HomeMy WebLinkAboutSeapath (2)v
CERTIFICATION OF EXEMPTION
_Y FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .0203.
cant Name G n y o✓/GV/� f ��� Phone Number
�ss
State Zip
t Locati (County, State Roa , Water Body, etc.) 2
Q n ✓)_ .y_t� _
d Dimensions of Project
/? . /2 t�
)roposed project to be located and constructed as described This certification of exemption from requiring a CAMA Pei
e is hereby certified as exempt from the CAMA permit re- valid for 90 days from the date of issuance. Following exph
ment pursuant to 15 NCAC 7K .0203. This exemption to a re-examination of the project and project site may be nece
A permit requirements does not alleviate the necessity of to continue this certification.
obtaining any other State, Federal, or Local authorization.
�y 46- 113Xl /D3 S 6
ETCH (SCALE. � K
le- ecti✓tc
Z!J / 7 ,
��! ®sr-rr T �i✓rrl yfs /,/r /%r /�lG'G G�
I
SEAPATH TOWERS
WRIGHTSVILLE BEACH, NC
BULKHEAD CAP REPAIR
REFUCE
to SMPE
A� 1
�. RoAOY y
Go13C4%E7 4
EXfos6
ReabRS
,6me Tt e t
u
Cp
DUDEK CONSULTING, P.C.
P.O. BOX 2882
WILMINGTON, NC 28402
(910) 762-1515
IL
�f 1� 6
��3
0-
REPAIR RECOMMENDATIONS
118H111
PAGE t't OF 24
SEAPATH TOWERS
WRIGHTSVILLE BEACH, NC
BULKHEAD CAP REPAIR
LN ENpi.
c fkkcl«w �
eop
G outs,;T I I Y
S PAl.t.e46% w° t
�s l TIP -
Li
AOST
food4D
De ZGP,i10
DUDEK CONSULTING, P.C. EXISTING DETERIORATION
P.O. BOX 2882 118Hi11
WILMING 7062-1 NC28402 PAGE f 1 OF Z4
DUDEK CONSULTING, P.C.
December 12, 2011
SEAPATH TOWER
322 Causeway Drive
Wrightsville Beach. NC 28480
Ph: 256-2080
Mr. David Foster MB: 604-0034
seapathinc@bellsouth.net
RE: Structural Engineering Assistance
Structural Evaluation and Recommendations for
Seawall Bulkhead Cap Repair at Seapath Towers
322 Causeway Drive
Wrightsville Beach, NC 28480
DC Project No.: 118H111
Mr. Foster:
PO BOX 2882
WILMINGTON, NC 28402
PHONE (910) 762-1515
FAX (910) 762-5850
FIRM LICENSE C-1489
RECEIVED
JUL 0 9 2012
DCM 'WILMINGTON. NC
At your request, Dudek Consulting, P.C. (DC) visited Seapath Towers at 322 Causeway
Drive, Wrightsville Beach, NC on December 6. 2011 to evaluate the concerns for the
deterioration of the bulkhead seawall concrete cap. The bulkhead was installed in 1982 as
a replacement project and faces Motts Channel to the southeast. Drawings for the
replacement project were available. See the attachments.
This evaluation is per the North Carolina State Building Code: Building Code, 2006 IBC with
North Carolina Amendments, 2009 Edition (NCBC) as the current building code and as a
guide for structural acceptance. No design calculations were required. No testing of
materials was performed. Information provided and reported by others is accepted as
truthful. The bulkhead and seawall cap are currently located in the 133-mph, exposure C
wind zone, as extrapolated, per the NCBC and ASCE 7-05 with no topographic site effects.
As seen during the visit, the bulkhead is concrete sheetpiling 8"x3'-0" capped with a
reinforced concrete cap 18" deep by 20" wide. Over the years, the concrete cap has
cracked laterally across the top of the cap near the sheetpiling joints and is rusting and
spalling on the cap face overlooking the channel. There are cracks at the corner tops. The
spalling appears to be associated with the rust expansion corrosion of the lowest rebar in
the cap on the channel side.
DUDEK CONSULTING, P.C.
PO BOX 2882
WILMINGTON, NC 28402
PHONE (910) 762-1515
FAX (910) 762-5850
FIRM LICENSE C-1489
3. With more than 25% loss of area, the repair is to include replacement of the tieback with
equivalent stainless steel material.
