HomeMy WebLinkAbout74828D - GaskinsCAMA /-< DREDGE & FILL NO. 74828 A B
I,ENERAL PERMIT Previous permit# >c
New '—Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued
ized by the State of North Carolina, Department of Environmental Quality
oastal Resources Commission in an area of environmental concern pursuant to 15A NCAC
❑ Rules attached.
Name � b N P'T f,4 kN x�r :Yt NN t F-& e � llL(N,, Project Location: County f.0 0
04 S. �� ► ✓� Street Address/ State Road/ Lot #(s)
N rta I c 11 State tJ C--ZI P 27 i ' 4 6 7 C u u
n_1_0 � 31 " '� $ E-Mail Subdivision
ad Agent N / 0 City ✓ cc, ] ZIP
CW ?MW
OPTA XES ❑ PTS
C OEA ❑ HHF
❑ IH ❑ URA ❑ N/A
PWS:
ees no PNA
yes no
Project/ Activity
S4 a -t/kJ
k) length
tform(s)
igth
nber ^^��
11prap length
distance offshore . G
t distance offshore •1
an 1
is yards
P
17 x !i
ozing
Length + (40 Z
not sure yes no
im: n/a yes
yes
ttached: efeg
ig permit may be required by: K-- bt �
.ocal Planning jurisdiction)
-T
Phone # ( ) River BasinW-C�y
Adj. Wtr. Body 47 aM k-,; G U LA nat /n
Closest Maj. Wtr. Body iD � h ( C- - L)N n
ri
rr
(Scale:
❑ See note on back regarding River Basin
kX�►.t � I�- �. r�aa ►n �� � � caw ��S
I
>� e M �� ` New goc4v I c �E
to ` E,cs�,evi
t
�la� �4—
I
5.,
(c 2 t
251c
New seaJ/ dc,a + 2 JP/L
of ft�4 to l
K 12 7 Po( 1,1P
wcAkwca-i -fin 6-v,+0-4- aptJ wend dock. '
)�dktAtk
�oza
-RoK�
I&."So��
From: Dail, Jason
Sent: Wednesday, July 8, 2020 9:03 AM
To: jennifer gaskins
Cc: Jonathan
Subject: RE: [External] 1402 Carolina Blvd - CAMA Pier & Minor Permits
Thank you
A couple of things.
-Please complete section 2 on the minor permit application package (Coastal Shoreline AEC impervious
coverage question).
-Please provide a check in the amt of $100, payable to NCDEQ to cover permitting cost for the CAMA
minor permit.
-Please include the amount of impervious coverage proposed within the 75' Area of Environmental
Concern (AEC). This is the area within 75' of the normal high water line, which in this case is the outer
edge of the bulkhead.
-based on google satellite imagery, it shows the western side of the existing residence a distance of
approximately 20'-22' from the normal high water line. Please be advised if the existing home is
demolished, you will be required to meet the 30' buffer requirements (i.e. 30' back from the bulkhead).
Please be sure to address this in your application package.
On the general permit side, please include an "initialed" waiver from the Town of Topsail Beach allowing
for the installation of the proposed boat lift, as it appears to encroach into the setback. Ms. Linda
checked the box, but did not initial the waiver section. This is required if Im to permit an encroaching
structure.
Please submit a check payable to NCDEQ in the amt. of $600 to cover the cost of the bulkhead and
proposed pier/dock.
Take care,
Jason
Jason Dail
Field Representative
NC Department of Environmental Quality
NC Division of Coastal Management
127 Cardinal Drive Ext.
----•-••-•-••........-•--
Records law and may be disclosed to third parties.
-----Original Message -----
From: jennifer gaskins [mailto:jwgaskins@gmail:com]
Sent: Tuesday, July 7, 202011:49 AM
To: Dail, Jason <jason,dai1cdenr,gov>
Cc: Jonathan <j0gaski11s66@&mai1:c9m>
Subject: [External] 1402 Carolina Blvd - CAMA Pier & Minor Permits
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious
email as an attachment to report.Spam@nc.gov<mai Ito: report.spam@nc.gov>
Jason,
I hope you are doing well! We are working on a project to raise our beach cottage at 1402 Carolina Blvd,
Topsail Beach. You have already visited the site with Hugh Barnes a month or so ago. Also, Greg Martin
will be reaching out to you as well about the seawall.
