Loading...
HomeMy WebLinkAboutCarolina (5)CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203. ant Name Of (Gt1O 11��,�G+Lj- C/U `�e f % r Phone Number ss ! lr State C Zip ,t Location (gounty, Statp Road, Water Body, etc.) 4imensions of proposed project to be located and constructed as described This certification of exemption from requiring a CAMA F ve is hereby certified as exempt from the CAMA permit re valid for 90 days from the date of issuance. Following exI ement pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be ne A permit requirements does not alleviate the necessity of to continue this certification. r obtaining any other State, Federal, or Local authorization. KETCH (SCALE: /-/L5 t.. //4-7 e4 1 F ylylr-Y, 74�` X0 *7-7 (? -7-�4 -�14IZ3. O �1 Applicant Name Address city --- Q Proiect Location Type CERTIFICATION OF EXEMPTION FROM REQUIRING A CAMA PERMIT as authorized by the State of North Carolina, Department of Environment, Health, and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0/03. 8,044 J rt#)o ff4- AP. A Phone Number 482lIf / Of Water Body, etc.) The proposed projectto be located and constructed as described above is hereby certified as exempt from the CAMA permit re- quirement pursuant to 15 NCAC 7K .02o/ This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other Stag, Federal, or Local authorization. State Zip This certification of exemption from requiring a CAMA permit valid for 90 da s from the date of issuance_ Following expiratic a re-examination of the project and project site may be necessa to continue this certification. SKETCH {SCALE: 1VT S s,,Robb L Mairs, Robb L Friday, December 16, 2011 1:58 PM Rynas, Stephen act: RE: FEMA-DR-4019, PW#228, Town of Carolina Beach ien, )roposed projects would be considered as maintenance and repair NOT requiring a CAMA Permit. ks and hope you have a nice weekend, n: Rynas, Stephen n Wednesday, December 14, 2011 4:44 PM Mairs, Robb L ject: FW: FEMA-DR-4019, PW#228, Town of Carolina Beach se review the attached Hurricane Irene FEMA project and advise me as to whether the proposed project would ;idered repair/maintenance NOT requiring a CAMA permit or would otherwise require a CAMA permit. se keep the subject line "FW: FEMA-DR-4019, PW#228, Town of Carolina Beach" intact in your reply, since it se ie tracking mechanism. I then forward your response to Sara Sanders. iks. m: Sanders, Sara jmaiIto: Sara. Sanders(Wenihs.4ov1 t: Wednesday, December 14, 2011 4:21 PM Rynas, Stephen iject: FEMA-DR-4019, PW#228, Town of Carolina Beach )hen ached, please find a cover letter requesting your comments on FEMA project worksheet #228, Town of Carolina ch. To assist in your review, I have also attached the project worksheet. )u have any questions, please call me at 571-208-8645. ink you, a Sanders 41 fi k W 110 &Au-f �E. -i kak-t�L& ro - iiD tZKi 0 -5e;<ua4 of JF(Aco 1" RAAa C06=Afir IMAO. PECEINED FEB 2 3 2012 DCM WILMINGTON, IS 41,7 LI 1 Oice ow -� � Wee c, 04 oce-Atl . RE EjVED FEB 2 3 2012 ®OM WILMINGTON, N, Ur