4. After the completion of all repairs to the tiebacks, the area grading and landscaping is to
be restored to an owner's acceptable.
It is the DC conclusion that the recommended repairs to the seawall concrete cap as Phase
1 and Phase 2 can provide an acceptable short term cosmetic restoration and a long term
structural repair for the stability of the bulkhead. With the above recommendations, the
repairs to the seawall concrete cap and the bulkhead will be structural acceptable for use
and occupancy and in compliance with the intent of NCBC requirements.
Dudek Consulting, P.C. appreciates the opportunity to be of assistance to you with the above
evaluation. Please contact us if you have any questions of need additional assistance.
Sincerely yours,
DUDEK CONSULTING, PC
Robert A. Dudek, P.E.
Structural Engineer
NC Registration No. 13202
Supporting Documents: Pages 24 of 24.
t f
(SEAL)
tlAY-15-2012 08:58A FROM: T0:2562094 P.212
`III' CERTIFICATE OF LIABILITY INSURANCE DATE (MM72/16/20:
�
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POL
9ELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHOF
tEPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the Dollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subio
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights
certificate holder In lieu of such endorsement(s).
PRODUCER C N AC
Insurance Management Consultants, Inc. PHONE (704) 799-1600 A 004)799-295t
P.O. Box 4177 E4AAIL
558 Williamson Road OSURER AFFORDINGCOVEPAGE Iff
Mooresville NC 28117 e18LWA1.8. SpecialtySpecillilty Inaursnco 2959
INSURED
i
Dudek Consulting, PC IN6
P. 0. Box 2802
(Wilmington NC 29402 _ 1I43MRP
COVERAfIFS CFRTIFK_ATF NIIUAV0CT.1n1 17175D2777 oevle�nAi uI IAAnen,
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PI
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT MATH RESPECT TO WHICI
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TI
EXCLUSIONS AND CONDITIONS OF SUCH POLICES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
SIR
IBM
TYPE OF INSURANCE
AD SUGN
POLICYNUMBER
M fPOLIOE
)
LIMITS
BIEt/ERAL UABILITY
COIIMERGi/4 GENERA, UABRITY
CLAIMS -MADE OCCUR
J
l
!
EACH NCE
f
I DAMAGE SS o ews
j
MED ERP ono oenon
f
PERSONAL i AOV IKAMY
f
GENERAL AGGREGATE
f
GENL AGGREGATE LIMIT APPLIES PER
POLICY PRO- LOC
PRODUCTS - COMPAW AGG
f
f
AUTOMOBILE
LIABILITY
ANY AUTO
ALL OWNED SCHEDULED
AUTOS AUTOS
HIRED AUTOS �D
COMBINED
-6��.
BODILY INJURY (Per pown)
f
BODILY INJURY (Pa erddslM)
f
,Por D
f
f
UMBRELLA LIAR
EItCESS LIAS
OCCUR
CLAIMS -MADE
EACH OCCURRENCE
f
AGGREGATE
f
DI R£T NTION Sf
WORKERS COMPENSATION
AND EMPLOYERS LIABILITY Y 1 M
ANY PROPRIETORIPARTNERIFXECUTNE a
MMB
OFFICEREER EXCLUDED?
Mendeuary In NMI
Ir yes des rbe under
JE SC RIPTION OF OPERATIONS bow
MIA
I
rATU- OTµ
EL. EACH ACCIDENT
f
E L DISEASE - EA EMPLOYE1
•-
f
E. DISEASE - POLICY tWT
f
A
PROFESSIONAL
LIABILITY
e9 11 21936
/23/2011
/2312022
1
PERCLIJM $50
ANNUAL AGGREGATE $50
DESCRIPTION OF OPERATIONS r LOCArONfi 1 VFWCLFE IAn.rw ACORD 101. Aedti,e W RemerMe SeA.dule, rmnr. opera ;e rep�Ine1
CERTIFICATE HOLDER CANCELLATION
Seapath Towers - Bulkhead Repair
October 13. 2011
Page 2
Professional Staff: Andrew Consulting will furnish the services of its employees at its standard hourly
rates for such employees at the time services are provided. Hours in excess of eight per day will be
charged at the standard hourly rate without premium.
Other services and costs: Expenses incurred by Andrew Consulting which are necessary for the
completion of the scope of services including travel and subsistence and other supplies and services
obtained from third parties are reimbursable at Andrew Consulting's cost plus a 15% administrative
handling charge. Other services provided by Andrew Consulting including computer time,
instrumentation usage, and reproduction are billed at Andrew Consulting's standard commercial
rates.
