Loading...
HomeMy WebLinkAbout63224D - Kure TOWN OF KURE BEACH 117 Settlers Lane Kure Beach, N.C. 28449 (910) 458-8216 GENERAL FUND PAY ****400 DOLLARS AND 00 CENTS **** VOID AFTER � This instrument has been pre-auditE LOCAL GOVERNMENT BUDGET PAY NCDENR TO THE � ORDER 127 CARDINAL DR EXT OF WILMINGTON, NC 28405 11205 L097ii' 1:053 10 L L 21':0005 2950 L6649v BB&T BRANCH BANKING & TRUST COMPANY Kure Beach, N.C. 28449 DATE CHECK 04/08/2014 5109 2210 - NCDENR REFERENCE DATE DESCRIPTION AMOUNT DISCOUNT - ---------------------------------------- 04 08/2014 04/08/14 400.00 ------ - PERMIT FOR DUNE MITIGATION 15-850-57-00 CHECK # DATE GROSS DISCOUNT ------------------------------------------------ division of Coastal Mgt. Habitat Impact Computer Sheet dicant: ��jh �„� Permit #: 6�13 z z y /9 /iy cribe below the HABITAT disturbances for the application. All values should match the name, and units of measurement rid in your Habitat code sheet. iitat Name DISTURB TYPE Choose One TOTAL Sq. Ft. (Applied for. Disturbance total includes any anticipated restoration or temp impacts) FINAL Sq. Ft. (Anticipated final disturbance. Excludes any restoration and/or temp impact amount) TOTAL Feet (Applied for. Disturbance total includes any anticipated restoration or temp impacts FINAL Feet (Anticipated final disturbance. Excludes any restoration and/< temp impact amount GDredge ❑ Fill ❑ Both Other ❑ 2 GQd 3 Z 000 Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ Dredge ❑ Fill ❑ Both ❑ Other ❑ ADJACENT RIPARIAN PROPERTY OWNER STATEMENT FOR CAMA MINOR PERMITS I hereby certify that 1 own property adjacent to OF k13r>?�""eEow 1� 's (Name of Property Owner) property located at (`kr-i� S(1'LA�b �/M .t ark- (Address, Lot, Block, Road, etc.) on T 4V'T �in , Al2,1 c, i N. C. (Waterbody) (Kure Beach, New Hanover County) He has described to me as shown in the attached application and project drawing(s), the development he is proposing at that location, and, I have no objections to his proposal. (APPLICATION AND DRAWING OF PROPOSED DEVELOPMENT ATTACHED) 41 rS Sign tur Print'or Type Aflame s, Robb L : John Batson[johnbatson@townofkurebeach.org] Wednesday, April 09, 2014 8:32 AM Mairs, Robb L mt: FW: Help Beach 906 NFFB , will you issue the permit based on this? Terry Randolph [mailto:victer@knology.net] Wednesday, April 09, 2014 4:07 AM >hn Batson erry Randolph' act: RE: Help Beach 906 NFFB Europe right now and wont be back for a month. I just arrived last night so I haven't set up my office yet. But e accept this email and my formal agreement to this project. I don't want of be the one getting in the way. I will rd the signed agreement form sometime this week. Thanks terry is John Batson [ma iIto: johnbatson@townofkurebeach.org] : Tuesday, April 08, 2014 7:50 PM icter@knology.net ect: Re: Help Beach 906 NFFB lore than 5 days. Start date within the next 3 weeks. from my Wad Apr 8, 2014, at 4:11 PM, "victerknology.net" <victer(u?knology.net> wrote: Hey John, How long will the project take to compute and what is the anticipated start date. Terry -------- Original message -------- From: John Batson Date:04/08/2014 1:57 PM (GMT-05:00) To: logy. net Subject: Help Beach 906 NFFB RECEIVE[ DCM WILMINGTON APR 0 9 2014 Hey Terry! Hope all is well with you! Would you be so kind as to help me? John Batson Inspections/ Planning/ Zoning/ Code Enforcement Town of Kure Beach 117 Settlers Lane Kure Beach, NC 28449 910.458.4269 F RECEIVE DCM WILMINGTON' APR 0 9 2014 -s, Robb L is John Batson Uohnbatson@townofkurebeach.org] Tuesday, April 08, 2014 10:24 AM Adam Knierim Mairs, Robb L ect: RE: Beach Bulldozing :hments: scan0001.pdf 1, Based on the costs you emailed me the other day, I received a consensus from my Council to move forward getting a bid to do this work. I am applying for the General Permit today. In the permit, I am applying for pushing sand from the high water mark landward to rebuild damaged dune vidth of each push I am applying for is 32'. The linear footage would be a total of 1000. 