We are staying at the cottage and can meet you to discuss any questions you might have. Attached are
the completed applications.
Let me know if you have any questions.
Thanks,
Jennifer
919-631-0873
--------------------
Jonathan
919-631-5078
DIRECTIONS FOR OBTAINING A CAMA GENERAL
PERMIT for a PIER, DOCK, BOATHOUSE/LIFT
To obtain authorization to construct a pier, you must submit the following items to your
CAMA Pen -nit Officer:
1. Signatures of no objection to the pier, from both adjacent riparian property
owners.
Fill out the attached forms, complete with drawing of the proposed
pier, and have your neighbors sign and date in the appropriate place.
If hand -delivering use the form that states such.
Q' If your neighbor will not sign the form, or lives out of town, you may
send the CERTIFIED MAIL /RETURN RECIEPT form, and 10 days
after the date of receipt (which is listed on the green cards returned to
you by the Post Office) the permit can be issued, even if no response
has been received.
If any part of the proposed pier is located within 15 feet of the
Riparian Access Corridor line, the applicable neighbor must check
AND initial the box to waive the 15 feet setback requirement. A
signed form, without this box checked, does not constitute a waiver.
The Riparian Access Corridor is not the extension of property lines
out into the water. It is established by two imaginary lines that extend
at a 90' angle from the channel of the waterbody to the highground
property corners. Your Local Permit Officer can --help you in
detennining your Riparian Access Corridor. In some cases, a survey
may be required.
2. Drawings of the proposed pier:
Your drawing must include the following information (see attached examples):
Your name and project address
Names of adjacent property owners
CO, Width of property and name of the waterbody
col Dimensions of the proposed structure, including distance to the
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
,3ouaAc&n-0,.GgsKI#'J'
Name of Property Owner Requesting Permit: w, Pas ICI N S
Mailing Address: 40y S , ird Sd-
MA ulIUC Z?S77
Phone Number: A 15 631 5'y'7k
Email Address: �I JAa� ]Cifv� t �P-
I certify that I have authorized
If I
eTr&q4-U-,F4
gent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: New Se &wcx � �
boa-I�1+
at my property located at I q O 2 am I t Nu lk�) u� j
110
in �" k ft County.
/ furthermore certify that / am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
11 Signature
c )6t� tuV. Q 5IC I�
Print or Type Name
Own,"
Title
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to An ii , .an d-�ni�A Gastfir6 's
property located at
l n � 3U J (Name of Property Owner)
� �O o�C Q �llJc:
on �a nk s �� (Address, Lot, Block, R ad, etc.)
tam n.D. , in , N.C.
(Waterbody) (City/Town and/or(County)
The applicant has described to me, as shown below, the development proposed at the above location
I have no objection to this proposal. /JA,-,-uc�-f�%� t
i have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(Individual proposing development must fill in description below or attach a site drawing)
a s t (,CLW i'�9
Boo-+ 1 r+-'T
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back
minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waiv,
the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
44/
1 do not wish to waive the 15' setback requirement.
(Property Owner Info mation) (Adjacent Property Owner Information)
11�-Ox
Si fur nn
c ya , V-�S Ic1�+) SigrXr!
Print or Type Name Print or Type"Nalne
��I V2 ('s�ral�..ic �� u�! 3�I frv�,l At.,P►-D
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
Name of Property Owner: p ti /
Address of Property: S_and AcceS �t q JrriAAge - uo( icl i I - �k t0"
(Lot or Street #, Street or Road; City & County)
Agent's Name g4Ai&,�C22v�Mailing Address: �Agent's phone--f�-ag---Pq-4-1 'P
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing the development
they are proposing A description or drawing with dimensions must be provided with this letter.
v VprI have no objections to this proposal. I have objections to this proposal.
