HomeMy WebLinkAbout01768D - Belville• CERTIFICATE OF EXEMPTION
FROM REQUIRING A LAMA PERMIT -, 01'
as authorized by the State of North Carolina,
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K;,,
j f�--6 cal
)licant Name 1 ;�� L :` LLV I c--L L- /a J tT thi '1AVj-- t Phdne Number !A(Q=
cress `�`.1 ' cL0 E Vv2_90 iAJLTT,� ��= 2CO'C7,
State N(- Zip ?
ject Location (County, State Road, Water Body, etc.) ) 'Z
)e and Dimensions of Project rv-\N\i M i:[: 1 6)(2- jz�--j)LNr c Z'T
proposed project to be located and constructed as described
e is hereby certified as exempt from the CAMA permit
irement pursuant to 15 NCAC 7K . This exemption
AMA permit requirements does not alleviate the necessity of
obtaining other State, Federal or Local authorization.
This certification of exemption from requiring a CAMA p
valid for 90 days from the date of issuance. Following exp
a re-examination of the project and project site may be nE
to continue this certification.
CETCH (SCALE: 1
I
(o•
tv �AL-I tjC,S 6e
C<tzj L (r( �_X)
�- N —,e
Ok f t 0 1 r tV1��j
Ill. t, C- j t n,i2/l 11
ppiicant Name
ddress 4
ity
roject Location
CERTIFICATE OF EXEMPTION
FROM REQUIRING A CAMA PERMIT N° 017
as authorized by the State of North Carolina,
Department of Environment and Natural Resources and the Coastal Resources Connmisslon
In an area of environmental concern pursuant to 15 NCAC Subchapter 7K_�o a-
IA-6r
.r s� t _t �% ���n X �A-PPAat A1- ___ Phcfne Number t' VO -Z33 =t
(County, State Road, Water Body, etc.)
State
Zip
ype and Dimensions of Project .__[�1�`� 2r 1? '—� t " VLL-1
ie proposed project to be located and constructed as described
ove Is hereby certlfled as exempt frorn the CAMA pernnit
quirement pursuant to 15 NCAC 7K L' Q'� . This exemption
CAMA permlt requirements does notalleviate leviate the necessity of
ur obtaining other State, Federal or Local authorization.
This certification of exemption from requiring a CAMA pe
valid for 90 days from the date of Issuance. Following expli
a re-examinatlon of the project and project site may be nec
to continue this certification.
SKETCH (SCALE:
e.,wLa
G-- Swz._--�
1"
22 P (% 'to YSk--- aO' Yv-)
L. N -----6