Loading...
HomeMy WebLinkAboutMoorings (2)Ir licant Name Tress . CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursua t to 15 NCAC Subchapter 7K .0203. �r ✓ eoli H,i S h014 �4iAet'n! Phone Number State /VC Zip _�A ect Location (County, State R d, Water Body, etc.) 3 C a ,� K/in+%< r��Jhl f (r�ti�- / e andPimensions of Project gea1i✓- e"ep � i/?-tti `., 71e-*? Ahe-1 e f , * , ,- - - 1 1 - - - !-.0 S 4 ! r 1,1i a " /,. T- — l 4'Al Z f, -, /its l i /.i proposed project to be located and constructed as described ie is hereby certified as exempt from the CAMA permit re- )ment pursuant to 15 NCAC 7K .0203. This exemption to 1A permit requirements does not alleviate the necessity of obtaining any other State, Federal, or Local authorization. This certification of exemption from requiring a CAMA pE valid for 90 days from the date of issuance. Following exp a re-examination of the project and project site may be nec to continue this certification. ETCH (SCALE: T S "re rP r�jl� .4 THE MOORINGS Causeway Drive F� Wtsville Bch. NC. MAY 01 2012 Proposal/ Contract � r i �, 3 �.�,•i9cJ 910-z�/-Q53?9 cl 3-5- n Wi1.IJ11NGI'014, NC . t2 1. Parties and Date: This Contract is made and entered into on 03-05-12, by The Moorings HOA whose address is 352 Causeway Drive hereafter referred to as "Owner", and Connaway Marine Construction,. whose address is 1541 Kings :Landing Rd., hereafter referred to as " Contractor". 2. Consideration: In consideration of the mutual premises and covenants contained in this contract, the parties agree to abide by all of the terms in this contract. 3. Work to be performed: Removal of walkway in a manner to save any and all materials that could be reused for the replacement of the walkway after completion of anchors and new concrete cap. Material will be then stored on site in a staging area for construction agreed to by the owners. After walkway has been removed, we expect to see The old bulkhead and where the old tie back rods have failed. Removal of the old concrete cap at this time will be necessary to free up the top of the concrete sheets. We will be able to utilize this material for backfill after anchors and new cap are installed and wall has been straightened. It's obvious to both engineers that visited the sight, the cap has failed therefore needing replacement. Normally, this is where the old bulkhead would have had a tie back system attached supporting the sheet pile. Excavation of materials behind the concrete wall including any of the old bulkhead pressure. We will install anew 8x8x16' or 8xl2xl2' whaler system that will be put against the existing concrete with the new tieback cable or rod that will attach to the outside of the new whaler. The spacing and depth of the new anchors will be determined by the soil conditions and amount of tonnage bearing to support the concrete wall to be determined by the engineer. Engineering will be provided by Jeff Troutman of Crisner, Troutman and Tanner Engineering Firm. I've also met on site with David Turkletaub who is also a structural engineer who was under the impression that the wall is a complete failure and needs to be replaced. I have used the Crisner, Troutman Firm for numerous projects in the past, and am confident that their solution will be appropriate in this situation. The engineering fees for their services will constitute a separate contract with the HOA as well as the installation of the irrigation, plumbing, and all electrical wiring. Connaway Marine will be abler to remove these services but the installation should be done by whomever is currently keeping these in service. The recommendations by Crisner, Troutman will be included and incorporated as part of this contract and installation will proceed as suggested by the engineering firm. Once pressure is applied to the whalers and the installation of the anchors is complete, we will record our tonnage values and photograph them for your records and the engineering firm. After the wall is straightened to the best of our ability and the new whaler system is installed we will form and pour a new concrete cap as designed by Troutman Engineering. If the engineering firm feels that it is necessary to add tiebacks to the new cap these will be installed at this time. Once the new cap has been poured in place, we will give it a few days to cure, then mirafi fabric which is a roadbed cloth that is applied between the concrete and backfill. Starting with the concrete and large stone, we will begin installation of backfill and compact fill dirt until the proper elevation is reached. After backfill your electrical plumbing and the other contractors may at this OME: DescHlrrioN TYPICAL BULKHEAD SECTION IE MOORINGS BULKHEAD ANCHOR REPAIR , EASTERN HALF AND EAST SIDE OF EXISTING ALL C R E S E TROUTM DESIGN: CHECK: JOB NO: SHEET: T Q N N E )4.17.12 JRT JRT 6853 1 1 ^ OF CA ;2pQ`f�FESSI0%. iy9i' k4\ SEAL 22567 ` , �Troutmip te:allnedy2ysiO4.1 1 Jeffrey 0R. Troutman,PEv �Bte: 2012.04.17 15:47:16-04'00' -NivC — SIG- Ds G ° 1`ww 4�G10 PSi conic cecJ p w/ IM4pi& p*t Ar2D177& NIL xt2 D�•o � 4l A( --- rL1l - B IEt-6D +. 5,41�• V 4 A 6S J ET�i� 6 WISP, _ MvaL jf- & •° a , a �` /��� � �, q. c� �s�t A►°t3 P�7 f l( OR *8 DYW ID e,- T tS&x0 Vt I Co4T 4cTN StIAU•- 1�m1, PA',, A .D. cAt t1 wl R..4n � -. r __.- n�- I 8< &4rAOcaog4� 4!d v-