HomeMy WebLinkAbout54460D - WilliamsCAVA / DREDGE & FILL '�."�_qI5 �
GENERAL PERMIT
INew ❑Modification ❑!Complete Reissue El Partial Reissu
>rized by the State of North Carolina, Department of Environment and Na
Coastal Resources Commission in an area of environmental concern pursu
rt Name � � k 11VYVyO
V-1 )rJC�►'���Fax#�)
i Agent OW
u CW *W t�PTA ❑ ES D PTS
❑ OEA ❑ HHF ❑ IH ❑ UBA �—, N/A
❑ PWS: ❑ FC:
no,: PNA yes % no Crit.Hab. yes / no
5
Previous permit #
e Date previous permit issued
tural Resources � � 1 � 11`-, \
ant to 15A NCAC V V
Rules attached.
Project Location: County�,1" Fu„v VCx
Street Address/ State Road/ Lot #(s)
Subdiv'siiooln 1 v
City l ZIP
Phone # ( ) River Basin
Adj. Wtr. Body V 1 ` nat
Closest Maj. Wtr. Body V�
of Projec't/4 ,Activity [- VJ,\,qA�;VVAI
�,..►%,�.�c (Scale:
dock) length
- pierks�
length
number
ead/ Rip/Ienavg distae
naxdistre
channe
:ubic ds
am
ou / Boatlift
Bulldozing
-t � A_Vj 4 1 �.
line Length
not sure
yes
i
ags: not sure
yes
orium: n/a
yes
Ano
s:
yes
r Attached:
yes
ding permit may be required by:
`1 ❑ See n to on back regardi?g River Basin
l-1 i � iCAl I 1 / /_ `� IUTA 14 T/i� " /1 . — I _ i _ n C
AA
jtl�myo yv ( � �kwv)
1 Gmail
Estimate 3074 from H5 CONSTRUCTION, LLC
da Williams <brendapwilliams@yahoo.com>
V-To: Brenda Williams <brendapwilliams@yahoo.com>
llerrit Hon <memt@h5constructionllc.com>
Merrit Hon <merrithonl4@gmail.
Mon, Jun 12, 2017 at 10:'
)unds good! We have no concern when the work is done, except as soon as possible ... I'm sur,
'eryone says that though:) Tara McPhereson with CAMA has already been out to the property
id Matt came out to speak with her at that time, so I don't know if they will need to go back out
site again....?
iyway, since we are not going to do the shore stabilization at this time, we would like for Matt t
Id 2 more pilings to be driven in, up close to the shore on either side of the pilings that have bE
.posed by the shore wash out. I think he will remember which ones I'm speaking of .... they WEI
ilding the little walkway to get over to the dock from the land .... I think he said they were like
50-$200 each....? just let me know how much extrYithe
ll add .... I'll be happy to sign an updatE
Ireement, if necessary. We (1) will try to have much ree growth removed so they can ha
etty easy access. We plan to be down this weeken he needs to get with us for any reason,
ranks tons for your patience with us!!! I look forward to
crazy grandsons to go out on!
ive a good week!
;st regards-
enda Williams
)m: Merdt Hon <merrit@h5constructionilc.com>
: Brenda Williams < brendapwil liam s @yahoo. com >
nt: Monday, June 12, 2017 9:44 AM
bject: Re: Estimate 3074 from H5 CONSTRUCTION, LLC
oted text hidden]
ving a dock that I feel comfortable fo
Ate,
WMENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
leverly Eaves Perdue Braxton C. Davis
I
overnor Director
AGENT AUTHORIZATION FORM
Date: & 1 '7 / %
Dee Freeman
Secretary
me of Property Owner Applying for Permit: Name of Authorized Agent for this project:
I)a-r' lZ— %%i 111 "a VtI
ner's Mailing Address:
)o h R e- ,��
-halo-#<<NG 27-0
Agent's Mailing Address:
5 2798 Sea Vista Dr.
CONSTRUCTION
Supply, NC 28462
one Number t!/2-Phone Number( 9/Ut k�6) — 43 �11
rtify that I have authorized the agent listed above to act on my behalf, for the purpose of applying
Ind obtaining all CAMA Permits necessary to install or construct the following (activity):
my property located at
certification is valid thru (date)
Property Owner Signature
S W s—t-11-i �
ADJACENT RIPARIAN PROPERTY OWNER STATEMENT
I hereby certify that I own property adjacent to A s
property located at
� C(JVame of Property Owner)
I � � � (,V J f
on ���L �S (�{ [LC (Address, Lo"IQck, o d, etc )
in t ; (W— S A 6�Z— , N.C.
(Waterbody) (City/Town andlor County)
The applic t has described to me, as shown below, the development proposed at the above
location.
I have no objection to this proposal.
I have objections to this proposal.
DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT
(individual proposing development must fill in description below or attach a site drawing)
j �15 i'lt (I Iry cl ooS c v a /< to
`5
-- �e �C4 I I' �'1 U i � CL (C� 1 I Gt t L� l'2 iy► (-'\/� ��/1
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin
must be set back a minimum distance of 15' from my area of riparian access unless waived by
me. (If you wish to waive the setback, you must initial the appropriate blank below.)
/ I do wish to waive the 15' setback requirement.
I do not wish to waive the 15' setback requirement.
(Property Owner r Information) d}aeerttf're7!wner Information)
Signature tt Signat Vie*
�e- � G • W 1 I I r GZ Y115 ia� -_ \
Print L or T e N me Print or Type Name
Mailing Address Math Addr ss
C Cleft , /V� �si
�City/State2ip„ J� . / . , I _ _ _ _ t _ i City/te2ip
Pherson, Tara
Steve Edwards <SEdwards@ci.oak-island.nc.us>
Wednesday, July 05, 2017 3:31 PM
MacPherson, Tara
act: RE: 125 SW 5th riparian notification
otice the adjacent owner did not initial the waiver section.
ig as they are not expanding the project, I am fine with the repairs.
<s,
n Edwards
lopment Services Director
of Oak Island
E. Oak Island
sland, NC 28465
(910) 278-5024
(910) 278-1811
is MacPherson, Tara [mailto:tara.macpherson@ncdenr.gov]
: Wednesday, July 05, 2017 2:55 PM
;teve Edwards
1errit Hon
ect: 125 SW 5th riparian notification
?ve, Hope you had a great 41h! This project needs a town notification since the property owns two adjacent lots.
ve the Town just needed a drawing. Will you please send me an email stating that the Town has received
cation once the pertinent staff member gets to review the attached drawing? I also attached a copy of the oth
:ent notification since it gives project details and copied h5 construction on this email.
ks!
MacPherson
Specialist
livision of Coastal Management
irtment of Environmental Quality
:�'^ t ,,fit �' �"' �, •��. ��
��•« � ". � -^_, f /fir.
„' y` �•� a
kA
k�
125 SW 5th St 4.
D
a,
� al •
f
r
8/2/2017
Johnson & Johnson PLLC
Alan Johnson
BB&T
1797
$600.00 GP 69359D
8/2/2017
Varnam's Docks & Bulkheads
James Keen
BB&T
7267
$200.00 GP 69365D
8/2/2017
Grice Construction
Carl L. Britt
BB&T
11407
$200.00 GP 69352D
8/2/2017
Grice Construction
Stephen Pouask
BB&T
11385
$200.00 GP 69334D
8/2/2017
Backwater Marine Construction
Craven D. Milliaan Jr.
BB&T
2976
$200.00 GP 69351 D