant to Section 15.4 of AIA Document A201-2007 [ ] Litigation in a court of competent jurisdiction [ ] Other (Spec6) ARTICLE 7 TERMINATION OR SUSPENSION § 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201 2007. § 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201 2007. ARTICLE 8 NISCELLANEOUS PROVISIONS § 8.1 Where reference is made in this Agreement to a provision of AIA Document A201-2007 or another Contract Documment, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. § 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is dun at the rate stated below, or is the absence thereof, at the legal rate prevailing firm time to time at the place where the Project is located (T=ert rate of interest agreed upon, if any ) 1 5 %five § 8.3 The Owner's representative: (Name, address and other information) Ms. Holmes Ramey , •Tro- a S ivtr 1000 Caswell Beach Drive Unit 601 Oak Island, NC 28465 Alt 1%l �s �n'tConur� 45S at:.� Q� �s%anal- Bea Mr. Tim Price Velocity Services Group, Inc. 4o6-B Madeline TmA, Drive Castle Rayne, NC 29429 § 8.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the Other parly- § &6 Other provisions: l iquated Damages: See attached liquidated damages paragraph supplementary conditions (attached} ARTICLE 9 ENWERATION OF CONTRACT DOCUMENTS § 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are euwneratsd in the sections below. § 9.1A The Agreement is this executed AIA Document A101-2007, Standard Form of Agreement Between Owner and Contractor. § 9A.2 The General Conditions are AIA Document A201 2007, General Conditions of the Contract for Construction. § 9.1.3 The Supplementary and other Conditions of the Contract: Document Title Supplementary General Conditions Date pages 12/5/2011 I § 9.1.4 The Specifications: (Either list the Specifications here or refer to an exhibit attached to this Agreement) As listed on Sheet CO Oak Island Beach Villas Exterior Renovations dated 12/12/2011 Secuon Title Date § 9A.5 The Drawings: (Either list the Drawings here or refer to an exhibit attached to this Agreement) As listed on Sheet CO Oak Island Beach Villas Exterior Renovations dated 12/12/2011 Number Title Date § 9.1.6 The Addenda, if any: Number Date pages 1 11/9/1l 2 11/15/11 Pages Portions of Addenda relating to bidding requirements are not part of the Contract Documents melees the bidding remriremeots are also enumerated in this Article 9. Other documents, if any, listed blow. (List here arty additiovnd docrm w that arse intended to form part of the Contract Documents. A Dorwnemt A201 2007 pnaovidrs that bidding requirements such as advertisement or mwvitatiorn to bic( imtructiow roBuUm, smttple forms and the Conowtor's bid are not part of die Contract Documents unless enwnerated in this Agreemerd They Amid be listed here only if intended to be part of the Contract Dmwmnta.) ARTICLE 10 INSURANCE AND BDNDS The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201 2007. (State bonding requirements, if any, and limits of liability for insurance required in Article I ofALt Docwnent A201-2007.) Type of insurance or bond Limit of BaNky or bond amount POO) Builders Risk Insurance Not less than S2,000,000.00 per occurrence m coverage This Agreement entered into as of the day and year first written above. nc�o ka"Y"T. u�rrt� OYMER (Signature) TRACTOR (Signature) Ms. Holmes Ramaly Oak Island Beach Villas Owners Association Inc., eaiVjAg fl- Mr. Tim Price Velocity Services Group, Inc. (Printed name and title) (Printed name and title) 5/2011 Liquidated Damages Owner and Contractor recognize that time is of the essence to this Agreement and that the Owner will suffer fnar if the Work is not completed within the times specified in these Supplementary General Conditions; plus extens reto. Both parties also recognize the delays, difficulties and expense involved in proving, in a legal or arbitra seeding, the actual loss suffered by the Owner if the Work is not completed on time. Accordingly, in lieu of requl ;h proof, the Owner and Contractor agree that as liquidated damages for delay (But not as a penalty) the Contra ill pay to the Owner for each day (including without limitation holidays and weekends) in excess of the term allowec ial Completion of the Work, the Contractor shall pay to the Owner the sum of One Thousand Dollars ($1,000.00► � as liquidated damages. Final Completion Liquidated Damages will continue until the Work is finally complete. 12011 Supplementary General Conditions :11fications to the General Conditions he Supplementary General Conditions together with the General Conditions of the Contract, the Drawings, the finical Specifications, the Agreement, all Addenda, and all Modifications compose the Contract Documents, all of .h shall apply to all branches of the work with equal force. 'he following changes have been made to the contract drawings and specifications: 1) The Owner will purchase the windows and sliding doors. The Contractor will inspect and inventory the lows and sliding doors purchased by the Owner. Upon this inspection, made at the time of delivery, the Contractor opts full responsibility for care, custody and control. The Contract includes all costs for inventorying, storing, and filling Owner provided windows and sliding doors. 2) The roofing replacement work has been removed from this Contract. The current scope of work includes filling required flashings to the new roof. Contractor understands and acknowledges the owner has separately hirec ing contractor (Baker Roofing) to remove and replace the roofing system on Buildings 100 and 200 during the samE cd Contractor will be performing his work. Contractor understands he is acting as General Contractor and agrees t( 'dinate trades and timeline with Baker Roofing. 4dditional General Conditions 1) Contractor shall submit a construction schedule and schedule of values to the engineer for approval withii (2) weeks of the notice to proceed. - The construction schedule will clearly identify all construction tasks with each task scheduled complel ending more than one (1) week. All major subcontractors must sign schedule. - The schedule of values will clearly show material costs for each billable item. 2) Contractor will attend weekly meetings onsite with the property manager to discuss issues, concerns and Rly work progress. Major subcontractors actively performing work on site will be required to attend. All contractors are required to attend the weekly meeting a minimum of two (2) weeks prior to beginning work on site. 3) Contractor shall submit to the property manager bi-weekly written progress reports reflecting work progre I pertains to the completion schedule. 4) Approved work days are Monday thru Saturday from 7:00 AM to 7:00 PM. Extended work hours or work s must be approved by the Owner in writing a minimum of one (1) week prior to the requested date. Contactor shal work April 6, 7, or 8, 2012. 5) Weather delays must be requested in writing to the property manager at the 1st of each month. Weather Sys will only be considered if the number of weather days in a given month exceeds the historical monthly average I ;well Beach, NC. 6) Change orders. A change in the construction from the contract documents will not be permitted unless a nge order has been evaluated by the engineer and approved by the Owner in writing prior to ordering material or forming work. 7) Decorum on site. No alcoholic beverages, or drugs (unless prescribed by a physician) are permitted on s loud music is permitted on site. The following is not permitted on site: indecent language or improper dress. 8) Restroom facilities to be provided by contractor. Please ensure that the portalets are serviced on a routir is while on site 9) Parking will be designated by the Owner. 10) Contractor is to maintain a record drawing on site that shows any structural repair made to the plans in i 11) The Contractor is solely responsible for safety on the construction site. 12) Contractor to pay for all building permits.