Ifyou have objections to what is being proposed, you must notify the Division of Coastal Management (DCM) in
writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext.,
Wilmington, NC, 28405-3845. DCM representatives can also be contacted at (910) 796-7215. No response is
considered the same as no objection if you have been notified by Certified Mall
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
�l I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner Information)
SiOalure
1"xn 1 )- (Q S
Print or Type Name
(Adjacent Property Owner Information)
Si /n t ure l !�- W�� / l �4
Print or Type Name
q0 )
Mailing Address
ozs-4-n4"
Mailing Address
SECTION .1200—GENERAL PERMIT FOR CONSTRUCTION OF PIERS AND DOCKING FACILITIES: IN
ESTUARINE AND PUBLIC TRUST WATERS AND OCEAN HAZARD AREAS
15A NCAC 07H .1201 PURPOSE
A permit under this Section shall allow the construction of new piers and docking facilities (including pile supported -or
floating) in the estuarine and public trust waters AECs and construction of new piers and docks within coastal wetlands
AECs according to the authority provided in Subchapter 07J A 100 and according to the Rules in this Section. This
permit shall not apply to oceanfront shorelines or to waters and shorelines adjacent to the Ocean Hazard AEC with the
exception of those shorelines that feature characteristics of the Estuarine Shoreline AEC. Such features include the
presence of wetland vegetation, lower wave energy, and lower erosion rates than the adjacent Ocean Erodible Area.
History Note: Authority G.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff' March 1, 1984;
Amended Eff. July 1, 2009; April 1, 2003,
15A NCAC 07H .1202 APPROVAL PROCEDURES
(a) An applicant for a General Permit under this Subchapter shall contact the Division of Coastal Management and
request approval for development. The applicant shall provide information on site location, dimensions of the project
area, and his name and address.
(b) The applicant shall provide:
(1) confirmation that a written statement has been obtained signed by the adjacent riparian property
owners indicating that they have no objections to the proposed work; or
(2) confirmation that the adjacent riparian property owners have been notified by certified mail of the
proposed work. The notice shall instruct adjacent property owners to provide any comments on the
proposed development in writing for consideration by permitting officials to the Division of Coastal
Management within 10 days of receipt of the notice, and, indicate that no response will be interpreted
as no objection. DCM staff shall review all comments and determine, based on their relevance to the
potential impacts of the proposed project, if the proposed project can be approved by a General Permit.
If DCM staff finds that the comments are worthy of more in-depth review, DCM shall notify the
applicant that he must submit an application for a major development permit.
(c) No work shall begin until an on -site meeting is held with the applicant and a Division of Coastal Management
representative to review the proposed development. Written authorization to proceed with the proposed development
shall be issued if the Division representative finds that the application meets all the requirements of this Subchapter.
Construction shall be completed within 120 days of the issuance of the general authorization or the authorization shall
expire and it shall be necessary to re-examine the proposed development to determine if the general authorization may be
reissued.
(d) Any modification or addition to the authorized project shall require prior approval from the Division of Coastal
Management.
History Note: Authority C.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Ef. . March 1, 1984;
Amended Eff.' October 1, 2007; August 1, 1998; January 1, 1990.
15A NCAC 07H .1203 PERMIT FEE
The applicant shall pay a permit fee of two hundred dollars ($200.00) by check or money order payable to the
Department.
History Note: Authority G.S. 113A-107; 113A-113(b); 113A-118.1; 113A-119; 113-119.1; 113A-124;
Ef. .. March 1, 1984;
Amended E, . September 1, 2006; August 1, 2000; March 1, 1991..
15A NCAC 07H .1204 GENERAL CONDITIONS
t. N W.— .,..a t L: , , ir.:I:t:— k., th...e.....I ..a..,,:t .at F th :n t6:. Q—t;. A.11 6. F . th.. nvnl.. 4— . ....4'
(c) There shall be no interference with navigation or use of the waters by the public by the existence of piers and
docking facilities.
(d) The permit set forth in this Section shall not be applicable to proposed construction where the Department
determines that the proposed activity will endanger adjoining properties or significantly affect historic, cultural, scenic,
conservation or recreation values, identified in G.S. 113A-102 and G.S. 113A-113(b)(4).
(e) The permit set forth in this Section does not eliminate the need to obtain any other required state, local, or federal
authorization.
(f) Development carried out under the permit set forth in this Section shall be consistent with all local requirements,
AEC Guidelines, and local land use plans current at the time of authorization.