1 am attaching a site pla ,ing parameters of the project. The total is 2944'. As we discussed, some of the areas needing to be worked on ; ontiguous. Thanks so much. Let me know what else you need from me. is Adam Knierim [mailto:adamknierim@gmail.com] Thursday, April 03, 2014 3:52 PM )hn Batson act: Beach Bulldozing , ked through our records and am attaching the proposal for the work we performed at Ocean Dunes. Th cost for constructing a berm along 635' of beach was $9,750. We can reduce the unit cost significantly idering that you are looking at 1,000' rather than 635'. I am thinking the project would cost somewhere ieighborhood of $11,500 - $12,500. Let me know if this is out of line with the budget constraints and i )ossibly cut down on the linear footage of shoreline requiring work. Thanks again and talk to you soon n C. Knierim, M.S. ident/Coastal Geologist itech, LLC Circle Drive ipstead, NC 28443 ;e 910.270.4058 910.297.7710 )10.270.4058 RECEIVED DCM WILMINGTON, I APR 0 9 2014 R:m_ MIR TTQ7 SETTLERS -u! UJLJ-I�-L 7-777W [I]MrLL F,7 r 7�f 1 �'��� ems' ISA)t j � q Olt -- lay rs, Robb L n: Mairs, Robb L t: Wednesday, April 09, 2014 3:19 PM Huggett, Doug; Davis, Braxton C Wilson, Debra ject: RE: Is this something like what you were looking for? g and Braxton, I issued the beach bulldozing GP this afternoon to the Town c/o Mr. John Batson. i ks, 0 n: Huggett, Doug t: Wednesday, April 02, 2014 4:47 PM Davis, Braxton C Wilson, Debra; Mairs, Robb L jest: Is this something like what you were looking for? ,ton ked into the issue that you and I talked about earlier this afternoon. Here is what I found out. b Mairs met with the Town of Kure Beach on 3/21/14 to talk about a possible beach bulldozing permit that woL eliminate problems relating to a scarp that formed after the recent no -name storm. Robb took the picture bel ng the site visit. )tification of each property owner by certified mail, in which case each adjacent property owner would have 1C to submit comment. At this time Robb also provided the names of two local beach bulldozing contractors to th i at this meeting. result of this meeting, and because this project area is also within the boundaries of the Corps 50-year CSDR !ct, Robb contacted the Corps to see whether the bulldozing could be done under the authority of the Corps pr( or at the expense of the Corps. Robb was told by the Corps that there was no money allocated for this type of ity, and that the proposed project appeared to fall outside the scope of what the Corps considered to be the ral Project. F 1PM on 4/2/14, the Town had not gotten back with Robb about if or how they wished to proceed with the prc sponse to your inquiry, Robb contacted the Town and it does seem that they would like to proceed with the ?ct. Robb again went through the procedures required to obtain a GP 1800. Robb also contacted a contractor, Fown had been in contact with, and Robb was told that the project could be done in as little as three (3) days. i this in mind, and assuming that the Town began the GP permit process within the next couple of days, it is like a permit could be issued anywhere from early next week (4/7) to early the week after next (4/14) depending o quickly adjacent property owner notification requirements are satisfied. Assuming that the contractor can get k quickly following the issuance of the permit, the Town should have adequate time to get the project complet( ire the sea turtle nesting moratorium period begins on May 1. However, if initiation of the project is delayed fc e reason, relief from the moratorium is potentially allowable under 1805(f), which reads as follows: i order to minimize adverse impacts to nesting sea turtles, no work shall occur within the period of May 1 throui ember 15 of any year, without the prior approval of the Division of