HomeMy WebLinkAboutWestportcant Name
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environment, Health, and Natural Resources and the Coastal Resources Commission
in an area of environmental concern pursuant to 15 NCAC Subchapter 7K .020
Phone Number l
act Location (County, State Road, Water Body, etc.) ads=I'1 F �Q bsi r1 O CA Ihtad lb,f 11A
and Dimensions of Project Y& f U
roposed project to be located and constructed as described
is hereby certified as exempt from the CAMA permit re-
pent pursuant to 15 NCAC 7K .020111�his exemption to
a permit requirements does not alleviate the necessity of
)btaining any other State, Federal, or Local authorization.
This certification of exemption from requiring a CAMA pert
valid for 90 days from the date of issuance. Following expiry
a re-examination of the project and project site may be nece!
to continue this certification.
:TCH (SCALE:
M Bur k sm I I V Cewtot fcd _ 0
-tO- Kcu l aKd 401011 Ala red
L) AAV (0, L-hs IW4 IX
aaU dance
�
a�rnvrcl
0'o nj is ate d
b0lo (441-u
ars, Courtney
n: Deborah Conard < portcityexecutive@cha rter. net>
,. Monday, July 24, 2017 9:56 AM
Spears, Courtney
carolinamarineconstruction@charter.net
ect: Westport finger dock repair/ replacement
chments: GoogleEarth_Image 'pg
J morning Courtney,
pe you had a great weekend. We had a company cook out yesterday with all the guys and their families ... was hi
un. I have attached an overhead showing the finger dock that is unstable and needed replacing at Westport as
issed Friday. It is a 4 ft x 32 ft that had saturated floats and was never framed properly in the first place ... which
o its instability. We are simply proposing to replace it with a new section that has been properly constructed. PI
ie know if you need anything else. As always ..I appreciate your help in getting this problem resolved for the
eowners. Thanks Mike
EM
Aw
101*