History Note: AuthorityG.S. 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended Eff. May 1, 1990;
RRC Objection due to ambiguity Eff. May 19, 1994;
Amended Eff. August 1, 2014; July 1, 2009; August 1, 1998; July 1, 1994.
15A NCAC 07H .1205 SPECIFIC CONDITIONS
(a) Piers and docking facilities may extend or be located up to a maximum of 400 feet waterward from the normal high
water line or the normal water level, whichever is applicable.
(b) Piers and docking facilities shall not extend beyond the established pier length along the same shoreline for similar
use. This restriction shall not apply to piers and docking facilities 100 feet or less in length unless necessary to avoid
interference with navigation or other uses of the waters by the public such as blocking established navigation routes or
interfering with access to adjoining properties as determined by the Division of Coastal Management. The length of piers
and docking facilities shall be measured from the waterward edge of any wetlands that border the water body.
(c) Piers and docking facilities longer than 200 feet shall be permitted only if the proposed length gives access to deeper
water at a rate of at least one foot at each 100 foot increment of pier length longer than 200 feet, or if the additional
length is necessary to span some obstruction to navigation. Measurements to determine pier and docking -facility lengths
shall be made from the waterward edge of any coastal wetland vegetation that borders the water body.
(d) Piers shall be no wider than six feet and shall be elevated at least three feet above any coastal wetland substrate as
measured from the bottom of the decking.
(e) The total square footage of shaded impact for docks and mooring facilities (excluding the pier) allowed shall be 8
square feet per linear foot of shoreline with a maximum of 800 square feet. In calculating the shaded impact, uncovered
open water slips shall not be counted in the total.
(f) The maximum size of any individual component of the docking facility authorized by this General Permit shall not
exceed 400 square feet.
(g) Docking facilities shall not be constructed in a designated Primary Nursery Area with less than two feet of water at
normal low water level or normal water level under the general permit set forth in this Section without prior approval
from the Division of Marine Fisheries or the Wildlife Resources Commission.
(h) Piers and docking facilities located over shellfish beds or submerged aquatic vegetation (as defined by the Marine
Fisheries Commission) may be constructed without prior consultation from the Division of Marine Fisheries or the
Wildlife Resources Commission if the following two conditions are met:
(1) Water depth at the docking facility location is equal to or greater than two feet of water at normal low
water level or normal water level; and
(2) The pier and docking facility is located to minimize the area of submerged aquatic vegetation or
shellfish beds under the structure as detennined by the Division of Coastal Management.
(i) Floating piers and floating docking facilities located in Primary Nursery Areas, over shellfish beds, or over
submerged aquatic vegetation shall be allowed if the water depth between the bottom of the proposed structure and the
substrate is at least 18 inches at normal low water level or normal water level.
0) Docking facilities shall have no more than six feet of any dimension extending over coastal wetlands and shall be
elevated at least three feet above any coastal wetland substrate as measured from the bottom of the decking.
(k) The width requirements established in Paragraph (d) of this Rule shall not apply to pier structures in existence on or
before July 1, 2001 when structural modifications are needed to prevent or minimize storm damage. In these cases,
pilings and cross bracing may be used to provide structural support as long as they do not extend more than of two feet
(t) The diagram shown below illustrates various shoreline configurations:
t r r' �Iy�yl
rXAMPIFs
RIPARIAN ACCESS ARIAS
PHCIIECT AREA
°•> LUGF OF CIIANNH Olt
°.yi y • . t 3� of
rtcti +:. i DELI 1VATFR
PROPERTY IINF
RIPAEIAN LIMIT
MEAN IIIGII WATI It
M' WATER
(u) Shared piers or docking facilities shall be allowed and encouraged provided that in addition to complying with
(a) through (t) of this Rule the following shall also apply:
(1) The shared pier or docking facility shall be confined to two adjacent riparian property owners and the
landward point of origination of the structure shall overlap the shared property line.
(2) Shared piers and docking facilities shall be designed to provide docking space for no more than four
boats.
(3) The total square footage of shaded impact for docks and mooring facilities shall be calculated using (e)
of this Rule and in addition shall allow for combined shoreline of both properties.