We will invoice monthly for our services. Payment is due upon receipt. Interest due at 1-1/2% per
month on outstanding invoices in excess of 30 days.
Client agrees that Consultant has the right to suspend or terminate service if undisputed charges are
not paid within 45 days of receipt of Consultant's invoice, and Client agrees to waive any claim
against Consultant, and to indemnify, defend, and hold Consultant harmless from and against any
claims arising from Consultant's suspension or termination due to Client's failure to provide timely
payment. Client recognizes that any charges not paid within 30 days are subject to a late payment
charge equivalent to 1.5 percent of the balance due for each additional month or fraction thereof that
undisputed charges remain unpaid. Any charges held to be in dispute include reasonable attorney
and court fees.
Our standard hourly rates are:
Senior Registered Engineer $165.001hour
Engineering Assistant $ 90.00/hour
Secretary $ 60.00/hour
Outside Consultants Invoice Cost + 15%
These rates include salary costs, payroll taxes, sick leave, vacation, general overhead, indirect
expenses, office operating costs, professional liability insurance, etc.
s and Conditions: Standard NSPE/CEC Conditions "EJCDC No. E-570 (2006 Edition)".
Client agrees to name Andrew Consulting Engineers, PC. as additional insured under Builder's Risk policy for any
construction involved.
Mediation: Prior to litigation and/or arbitration, the parties shall endeavor to settle disputes by mediation in accordance
with the Construction Industry Mediation Rules of the American Arbitration Association currently in effect unless the parties
mutually agree othermse. Demand fcr mediation shall be filed in writing with the other parry to the Agreement and with the
American Arbitration Association. A demand for mediation shall be made within a reasonable time after the claim, dispute
or other matter in question has arisen. In no event shall the demand for mediation be made after the date when institution
of legal or equitable proceedings based on such claim, dispute or other matter in question would be barred by the
applicable statute of limitations.
Seapath Tower
322 Causeway Drive
Wrightsville Beach, NC 28480
Page 2
We have included all labor, equipment, materials, and supervision necessary to perform the above
scope of work. We have not included any permits in the above pricing as they were not
identified in the scope of work. All permits have been assumed to be provided by the owner,
Please do not hesitate to contact me with any questions or concerns regarding this proposal.
Thank you again for the opportunity.
Respectfully,
Waterline Marine Construction & Consulting, Inc.
Michael P. Hoke
Vice President
/MPH
v CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by lhu State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCCAAC Subchapter 7K .0/03.
Applicant Name t l7f,L_-%!�Y_!1_ __. %07�FC?SfCi� Phone Number
Address 2 , !L,�{____.___-_--
-
,fit � ----- - - -- - - - --
city — r / %/E c i , State _ill- _ Zip
Project LocatiQ (County, S to Ro , Water dy, etc.) _ rwr �22 l �i,tr�..aa l►-
4, / rLj 11fi5 yi /l1 !_._L L, � _-�1 f �S ✓Si>n! -� _._ ��.i._ �
Type dDimensionsof reject
a6w-eel Z26Q2 ZZ— --
The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA permit is
above is hereby certified as exempt from the CAMA permit m- valid for g0 days from the date of issuance. Following expiration,
quirement pursuant to 15 NCAC 7K .0j73. This exemption to a re-examination of the project and project site may be necessary
CAMA permit requirements does not a1aviate the necessity of to continue this certification.
yourobtainin�y other State, Federal, or Locc�al authorimt:en.
SKETCH N L 14C 113n /�3 5 (SCALE:
r
- ��� �����°/<<-,y���s
� 1�,�✓i- �/�> :;GNP/
��%�l�/•'! �ls/"' /6�1� ✓l' L/ll�r' �19�'r �G'is `% �f /�f
Any person who proceeds with a development without the con-
sent of a CAMA official under the mistaken assumption that the
development Is exempted, will be in violation of the CAMA it there
Applicant's si ure
l !'�
is a subsequent determination that a permit was required for the
development.
CAMficiaratu
s s' nre
The applicant certifies by signing this exemption that (1) the ap-
plicant has read and will abide by the conditions of this exemp-
Issuing date
/� /J
tion, 1arrrnt
I h
—
--
Expiration date
�k
Attachment: 15 North Carolina Administrative Code 7K .0203