Loading...
HomeMy WebLinkAbout02190D - BaldCERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT YT'0 02 as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K licant Name V ILL,E('L Phone Number ress3G�,9 State ILL Zip ject Location (County, State Road, Water Body, etc.) 711 l�f 'i %. LT1T 1� -4i � j A51 t r e and Dimensions of Project P4,k'1-1 rC t ( r I N)J I— 4 I W r-n 11 N f t1 1 proposed project to be located and constructed as described ve is hereby certified as exempt from tFe CAMA permit irement pursuant to 15 NCAC 7K " I This exemption :AMA permit requirements does not alleviate the necessity of it obtaining other State, Federal or Local authorization. This certification of exemption from requiring a CAMA valid for 90 days from the date of issuance. Following e) a re-examination of the project and project site may be i to continue this certification. ;KETCH (SCALE: � Y\J Or UZ143 Vi I 1 t1 ? tY.�<. I L(r:5 �j �,� }�� ►�C t: IvAL1 �j N TtL t1Z iV iS 0 I� ``L—Ititof0 CERTIFICATE OF EXEMPTION FROM REQUIRING A CAMA PERMIT N? 0219( as authorized by the State of North Carolina, Depar-u-nent or Environment and Natural Resources and the Coastal Resources Commission In an area of environmental concern pursuant to 15 NCAC Subchapter 7K OL-03 Applicant Name -r4J1::7- V)LA, -c _LF- thDba Phone Number q1 0 ATZ T Address—ft E!cx --�3DC)q City State ply_ zip Zi Project Location (C t St t Road, Water Body, etc,) _ SOUTR Type and Dimensions of Project The proposed project to be located and constructed as described above Is hereby cerdfled as exempt from t4e CAMA permit 'equjrement pursuant to 15 NCAC 7K 0 f 0,3. This exemption :o CAMA permit requirements does not alleviate the necessity of ✓our obtaining other State, Federal or Local authorization. This certification of exemption from requiring a CAMA permit valid for 90 days from the date of Issuance. Following expiratio a re-examination of the project and project site may be necessa to continue this certiflcatlon. ISKETCH — (SCALE; 0 TO �- Q A-S 6 kTli-6-1 PAYV0 PWIS 6) ANI Z go