Loading...
HomeMy WebLinkAbout01753D - PelicanCERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commj§.sion in an area of environmental concern pursuant to 15 NCAC Subchapter 7K , NP-3 „ / 01'7 164,1 1✓/17 / roposed project to be located and constructed as described This certification of exemption from requiring a CAMA pe is hereby certified as exempt from the CAMA permit valid for 90 days from the date of issuance. Following exph ement pursuant to 15 NCAC 7K VZ", . This exemption a re-examination of the project and project site may be nec MA permit requirements does not alleviate the necessity of to continue this certification. )btaining other State, Federal or Local authorization. =TCH 1 (SCALE: >%7� iL /`'��ti o o �e l-- q r N 'LO I `I Lzilvironment and Natural Resources Beverly Eaves r*'erdue Govemor Division of Coastal James N. � Management egson. Director Dee Freeman, Secretary Date 'S ll I Zoj Name of Property, (?caner APPhying for Permit: Mailing Address: 11—ZIL", (.'v 1 . I 1 certify that 1 have authorized (agent) o v p-- to act OR ip� behalf, for the purpose of apph•ing for and obtaining all CAMA Permits necessary to install or construct (acti%,ity) at (my property located at) This certification is %-alid thru (date) PL Ycr- RECEWED irs, Robb L n: Hal Fogleman [hal-amc@charter.net] t: Wednesday, May 14, 2014 11:19 AM Mairs, Robb L ject: Re: Pelican point <s like the walkway isV6 x 336 and *e platform is 18 x 20:1• ik you. 4ay 13, 2014, at 4:44 PM, Mairs, Robb L <robb.mairs(ncdenr.gov> wrote: iat would work, we just need to make sure you are doing less than 50% replacement with dimensions to keep this as maintenance and repair. tanks. Looks like Avenel is moving along well. ----Original Message----- -om: Hal Fogleman [mailto:hal-amc(@charter.net] ?nt: Tuesday, May 13, 2014 4:43 PM ): Mairs, Robb L abject: Re: Pelican point I didn't measure all that. I can pull it off google earth if you'd like - tanks, 31 Fogleman Llied Marine Contractors LLC LO-367-2159 ?nt from my iPhone )n May 13, 2014, at 4:41 PM, "Mairs, Robb L" <robb.mairs(@ncdenr.gov> wrote: (hanks, )o you have the dimensions of the existing pier and platform area in relation to the sting floaters? Cobb -----Original Message----- ofl oL x % -l'of %(-,