Coastal Management, in coordination with t th Carolina Wildlife Resources Commission, the United States Fish and Wildlife Service and the United States Arr )s of Engineers, that the work can be accomplished without adversely impacting sea turtle nests or suitable nesi itot. issues that the Wildlife Resources Commission and US Fish and Wildlife Service generally examine or consider (ing a recommendation to grant or not grant moratorium relief are as follows: - Amount of extra time requested. - How much progress the applicant has made towards project completion before the be of the moratorium condition. - Environmental factors such as water temperature that effect the likelihood that turtles will be nesting the beach during the periods during which moratorium relief is requested. - Historical nesting data for the beach in question. your information, the following is a comment that the USFWS provided on a very recent beach bulldozing perr uest for the Town of Oak Island. le Service strongly recommends that all beach grading activities be completed prior to April 30, including nobilization of all equipment from the beach. No activities should be authorized after April 30. If the Town of C ind requests authorization for any work to be conducted on the beach after April 30 (grading, scraping, nobilization, etc.), then the activity is likely to require a Biological Opinion and Incidental Take Statement for po )acts to nesting sea turtles." >e let me know if you have any additional questions. Huggett ager, Major Permits and Consistency Unit Division of Coastal Management Zommerce Avenue ?head City, NC 28557 ) 808-2808 ext. 212 iil correspondence to and from this address may be subject to the North Carolina Lic Records Law and may be disclosed to third parties. -th Fort Fisher to 906 North Fort Fisher Or Height: 4' - 6' h: 32' re: 800 Block North Fort Fisher mir MaTf-lielam �� 11 r►r� �`1i -,A, n Batson 1: Terry Randolph <victer@knology.net> Wednesday, April 09, 2014 4:07 AM John Batson 'Terry Randolph' ect: RE: Help Beach 906 NFFB i Europe right now and wont be back for a month. I just arrived last night so I haven't set up my office yet. But 5e accept this email and my formal agreement to this project. I don't want of be the one getting in the way. I wil and the signed agreement form sometime this week. Thanks terry n: John Batson[mailto:johnbatson@townofkurebeach.org] t: Tuesday, April 08, 2014 7:50 PM ✓icter@knology.net ject: Re: Help Beach 906 NFFB nore than 5 days. Start date within the next 3 weeks. from my iPad kpr 8, 2014, at 4:11 PM, "victer e,knology.net" <victer e knology.net> wrote: Hey John, How long will the project take to compute and what is the anticipated start date. Terry -------- Original message -------- From: John Batson Date:04/08/2014 1:57 PM (GMT-05:00) To: victer e,knology net Subject: Help Beach 906 NFFB Hey Terry! Hope all is well with you! Would you be so kind as to help me? Town Council has authorized me to obtain a General CAMA permit to build up some of the dunes that were damaged in the winter storm on March 6-7. In order to do this, I need you as an adjoining property owner to sign this form saying that you do not object. I have included a site plan of what is proposed. Please sign the form, and return to me via email if at all possible. Thank You! ADJACENT RIPARIAN PROPERTY OWNER STATEMENT FOR CAMA MINOR PERMITS I hereby certify that I own property adjacent to X�-lU of ,iN"Eff- W,- 's C; (Name of Property Owner) property located at e rtG{}>DtX� (Address, Lot, Block, Road, etc.) �� on ,%�G inlj���tC F� , N.C. (Waterbody) (Kure Beach, New Hanover County) He has described to me as shown in the attached application and project drawing(s), the development he is proposing at that location, and, I have no objections to his proposal. (APPLICATION AND DRAWING OF PROPOSED DEVELOPMENT ATTACHED) '7,3 /urDtert4 �� Sign ture Print or Type Name _