HomeMy WebLinkAbout01713D - BHICERTIFICATE OF EXEMPTION
FROM REQUIRING A LAMA PERMIT 01'
as authorized by the State of North Carolina,
Department of Environment and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K I 101:,
)licant Name t� Lei. ` /0 'b O (E ►1,1/fi)ejj!� Phone Number i i 0 - -79 `i
tress La.x (" —C-i
i State �,Je- Zip
ject Lo ation (County, State Road, r _ WaterBody, etc.) tJ
>e and Dimensions of Project
proposed project to be located and constructed as described
e is hereby certified as exempt from the CAMA permit
irement pursuant to 15 NCAC 7K nC4. This exemption
AMA permit requirements does not alleviate the necessity of
obtaining other State, Federal or Local authorization.
This certification of exemption from requiring a CAMA p
valid for 90 days from the date of issuance. Following exf
a re-examination of the project and project site may be nE
to continue this certification.
(ETCH (SCALE:
JVTFY D\Ni W l le i -i IL - C r hvl ll 17Z-�
1) /+i� 2-/2'51 14- :;�' C t- ( n " 2-1-Z (cl ( 4- le
S-�v vC
lil.S
Bruce Marek, P.E.
P. O. Box 3069
Bald Head Island, NC 28461
910-228-2484 Cell
February 25, 2014
Ms. Heather Coats
NCDENR Division of Coastal Management
127 Cardinal Drive Extension
Wilmington, NC 28405
Re: Repair Exemption Request: Bald Head Island Marina South Jettywalk: CAMA 172-87 Mani
Development
Dear Ms. Coats:
Included are 5 color copies of an 11 "x 17" color drawing C2 seal dated 2-25-14 in support of d
Repair Exemption Request for the Bald Head Island Limited, LLC CAMA Permit 172-87, Mari
Development.
Some of the inside wood bandboard of the south jettywalk (i.e. visible from the inside of the entran
channel when entering by ferry) requires replacement due to damage from one of the recent wine
storms. It appears to be appx 20' in length appx 1/3 of the length in from the outer end of the jetty.
Along with the bandboard it appears that we also will need to replace some of the 2"x4" deck boar(
appx 7 buttresses, and some some of the girders/wood support framing. I am showing this in the 2
region of the missing bandboard, but we would like the permission to repair any other damag
decking or structure we may find along the jettywalk and the approach wood walkway.
I will stop in,jwsi 19w,repair exemption form once you have it prepared. If you have any questiot
please calL4 ie at 'g484. Thanks for your kind attention to this matter.
90
=m js�9� D z"
6-/00�
„ARE
Bruce Marek, P.E.
For Bald Head Island Limited, LLC Planning Dept.
Enclosures