Loading...
HomeMy WebLinkAbout01706D - CarolinaCERTIFICATE OF EXEMPTIO FROM REQUIRING A LAMA PERMIT Ol as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission in an area of environmental concern pursuant to 15 NCAC Subchapter 7K , o a �2 5�7 0/7C G1h'i /SAClX Gih /7G Phone Number 2 up --a proposed project to be located and constructed as described This certification of exemption from requiring a CAMA I ✓e is hereby certified as exempt from the CAMA permit valid for 90 days from the date of issuance. Following ex iirement pursuant to 15 NCAC 7K 0117. This exemption a re-examination of the project and project site may be n AMA permit requirements does not alleviate the necessity of to continue this certification. obtaining other State, Federal or Local authorization. KETCH (SCALE: / CERTIFICATE OF EXEMPTION FROM REQUIRING A LAMA PERMIT N° 0171 as authorized by the State of North Carolina, Department of Environment and Natural Resources and the Coastal Resources Commission In an area of environmental concern pursuant to 15 NCAC Subchapter 7K.., 0,V.2 Applicant Name _�0-0 � , e Ci �/i _ / ' �� r - r" Phone Number Address Y —_�'. i�.K� r�tlm— - -- ---- — ---- State _ /� Zip city -2�i Project Location (County State Roay, Water Body, tc.) Z. Ty/pe'and D/imensions of Protect �� • / � • It , _/ _.11C..��`'1 _.__ _ _ �.�'� ! �._..._�l�tG:LE_'�i' .� L _ / G`�di ✓''��t l�l�'s�r ,f� The proposed project to be located and constructed as described This certification of exemption from requiring a CAMA pern above is hereby certified as exempt from the CAMA permit valid for 90 days from the date of issuance. Following expirai requirement pursuant to 15 NCAC 7K • O ! Z, This exemption a re-examinatlon of the project and project site may be necei to CAMA permit requirements does not alleviate the necessity of to continue this certification. your obtaining other State, Federal of Local authorization. SKETCH (SCALE: A, .!55 111�7111-11;1;-' -s, Robb L is Brian Stanberry [brian.stanberry@carolinabeach.org] Tuesday, January 21, 2014 10:59 AM Mairs, Robb L ect: RE: X Mas trees - CB Dunes :hments: Christmas Tree Dune Stabilization. pdf :hed is a quick pdf of the locations that they will be installing the Christmas trees. Let me know if I can help in Thanks for the assistance. in Stanberry ctor of Public Works n of Carolina Beach '58-8291 office '43-183? mobile i. stanberry(&carol inabeach.org �Roc�♦ M LAIMER: iil correspondence to and from this address may be subject to the North Carolina Public Records Law and may t )sed to third parties is Mairs, Robb L [mailto:robb.mairs@ncdenr.gov] : Thursday, January 09, 2014 10:50 AM Wan Stanberry ect: RE: X Mas trees - CB Dunes ks and hope you had nice holiday season as well. As long as the placement of the trees follows the guidelines I JCAC 07K .0212 (rules and graphic attached). iks, b Mairs, Field Representative )ivicinn of (.nactnI Unnnncmant have been doing some research on best practices for xmas tree installation for dune tblishment. native date for installation Sat Jan 25th. ;re are a variety of methods and procedures to be used. However to be compliant with DENR instructions provided previously we need to plant in a similar fashion as traditior d fencing. nd fencing installed waterward of the crest of the frontal or primary dune shall be install Ingle no less than 45 degrees to the shoreline. Individual sections of sand fence shall no eed more than 10 feet in length (except for public accessways) and shall be spaced no le 1 seven feet apart, and shall not extend more than 10 feet waterward of the following itions, whichever is most waterward." 211 would install trees on the frontal edge ocean side of the dune. In areas sparse or absent Ming vegetation. -les can be used in conjunction with existing sand fencing in areas were fencing is been buri s can easily attach to top of fencing or along side of fencing if enough is still exposed. timating trees will be used in rows of aprox 3 trees each to comply wit 10' maximum length ws aprox 8' apart portant trees are secured properly to prevent dislodgement. for total quantity estimates... 4' area of bare dune ocean side, would receive 3 rows of 3 trees, total 9 trees. ;refore every 24' of non -vegetated frontal dune would receive aprox 9 trees. could be best to limit total number beach accesses for staging. I suggest we let the dunes vhat they need. If there are not a lot of areas without vegetation of the frontal side of dui i we don't need that many trees. But if there are lets plant what we can where the dunes , teed. Page 1 of 1 Parcels Tcwin Limits 11 Roads 1 .54 Feet