(4) The property owners of the shared pier shall not be required to obtain a 15-foot waiver from each other
as described in subparagraph (q) of this rule as is applies to the shared riparian line for any work
associated with the shared pier, provided that the title owners of both properties have executed a shared
pier agreement that has become a part of the permit file.
(5) The construction of a second access pier or docking facility not associated with the shared pier shall
not be authorized under the general permit set forth in this Section.
History Note: Authority G.S 113A-107(a); 113A-107(b); 113A-113(b); 113A-118.1; 113A-124;
Eff. March 1, 1984;
Amended F.ff neremher I 1091 • A,fnv I 1901)• A.fnrrh I 1001)
May 31, 2020
Land Owner
Jennifer and Jonathan Gaskins
404 S. 3rd St, Smithfield NC 27577
919-631-5078 Jonathan's cell
919-631-0873 Jennifer's
idgaskins66@gmail.com Jonathan's email
6wgaskins@gmail.com Jennifer's email
Location of Project
1402 Carolina Blvd
Topsail Beach, NC 28445
Description of Proiect
1. Seawall
a. Current wooden seawall is deteriorating and needs replacing
b. New seawall will be vinyl
c. New seawall will extend 1-2 feet
2. Boat lift
a. Add boatlift adjacent to floating dock on side of adjacent property owner # 1.
Approximately 10 x 12 feet
b. Based on riparian access corridor line, the boat lift will not infringe on the 15 ft
setback
Size of Lot/Parcel
Parcel #: 42029386520000
7,137 sq ft
Name of Adjacent Property Owner # 1
Bramco Partners
3311 Avon Rd
Durham, NC 27707
Adjacent Property Address # 1
,ja, V-5 Ckann12A u Uhani
N qW I m ark,
r
G,nl< S Ciwlrvel
Name o/ Permit Hoider
Check
Same
- - _
Southern Bank
Same _
USAA Federal Savings Bank
Gilbert Morton
BB&T
Cynthia Vogler
BB&T
Michael D Biggers
BB&T
Rodney Whitaker
BB&T _
John Rankin
BB&T
Phillip Jurney
BB&T
Robert Noble IV
BB&T
William Burton
BB&T
15878 $ 200.00 GP #76581 D
_.
4625 $ 600.00 GP #74828D
13941 $ 200.00 GP #76192D
--
13939 $ 200.00 GP #76191 D
13936 $ 200.00_ GP #76568D
_
_ 13942 $ 200.00 GP#76571D _-
13943 $ 200.00 GP #76572D
13940 $ 200.00 'GP#76570D
_
13937 $ 600.00 GP#76569D
13937 $ 400.00 GP #761900
Columns
JD rct.
CERTIFIED MAIL • RETURN RECEIPT REQUESTED
DIVISION OF COASTAL MANAGEMENT
ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM
Name of Property Owner:
Address of Property: C-U `y I i ri- ,
i
(Lot or Street #, Street or Road, tity & ounty)
Agent's Name #: Mailing Address:
Agent's phone #:
I hereby certify that I own property adjacent to the above referenced property. The individual
applying for this permit has described to me as shown on the attached drawing_the development
they are proposing. A description or drawing with dimensions must be provided with this letter.
r"4fgI have no objections to this proposal. _ I have objections to this proposal.
If you have objections to what is being proposed, you must notify the Division of Coastal Management (DCM) in
writing within 10 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext.,
Wilmington, NC, 28405.3845. DCM representatives can also be contacted at (910) 796-7215. No response is
considered the same as no objection if you have been notified by Certified Mail.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, breakwater, boathouse, lift, or groin must be set
back a minimum distance of 15' from my area of riparian access unless waived by me. (If you
wish to waive the setback, you must initial the appropriate blank below.)
I do wish to waive the 15' setback requirement.
�I do not wish to waive the 15' setback requirement.
;,(Property Owner Information)
�rult�rle'
Print or Type Name
(Adjacent Property,Owner Information)
Si nature
Print or Type Name
V4
Lk) q S', Ti I/-i S�
Mailing Address
33 t % /�V n,•., /P—O A—D
Mailing Address
AIWV axMSG
AIL
! I
i—3'��at��d�pth@ Mlan1
Ivx2o
20" i Zo'
d
I I
� 15�
! MA'S H
�o'